PROJECT_DESCRIPTION_WA_NPS_PRES_2015(2).pdf
PDF 14 KB Posted
- Solicitation number
- DTFH70-16-R-00005
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A002_WA_NPS_PRES_2015(2).pdf | ||
| A001_WA_NPS_PRES_2015(2).pdf | ||
| IFB_PP_Olympic_2.pdf | ||
| _ALL_Plans_WA_NPS_PRES_15-1_OLYM_Phase_II_8-30-16.pdf | ||
| OLYM_C5_RipReport.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WA NPS PRES 2015(2), Pavement Preservation Olympic Phase II, Olympic National Park, Clallam County, Washington
The work consists of microsurfacing, patching, striping, signage and other small items of work.
Project length: 21.5 Miles
Tentative Fixed Completion Date: Fall 2017 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range: $2 million to $3 million
Location: 35 Miles SW of Port Angeles, WA
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-14
B as e
DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) No 153 Contractor Quality Control and Assurance
(yes/no) Yes 154 Contractor Sampling & Testing (yes/no) Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes DIVISION 400 – Asphalt Pavements & Surface Treatments 409 Micro Surfacing – Type 2 Micro Surfacing - Type 3
109,000 sy 216,500 sy
414 Asphalt Pavement Crack cleaning & Sealing 26 miles 418 Asphalt Concrete Pavement Patching 4,440 sy DIVISION 600 – Incidental Construction 622 Rental Equipment (yes/no) Yes 623 General Labor (yes/no) Yes 633 Permanent Traffic Control (traffic control devices) Sign System 30 ea 634 Permanent Pavement Markings (traffic pavement markings)Striping Symbols
761,000 lf 86 ea
635 Temporary Traffic Control – Flagger 1500 hr 635 Temporary Traffic Control – Cone Traffic supervisor Pavement markings Construction Signs
220 ea 86 days 93,000 lf 300 sf