WA NPS OLYM 11(9), Rehabilitate Route 11, Lake Crescent Road (US Hwy

101) & WA CLALLAM 92210(1), East Beach Road, Olympic National Park, Clallam County, Washington

The work consists of subexcavation, wall, culvert, riprap, asphalt milling, paving and other small items of work.

Project length: 15.6 Miles

Tentative Fixed Completion Date: Fall 2019 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Estimated Price Range: Over $20 million

Location: 20 Miles W of Port Angeles, Washington

DESCRIPTION OF WORK in US CUSTOMARY UNITS

FP-14

O ne

S ch ed ul e Sc h N am e

A

DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes 153 Contractor Quality Control and Assurance

(yes/no) Yes 154 Contractor Sampling & Testing (yes/no) Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes 157 Soil Erosion & Sediment Control, Temporary Diversion Channel LPSM 157 Soil Erosion & Sediment Control, Temporary Turf Establishment 1.0 ACRE 157 Soil Erosion & Sediment Control, Silt Fence 600 LNFT 157 Soil Erosion & Sediment Control, Fiber Roll 42,800 LNFT 157 Soil Erosion & Sediment Control, Floating Turbidity Chain 2,300 LNFT 158 Watering for Dust Control LPSM

DIVISION 200 – Earthwork 201 Clearing & Grubbing 15,365 SQYD 203 Removal of Inlet Grate 23 EACH 203 Removal of Sign 172 EACH 203 Removal of Structures and Obstructions (Anchor Connection to Structure) 8 EACH 203 Removal of Wheelstop (Log) 89 EACH 203 Removal of Curb and Gutter, Concrete 450 LNFT 203 Removal Guardrail 46,705 LNFT 203 Removal of Wall 205 SQYD 204 Roadway Excavation 7000 CUYD 204 Subexcavation 14,000 CUYD 204 Select Borrow 26,000 TON 207 Separation-Stabilization Geotextile, Class 1, Type A 18,000 SQYD 207 Geotextile Filter, Class 1, Type B 1,700 SQYD

FP-14

O ne

S ch ed ul e Sc h N

A

207 Geotextile Filter, Class 1, Type C (Outlet Protection) 720 SQYD 207 Geogrid, Stabilization 62,000 SQYD 211 Roadway Obliteration, Method 1 5,000 SQYD

DIVISION 250 – Slope Reinforcement and Retaining Walls 251 Placed Riprap, Method A, Class 3 2,400 CUYD 253 Gabions 300 SQFT 255 Mechanically Stabilized Earth Wall, Welded Wire Face 1,930 SQFT 260 Rock Bolt 4,900 LNFT 260 Rock Dowel 100 LNFT

DIVISION 300 – Aggregate and Base Courses 302 Roadway Aggregate, Method 2 15,000 TON 303 Ditch Reconditioning 57,000 LNFT

DIVISION 400 – Asphalt Pavements & Surface Treatments 401 Asphalt Concrete Pavement By Gyratory Mix Design Method 100,800 TON 401 Antistrip Additive, Type 3 960 TON 403 Asphalt Concrete Pavement, Type 1 3,675 TON 412 Tack Coat (Tack Coat Grade CSS-1, CSS-1H, SS-1, SS-1H) 290 TON 413 Asphalt Pavement Milling (7 ½ Inch Depth) 201,000 SQYD 413 Asphalt Pavement Milling, 3-Inch Depth 35,000 SQYD

DIVISION 600 – Incidental Construction 601 Concrete, Headwall 4 EACH 602 24-inch Pipe Culvert 1,860 LNFT 602 30-inch Pipe Culvert 80 LNFT 602 36-inch Pipe Culvert 70 LNFT 602 10 feet Span, 8 feet Rise Precast Reinforced Concrete Box Culvert 60 LNFT 603 Structural Plate Arch 60 LNFT 604 Inlet Top 23 EACH 605 Standard Underdrain System 12,500 LNFT 607 Cleaning Culvert in Place 3 EACH 607 Lining 18-inch Pipe Culvert 51 LNFT 609 Curb & Gutter, Concrete, 7-inch Depth 500 LNFT 609 Gutter, Concrete 1,500 LNFT 609 Wheelstop, Concrete (Log Pattern) 75 EACH 617 Guardrail System G4, Type 4, Class B Steel Posts 46,900 LNFT 617 Terminal Section (Type 4) 12 EACH

2 EACH

617 Terminal Section, Type Flared 12 EACH 617 Terminal Section, Type Tangent 34 EACH

FP-14

O ne

S ch ed ul e Sc h N

A

617 Structure Transition Railing, G4 System 100 LNFT 619 Fences, Rail (Log) 960 LNFT 620 Rubble Masonry, Medium Pointed Finish 10 CUYD 620 Stone Masonry Guardwall 50 LNFT 622 Rental Equipment, Backhoe (yes/no) Yes 622 Rental Equipment, Hydraulic Excavator (yes/no) Yes 622 Rental Equipment, Chain Saw (yes/no) Yes 623 General Labor (yes/no) Yes 623 Special Labor, Slope Scaling 300 HOUR 624 Furnishing and Placing Topsoil 8,000 CUYD 625 Turf Establishment 3,300 SQYD 629 Rolled Erosion Control Product, Type 4 (Temporary) 1,130 SQYD 633 Sign System (Interpretive) 2 Each 633 Sign System 1,230 SQFT 633 Delineator, Type Flexible (Brown) 650 EACH 634 Permanent Markings, Type B, Solid (Yellow) 260,500 LNFT 634 Permanent Markings, Type B, Solid (White) 342,700 LNFT 634 Permanent Markings, Type B Broken (White) 34,000 LNFT 634 Permanent Markings, Type B Dotted (White) 5400 LNFT 634 Permanent Markings, Type B, Turn Arrow 6 EACH 634 Permanent Markings, Type B, Straight Arrow 2 EACH 634 Permanent Markings, Type B, Accessibility Symbol 2 EACH 634 Recessed Pavement Marker, Bi-Directional Reflective (Yellow) 1,380 EACH 634 Recessed Pavement Marker, Mono-Directional Reflective (White) 130 EACH 635 Temporary Traffic Control, Traffic Control Supervisor 1,010 DAY 635 Temporary Traffic Control, Barricade Type 3 16 EACH 635 Temporary Traffic Control, Tubular Marker, Type 42-inch 540 EACH 635 Temporary Traffic Control, Drum 260 EACH 635 Temporary Traffic Control, Warning Light Type A 50 EACH 635 Temporary Traffic Control, Warning Light Type B 6 EACH 635 Temporary Traffic Control, Warning Light Type C 506 EACH 635 Temporary Traffic Control, Portable Changeable Message Sign 9 EACH 635 Temporary Traffic Control, Traffic Signal System 3 EACH 635 Temporary Traffic Control, Concrete Barrier 5,000 LNFT 635 Temporary Traffic Control, Pavement Markings 62,000 LNFT 635 Temporary Traffic Control, Construction Sign 1,329 SQFT 635 Temporary Traffic Control, Flagger 45,500 HOUR 635 Temporary Traffic Control, Pilot Car 20,150 HOUR 635 Temporary Traffic Control, Traffic Control Supervisor 950 DAY 646 Fixture, Shelter (Bus)(Government Provided) 2 EACH 646 Fixture, Handrail 100 LNFT

FP-14

O ne

S ch ed ul e Sc h N

A

646 Fixture, Portable Toilet 2 EACH 646 Roadside Development (Stone Masonry Guardwall with sign) LPSM 647 Mitigation, Fish Passage Boulder 34 EACH 647 Mitigation, Streambed Material 230 CUYD 647 Mitigation, Streambed Channel Reconstruction 570 CUYD 651 Temporary Roadway Protection 400 LNFT