WA_FS_ERFO_151-2101_Plans.pdf
PDF 10 MB Posted
- Attached to
- WA FS ERFO 151-2101, FDR 2922 Repair
- Solicitation number
- DTFH70-16-B-00016
About this file
Plans_WA FS ERFO 151-2101
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 11/2001
REVISED: 9/2005 1/2007 10/2009 10/2014
W101-1
AND ABBREVIATIONS
PLAN SYMBOLS
P
M
A p r il
U
S C c m y fi le s p w p r o d u c ti o n d w a fs e r fo a a b .d g n
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
STATE PROJECT
NUMBER
SHEET
A.2FS ERFO 151-2101WA
BH
CP GPS
JH
TP
DI
36 31
6 1
36 31
6 1
SEC.
SEC.
EL. 1234.56
N
E
RIP
G G
W W
DI
T T
NO SCALE
- no symbol -wall face
N
W west drwg(s).
dist.
diaph.
diag.
dia.
DHV
D exp. jt.
exc.
EW
ER
EQ or eq.
EP
emb.
elev.
El. 94.16 ft e
E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east drawing(s) distance diaphragm diagonal diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge)
HW
hex.
hdwl.
high water hexagon headwall ftg.
ft3 ft2 flg.
fin.
footing cubic foot (feet) square foot flange finish jt.
ID
joint inside diameter
LW
lt. or LT
Ls
LPSM
long.
LNFT
lat.
lam.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve
NC
N normal crown north
OG
OD
o. to o.
o. c.
original ground outside diameter out to out on center pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W
R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed yd3 yd2 cubic yard(s) square yard sym.
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sec.
SC
SADT
S symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
monument minimum thousand gallon maximum material
NOTE:
on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend 1.
Property Line w/Found Property Corner
Section Corner (Found, Projected)16
Section Line16
Section Corner (Found, Projected)4
Section Line4
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
Trail
Lake, Pond or Reservoir; Marshland
Spring or Seep
Material Source; Bore Hole; Test Pit
Section Line
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Section Corner (Found, Projected)
Large Creek or River
Spot Elevation; Coordinate Grid Tick
Above Ground Tank; Underground Tank
Treeline; Individual Trees
Boulder; Well; Satellite Dish; Grave
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
Silt Fence
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
BLM Lands Boundary
Railroad
Intermittent Drainage or Small Creek
Control Point (Terrestrial and GPS); Jump Hub θs Ø
∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.
AH
ADT
abut.
bearing bridge balance point bench mark back brg.
br.
BP
BM
BK
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center mile post main line
M.P.
M.L.
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use, EXISTING PROPOSED
Transition
Toe of Fill
Top of Cut
CL
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Concrete Barrier
Slope Stake Limits
Pipe Culvert with Drop Inlet
Box Culvert
Delineators
Underground Utilities
Overhead/Above Ground Utilities
Signs (single, double post; portable)
Miscellaneous Utility Features
Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
Fiber Roll or Wattle
SCALE IN MILES
(Bruch & Bruch)
Snider Pit
To Port Angeles
36 miles
0.4 Miles
FR
-29
FR-2900
F R
1.6 Miles
Jct.
2.4 Miles
To Forks
15 miles
N
END PROJECT
BEGIN PROJECT
0 1 21 d R h c n a
R r e p o o
C
100+00.00
FDR 2922 REPAIR
WA FS ERFO 151-2101
104+66.00
FDR 2922 REPAIR
WA FS ERFO 151-2101
A.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft
D m y fi le s p w p r o d u c ti o n d w a e r f1 a c .d g n
WA FS ERFO 151-2101
A p r il
K
H a r r is o n
B e lg a r d
C h e c k e d b y
D e s ig n e d b y
VICINITY MAP
Cooper Ranch Road
Jct. HWY 101 and
MP 212.0
Sheet and Description
Section C Section D Section E Section F Section G
Typical Section Plan & Profile Drainage Erosion Control Temporary Traffic Control ALLOWANCE Bid Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
A0060 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15702-1000 SOIL EROSION CONTROL, TEMPORARY DIVERSION CHANNEL LPSM ALL ALL
A0140 15702-2000 SOIL EROSION CONTROL, TURBIDITY MONITORING LPSM ALL
A0160 15705-0100 SOIL EROSION CONTROL, SILT FENCE LNFT 300 300
A0180 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 1,700 1,700
A0200 15706-0200 SOIL EROSION CONTROL, CHECK DAM EACH 8 8
A0220 20102-0000 CLEARING AND GRUBBING LPSM ALL ALL
A0240 20301-1900 REMOVAL OF PIPE CULVERT (36-inch culvert and corrugated metal spillway) EACH 1 1
A0260 20301-1900 REMOVAL OF PIPE CULVERT (48-inch culvert and corrugated metal spillway) EACH 1 1
A0280 20411-0000 SELECT BORROW (government furnished) TON 11,250 11,250
A0300 20411-0000 SELECT BORROW TON 550 550
A0320 20701-1000 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 2, TYPE E SQYD 700 700
A0340 20720-0100 REINFORCEMENT GEOSYNTHETIC, TYPE 1 SQYD 7,100 7,100
A0360 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3 CUYD 800 550 1,350
A0380 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 400 400
A0400 60201-2300 120-INCH PIPE CULVERT (government furnished) LPSM ALL ALL
A0420 60601-0000 SPILLWAY ASSEMBLY (government furnished) EACH 1 1
A0440 62201-0900 WHEEL LOADER, 2 CUBIC YARD MINIMUM RATED CAPACITY HOUR 8 8
A0460 62201-2050 ROLLER HOUR 8 8
A0480 62201-2750 MOTOR GRADER HOUR 20 20
A0500 62201-3400 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY WITH
THUMB ATTACHMENT HOUR 8 8
A0520 62201-3750 CHAIN SAW HOUR 4 4
A0540 62301-0000 GENERAL LABOR HOUR 20 20
A0560 62501-0000 TURF ESTABLISHMENT ACRE 0.6 0.6
A0580 62901-1100 ROLLED EROSION CONTROL PRODUCT, TYPE 4 SQYD 2,700 2,700
A0600 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 (8-ft width) EACH 4 4
A0620 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN SQFT 72 72
-A pr -2
:4
A M c:
\m yf ile s\ pw
_p ro du ct io n\ d0 w a-fs
-e rf o- Es tim at e.
xl sx ]S he et
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
STATE PROJECT
B.1FS ERFO 151-2101WA
NUMBER
FDR 2922 REPAIR
100+00 TO 104+66
MAINLINE TYPICAL
1:
1.
TYPICAL SECTIONS
C.1
STATE PROJECT
NUMBER
SHEET
U
S I n t2
D c m y fi le s p w p r o d u c ti o n d w a e r f1 c a .d g n
WA FS ERFO 151-2101
A
A p r il
H a r r is
B e lg a
C h e c k e d b y
D e s ig n e d b y
4% crown
1:1.75
NO SCALE
FOOTNOTE:
NOTE:
Shoulder width varies to tie into existing roadway.
1.
6" compacted depth
Roadway aggregate, method 2, select borrow according to Section 204 and Subsection 704.07.
furnishWhen government furnished select borrow is exhausted
LC
Shldr
1'
Traveled way
18'
Shldr
1'
Profile grade
Finished grade at the rate 'e' as indicated on the plan curve data table.
Tie into existing superelevation. Superelevate roadway on curve
Select borrow
1:1.75
1:
1.
Shdr_Outside_Layer1_L
Slope_Stake_Cut_L
Shdr_EOP_Layer1_L
Pvmt_ETW_LayerTop_L
Slope_Stake_Fill
Shdr_EOP_LayerTop_L
Pvmt_ETW_Layer1_L
Shdr_Outside_Layer1_R
Pvmt_ETW_LayerTop_R
Shdr_EOP_Layer1_R
Pvmt_ETW_Layer1_R
Shdr_EOP_LayerTop_R
Pvmt_CL_LayerTop
Pvmt_CL_Layer1
Exterior Boundary
DETAIL
EMBANKMENT
NO SCALE
C.2
STATE PROJECT
NUMBER
SHEET
U
S I n t2
D c m y fi le s p w p r o d u c ti o n d w a e r f1 c b .d g n
WA FS ERFO 151-2101
A p r il
H a r r is
B e lg a
C h e c k e d b y
D e s ig n e d b y
NOTE:
Finished grade
1.
12'
20'
Elevation 127
Profile grade
Elevation 105
See Sheet E.9 for details
Riprap toe
Table 704-1.
select borrow according to Section 204 and Subsection 704.07, When government furnished select borrow is exhausted furnish
Existing ground
LC
20' Length at 1' vertical spacing
Reinforcement geosynthetic, type 1
3 Layers of
12' Length at 2' vertical spacing
Reinforcement geosynthetic, type 1
QUANTITIES
TABULATION OF
D.1
STATE PROJECT
NUMBER
SHEET
U
S I n t2
D c m y fi le s p w p r o d u c ti o n d w a e f1 fa .d g n
WA FS ERFO 151-2101
A p r il
H a r r is
B e lg a
C h e c k e d b y
D e s ig n e d b y
1 Estimated quantity to be used for information only
END PROJECT
P O T .0
P C .0 6 P
T
.0
P C
.1
SCALE IN FEET
12.5 5025
N
BEGIN PROJECT
Curve 1
Cu rv e
WA FS ERFO 151-2101
100+00
WA FS ERFO 151-2101
104+66
D.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 fb .d g n
WA FS ERFO 151-2101
A p r il
H a r r is
B e lg a
C h e c k e d b y
D e s ig n e d b
Road work project limits are based on culvert excavation access. Clearing limits follow the project limits.
Project limits not shown on plans extend along the approach road 30-ft RT and LT of centerline from Sta. 100+00 to 90+00.
PLAN VIEW
P O T .0
P C .0
P T
.0
P C
.1
P T
.1
0 1
15 2
Project limits
(See Note 2)
Line to be constructed
Placed riprap, class 3, energy dissapator, See E Sheets for quantities and details
Place riprap, class 3, riprap toe, see E Sheets for quantities and details
LEGEND:
Wooden Hub
Control Point
(See Note 2)
Project limits
CONTROL PT 11
Proposed edge of traveled way
Placed riprap, class 3, riprap end treatment.
See E Sheets for quantities and details
Install 120" culvert
Sta 102+61.12.
See E Sheets for quantities and details
Sta 102+72
Remove existing 48" culvert
CONTROL PT 10
(See Note 1)
Project Limits
Line to be constructede
Edge of existing roadway
CONTROL PT 14
Placed riprap, class 3, embankment protection.
See E Sheets for quantities and details
CONTROL PT 15
Remove existing
36" culvert Sta 102+19
Do not use existing
36" Culvert as temporary water diversion
CONTROL PT 9
2.
1.
Edge of failed slope
Land slide area
Edge of failed slope
N 4° 4' 2.
E
S ° 3
' 5
.3 E
BEGIN PROJECT
END PROJECT
140 140
165 165
190 190
215 215
240 240
265 265
290 290
315 315
340 340
100+00 101+25 105+00103+75102+50
65 65
V I
P V I
P V I
.0
0 1
.0
+2.4691
68' VC
.3
+0.1987%
+7.5
8%
219' VC
.9
+4.16 67%
67' VC
.4
D.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 fc .d g n
WA FS ERFO 151-2101
A p r il
H a r r is
B e lg a
C h e c k e d b y
D e s ig n e d b y
WA FS ERFO 151-2101
100+00
WA FS ERFO 151-2101
104+66
PROFILE
Remove existing 36" culvert
Install 120" culvert see E Sheets for details
Remove existing 48" culvert
Existing ground
Profile grade
Culvert excavation
A p r il
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 fd .d g n
STATE PROJECT
NUMBER
SHEET
WA FS ERFO 151-2101 D.4
P O T .0
P C .0
P T
.0
P C
.1
P T
.1
'-0
'-0
'-0
'-0
'-0
52'- 2"
66'-8"
'-0
'-0
'-0
CONTROL PT 11
FOUND WOOD HUB
Creek centerline
CONTROL PT 10
Project Limits
Line to be constructed
CONTROL PT 14
CREEK CENTERLINE
0 1
S
B e lg a r d
K
H a r r is o n
C h e c k e d b y
D e s ig n e d b y
Approach road
Sta. 90+00. See Table for details Project limits terminated at
PROJECT LIMITS
Landslide area
POINT
NUMBER NORTH EAST ELEVATION DESCRIPTION
9 10222.320 4741.600 203.400 PK Nail in tree root on top of bank
10 9996.890 5001.890 199.700 Wooden Hub & Tack
11 10123.630 4823.440 196.490 Rebar with cap (M2C)
14 10099.750 5142.030 211.600 Rebar with top sheared off by impact
15 9895.040 5019.850 182.400 Spike in Alder Tree
PROJECT : WA FS ERFO 151-2101
FOREST : OLYMPIC NATIONAL FOREST
DATE OF FIELD WORK : December 2015 DATE OF FINAL ADJUSTMENT : December 27, 2015
PROJECT UNITS : US SURVEY FOOT
COORDINATE SYSTEM : Assumed VERTICAL DATUM : Assumed
PROJECT COORDINATES
STATE PROJECT
FS ERFO 151-2101 D.5WA
C
M yF ile s\
Fi el d_ Fi le s\
W as hi ng to n\
_E R
FO
\F D
R
_R ep ai r\ [C on tr ol _P la n_
Sh ee t.
xl sx ]S he et
-M ar -2
:1
A
D es ig ne r
D
C he ck er
D es ig ne d by
C he ck ed b y:
NUMBER
SURVEY CONTROL
E.1
STATE PROJECT
NUMBER
SHEET
U
S I n t2
D c m y fi le s p w p r o d u c ti o n d w a fs e r fo e a .d g n
WA FS ERFO 151-2101
A p r il
H a r r is
B e lg a
C h e c k e d b y
D e s ig n e d b
Estimated quantity to be used for information only1
115 120
E.2
STATE PROJECT
NUMBER
SHEET
WA
D A
T E
P
A T
H
$ PLAN & PROFILE
CULVERT REPLACEMENT
FS ERFO 151-2101
K
H a r r is o n
C h e c k e d b
J
N e ig h o e s ig n e d b y
LC
SCALE IN FEET
20 0 20 40 60 80
OUTLETINLETPIPEHYDRAULIC INFORMATION
0 40 804080
LC
LENGTH: 120 ft
HEADWALL: RIPRAP
N
200 240200240280
SPAN: 10.0 ft RISE: 10.0 ft
Flow
Q : 14.1 CFS
Q : 33 CFS
centerline
New culvert
Existing ground
Proposed channel flowline
48" dia. culvert
Remove existing
NOTE:
Proposed roadway
Proposed roadway
Clearing limits
Creek
Q : 30 CFS BURIAL DEPTH: NA BURIAL DEPTH: NA
LOWER BEVEL HEIGHT: NA
BEVEL: NA
HEADWALL: NA
MATERIAL: Aluminized
WALL THICKNESS: 10 Ga
120160 120 160 280
Flow
36" dia. culvert
Remove existing
(See Sheet E.8 for details) energy dissipator
Placed riprap, class 3, Proposed road grade
(See Sheet E.8 for details) energy dissipator
Placed riprap, class 3, 1:
1.
(see Sheet E.7 for details) both side of pipe (typ.)
Place anchor assembly
20'
120'
Slope 2.66%
PIPE SLOPE: 0.0266 ft/ft SPILLWAY SLOPE: 0.6667 ft/ft
Culvert outlet
Sta. 102+61.12, 59.28 RT
Culvert inlet
Sta. 102+61.12, 60.67 LT
Spillway outlet elev. 101.74'
40'
Proposed flowline spacing 8' max.
Culvert inlet elev. 171.09'
Culvert outlet elev. 167.90'
(see Sheet E.6 for details) riprap end treatment
Placed riprap, class 3, (see Sheet E.6 for details) riprap end treatment
Placed riprap, class 3, TYPE: Round CSP 9946.79/4993.65/171.09'INV N/E/EL: INV N/E/EL: 10066.36/4984.10/167.90'
HW : 172.96 ft
HW : 172.87 ft
BEVEL: NA
LOWER BEVEL HEIGHT: NA
E.7 for details) spillway (See Sheet outside of buried
Finish grade along
Corrugated metal pillway outlet
Sta. 102+61.12, 148.21 RT
(See Sheet E.8 for details) embankment protection
Placed riprap, class 3, m et al s pi llw ay
0' C or ru ga te d
(See Sheet E.9 for details) embankment toe
Placed riprap, class 3, (See Sheet E.7 for details)
10' dia. half-pipe metal spillway assembly, Proposed corrugated pipe culvert
Proposed 120-inch dia.
Sta. 102+61.12
1.
and see D Sheets for quantities)
(See Sheet E.8 for details embankment toe
Placed riprap, class 3, spillway.
other components necessary to assemble and install the culvert and half-round segments with base angle footer. Contractor to provide all
The corrugated metal spillway pipe consists of 6 (20 foot long)
6 (20 foot long) segments, 5 annular bands, and 5 neoprene gaskets.
government furnished. The 120-inch diameter pipe culvert consists of
120-inch pipe culvert and half-round corrugated metal spillway are
STANDARD APPROVED FOR USE 12/1993
REVISED: 4/1994 6/2005
602-1
METAL PIPE CULVERT
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS 5" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
5" x 1" CORRUGATIONS3" x 1" CORRUGATIONS" CORRUGATIONS2 1" x 3
METAL THICKNESS (INCH/GAGE)
0.064/160.079/140.109/120.138/10 0.168/8 0.064/160.079/140.109/120.138/10 0.168/8 0.064/160.079/140.109/120.138/10 0.168/8 0.060/160.075/140.105/120.135/10 0.164/8 0.060/160.075/140.105/120.135/10 0.164/8
0.060/160.075/140.105/120.135/100.060/160.075/140.105/120.135/100.064/160.079/140.109/120.138/10 0.168/8 0.079/140.109/120.138/10 0.168/8 0.079/140.109/120.138/10 0.168/8
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET) MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)
142 x 91
137 x 87
128 x 83
117 x 79
112 x 75
103 x 71
95 x 67
87 x 63
83 x 57
81 x 59
77 x 52
73 x 55
71 x 47
66 x 51
64 x 43
60 x 46
57 x 38
49 x 33
42 x 29
35 x 24
28 x 20
24 x 18
21 x 15
17 x 13
3.5
103 x 71
95 x 67
87 x 63
81 x 59
73 x 55
66 x 51
64 x 43
60 x 46
57 x 38
49 x 33
42 x 29
35 x 24
28 x 20
24 x 18
21 x 15
17 x 13
3.5
INCHESINCHES INCHESINCHES
INCHESINCHESINCHESINCHESINCHESINCHESINCHESINCHES
Fill heights exceeding 100 feet require
STATE PROJECT
NUMBER
SHEET
E.3
FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY STANDARD
STANDARD
p r il
U m y fi le s p w p r o d u c ti o n d w a fs e r fo e c .d g n
FS ERFO 151-2101WAMETAL ROUND PIPE CULVERT
METAL PIPE ARCH CULVERT
FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT
FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT
STEEL ALUMINUM
DIAMETER
VALENT
EQUI-
RADIUS
CORNER
MINIMUM
COVER
MINIMUM
SPAN x RISE
SIZE
PIPE ARCH
SIZE
PIPE ARCH
SPAN x RISE DIAMETER
VALENT
EQUI-
RADIUS
CORNER
MINIMUM
COVER
MINIMUM
COVER
MINIMUM
DIAMETER
SIZE
PIPE
SIZE
PIPE
DIAMETER COVER
MINIMUM
ALUMINUMSTEEL
NO SCALE
of camber or increase the pipe culvert gradient.
elevation of the inlet invert, reduce the amount parabolic curve as designed exceeds the curve. If the midpoint elevation on the pipe length. Develop camber on a parabolic inverts an ordinate amount equal to 1% of the from a chord through the inlet and outlet
When directed, camber pipe culverts upward
4.
3.
2.
1.
NOTE:
pavement for both flexible and rigid pavement.
from the top of the pipe to the top of the rigid pavements. Measure maximum fill height pavements, and to the top of the pavement for pipe culvert to the subgrade for flexible
Measure minimum cover from the top of the corrugation pipe.
Obtain approval before furnishing annular of helical lockseam and welded seam pipe.
corrugations are more restrictive than those
Fill heights for culvert pipe with annular lockseam and welded seam pipe only.
The fill heights in the table are for helical special analysis by the CO.
REVISED: 4/1994 6/2005
602-2
COUPLING BAND
METAL PIPE CULVERT
MINIMUM BAND WIDTH (INCHES)
1 x 2
1 x 3
3 x 1
5 x 1 78 to 144
36 to 72
78 to 144
36 to 72
78 to 84
42 to 72
12 to 36
87 x 64 to 142 x 91
60 x 46 to 81 x 59
87 x 64 to 142 x 91
60 x 46 to 81 x 59
49 x 33 to 83 x 57
17 x 13 to 42 x 29
10.5
10.5
10.5
10.5
10.5
10.5
10.5
INCHESINCHESINCHES
" for 18" round culvert (21" x 15" pipe arch) or less8
" for 21" round culvert (24" x 18" pipe arch) or more2
" corrugations. A 12 inch band is acceptable on pipe ends 2 1" x 3
2ends rerolled with 2
" corrugations on rerolled pipe ends.2 1" x 3
STATE PROJECT
NUMBER
SHEET
E.4
FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY STANDARD
STANDARD
p r il
U m y fi le s p w p r o d u c ti o n d w a fs e r fo e d .d g n
FS ERFO 151-2101WA
DIAMETER
ROUND PIPE
SPAN x RISE
PIPE ARCH
BANDS
CORRUGATED
ANNULAR
BANDS
CORRUGATED
HELICALLY
BANDS
CORRUGATED
SEMI-
SIZE
CORRUGATION
underdrain
COUPLING BANDS FOR METAL PIPE CULVERT
NO SCALE
Use annular corrugated bands with pipes having annular corrugations or with helical pipe dimension of the end corrugation in the pipe.
For helically corrugated pipe with rerolled ends, the nominal corrugations size refers to the
Use helical corrugated bands with pipes having helically corrugated ends.
as the connecting pipe. Provide coupling bands not more than 3 nominal sheet thicknesses
Fabricate annular, helical and semi-corrugated type coupling bands from the same metal
Second angle connection optional Second angle connection optional having rerolled end to form annular corrugations. A 10.5 inch band is acceptable on pipe rerolled with 3" x 1" pipe corrugations.
The minimum band widths shown for 3" x 1" and 5" x 1" corrugated sizes apply to steel, or 0.036 inch for aluminum, or a plastic with an equivalent strength to metal.
less. Use a matching metal having a nominal thickness of not less than 0.040 inch for
Smooth sleeve-type couplers and flat bands may be used for pipe diameters of 12" or
42" diameter to 42" diameter, required above
42" diameter to 42" diameter, required above steel or 0.048 inch for aluminum. Fasten coupling bands with the following diameter of bolt:
thinner than the thickness of the pipe to be connected, and no thinner than 0.052 inch for
2.
1.
SMOOTH SLEEVE BAND FLAT BAND
SEMI-CORRUGATED BAND
HELICAL BANDANNULAR BANDSTANDARD BAND CONNECTIONS
SLEEVE JOINT
SIDE VIEW SIDE VIEW SIDE VIEW
END VIEW
END VIEWEND VIEW
Oval Lug
Band Angle
Bar & Strap
Integral Flange Wedge and Strap
Stab type joint
Smoother sleeve with center stop.
NOTE:
W
W W W
Band Band
Band corrugation in pipe end with second annular around band meshes
Continuous corrugation
Band Bolts Band Bolts
Pipe
Band
Bolts
Angle
Pipe
BandBand
Bolts
Pipe heel and toe of angle of corrugation at fillet weld at crest
Rivet, spot weld, or
Angle
Wedge be used.
Highway Bridges, Division II Section 26 may criteria of AASHTO Standard specifications for devices that comply with the joint performance
Other types of coupling bands or fastening specified in the Special Contract Requirements.
Watertight pipe joints are not required unless
3 4 5 of corrugation at heel and toe of angle
Rivet, spot weld, or fillet weld at crest strap connector
Bolt, bar and
DRAFT: 10/2014
REVISED: 4/1994 6/2005
602-3
PIPE CULVERT BEDDING
METAL AND PLASTIC
> 54"
12" to 54"
6"
4"
48" and UP
UP to 48" 24" span or 36", STATE PROJECT
NUMBER
SHEET
E.5
FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY STANDARD
STANDARD
p r il
U m y fi le s p w p r o d u c ti o n d w a fs e r fo e e .d g n
FS ERFO 151-2101WA
LEGEND:
BEDDING DEPTH
MINIMUM SPACING
SPACING
or SPAN
DIAMETER
PIPE SIZE (H) DEPTH
NO SCALE
or 36" (max.) for embankment installations not exceeding 6" compacted depth.
exceeding 6" compacted depth. Or lean concrete
2'-0" ±
1'-0" ±
2H or 12' (max.)2H or 12' (max.)
18" ±
18" ±18"±
18" (min.)
minimum
1'-0"
"2H or 12' (max.)2H or 12' (max.)
2H or 12' (max.)1
2H or 12' (max.)
(min.)
6"
2H or 12' (max.)
(min.)
6"
2H or 12' (max.) 2H or 12' (max.)
6" in uncompacted depth.
12" (min.), 24" (max.)
"/foot of cover,2
* Reduce to 18" for
See Section 704 for bedding and backfill requirements.
dimension of all pipe arch culverts.
H equals the diameter of all round pipe culverts or the rise amount of camber or increase the pipe culvert gradient.
designed exceeds the elevation of the inlet invert, reduce the curve. If the midpoint elevation on the parabolic curve as to 1% of the pipe length. Develop camber on a parabolic through the inlet and outlet inverts an ordinate amount equal
When directed, camber pipe culverts upward from a chord
3.
2.
1.
be adjusted to tie into impervious material.
granular material is used for backfill. Width may material at the pipe culvert inlet where
Construct piping plug of impermeable backfill
MULTIPLE PIPE INSTALLATION
PIPING PLUG
TRENCH EXCAVATION IN EMBANKMENT
BELOW NATURAL GROUND OR
ON UNSTABLE MATERIAL
NATURAL GROUND
ABOVE AND BELOW
ON NATURAL GROUND
ABOVE NATURAL GROUND
ON UNYIELDING MATERIAL
PIPE BEDDING
ELEVATION
SECTION A-A
Bedding material (uncompacted)
Impermeable backfill material.
Roadway embankment Roadway embankment
Natural ground
Toe plate Toe plate
Natural ground Natural ground
Roadway embankment
Roadway excavation
Natural ground
NOTE:
H H or Span
Diameter or Span
Diameter
H
Width
(see table)
Minimum spacing
H H
H H
H H
H H
H
H
H H
H
Finished subgrade Finished subgrade
Natural ground section
Metal end
Finished subgrade
Pipe culvert
Embankment slope
High water elevation treatment
Culvert end
Piping plug before trench excavation embankment height
Finished subgrade or
Original natural ground surface
A
A
Finished subgrade
Roadway embankment
Metal end section
Roadway embankment
Finished subgrade compact in layers not over compressible material. Lightly and replace with selected fine
Remove unyielding material trench excavations
Embankment material placed in layers
Compacted backfill material placed in layers not backfill in accordance with Section 614.
whichever is less fill material properly compacted with approved granular foundation firm bearing soil and replace
Remove unstable material to
Bedding
Bedding
Bedding
Bedding depth table
See bedding excavation in trench
Half diameter or
HH
DETAILS
RIPRAP HEADWALL
1.5
E.6
STATE PROJECT
NUMBER
SHEET
A p r il
I n t_ ft m y fi le s p w p r o d u c ti o n d w a fs e r fo e f.
d g
WA FS ERFO 151-2101
H a r r is
B e lg a
C h e c k e d b y
D e s ig n e d b y
NOTE:
FRONT VIEW SIDE VIEW
2.
1.
Placed riprap, class 3
Placed riprap, class 3 embankment, beneath and at all sides of placed riprap.
Place earthwork geotextile between riprap and ground or
Contractor to field verify all invert elevations, prior to installation.
NO SCALE
" m in
R is e
W2
10' Span W2
R is e
Separation-stabilization geotextile, class 2, type E
RIPRAP INLET END TREATMENT
SPILLWAY ASSEMBLY
E.7
STATE PROJECT
NUMBER
SHEET
A p r il
I n t_ ft m y fi le s p w p r o d u c ti o n d w a fs e r fo e g .d g
H a r r is
B e lg a
C h e c k e d b y
D e s ig n e d b y
NO SCALE
ANCHOR PLATE
1" " thickness4
1Steel plate, "2 14 "2
R 1"
" slots2 1" x 1'16
1'-0"
PIPE ANCHOR ASSEMBLY
"8
Anchor plate
SPILLWAY ASSEMBLY
sides of pipe assembly, both
Pipe anchor
Pipe culvert pipe joint (typ.)
Half-round with angle base footer (gov. furnished)
10' diameter half-round corrugated steel pipe
Collar of 2" pipe or equal
NOTE:
8'-6"
3"
(two at each plate)
3/4" anchor bolt and nut spacing 8' max.
Finish grade steel pipe
"2 110' x 1 outlet and adjacent to spillway.
5. See sheet E.8 for riprap placement details at spillway
4. Approved alternate designs may be used.
3. Galvanize all items of anchor assembly after fabrication.
overlap before bolting.
" radius bead of approved caulking under each 16 3 by placing a manufactures requirements. Make all connections water tight
2. Connect half-round segments by overlapping and bolting per assembly.
all other components necessary for installation of the anchor long segments with angle base footer. Contractor to provide corrugated steel pipe. Half-round pipe consists of 6, 20 foot
1. Assembly spillway from government furnished half-round
Slope
E.8
STATE PROJECT
NUMBER
SHEET
A p r il
I n t_ ft m y fi le s p w p r o d u c ti o n d w a fs e r fo e h .d g
H a r r is
B e lg a
C h e c k e d b y
D e s ig n e d b y
SlopeSlope Slope
EMBANKMENT PROTECTION
ENERGY DISSIPATOR AND
RIPRAP
NO SCALE
Varies 20' to 40'
D
1.5
40'
10'
PLAN
EMBANKMENT PROTECTION
ENERGY DISSIPATOR AND
SECTION A-A
EMBANKMENT PROTECTION
ENERGY DISSIPATOR AND
SECTION C-C
RIPRAP EMBANKMENT PROTECTION
SECTION B-B
RIPRAP ENERGY DISSIPATOR
10'40'
Separation-stabilization geotextile, class 2, type E Separation-stabilization geotextile, class 2, type E
Riprap energy dissipator Riprap energy dissipatorRiprap embankment protection Riprap embankment protection
Corrugated metal spillway
Placed riprap, class 3 invert of spillway energy dissipator to drain to
Transition slope of riprap
Corrugated metal spillway
Placed riprap, class 3
Placed riprap, class 3
Sheet E.7 for details) and anchor assembly (see
Corrugated metal spillway
5' D 5'
AA
C
C
B
B
E.9
NUMBER
SHEET
A p r il
I n t_ ft m y fi le s p w p r o d u c ti o n d w a fs e r fo e i.
d g
H a r r is
B e lg a
C h e c k e d b y
D e s ig n e d b y
DETAILS
RIPRAP TOE
5 9 0 9
5 10
125 130 135
0 14
5 15
NO SCALE
Elev. 127.0
Elev. 105.0
TYPICAL SECTIONPLAN
NOTE:
energy dissipator details.
See Sheet E.8 for riprap embankment protection and riprap1.
Finish grade
Placed riprap, class 3
Place riprap toe outside the limits of riprap embankment and energy dissipator
Placed riprap, class 3
Elevation 105.0 Elevation 127.0
Centerline of spillway
Finish grade contour
F.1
NUMBER
SHEET
U
S I n t2
D c m y fi le s p w p r o d u c ti o n d w a fs e r fo fa .d g n
WA FS ERFO 151-2101
A p r il
K
H a r r is
N e ig h o
C h e c k e d b y
D e s ig n e d b y
QUANTITIES
1 Estimated quantity to be used for information only
CONTROL PLAN
PERMANENT EROSION
N
0 1
15 2
F.2
STATE PROJECT
NUMBER
SHEET
U
S I n t2
D c m y fi le s p w p r o d u c ti o n d w a fs e r fo fb .d g n
WA FS ERFO 151-2101
A p r il
H a r r is
N e ig h o
C h e c k e d b y
D e s ig n e d b y
LEGEND:
Direction of flow arrow
Existing Culvert
SCALE IN FEET
0 20 40 6020
NOTE:
3.
2.
1.
completed.
areas after slope shaping and finishing operations have been
Apply permanent slope protection on all bare soil and placed topsoil where construction activities have ceased.
Apply soil erosion control mulching w/in 14 days in exposed areas details.
See Sedimentation Wattle Detail drawings for location installation
Sediment wattle lines shown are for illustration only.
Clearing limits
Placed riprap
Finish Contour
See Sheet F.5 (typ.)
installation along ditch.
Check dam
See Sheet F.4 (typ.)
Fiber roll installation along slope
Fiber roll
Check dam
Product, Type 4
Rolled Erosion Control
See Sheet F.6 (typ.)
installation on slopes.
Rolled erosion control product, type 4
CONTROL PLAN
TEMPORARY EROSION
N
F.3
STATE PROJECT
NUMBER
SHEET
U
S I n t2
D c m y fi le s p w p r o d u c ti o n d w a fs e r fo fc .d g n
WA FS ERFO 151-2101
A p r il
H a r r is
N e ig h o
C h e c k e d b y
D e s ig n e d b y
130 1
200 2
15 2
SCALE IN FEET
0 20 40 6020
Ø embankment
Roadway embankment
Roadway
Temporary culvert backfill Subgrade
Natural ground
Bedding
TEMPORARY DIVERSION PIPE
SECTION
NOTE:
3.
2.
1.
LEGEND:
Check dam
Direction of flow arrow
Existing Contour
Existing Culvert
Silt fence
Temporary diversion pipe sandbags
Temporary barrier
Clearing limits (typ.)
Construct temporary barrier
1% minimum slope piping, 24" dia. minimum
Temporary diversion
Silt fence. See Sheet F.7 (typ.)
Edge of existing road
See Sheet F.5 (typ.)
installation along ditch.
Check dam
Fiber roll temporary diversion outlet
Provide energy dissipator at according to the contractor's staging method and sequence.
construction staging. Modify erosion control plan and devices
Plan presented on this Sheet is illustration for assumed construction for proper drainage.
Coordinate temporary access and temporary diversion piping where construction activities have ceased.
Apply soil erosion control mulching w/in 14 days in exposed areas
FIBER ROLL
(ft) (ft)
Spacing Slope
STAKES REQUIRED
1:1
1:2
1:3
1:4 or flatter
Fiber roll length for each roll
Stakes required
FIBER ROLL SPACING
NO SCALE
T I
M E
D A
T E
D G
N
U
S E
R
F.4
STATE PROJECT
NUMBER
SHEET
U
S C u s to m a m y fi le s p w p r o d u c ti o n d w a fs e r fo fd .d g n .D
G N
WA FS ERFO 151-2101
A p r il
C h e c k e d b y
D e s ig n e d b y
Drive stakes at each end and at 4' spacing
Excavate trench 2"
3' min.
3' min. or
1" x 1" Wood stake
Fl ow
T o e o f fi ll s lo p e
ELEVATION
PLAN
Direction of runoff Fi ll slo pe disturbed areas
Runoff from as specified in plans
INSTALLATION BEYOND TOE OF SLOPE
INSTALLATION ALONG SLOPES
Step 2: Backfill soil against fiber rolls
FIBER ROLL STAKING DETAIL
PROPERLY STAKED AND ENTRENCHED FIBER ROLL
NOTE:
larger than fiber roll
Existing ground (typ.)
Existing ground
Fiber roll along contours.
Install fiber rolls
Flow direction soil to ground level
Backfilled and compacted
Slope t o
D ire c tio n o f R u n o ff
Flow
Slope uphill side of sediment wattle
Place excavated material on
Pay Lim its
Pay Lim its
" (m in.)
ove rlap
Wood stakes. See Note 3
1" x 1" or 1" Ø
3.
2.
1.
sp ac in g ch ar t
S ee F ib er R ol l
Stagger joints (typ.)
m in m in
2" min.
SLOPE PROTECTION INSTALLATION
ALTERNATE FIBER ROLL JOINT DETAIL
Fiber Roll
Fiber Roll
FIBER ROLL LAPPING DETAIL
fiber roll while staking.
fiber roll and space stakes at 4' max. Do not crush from fiber roll end angles towards the adjacent
Overlap fiber rolls 24" minimum. Drive stakes at 6" conditions.
Use drainage ditch installation only in low flow permanent installations.
roll while staking. Live stakes may be used for until fiber roll is secure to slope. Do not crush and install fiber rolls
Step 1: Excavate trench
Direction of runof f from distur bed area s
CHECK DAM
6''
(ft)
(ft)
12" (min.)
16" min
6%
5%
4%
3%
2%
GRADE
DITCH
6%
5%
4%
3%
2% on ditch grades steeper than 6%
* Do not use gravel bag check dams
GRAVEL BAG CHECK DAM
Gravel bag
(See Note 7)
CHECK DAM SPACING*
FIBER ROLL
(See Note 7)
CHECK DAM SPACING*
GRAVEL BAG
(See Note 7)
CHECK DAM SPACING
RIPRAP
CROSS SECTION
FLAT-BOTTOM DITCH
SPACING (max.)
CHECK DAM SPACING (max.)
CHECK DAM
SPACING (max.)
CHECK DAM
GRADE
DITCH
GRADE
DITCH
5%
4%
3%
2%
F.5
STATE PROJECT
NUMBER
SHEET
U
S C u s to m a m y fi le s p w p r o d u c ti o n d w a fs e r fo fe .d g n
WA FS ERFO 151-2101
A p r il
C h e c k e d b y
D e s ig n e d b y
CHECK DAM DETAIL
6"
(ft)
12'' (typ.)
6'' min
6" min.
Trench 2" min.
12" (min.)
7.
6.
5.
4.
3.
2.
1.
Adjust check dam spacing based on site-specific conditions.
around the ends of the fiber roll.
Provide sufficient length to prevent water from flowing
Expose stakes 2" (min.) above top of fiber roll.
Drive stakes into undisturbed soil of trench bottom 16" (min).
2' (max) spacing.
Drive stakes at each end of the fiber roll and at
Stake fiber rolls in place with 1⅛" x 1⅛" wood stakes.
Install check dams in ditches perpendicular to the flowline.
Repair all rills or gullies and properly compact prior to installation.
requirements of the check dam device.
may be used as approved by the CO, to meet the functional
Check dams of fiber rolls, riprap, or gravel bags
9" Ø min.
Fiber roll
Trench 2" min.
RIPRAP CHECK DAM
CROSS SECTION
PLAN
Flow
Flow
Se e
Not e
CROSS SECTION CROSS SECTION
V-DITCH
See Note 6 the ends to prevent flow around
Curve ends upstream similar for flat-bottom ditches.
Check dam installation details are
V-ditch design shown.
See Note 5
Flow Line
STAKING DETAIL
FIBER ROLL
uphill side of fiber roll
Place excavated material on
Placed riprap, class 1
Placed riprap, class 1 steeper than 5%.
log check dams on ditch grades sediment log. Do not use sediment
* Spacing calculated based on 9" Ø min
FIBER ROLL CHECK DAM
Flow
Placed riprap, class 1
9" min.
6"
6''
ROLLED EROSION CONTROL
PRODUCT ON SLOPES
F.6
STATE PROJECT
NUMBER
SHEET
U
S C u s to m a m y fi le s p w p r o d u c ti o n d w a fs e r fo ff .d g n .D
G N
WA FS ERFO 151-2101
A p r il
C h e c k e d b y
D e s ig n e d b y
3'
FLOW
PERSPECTIVE VIEW
NOTE:
DETAIL A
ANCHOR TRENCH
AT TOP OF SLOPE
DETAIL B
ANCHOR TRENCH
AT TOE OF SLOPE
DETAIL C
SHINGLE SPLICE
2.
1.
6" x 6" trench
Staple
Erosion control blanket
Blanket edge
Staple (typ.)
Blanket ends
Staple
6" x 6" trench
Slope stake native soil
Compacted
Toe of slope
Compacted native soil blanket control
Erosion m ax c-c
" (m a x.)
c-c
' (m ax.)
c-c
(m ax c-c
4" (min.) edge overlap
S tap le sp acin g
S ee N ote 1
12" spacing
Staples, Pr ev ail in g wi nd
Se e
Not e
Staples, 12" spacing
6" m
in. overlap
Overlap in the direction of the prevailing wind.
Install staples according to the manufacturer's recommendations.
NO SCALE
See Detail A at top of slope.
Anchor trench
Shingle splice. See Detail C
See Detail B
Anchor trench at toe of slope.
Erosion control blanket
SILT FENCE
F.7
STATE PROJECT
NUMBER
SHEET
U
S C u s to m a m y fi le s p w p r o d u c ti o n d w a fs e r fo fg .d g n .D
G N
WA FS ERFO 151-2101
A p r il
C h e c k e d b y
D e s ig n e d b y
PLAN
Fasten fabric to posts.
around each post one full turn.
Fold geotextile fabric
Staple or tie
POSTS AT JOINTS
Section A fabric
Geotextile
Section B
Geotextile fabricTop of posts tied together.
Posts driven tightly together.
Steel or wood posts
POST AND GEOTEXTILE INSTALLATION DETAIL
SILT FENCE INSTALLATION AT TOE OF FILL
4.
3.
2.
1.
Fi ll slo pe
Flow
T o e o f s lo p e
Flow
Flow
PLAN
ELEVATION
Varies
Varies fo r s p a c in g
S e e n o te
Limits of clearing
Support mesh
Backfilled and compacted soil
Steel or wood post
(undisturbed)
Existing ground
Geotextile
6 ft. (max.) spacing without fence support.
10 ft. (max.) spacing with fence support.
m in m in
6" min. trench min.
4"
END DETAIL
ELEVATION
Fi ll sl op e
See Note 3
PLAN
T o e o f s lo p e
Note 3See
Posts Detail
See End
End posts
See End Posts Detail
End posts
END POSTS DETAIL
PLAN
Geotextile fabric
Steel or wood post
Staple or tie
NOTE:
m in running around the ends.
Curve ends of silt fence upgrade to prevent water from as possible.
Install silt fence to follow the ground contours as closely does not slide down, supporting posts.
All types must ensure silt fence remains attached to, and manufacturer's recommendations for installation procedures.
as long as specified dimensions are satisfied. Follow
Alternate preassembled silt fence options will be allowed
G.1
STATE PROJECT
NUMBER
SHEET
U
S I n t2
D c m y fi le s p w p r o d u c ti o n d w a e f1 n a .d g n
WA FS ERFO 151-2101
A p r il
H a r r is
B e lg a
C h e c k e d b y
D e s ig n e d b y
1. See Sheet G.3 for Ref-2 sign.
R11-2
ROAD
CLOSED
TYPE 3 BARRICADE
8 FT
R=13/8"
TH=03/4"
IN=01/2"
BORDER
ROAD CLOSURE DETAIL
TRAFFIC CONTROL
TEMPORARY
NOTE:
NO SCALE
500 FT
CLOSED
ROAD
1000 FT
CLOSED
ROAD
W20-3
W20-3
ROAD
CLOSED
4'-0"
3" 4"C 3" 4"C 3" 4"B 3"
REF-2
4. Conform with the current M.U.T.C.D edition on all signing.
3. Sign colors are orange background with black legend and border.
2. Mount signs on wood posts. See Standard 635-14.
1. Adjust location to match field conditions as approved by CO.
FDR 2922
AUG 01 - NOV 30
G.2
STATE PROJECT
NUMBER
SHEET
A p r il
U
S I n t2
D c m y fi le s p w p r o d u c ti o n d w a fs e r fo h b .d g
H a r r is
B e lg a
C h e c k e d b y
D e s ig n e d b y to front of barricade
Mount supplemental signs
F
T F
T
F
T
See detail this sheet Type 3 barricade
F D
R R e p a ir
Diamond ≤ 48"
> 30'
> 17'
12' - 16'
> 13'
< 10
65 - 95
65 - 95
50 - 65
50 - 65
20 - 50
10 - 20
10 - 20
6 x 6
4 x 6
4 x 6
6 x 6
4 x 6
4 x 4
6 x 6
4 x 6
4 x 4
(INCH) (INCH)
(INCH)
1.5
1.5
1.5
(SQFT)
STANDARD APPROVED FOR USE 6/2005
DRAFT: 9/2014
REVISED:
635-14
Other Shapes ≤ 48" Diamond ≤ 36"
Other Shapes ≤ 12' Diamond ≤ 48"
STATE PROJECT
NUMBER
SHEET
G.3
FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY STANDARD
STANDARD
A p r il
U m y fi le s p w p r o d u c ti o n d w a fs e r fo h c .d g n
FS ERFO 151-2101WA
NO SCALE
"X"
WIDTH AREA
OF POSTS
NUMBER POST SIZE D HOLE SIZE
WOOD POST SELECTION TABLE
TEMPORARY TRAFFIC CONTROL
WOOD POSTS
SIGN INSTALLATION
200' m in m in
6' - 12'
" dia. bolts 4 1Attach sign panels with a minimum of 2 -
6" x 6" or larger.
Use 7' minimum spacing between posts for sign posts and 6' minimum mounting height for secondary sign.
use 7' minimum mounting height for main sign a minimum lateral distance of 1' behind the face of lateral offset of 2' may be used. In areas with curbs, NOTE:
Post
See table for hole size parallel to sign face.
Field drill holes through post
Local tangent
Bottom of sign panel
X
H
H
D
H
0.75X
X
X
H
Y D
H
0.2X
0.6X
0.2X
SINGLE POST SIGN TWO POST SIGN
SIGN INSTALLATION ANGLE
POST DETAIL
D
See post detail (typ.)
Break-away holes.
S e e N o te
S e e N o te
7.
6.
5.
4.
3.
2.
1.
by the CO.
State standards may be used as an alternative if approved
See Note 4 E d g e o f tr a v e le d w a y
E d g e o f p a v e d s h o u ld e r
CL
Long side of post
D
90°
93°
In areas where lateral distance is limited, a minimum
D = Post embedment depth for average soil conditions.
Select post lengths to fit field conditions.
H1 and H2 = Overall post length.
per post.
In pedestrian locations, or in areas with obstructed views, the curb may be used.
FR-2922
SCALE IN MILES
N
REF-2
CLOSED
ROAD
500 FT
CLOSED
ROAD
1000 FT
CLOSED
ROAD
500 FT
CLOSED
ROAD
1000 FT
W20-3
W20-3
FR - 2922
F R
PLAN
ROAD CLOSURE
TEMPORARY W20-3
W20-3
END PROJECT
FS ERFO 151-2101
104+66
BEGIN PROJECT
FS ERFO 151-2101
100+00
G.4
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 n d .d g n
WA FS ERFO 151-2101
A p r il
H a r r is
B e lg a
C h e c k e d b y
D e s ig n e d b y
Type 3 Barricade
Place "Road Closed" sign E.F Calawah Bridge
Type 3 Barricade
Place "Road Closed" sign
Waste Area
File details come from the government source that posted it. Updated .