PROJECT_DESCRIPTION_FDR_2922_Repair.pdf

PDF 19 KB Posted

Attached to
WA FS ERFO 151-2101, FDR 2922 Repair
Solicitation number
DTFH70-16-B-00016
Issued by

View the file

Other files

File Type Posted
BidSum_FDR.pdf PDF
A004_WA_FS_ERFO_151-2101.pdf PDF
Q A_0622.pdf PDF
A003.pdf PDF
A002___WA_FS_ERFO_151-2101.pdf PDF
Q A_0616.pdf PDF
A001_WA_FS_ERFO_151-2101.pdf PDF
Plan_Request_for_Internet_FDR_2922_REPAIR.pdf PDF
WA_FS_ERFO_151-2101_Plans.pdf PDF
wa-fs-erfo1512101_Earthwork.pdf PDF
IFB_FDR_2922_REPAIR.pdf PDF
wa-fs-erfo1512101_XS.pdf PDF
GM18-16_WA_FS_ERFO_151-2101_FDR_2922_Geotechnical_Recommendations.pdf PDF
SWPPP_FDR_2922_Repair _WA_FS_ERFO_151-2101.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WA FS ERFO 151-2101, FDR 2922 Repair, Clallam County, Washington

The work consists of culvert replacement, grading aggregate surfacing and other small items of work.

Project length: .075 Miles

Tentative Fixed Completion Date: Fall 2016 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Estimated Price Range: $500 to $1 million

Location: 15 Miles NE of Forks, Washington

DESCRIPTION OF WORK in US CUSTOMARY UNITS

FP-14

O ne

S ch ed ul e A

DIVISION 150 – Project Requirements UNITS QTY.

151 Mobilization Yes 152 Construction Survey & Staking (yes/no) Yes 153 Contractor Quality Control and Assurance

(yes/no) Yes 154 Contractor Sampling & Testing (yes/no) Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes 157 Soil Erosion & Sediment Control (erosion control devices) Temporary Diversion Channel LPSM 1 157 Soil Erosion & Sediment Control (erosion control devices) Silt Fence LNFT 300 157 Soil Erosion & Sediment Control (erosion control devices) Fiber Roll LNFT 1700 157 Soil Erosion & Sediment Control (erosion control devices) Check Dam EACH 8 DIVISION 200 – Earthwork UNITS QTY.

201 Clearing & Grubbing LPSM 1 203 Removal of Pipe culvert EACH 2 204 Select borrow, Government Provided TON 11250 204 Select Borrow TON 550 207 Earthwork Geosynthetic SQYD 7800

O ne

S ch ed ul e A

DIVISION 250 – Slope Reinforcement and Retaining Walls UNITS QTY.

251 Riprap CUYD 1550 DIVISION 300 – Aggregate and Base Courses 302 Minor Crushed Aggregate TON 320 DIVISION 600 – Incidental Construction UNITS QTY.

602 Culverts & Drains (indicate one or both) LPSM 1 606 Spillway Assembly EACH 1 622 Rental Equipment (yes/no) Yes 623 General Labor (yes/no) Yes 625 Turf Establishment (indicate seeding or mulching separately) ACRE 0.6 625 Seeding, Hydraulic Method ACRE 0.6 625 Mulching, Hydraulic Method ACRE 0.6 629 Rolled Erosion Control Products & Cellular Confinement Systems (turf establishment) SQYD 2700 635 Temporary Traffic Control – Construction Sign SQFT 72 635 Temporary Traffic Control – Type 3 Barricade EACH 4

File details come from the government source that posted it. Updated .