INDEX TO SHEETS
A.2
STATE PROJECT
NUMBER
SHEET
I n t_ ft
D c m y fi le s p w p r o d u c ti o n d o r b m e d a b .d g n
OR
BLM ERFO 151-3204
BLM MED 2015(1)
P
M
F e b r u a r y
C h e c k e d b y
D e s ig n e d b y
INDEX TO SHEETS INDEX TO SHEETS
F. EROSION CONTROL (QCCR)
E. DRAINAGE (QCCR)
D. PLAN-PROFILE (QCCR)
C. TYPICAL SECTION (QCCR)
B. SUMMARIES
A. GENERAL INFORMATION
STD. DRWG. 157-1, SILT FENCE DETAILS
ON SLOPE
ROLLED EROSION CONTROL PRODUCT
SEDIMENT WATTLE DETAILS
CONTROL PLAN
QUARTZ CREEK TEMPORARY EROSION
CONTROL PLAN
QUARTZ CREEK PERMANENT EROSION
TABULATION OF QUANTITIES
ROCK WEIR DETAIL
SILL DETAIL
METAL PIPE CULVERT SEDIMENT RETENTION
(WITH SEDIMENT RETENTION SILLS)
SIMULATED STREAM CULVERT TREATMENT
RIPRAP HEADWALL & PIPE BEVEL DETAILS
STANDARD DRAWINGS
PLAN AND PROFILE
QUARTZ CREEK CULVERT REPLACEMENT
TABULATION OF DRAINAGE QUANTITIES
SURVEY CONTROL (QCCR)
ROADWAY DETAILS
ROADWAY PLAN AND PROFILE
TYPICAL SECTION
SUMMARY OF QUANTITIES
VICINITY MAP
PLAN SYMBOLS AND ABBREVIATIONS
INDEX TO SHEETS
TITLE SHEET
F.7
F.6
F.4-5
F.3
F.2
F.1
E.9
E.8
E.7
E.6
E.3-5
E.2
E.1
D.4
D.3
D.2
D.1
C.1
B.1-2
A.4
A.3
A.2
A.1
EROSION CONTROL PLAN
QUARTZ CREEK CULVERTS ARCHES TEMPORARY
EROSION CONTROL PLAN
QUARTZ CREEK CULVERTS ARCHES PERMANENT
TABULATION OF QUANTITIES
ROCK WEIR DETAIL
SIMULATED STREAM ARCH TREATMENT
ARCH RIPRAP END TREATMENT DETAILS
DETAILS
CONCRETE HEADWALL & WINGWALL RIPRAP
CONCRETE HEADWALL & WINGWALL DETAILS
ARCH DETAILS
PROFILE
QUARTZ CREEK CULVERTS ARCH 2 PLAN AND
PROFILE
QUANTZ CREEK CULVERTS ARCH 1 PLAN AND
TABULATION OF QUANTITIES
SURVEY CONTROL (QCC)
PLAN AND PROFILE
PLAN AND PROFILE
TABULATION OF QUANTITIES
TYPICAL SECTIONS
WOOD POST
CONSTRUCTION SIGNS, INSTALLATION
CLOSURE DETAILS
TEMPORARY TRAFFIC CONTROL ROAD
CLOSURE PLAN
TEMPORARY TRAFFIC CONTROL ROAD
TABULATION OF QUANTITIES
K.3
K.2
K.1
J.9
J.8
J.7
J.6
J.5
J.4
J.3
J.2
J.1
I.4
I.3
I.2
I.1
H.1
G.4
G.3
G.2
G.1
K. EROSION CONTROL (QCC)
J. DRAINAGE (QCC)
I. PLAN - PROFILE (QCC)
H. TYPICAL SECTION (QCC)
G. TEMPORARY TRAFFIC CONTROL PLAN
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 11/2001
REVISED: 9/2005 1/2007 10/2009 10/2014
W101-1
AND ABBREVIATIONS
PLAN SYMBOLS
A a r c h
U
S C m y fi le s p w p r o d u c ti o n d o r b m e d a c .d g n
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
STATE PROJECT
NUMBER
SHEET
A.3
BLM ERFO 151-3204
BLM MED 2015(1)
OR
BH
CP GPS
JH
TP
DI
36 31
6 1
36 31
6 1
SEC.
SEC.
EL. 1234.56
N
E
RIP
G G
W W
DI
T T
NO SCALE
- no symbol -wall face
N
W west drwg(s).
dist.
diaph.
diag.
dia.
DHV
D exp. jt.
exc.
EW
ER
EQ or eq.
EP
emb.
elev.
El. 94.16 ft e
E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east drawing(s) distance diaphragm diagonal diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge)
HW
hex.
hdwl.
high water hexagon headwall ftg.
ft3 ft2 flg.
fin.
footing cubic foot (feet) square foot flange finish jt.
ID
joint inside diameter
LW
lt. or LT
Ls
LPSM
long.
LNFT
lat.
lam.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve
NC
N normal crown north
OG
OD
o. to o.
o. c.
original ground outside diameter out to out on center pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W
R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed yd3 yd2 cubic yard(s) square yard sym.
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sec.
SC
SADT
S symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
monument minimum thousand gallon maximum material
NOTE:
on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend 1.
Property Line w/Found Property Corner
Section Corner (Found, Projected)16
Section Line16
Section Corner (Found, Projected)4
Section Line4
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
Trail
Lake, Pond or Reservoir; Marshland
Spring or Seep
Material Source; Bore Hole; Test Pit
Section Line
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Section Corner (Found, Projected)
Large Creek or River
Spot Elevation; Coordinate Grid Tick
Above Ground Tank; Underground Tank
Treeline; Individual Trees
Boulder; Well; Satellite Dish; Grave
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
Silt Fence
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
BLM Lands Boundary
Railroad
Intermittent Drainage or Small Creek
Control Point (Terrestrial and GPS); Jump Hub θs Ø
∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.
AH
ADT
abut.
bearing bridge balance point bench mark back brg.
br.
BP
BM
BK
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center mile post main line
M.P.
M.L.
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use, EXISTING PROPOSED
Transition
Toe of Fill
Top of Cut
CL
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Concrete Barrier
Slope Stake Limits
Pipe Culvert with Drop Inlet
Box Culvert
Delineators
Underground Utilities
Overhead/Above Ground Utilities
Signs (single, double post; portable)
Miscellaneous Utility Features
Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
Fiber Roll or Wattle
VICINITY MAP
R o a d
N
A.4
STATE PROJECT
NUMBER
SHEET
a r c h
I n t_ ft m y fi le s p w p r o d u c ti o n d o r b m e d a d .d g n
OR
BLM ERFO 151-3204
C h e c k e d b y
D e s ig n e d b y
SCALE IN MILES
1 0 2
Quarry and Disposal Site
Optional Material Source
MP 0.5
Q ua rt z
C r e e k m ile s
H o g C re e k b o a t ra m p
T o w a te r so u rc e a t
BLM 35-6-8
BLM 34-6-30
BLM 35-6-8
BLM 35-6-8
BLM 34-7-26
BLM 34-7-25.5
BLM 34-7-25.2
k e er
C d e m a n n U
23 24 19
181314 keer
C ts a
E moT ke er
C zt r a u Q k e er
C ztr a u Q k e er C go H at MP 0.1 on BLM 34-7-26
Optional Tree Disposal Site
QUARTZ CREEK
CULVERT REPLACEMENT (QCCR)
QUARTZ CREEK CULVERTS (QCC)
Sheet and Description
Section C Section D Section E Section F Section G Section H Section I Section J Section K
Typical Section
(QCCR)
Plan & Profile
(QCCR)
Drainage
(QCCR)
Erosion Control
(QCCR)
Temporary Traffic
Control Plan
Typical Section
(QCC)
Plan and Profile
(QCC)
Drainage
(QCC)
Erosion Control (QCC) ALLOWANCE Bid
Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND
STAKING LPSM ALL
A0060 15301-0010 CONTRACTOR QUALITY CONTROL
AND ASSURANCE LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15701-0000 SOIL EROSION CONTROL(QCC) LPSM ALL
A0140 15702-1000 SOIL EROSION CONTROL,
TEMPORARY DIVERSION
CHANNEL(QCCR) LPSM ALL
A0160 15702-1000 SOIL EROSION CONTROL,
TEMPORARY DIVERSION
CHANNEL(QCC) LPSM ALL
A0180 15705-0100 SOIL EROSION CONTROL, SILT
FENCE LNFT 336 336
A0200 15705-1400 SOIL EROSION CONTROL,
SEDIMENT LOG LNFT 510 510
A0220 15706-0200 SOIL EROSION CONTROL, CHECK
DAM EACH 26 26
A0240 20102-0000 CLEARING AND GRUBBING(QCC) LPSM ALL
A0260 20102-0000 CLEARING AND GRUBBING(QCCR) LPSM ALL
A0280 20301-1900 REMOVAL OF PIPE CULVERT EACH 1 2 3
A0300 20401-0000 ROADWAY EXCAVATION CUYD 395 248 50 693
A0320 20403-0000 UNCLASSIFIED BORROW See Footnote on
CUYD 500 500 Sheet D.1
A0340 20466-0000 CONSERVE AND STOCKPILE TOPSOIL CUYD 308 245 553
A0360 20701-0900 EARTHWORK GEOTEXTILE, TYPE
II-C SQYD 38 360 12 410
A0380 25101-2000 PLACED RIPRAP, CLASS 2(DITCH
TREATMENT) CUYD 14 50 6 70
A0400 25101-5000 PLACED RIPRAP, CLASS 5(RIPRAP
EMBANKMENT) CUYD 555 15 570
A0420 25101-5000 PLACED RIPRAP, CLASS 5(RIPRAP
END TREATMENT) CUYD 115 250 365
A0440 30802-2000 ROADWAY AGGREGATE, METHOD 2,
BASE GRADING C TON 605 635 80 1,320
A0460 30802-2000 ROADWAY AGGREGATE, METHOD 2,
SURFACE COURSE TON 274 168 40 482
A0480 40401-0000 MINOR HOT ASPHALT CONCRETE TON 105 5 110
3- M ar -2
6:
P M c:
\m yf ile s\ pw
_p ro du ct io n\ d0
Es tim at e-
.x ls x] Sh ee t
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of
Estimated Quantity
STATE PROJECT
B.1BLM MED 2015(1)
BLM ERFO 151-3204OR
SHEET
NUMBER
Sheet and Description
Section C Section D Section E Section F Section G Section H Section I Section J Section K
Typical Section
(QCCR)
Plan & Profile
(QCCR)
Drainage
(QCCR)
Erosion Control
(QCCR)
Temporary Traffic
Control Plan
Typical Section
(QCC)
Plan and Profile
(QCC)
Drainage
(QCC)
Erosion Control (QCC) ALLOWANCE Bid
Schedule
A0500 60103-0000 CONCRETE, HEADWALL EACH 1 1
A0520 60201-2500 144-INCH PIPE CULVERT LNFT 122 122
A0540 60304-0000 STRUCTURAL PLATE ARCH LNFT 180 180
A0560 62201-0350 BACKHOE HOUR 16 16
A0580 62201-3000 HYDRAULIC EXCAVATOR HOUR 16 16
A0600 62201-3750 CHAIN SAW HOUR 4 4
A0620 62301-0000 GENERAL LABOR HOUR 40 40
A0640 62407-0000 PLACING CONSERVED TOPSOIL CUYD 308 245 553
A0660 62503-0000 TURF ESTABLISHMENT SLRY 3 2 5
A0680 62901-0000 ROLLED EROSION CONTROL
PRODUCT, TYPE 4 SQYD 130 1,125 45 1,300
A0700 63502-0600 TEMPORARY TRAFFIC CONTROL,
BARRICADE TYPE 3 EACH 8 8
A0720 63504-1000 TEMPORARY TRAFFIC CONTROL,
CONSTRUCTION SIGN SQFT 134 20 154
A0740 64703-3010 MITIGATION, ROCK WEIR EACH 4 4
A0760 64703-6000 MITIGATION, FISH PASSAGE
BOULDER EACH 15 22 3 40
A0780 64704-1000 MITIGATION, STREAMBED MATERIAL CUYD 390 500 40 930
A0800 64704-1600 MITIGATION, STREAMBED CHANNEL
RECONSTRUCTION CUYD 325 250 25 600
Estimated Quantities
Remarks and/or Determination of
Estimated Quantity
3- M ar -2
6:
P M c:
\m yf ile s\ pw
_p ro du ct io n\ d0
Es tim at e-
.x ls x] Sh ee t
(2
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B.2BLM MED 2015(1)
BLM ERFO 151-3204OR
Varies
17+75 TO 23+10
MAINLINE TYPICAL
TYPICAL SECTION
Cross-slope (See Table 2)Cross-slope (See Table 2) Varies
Va rie s
QUARTZ CREEK CULVERT REPLACEMENT
(See Table 1 and Note 1)
Varies
C.1
STATE PROJECT
NUMBER
SHEET
a r c h
U
S I n t2
D c m y fi le s p w p r o d u c ti o n d o r b m e d c b .d g n
OR
C h e c k e d b y
D e s ig n e d b y
NO SCALE
FOOTNOTE:
Traveled way
Existing ground
LC
8" compacted depthgrading C, base course, method 2, Roadway aggregate, surface course, 4" compacted depth
Roadway aggregate, method 2, Cross Sections.
Construct culvert fill or daylight to existing ground as shown in
Ditch typcial is not applicable from 20+50 to 21+20.
slope variation.
See Cross Sections and Slope Staking Notes for shoulder
Profile grade
NOTE:
1.
Construct new road to match existing roadway width.
The variable width is designed to match existing roadway width.
D.1
STATE PROJECT
NUMBER
SHEET
U
S I n t2
D c m y fi le s p w p r o d u c ti o n d o r b m e d fa .d g n
OR
BLM ERFO 151-3204
BLM MED 2015(1)
M a r c h
C h e c k e d b y
D e s ig n e d b y
FOOTNOTE:
by the CO.
unsuitable material is found during excavation. If needed, used as directed Unclassified item is assumed quantity. It is intended to be used if
GPS
GPS
CP
P V I
Flow
Curve 1 Curve 2
C u r v e
Curve 4
CUYD
EXC.
CUYD
EMB.
22+0021+0020+0019+0018+00
1600 1600
1620 1620
1640 1640
1660 1660
1680 1680
1700 1700
D.2
STATE PROJECT
NUMBER
SHEET
M a r c h
I n t_ ft m y fi le s p w p r o d u c ti o n d o r b m e d fb .d g n
OR
C h e c k e d b y
D e s ig n e d b y
17+40 23+4023+00
P O
T
.0
P C
.5
P T
.8
P C
.6
P T
.7
P C
.4
PT
.3
PC
.8
P T
.4
P C
.4
0 1
21+00
1620 1620
1625 1625
1640 1640
,6
.5
,6
.7
-5.2365%
+9.1362%130' VC
K = 9
Existing ground
BEGIN PROJECT
17+75.00
END PROJECT
23+10
END PROJECT
23+10
See E Sheets for details
Install 144" culvert.
Line to be constructed
See E Sheets for details
Install 144" culvert.
20+93.19
El=1668.875
E=4121332.25
N=351670.44
Remove existing 36" culvert
20+94.37
NOTE:
Remove existing 36" culvert
SCALE IN FEET
0 20 40 6020
See Sheet D.3 for details
(riprap embankment), Placed riprap, class 5
Unnamed Creek Centerline
1.
Edge of existing road
Profile grade at centerline
El=1665.27
E=4121511.34
N=351808.61
Clearing limits
Clearing limits
Clearing limits for riprap footing detail
See Sheet D.3 for riprap footing detail
See Sheet D.3
Offset= 57.0 RT
Sta.= 21+03
Offset= 12 LT Sta.= 20+45
Offset= 33.0 LT Sta.= 20+45
Offset= 40.5 LT
Sta.= 19+55
Offset= 15.5 LT
Sta.= 21+40Offset= 43.5 LT
Sta.= 22+00 Offset= 33.8 LT
Sta.= 21+40 staging alignment
Optional construction and details
See Section E for quantity
(riprap end treatment).
Placed riprap, class 5
See Sheet D.3 for details
(riprap embankment).
Placed riprap, class 5
Offset= 47.5 RT
Sta.= 20+76 for quantity and details
See Section E
(riprap end treatment), Placed riprap, class 5
OR BLM MED 2015(1)
OR BLM MED 2015(1)
OR BLM MED 2015(1)
El=1668.875
E=4121332.25
N=351670.44 limits based on alternative construction staging.
The contractor may propose reducing the construction limits shown on cross sections.
Clearing limits shown are 5 feet beyond excavation culvert excavation access alignment as shown.
Road work construction limits are based on class 2. See Sheet D.3 for detail
Placed riprap ditch, 5' width
20+48 to 20+76 RT, (50 ft long) for roadway width variation
See Sheet C.1 Table 1
Proposed edge of road.
staging alignment construction
Optional Offset= 57.0 RT
Sta.= 20+88
Offset= 57.0 RT
Sta.= 20+82
Offset= 67.0 LT
Sta.= 21+03
Offset= 63 LT
Sta.= 19+57
Slope stake limits
ROADWAY DETAILS
NO SCALE
Vari able
Variable
V ar ie s 1V :1 .2 5H t o 1V :1 .5
H
V ar ie s 1V :1 .2 5H t o 1V :1 .5
H
20+45 to 21+40 LT
V aries 1V
:1.25H to 1V
:1.5H
21+40 to 22+00 LT
19+55 to 20+45 LT 20+76 to 21+03 RT
D.3
STATE PROJECT
NUMBER
SHEET
e b r u a r y
I n t_ ft m y fi le s p w p r o d u c ti o n d o r b m e d fc .d g n
OR
C h e c k e d b y
D e s ig n e d b y
Ditch invert
Riprap ditch, class 2
RIPRAP DITCH
Proposed road
Proposed channel flowline
RIPRAP EMBANKMENT DETAIL
(riprap embankment)
Placed riprap, class 5, Elev. 1635
Proposed road
Proposed channel flowline
Elev. 1650
RIPRAP EMBANKMENT DETAIL
(riprap embankment)
Placed riprap, class 5, Elev. 1635
Existing ground
Proposed channel flowline
Proposed road
RIPRAP EMBANKMENT DETAIL
.5
.5
See riprap footing detail
See riparap footing detail
See riprap footing detail
.5
.5
.5
(riprap embankment)
Placed riprap,class 5, RIPRAP FOOTING DETAIL
FOOTNOTE:
1 See Sheet D.2 and Sheet I.3 for width info.
STATE PLANE COORDINATES GEO COORDINATES
POINT
NUMBER NORTH EAST ELEVATION LATITUDE LONGITUDE ELLIPSOID
HEIGHT
COMBINED
FACTOR DESCRIPTION NOTE:
8000 351851.697 4121325.368 1653.810 42°35'35.392229"N 123°28'17.103757"W 1574.7352 0.99986944 Iron Rod w/2.5" alum cap marked 14117 1.
8001 351742.828 4121271.589 1659.600 42°35'34.298609"N 123°28'17.770676"W 1580.5219 0.99986921 Iron Rod w/2.5" alum cap marked 14118
8003 351844.085 4121208.740 1650.576 42°35'35.276213"N 123°28'18.658442"W 1571.5012 0.9998696 1/2" IR w/WSI CC
8004 351840.289 4121227.282 1650.287 42°35'35.245234"N 123°28'18.408897"W 1571.2122 0.99986961 1/2" IR w/WSI CC
8258 351706.773 4121316.857 1664.827 42°35'33.958534"N 123°28'17.148742"W 1585.7456 0.99986898 Hub and Tack
8263 351911.619 4121031.950 1631.242 42°35'35.880951"N 123°28'21.052617"W 1552.1705 0.99987049 Hub and Tack
PROJECT :Quartz Creek Culvert Repairs DATE OF FIELD WORK : September 2014
PROJECT UNITS : International Foot COORDINATE SYSTEM : Oregon South SPCS NAD83 (2011)
EPOCH DATE : 2010.0000
VERTICAL DATUM : Orthometric Elevations Based on the NAVD88 GEOID 12a
To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.
c:
\m yf ile s\ pw
_p ro du ct io n\ d0
Q ua rt z_ C on tr ol
_S he et .x ls x]
Sh ee t 2-
M ar
-2
4:
P
M W hi te
S hi el d
In c
W
FL
H D
S ur ve y
D es ig ne d by
C he ck ed b y:
STATE PROJECT
D.4
SHEET
NUMBER
BLM MED 2015(1)OR
SURVEY CONTROL (QCCR)
10.4 x 16 20301 -1900
20701 -0900
25101 -5000
60201 -2500
64703 -6000
64704 -1000
64704 -1600
Station
ES
TI
M
A
TE
D M
A X
IM
U M
C O
V
ER
S
TR
U C
TU
R A L
EX
C A V A
TI
O N
R
EM
O V A L
O F
PI
PE
C U
LV
ER
T
EA
R
TH
W O
R K G
EO
TE
X
TI
LE
TY
PE
II
-C
PL
A C
ED
R
IP
R A P, C
LA
S S
4-
IN
C
H P
IP
E
C U
LV
ER
T
M
IT
IG
A
TI
O N
FI
S H
P A S S A G
E B O
U
LD
ER
M
IT
IG
A
TI
O N
S
TR
EA
M
B
ED
TE
R
IA
L
M
IT
IG
A
TI
O N
S
TR
EA
M
H
A N
N
EL
R
EC
O N
S
TR
U C
TI
O N
S K
EW
A N
G
LE
REMARKS
See below for numbered notes
FEET CUYD EACH SQYD CUYD LNFT EACH CUYD CUYD
20+94 26 3000 1 38 115 122 15 390 325 1.5° 1
PROJECT TOTAL 3000 1 38 115 122 15 390 325
NOTE:
1. See Sheet E.2 for culvert design information
PAY ITEM NUMBER
TABULATION OF DRAINAGE QUANTITIES
c:
\m yf ile s\ pw _p ro du ct io n\ d0
D ra in ag e-
FP
_Q ua rt z C re ek .x ls x]
S he et 3-
M ar
-2
5:
P
M T.
P ha n
/2
D
C he ck er
/2
D es ig ne d by
C he ck ed b y:
STATE PROJECT
E.1
SHEET
NUMBER
BLM MED 2015 (1)
BLM ERFO 151-3204OR
Note: The quantities shown hereon are approximate and are subject to field adjustments.
E.2
NUMBER
SHEET
OR
BLM ERFO 151-3204
BLM MED 2015 (1)
D A
T E
P
A T h e c k e d b y
J
N e ig h o r n e s ig n e d b y
PLAN & PROFILE
REPLACEMENT
QUARTZ CREEK CULVERT
LC
SCALE IN FEET
10 0 10 20 30 40
OUTLETINLETPIPEHYDRAULIC INFORMATION
0 20 40 60 8020406080
LC
FOOTNOTE:
RIPRAPHEADWALL:
LENGTH: 122 ft
PIPE SLOPE: 0.070 ft/ft
WALL THICKNESS: 0.138 in
HEADWALL: RIPRAP
FLOWLINE SLOPE: 0.070 ft/ft
:1
:1
BEVEL: STEP, 1.5(h):1(v) BEVEL: STEP, 1.5(h):1(v)
N
100 120100120140
BANKFULL CHANNEL WIDTH: 8 ft
Flow
Slope 7.0%
SPAN: 12.0 ft riprap end treatment
Placed riprap, class 5, riprap end treatment
Placed riprap, class 5, riprap end treatment
Placed riprap, class 5, RISE: 12.0 ft
LOWER BEVEL HEIGHT: 3.0 ft
BURIAL DEPTH: 5.5 ft BURIAL DEPTH: 5.5 ft
LOWER BEVEL HEIGHT: 3.0 ft riprap end treatment
Placed riprap, class 5, Flow
Q : 57.7 CFS
Q : 142 CFS
Q : 159 CFS
INV N/E/EL: 4121279.33/351811.57/1607.45'HW : 1623.46 ft
4121166.52/351858.02/1615.99'INV N/E/EL:
centerline
New culvert
Existing ground
Proposed channel flowline bottom
Construct channel
Proposed channel flowline
Sta. 20+94.33, 56.62 RT
Sta. 20+14.35, 63.76 LT
36" dia. culvert
Remove existing
36" dia. culvert
Remove existing sills. See Sheet E.8
Sediment retention
HW : 1623.64 ft
TYPE: Metal Round Pipe
Rock weir per Sheet E.9 (typ.)
8' (typ.)
See Sheet E.6 for Riprap End Treatment Details.
See Sheet E.9 for placement details.
Rock weirs not shown on this plan view.
NOTE:
1.
fish passage boulders per detail Sheet E.7
Backfill with streambed material and
Proposed roadway
Proposed roadway
Clearing limits
Cre ek
(See cross sections for info.)
Proposed road grade
MATERIAL: Aluminized, Type 2 Helical
See Sheet D.1 for quantity riprap embankment
Placed riprap, class 5, (See Sheet D.1 for quantity) riprap embankment
Placed riprap, class 5, (See Sheet D.1 for quantity) riprap embankment
Placed riprap, class 5, (See Sheet D.1 for quantity) riprap embankment
Placed riprap, class 5, (see Sheet E.6 for details) Pipe bevel ends (typ.)
1.5° skew pipe culvert
Proposed 12' dia.
Sta. 20+93.19
STANDARD APPROVED FOR USE 12/1993
REVISED: 4/1994 6/2005
602-1
METAL PIPE CULVERT
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS 5" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
5" x 1" CORRUGATIONS3" x 1" CORRUGATIONS" CORRUGATIONS2 1" x 3
METAL THICKNESS (INCH/GAGE)
0.064/160.079/140.109/120.138/10 0.168/8 0.064/160.079/140.109/120.138/10 0.168/8 0.064/160.079/140.109/120.138/10 0.168/8 0.060/160.075/140.105/120.135/10 0.164/8 0.060/160.075/140.105/120.135/10 0.164/8
0.060/160.075/140.105/120.135/100.060/160.075/140.105/120.135/100.064/160.079/140.109/120.138/10 0.168/8 0.079/140.109/120.138/10 0.168/8 0.079/140.109/120.138/10 0.168/8
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET) MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)
142 x 91
137 x 87
128 x 83
117 x 79
112 x 75
103 x 71
95 x 67
87 x 63
83 x 57
81 x 59
77 x 52
73 x 55
71 x 47
66 x 51
64 x 43
60 x 46
57 x 38
49 x 33
42 x 29
35 x 24
28 x 20
24 x 18
21 x 15
17 x 13
3.5
103 x 71
95 x 67
87 x 63
81 x 59
73 x 55
66 x 51
64 x 43
60 x 46
57 x 38
49 x 33
42 x 29
35 x 24
28 x 20
24 x 18
21 x 15
17 x 13
3.5
INCHESINCHES INCHESINCHES
INCHESINCHESINCHESINCHESINCHESINCHESINCHESINCHES
Fill heights exceeding 100 feet require
STATE PROJECT
NUMBER
SHEET
E.3
FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY STANDARD
STANDARD
N o v e m b e r
U m y fi le s p w p r o d u c ti o n d o r b m e d e c .d g n
BLM ERFO 151-3204
BLM MED 2015(1)
ORMETAL ROUND PIPE CULVERT
METAL PIPE ARCH CULVERT
FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT
FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT
STEEL ALUMINUM
DIAMETER
VALENT
EQUI-
RADIUS
CORNER
MINIMUM
COVER
MINIMUM
SPAN x RISE
SIZE
PIPE ARCH
SIZE
PIPE ARCH
SPAN x RISE DIAMETER
VALENT
EQUI-
RADIUS
CORNER
MINIMUM
COVER
MINIMUM
COVER
MINIMUM
DIAMETER
SIZE
PIPE
SIZE
PIPE
DIAMETER COVER
MINIMUM
ALUMINUMSTEEL
NO SCALE
of camber or increase the pipe culvert gradient.
elevation of the inlet invert, reduce the amount parabolic curve as designed exceeds the curve. If the midpoint elevation on the pipe length. Develop camber on a parabolic inverts an ordinate amount equal to 1% of the from a chord through the inlet and outlet
When directed, camber pipe culverts upward
4.
3.
2.
1.
NOTE:
pavement for both flexible and rigid pavement.
from the top of the pipe to the top of the rigid pavements. Measure maximum fill height pavements, and to the top of the pavement for pipe culvert to the subgrade for flexible
Measure minimum cover from the top of the corrugation pipe.
Obtain approval before furnishing annular of helical lockseam and welded seam pipe.
corrugations are more restrictive than those
Fill heights for culvert pipe with annular lockseam and welded seam pipe only.
The fill heights in the table are for helical special analysis by the CO.
REVISED: 4/1994 6/2005
602-2
COUPLING BAND
METAL PIPE CULVERT
MINIMUM BAND WIDTH (INCHES)
1 x 2
1 x 3
3 x 1
5 x 1 78 to 144
36 to 72
78 to 144
36 to 72
78 to 84
42 to 72
12 to 36
87 x 64 to 142 x 91
60 x 46 to 81 x 59
87 x 64 to 142 x 91
60 x 46 to 81 x 59
49 x 33 to 83 x 57
17 x 13 to 42 x 29
10.5
10.5
10.5
10.5
10.5
10.5
10.5
INCHESINCHESINCHES
" for 18" round culvert (21" x 15" pipe arch) or less8
" for 21" round culvert (24" x 18" pipe arch) or more2
" corrugations. A 12 inch band is acceptable on pipe ends 2 1" x 3
2ends rerolled with 2
" corrugations on rerolled pipe ends.2 1" x 3
STATE PROJECT
NUMBER
SHEET
E.4
FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY STANDARD
STANDARD
N o v e m b e r
U m y fi le s p w p r o d u c ti o n d o r b m e d e d .d g n
BLM ERFO 151-3204
BLM MED 2015(1)
OR
DIAMETER
ROUND PIPE
SPAN x RISE
PIPE ARCH
BANDS
CORRUGATED
ANNULAR
BANDS
CORRUGATED
HELICALLY
BANDS
CORRUGATED
SEMI-
SIZE
CORRUGATION
underdrain
COUPLING BANDS FOR METAL PIPE CULVERT
NO SCALE
Use annular corrugated bands with pipes having annular corrugations or with helical pipe dimension of the end corrugation in the pipe.
For helically corrugated pipe with rerolled ends, the nominal corrugations size refers to the
Use helical corrugated bands with pipes having helically corrugated ends.
as the connecting pipe. Provide coupling bands not more than 3 nominal sheet thicknesses
Fabricate annular, helical and semi-corrugated type coupling bands from the same metal
Second angle connection optional Second angle connection optional having rerolled end to form annular corrugations. A 10.5 inch band is acceptable on pipe rerolled with 3" x 1" pipe corrugations.
The minimum band widths shown for 3" x 1" and 5" x 1" corrugated sizes apply to steel, or 0.036 inch for aluminum, or a plastic with an equivalent strength to metal.
less. Use a matching metal having a nominal thickness of not less than 0.040 inch for
Smooth sleeve-type couplers and flat bands may be used for pipe diameters of 12" or
42" diameter to 42" diameter, required above
42" diameter to 42" diameter, required above steel or 0.048 inch for aluminum. Fasten coupling bands with the following diameter of bolt:
thinner than the thickness of the pipe to be connected, and no thinner than 0.052 inch for
2.
1.
SMOOTH SLEEVE BAND FLAT BAND
SEMI-CORRUGATED BAND
HELICAL BANDANNULAR BANDSTANDARD BAND CONNECTIONS
SLEEVE JOINT
SIDE VIEW SIDE VIEW SIDE VIEW
END VIEW
END VIEWEND VIEW
Oval Lug
Band Angle
Bar & Strap
Integral Flange Wedge and Strap
Stab type joint
Smoother sleeve with center stop.
NOTE:
W
W W W
Band Band
Band corrugation in pipe end with second annular around band meshes
Continuous corrugation
Band Bolts Band Bolts
Pipe
Band
Bolts
Angle
Pipe
BandBand
Bolts
Pipe heel and toe of angle of corrugation at fillet weld at crest
Rivet, spot weld, or
Angle
Wedge be used.
Highway Bridges, Division II Section 26 may criteria of AASHTO Standard specifications for devices that comply with the joint performance
Other types of coupling bands or fastening specified in the Special Contract Requirements.
Watertight pipe joints are not required unless
3 4 5 of corrugation at heel and toe of angle
Rivet, spot weld, or fillet weld at crest strap connector
Bolt, bar and
DRAFT: 10/2014
REVISED: 4/1994 6/2005
602-3
PIPE CULVERT BEDDING
METAL AND PLASTIC
> 54"
12" to 54"
6"
4"
48" and UP
UP to 48" 24" span or 36", STATE PROJECT
NUMBER
SHEET
E.5
FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY STANDARD
STANDARD
N o v e m b e r
U m y fi le s p w p r o d u c ti o n d o r b m e d e e .d g n
BLM ERFO 151-3204
BLM MED 2015(1)
OR
LEGEND:
BEDDING DEPTH
MINIMUM SPACING
SPACING
or SPAN
DIAMETER
PIPE SIZE (H) DEPTH
NO SCALE
or 36" (max.) for embankment installations not exceeding 6" compacted depth.
exceeding 6" compacted depth. Or lean concrete
2'-0" ±
1'-0" ±
2H or 12' (max.)2H or 12' (max.)
18" ±
18" ±18"±
18" (min.)
minimum
1'-0"
"2H or 12' (max.)2H or 12' (max.)
2H or 12' (max.)1
2H or 12' (max.)
(min.)
6"
2H or 12' (max.)
(min.)
6"
2H or 12' (max.) 2H or 12' (max.)
6" in uncompacted depth.
12" (min.), 24" (max.)
"/foot of cover,2
* Reduce to 18" for
See Section 704 for bedding and backfill requirements.
dimension of all pipe arch culverts.
H equals the diameter of all round pipe culverts or the rise amount of camber or increase the pipe culvert gradient.
designed exceeds the elevation of the inlet invert, reduce the curve. If the midpoint elevation on the parabolic curve as to 1% of the pipe length. Develop camber on a parabolic through the inlet and outlet inverts an ordinate amount equal
When directed, camber pipe culverts upward from a chord
3.
2.
1.
be adjusted to tie into impervious material.
granular material is used for backfill. Width may material at the pipe culvert inlet where
Construct piping plug of impermeable backfill
MULTIPLE PIPE INSTALLATION
PIPING PLUG
TRENCH EXCAVATION IN EMBANKMENT
BELOW NATURAL GROUND OR
ON UNSTABLE MATERIAL
NATURAL GROUND
ABOVE AND BELOW
ON NATURAL GROUND
ABOVE NATURAL GROUND
ON UNYIELDING MATERIAL
PIPE BEDDING
ELEVATION
SECTION A-A
Bedding material (uncompacted)
Impermeable backfill material.
Roadway embankment Roadway embankment
Natural ground
Toe plate Toe plate
Natural ground Natural ground
Roadway embankment
Roadway excavation
Natural ground
NOTE:
H H or Span
Diameter or Span
Diameter
H
Width
(see table)
Minimum spacing
H H
H H
H H
H H
H
H
H H
Finished subgrade Finished subgrade
Natural ground section
Metal end
Finished subgrade
Pipe culvert
Embankment slope
High water elevation treatment
Culvert end
Piping plug before trench excavation embankment height
Finished subgrade or
Original natural ground surface
A
A
Finished subgrade
Roadway embankment
Metal end section
Roadway embankment
Finished subgrade compact in layers not over compressible material. Lightly and replace with selected fine
Remove unyielding material trench excavations
Embankment material placed in layers
Compacted backfill material placed in layers not backfill in accordance with Section 614.
whichever is less fill material properly compacted with approved granular foundation firm bearing soil and replace
Remove unstable material to
Bedding
Bedding
Bedding
Bedding depth table
See bedding excavation in trench
Half diameter or
HH
o p la n s w h e r e s h o w n e m b a n k m e n t
E.6
STATE PROJECT
NUMBER
SHEET
J a n u a r y
I n t_ ft m y fi le s p w p r o d u c ti o n d o r b m e d e f.
d g n
OR
C h e c k e d b y
D e s ig n e d b y
PIPE BEVEL DETAILS
RIPRAP HEADWALL &
Sl op e
PIPE BEVEL DETAIL
SKEW ANGLE DIAGRAM
c e n te r li n e
R o a d w a y
Cu lv er t ce nt er lin e
BOP
NOTE:
FOOTNOTE:
EOP
RIPRAP END TREATMENT
Sl op e
FRONT VIEW SIDE VIEW
shown in the plans
Streambed material where shown in the plans
Streambed material where
2.
1.
.2
D o r R o r R is e
R
D ia m e te r
D
W
W2
Variable W2
V a r ia b le R is e
V a r ia b le R is e
Slope to match pipe bevel per sheet E.2
Placed riprap, class 5
Placed riprap, class 5
R ip r a p
R ip r a p e n d t r e a tm e n t embankment, beneath and at all sides of placed riprap.
Place earthwork geotextile between riprap and ground or
Contractor to field verify all invert elevations, prior to installation.
NO SCALE
" m in
Skew angle
Earthwork geotextile, type II-C
LOCATION
(ft)
D
(ft)
W
INFILL INFORMATIONAL QUANTITIES
Class C5.5
GRADATION
COBBLE
STREAMBED
(in)
BOULDER DIAMETER
FISH PASSAGE
Quartz Creek 8.0
(ft)
X
8.0
SEDIMENT RETENTION SILLS)
TREATMENT (WITH
SIMULATED STREAM CULVERT
E.7
STATE PROJECT
NUMBER
SHEET
J a n u a r y
I n t_ ft m y fi le s p w p r o d u c ti o n d o r b m e d e g .d g n
OR
C h e c k e d b y
D e s ig n e d b y
SECTION A-A
PLAN
NOTE:
FOOTNOTE:
3.
2.
1.
W
Bank stone
Streambed sediment
Streambed cobble
Channel flowline
Streambed sediment
Flow
SECTION B-B
(typ.)
36" min.
or Length on plan sheet
Streambed cobble
LC
Flow
BB
A
A side and match sediment retention sill spacing
Stagger fish boulders each
Bank stone
Channel flowline boulder
Fish passage
Round pipe culvert wall Streambed top
Round culvert
Culvert wall
Culvert outlet
Culvert outlet
4' min.
W
X (typ.)
X (typ.)
B u r ia l d e p th
D sill per detail Sheet E.8
Sediment retention
Fish passage boulder
Rock weir per detail Sheet E.9 sill per detail Sheet E.8
Sediment retention
Fish passage boulder detail Sheet E.8
Rock weir per sill per detail Sheet E.8
Sediment retention
Streambed sediment
NO SCALE
See supplemental specifications for material requirements.
18-inches or as specified on plan sheet.
dimension.
smallest 4 3Embed fish passage boulders within active channel sediment where listed in the infill quantities table.
Construct well defined banks with bank stone and streambed parabolic shape.
Slope streambed aggregate towards flowline to ensure
Stagger in-channel fish passage boulder within the culvert span.
streambed cobble, and bank stone gradations.
See supplemental specifications for streambed sediment, Mix streambed cobbles evenly throughout streambed sediment.
1/4
LOCATION (in)
B
(in)
SEDIMENT RETENTION SILLS
24 96
(no.)
Min.
SRS
1 1/4
15Quartz Creek
(in)
X
10.2
DETAILS
SEDIMENT RETENTION SILL
METAL PIPE CULVERT
E.8
STATE PROJECT
NUMBER
SHEET
J a n u a r y
I n t_ ft m y fi le s p w p r o d u c ti o n d o r b m e d e h .d g n
OR
C h e c k e d b y
D e s ig n e d b y
0.25"
DETAIL
PLATE AND CONNECTOR
NOTE:
H
Flow
LC
H B
24" typ.
Dimensions without units are inches.
locating SRS in corrugation valleys or away from plate seems.
X dimension may be varied +/- 6 inches as needed for
Apply two coats zinc paint to all welds.
Hot dip galvanized baffles and gussets.
4.
3.
2.
1.
retention sill
Top of sediment (A36 steel plate)
Sediment retention sill (SRS)
Culvert wall
(0.25" A36 steel plate)
Gussetsteel plate)
(0.25" A36
Gusset
X
Metal round pipe
NO SCALE
CROSS-SECTION
ROUND PIPE
SEDIMENT RETENTION SILLS (SRS)
LOCATION (ft)
W
(ft)
B
(ft)
Z
Quartz Creek (Inside Culvert)
Quartz Creek (Outside Culvert)
4.5
(in)
DIAMETER
FOOTER ROCK
TOP ROCK AND
(no.)
QUANTITY
ROCK WEIR
ROCK WEIR INFORMATION
DETAIL
ROCK WEIR
E.9
STATE PROJECT
NUMBER
SHEET
J a n u a r y
I n t_ ft m y fi le s p w p r o d u c ti o n d o r b m e d e i.
d g n
OR
C h e c k e d b y
D e s ig n e d b y
Dimensions not labeled are in inches.
ELEVATION
NOTE:
FOOTNOTE:
A
A
PLAN
1.
SECTION A-A
Footer rock channel
Bottom of channel
Bottom of
Top rock
Flow normal low flow
Edge of water
Footer rock water level
Ordinary high streambed material elevation or top of
Original streambed
Top rock
Top rock
F lo w water level
Ordinary high
Footer rock
Control point
W
6"
Z
D o w n s tr e a m f r o m c o n tr o l)
B B
B B
NO SCALE
3 4
3 4
1 2 1 2
3 4
Align footer rocks flush against bed retention sills inside culvert.
and stable foundation for the top rocks.
Place footer rocks close together to create a tightly packed streambed material.
Fill voids in top rock and footer rock with specified only.3 1Space top rocks in center
Orient top rocks to deflect water towards center of stream.
W3
W3 1 W3
1 W3
F.1
STATE PROJECT
NUMBER
SHEET
U
S I n t2
D c m y fi le s p w p r o d u c ti o n d o r b m e d d a .d g n
OR
BLM ERFO 151-3204
BLM MED 2015(1)
N o v e m b e r
C h e c k e d b y
D e s ig n e d b
1620162
16251625
16351635
16401640
16451645
N
CONTROL PLAN
PERMANENT EROSION
QUARTZ CREEK
F.2
STATE PROJECT
NUMBER
SHEET
e b r u a r y
I n t_ ft m y fi le s p w p r o d u c ti o n d o r b m e d d b .d g n
OR
C h e c k e d b y
D e s ig n e d b y
21+00
LEGEND:
Sediment wattle
Direction of flow arrow
Placed Riprap at culvert
Existing Contour
NOTE:
Existing Culvert
Limits of ordinary high water
3.
2.
1.
Riprap embankment
See Sheet F.5 (typ.)
installation along ditch.
Sediment wattle check dam installation. See Sheet F.4 (typ.)
Sediment wattle slope protection
See Sheet F.6 (typ.)
Slope protection erosion control blanket.
Sediment wattle check dam completed.
areas after slope shaping and finishing operations have been
Apply permanent slope protection on all bare soil and placed topsoil where construction activities have ceased.
Apply soil erosion control mulching w/in 14 days in exposed areas details.
See Sedimentation Wattle Detail drawings for location installation
Sediment wattle lines shown are for illustration only.
SCALE IN FEET
0 20 40 6020
Clearing limits inlet/outlet and ditch
Control Products), Type 4
Temporary RECP (Rolled Erosion
1620162
16251625
16351635
16401640
16451645
N
CONTROL PLAN
TEMPORARY EROSION
QUARTZ CREEK
F.3
STATE PROJECT
NUMBER
SHEET
J a n u a r y
I n t_ ft m y fi le s p w p r o d u c ti o n d o r b m e d d c .d g n
OR
C h e c k e d b y
D e s ig n e d b y
LEGEND:
Check dam
Sediment wattle
Direction of flow arrow
Existing Contour
NOTE:
Existing Culvert
Limits of ordinary high water
Silt fence
Construct temporary barrier
Ø embankment
Roadway embankment
Roadway
Silt fence. See Sheet F.7 (typ.)
Temporary diversion pipe backflow into natural channel
Construct temporary barrier to prevent
See Sheet F.5 (typ.)
installation along ditch.
Sediment wattle check dam
Temporary culvert backfill Subgrade
Natural ground
Bedding
TEMPORARY DIVERSION PIPE
SECTION
sandbags
Temporary barrier
SCALE IN FEET
0 20 40 6020
Clearing limits (typ.)
Proposed construction access
1% minimum slope piping, 30" dia. minimum
Temporary diversion
Edge of existing road method and sequence.
Modify erosion control plan and devices according to the contractor's staging
Plan presented on this Sheet is illustration for assumed construction staging.
construction for proper drainage.
Coordinate temporary access and temporary diversion piping where construction activities have ceased.
Apply soil erosion control mulching w/in 14 days in exposed areas
3.
2.
1.
SLOPE SPACING
(FT)
SPACING *
ALONG SLOPE
1:2 - 1:1
1:3 - 1:2
1:4 - 1:3
1:4 or flatter
NO SCALE
DETAILS
SEDIMENT WATTLE
BLM ERFO 151-3204
BLM MED 2015(1)
F.4
STATE PROJECT
NUMBER
SHEET
U
S C u s to m a m y fi le s p w p r o d u c ti o n d o r b m e d d d .d g n .D
G N
OR
M a y
C h e c k e d b y
D e s ig n e d b y
Sediment wattle
Sediment wattle
A
A
Flow
D ire ctio n o f R u n o ff
Stagger Joints (typ.)
Install wattles along contour uphill side of sediment wattle
Place excavated material on
Sediment wattle uphill side of sediment wattle
Place excavated material on
Toe of slope
4' max.
SLOPE PROTECTION INSTALLATION
SEDIMENT WATTLE
joints (typ.)
Tightly abut
B
B
D ire c tio n o f R u n o ff
Sediment wattle
Sediment wattleFlowC
C
NOTE:
12" min.
Slope
Slope
6.
5.
4.
3.
2.
1.
SHEET 1 OF 2
Wood stakes. See Note 6
1" x 1" or 1" Ø uphill side of sediment wattle
Place excavated material on
B
B spacing chart See wattle recommendation manufacturer's or according to
Trench 2" min.
recommendation manufacturer's or according to
Trench 2" min.
recommendation manufacturer's or according to
Trench 2" min.
12" min.
12" min.
Wood stakes. See Notes 5 & 6
1" x 1" or 1" Ø
Wood stakes. See Note 6
1" x 1" or 1" Ø
SLOPE PROTECTION INSTALLATION
ALTERNATE WATTLE JOINT DETAIL
segment.
stake on either side of the damaged area terminating the wattle crushed or damaged wattle during the installation. Place a
Expose stakes 2" min. above top of wattle. Remove and replace and space stakes at 4' max. Do not crush wattle while staking.
stakes at 6" from wattle end angles towards the adjacent wattle to prevent sediment passing through the field joint. Drive
Abut adjacent wattles tightly or overlap wattles 24" minimum to ensure containment and prevent channeling.
rather than under it. Curve terminal ends of wattles upgrade of wattle to ensure storm water is forced flow through wattle bottom and sides. Compact soil backfill against upstream side
Place sediment wattles in continuous contact with trench trenches.
obstructions to ensure wattles will have direct contact with the to water flow. Remove all rocks, clods, vegetation or other
Construct trenches along the slope contour and perpendicular up the slope per table.
Start the wattle placement at the toe of slope and then space
Table, apply spacing intervals per the steeper slope ratio given.
For slope ratios in between those shown in the Wattle Spacing
Repair any rills or gullies prior to installation.
Pay Lim its
Pay Lim its
" (m in.)
ove rlap sediment wattle
* Spacing based on 12" Ø min.
WATTLE JOINT DETAIL
SECTION A
STAKE DETAIL
SECTION B
WATTLE LAPPING DETAIL
SECTION C
Flow
PROFILE
CROSS SECTION
GRADE
DITCH
max.
SPACING (S)
SPACING*
ALONG DITCH
NO SCALE
DETAILS
SEDIMENT WATTLE
A B
7%
5%
4%
3%
2%
1%
BLM ERFO 151-3204
BLM MED 2015(1)
F.5
STATE PROJECT
NUMBER
SHEET
B .B a s e .U
S c m y fi le s p w p r o d u c ti o n d
W o r k d d .c e l
OR
M a y
C h e c k e d b y
D e s ig n e d b y
PLAN
Direction of runoff
Flow direction
INSTALLATION BEYOND TOE OF SLOPE
disturbed areas
Runoff from as specified in plans
T o e o f fi ll s lo p
3' min. or
Existing ground
Sediment wattle
Flow
PLAN
INSTALLATION ALONG DITCH
NOTE:
(FT)
Flow
Flow Line
CROSS SECTION
STAKING DETAIL
SHEET 2 OF 2
above top of wattle
Expose stakes 2" min.
2' max. between stakes
6" min. 6" min.
uphhill side of sediment wattle
Place excavated material on penetration (typ.)
1'-6" min.
Wattle
Flowline
Space check dams the same elevation
"A" and "B" are the distance apart where points between stakes 4' max.
Wooden stake (typ.)
" 4 3" x 4
Wattle flow around the ends
Curve ends upstream to prevent
4.
3.
2.
1.
Fi ll slo pe cut ends or substitue biobags.
For narrow ditches either cut wattles to fit ditch width and close at maximum space as shown.
Do not crush wattle while staking. Drive stakes at each end and
Install check dams in ditches perpendicular to the flowline.
Repair all rills or gullies prior to installation.
sediment wattle
* Spacing based on 12" Ø min.
6"
6''
ROLLED EROSION CONTROL
PRODUCT ON SLOPES
BLM ERFO 151-3204
BLM MED 2015 (1)
F.6
STATE PROJECT
NUMBER
SHEET
U
S C u s to m a m y fi le s p w p r o d u c ti o n d o r b m e d d f.
d g n .D
G N
OR
M a y
C h e c k e d b y
D e s ig n e d b y
3'
FLOW
PERSPECTIVE VIEW
NOTE:
DETAIL A
ANCHOR TRENCH
AT TOP OF SLOPE
DETAIL B
ANCHOR TRENCH
AT TOE OF SLOPE
DETAIL C
SHINGLE SPLICE
2.
1.
6" x 6" trench
Staple
Erosion control blanket
Blanket edge
Staple (typ.)
Blanket ends
Staple
6" x 6" trench
Slope stake native soil
Compacted
Toe of slope
Compacted native soil blanket control
Erosion m ax c-c
" (m a x.)
c-c
' (m ax.)
c-c
(m ax c-c
4" (min.) edge overlap
S tap le sp acin g
S ee N ote 1
12" spacing
Staples, Pr ev ail in g wi nd
Se e
Not e
Staples, 12" spacing
6" m
in. overlap
Overlap in the direction of the prevailing wind.
Install staples according to the manufacturer's recommendations.
NO SCALE
See Detail A at top of slope.
Anchor trench
Shingle splice. See Detail C
See Detail B
Anchor trench at toe of slope.
Erosion control blanket
STANDARD APPROVED FOR USE 6/2005
DRAFT: 3/2014
REVISED: 6/2007
157-1
SILT FENCE
STATE PROJECT
NUMBER
SHEET
F.7
FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY STANDARD
STANDARD
N o v e m b e r
U m y fi le s p w p r o d u c ti o n d o r b m e d d g .d g n
BLM ERFO 151-3204
BLM MED 2015(1)
OR
NO SCALE
6 ft. (max.) spacing without fence support.
10 ft. (max.) spacing with fence support.
m in m in m in min.
4"
6" min. trench
NOTE:
fo s p a c in g
S e e n o te
POST AND GEOTEXTILE INSTALLATION DETAIL
SILT FENCE INSTALLATION AT TOE OF FILL
See Note 1
SILT FENCE INSTALLATION IN A DRAINAGE DITCH
4.
3.
2.
1.
Fi ll slo pe around the end of the silt fence prevent water from flowing
Provide sufficient length to
Flow
Flow
T o e o f s lo p e
Flow
Limits of clearing
Flow
Support mesh
Backfilled and compacted soil
Steel or wood post
PLAN
ELEVATION
See Note 4 for spacing the ends.
silt fence upgrade to prevent water from running around
Install silt fence along ground contours. Curve ends of does not slide down, supporting posts.
All types must ensure silt fence remains attached to, and manufacturer's recommendations for installation procedures.
as long as specified dimensions are satisfied. Follow
Alternate preassembled silt fence options will be allowed when specified on Erosion Control Plan.
Use drainage ditch installation for low flow conditions only
(undisturbed)
Existing ground
Geotextile
QUANTITIES
TABULATION OF
G.1
STATE PROJECT
NUMBER
SHEET
U
S I n t2
D c m y fi le s p w p r o d u c ti o n d o r b m e d n a .d g n
OR
BLM ERFO 151-3204
BLM MED 2015(1)
a r c h
C h e c k e d b y
D e s ig n e d b y
NOTE:
2.
1.
information on roadway closure.
actual month and dates of roadway closure. See Subsection 156.03 for more
Fabricade and install reference signs with MMM DD - MMM DD reflecting
See Sheet G.3 for reference sign.
R o a d
BEGIN PROJECT
END PROJECT
NOTE:
CLOSED
ROAD
AHEAD
W20-3
W20-3
W20-3
CLOSED
ROAD
1000 FT
CLOSED
ROAD
500 FT
REF-1
Q ua rt z
C r e e k BLM Rd 35-6-8
ROAD CLOSURE PLAN
TRAFFIC CONTROL
TEMPORARY
23+10.00
Closed 2000 FT
17+75.00
BLM
35-6-8
8-6 -5
ML
B
CLOSED
ROAD
4 MILES
W20-3
CLOSED
ROAD
2 MILES
W20-3
OR BLM MED 2015(1)
OR BLM MED 2015(1)
d R o g u H
CLOSED
ROAD
1000 FT
W20-3
REF-2
REF-3
G.2
STATE PROJECT
NUMBER
SHEET
a r c h
U
S I n t2
D c m y fi le s p w p r o d u c ti o n d o r b m e d n b .d g n
OR
C h e c k e d b y
D e s ig n e d b y
SCALE IN MILES
1 0 2
Quarry
Hog Creek for details See Sheet G.2 Road Closed, for details
See Sheet G.3
Road closed, BLM 34-6-19.2
BLM 34-6-30
for details See Sheet G.3 Road closed, Replacement Culvert Creek Quartz
Culvert Quartz Creek
R11-2
ROAD
CLOSED
TYPE 3 BARRICADE
8 FT
REF-1
BLM Rd 35-6-8
3'-6"
31/2"
4"C
3"
4"C
31/2"
R=13/8"
TH=03/4"
IN=01/2"
BORDER
ROAD CLOSURE DETAIL
TRAFFIC CONTROL
TEMPORARY
NOTE:
5. Conform with the current M.U.T.C.D edition on all signing.
4. Use standard alphabet sizes, letter series C.
3. Sign colors are orange background with black legend and border.
2. Mount signs on wood posts. See standard 635-14.
1. Adjust location to match field conditions as approved by CO.
NO SCALE
500 FT
CLOSED
ROAD
1000 FT
CLOSED
ROAD
W20-3
W20-3
Closed 2000 FT
ROAD
CLOSED
ROAD
CLOSED
4'-0"
3" 4"C 3" 4"C 3" 4"B 3"
REF-2
4'-0"
4" 4"B 4"1
REF-3
G.3
STATE PROJECT
NUMBER
SHEET
a r c h
U
S I n t2
D c m y fi le s p w p r o d u c ti o n d o r b m e d n c .d g n
OR
C h e c k e d b y
D e s ig n e d b y to front of barricade
Mount supplemental signs
C r e e k C u lv e r t
Q u a tz
F
T F
T
F
T
See detail this sheet Type 3 barricade
Diamond ≤ 48"
> 30'
> 17'
12' - 16'
> 13'
< 10
65 - 95
65 - 95
50 - 65
50 - 65
20 - 50
10 - 20
10 - 20
6 x 6
4 x 6
4 x 6
6 x 6
4 x 6
4 x 4
6 x 6
4 x 6
4 x 4
(INCH) (INCH)
(INCH)
1.5
1.5
1.5
(SQFT)
STANDARD APPROVED FOR USE 6/2005
DRAFT: 9/2014
REVISED:
635-14
Other Shapes ≤ 48" Diamond ≤ 36"
Other Shapes ≤ 12' Diamond ≤ 48"
STATE PROJECT
NUMBER
SHEET
G.4
FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY STANDARD
STANDARD
N o v e m b e r
U m y fi le s p w p r o d u c ti o n d o r b m e d n d .d g n
BLM ERFO 151-3204
BLM MED 2015(1)
OR
NO SCALE
"X"
WIDTH AREA
OF POSTS
NUMBER POST SIZE D HOLE SIZE
WOOD POST SELECTION TABLE
TEMPORARY TRAFFIC CONTROL
WOOD POSTS
SIGN INSTALLATION
200' m in m in
6' - 12'
" dia. bolts 4 1Attach sign panels with a minimum of 2 -
6" x 6" or larger.
Use 7' minimum spacing between posts for sign posts and 6' minimum mounting height for secondary sign.
use 7' minimum mounting height for main sign a minimum lateral distance of 1' behind the face of lateral offset of 2' may be used. In areas with curbs, NOTE:
Post
See table for hole size parallel to sign face.
Field drill holes through post
Local tangent
Bottom of sign panel
X
H
H
D
H
0.75X
X
X
H
Y D
H
0.2X
0.6X
0.2X
SINGLE POST SIGN TWO POST SIGN
SIGN INSTALLATION ANGLE
POST DETAIL
D
See post detail (typ.)
Break-away holes.
S e e N o te
S e e N o te
7.
6.
5.
4.
3.
2.
1.
by the CO.
State standards may be used as an alternative if approved
See Note 4 E d g e o f tr a v e le d w a y
E d g e o f p a v e d s h o u ld e r
CL
Long side of post
D
90°
93°
In areas where lateral distance is limited, a minimum
D = Post embedment depth for average soil conditions.
Select post lengths to fit field conditions.
H1 and H2 = Overall post length.
per post.
In pedestrian locations, or in areas with obstructed views, the curb may be used.
TYPICAL SECTION
Varies Va rie s
Varies
Varies Va rie s
18'
Va rie s
QUARTZ CREEK CULVERTS
18'
Va rie s
QUARTZ CREEK CULVERTS
44+00.00 to 46+00.00
APPROACH ROAD TYPICAL
35+20.00 to 38+20.00
MAINLINE TYPICAL
2.5%2.5%
2.5%2.5%
H.1
STATE PROJECT
NUMBER
SHEET
a r c h
U
S I n t2
D c m y fi le s p w p r o d u c ti o n d o r c b .d g n
OR
C h e c k e d b y
D e s ig n e d b y
NO SCALE
FOOTNOTE:
Traveled way
Existing ground
LC
8-inch compacted depth grading C,base course, Roadway aggregate, method 2, Traveled way
Existing ground
LC
surface course, 4-inch compacted depth
Roadway aggregate, method 2, 8-inch compacted depth grading C,base course, Roadway aggregate, method 2, 1 1
Profile grade
3-inch compacted depth
Minor hot asphalt concrete
1 1
Profile grade
Width may vary to match with existing roadway width.
allowed is 1:1.5.
Construct slope to match with existing topography. Steepest slope material placement.
Submit cross slope info. to the CO for approval before final where superelevation is needed to match with existing road.
Construct cross slope at normal crown of 2.5% as shown except
I.1
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r e b fa .d g n
OR
BLM ERFO 151-3204
BLM MED 2015 (1)
a r c h
C h e c k e d b y
D e s ig n e d b
I
.0
P C
.9
P T
.4
P C
.1
P T
.2
POT 4
4+
00.
PC 44+20.20
PT 44+63.40
48" C M P
48" C M P
-1.0317%
,3
.5
.3
8%
430' VC
K = 26
.3
8%
,3
.8
50' VC
K = 28 + .1
N
D
Curve= C4
R= 155.00'
T= 53.17'
CP
15105
D
R= 110.00'
T= 21.88'
L= 43.20'
Curve= C400
T= 44.91'
R= 300.00'
Curve= C5
D
L= 89.17'
L= 102.45'
,3
.8
CUYD
EXC.
CUYD
EMB.
38+0037+00 36+0035+0034+00
1348 1372
I.2
STATE PROJECT
BLM ERFO 251-3204
BLM MED 2015(1)
M a r c h
I n t_ ft m y fi le s p w p r o d u c ti o n d o r e b fb .d g
C h e c k e d b y
D e s ig n e d b y
Existing ground Existing ground
Profile grade
Profile grade
Quartz Creek Culvert, mainline
Line to be constructed see Sheet I.3
Approach road
END WORK
BEGIN WORK
(Mainline) 38+20.00
QUARTZ CREEK CULVERT
(Mainline) 35+20.00
QUARTZ CREEK CULVERT
see Section J
Place riprap, class 5 and wingwall see Section J
Construct headwall
Clearing/construction limit
Clearing/construction limits pavement elevation
Pave to match existing pavement vertically.
Saw cut existing pavement elevation
Pave to match existing pavement vertically.
Saw cut existing
El= 1386.82
E= 4122704.50
N= 349,299.50
El= 1386.82
E= 4122704.50
N= 349,299.50
I n s ta ll c u lv e r t, S e e S h e e t J .2 f o r d e ta il s
R e m o v e e x is ti n g p ip e c u lv e r t
.7
NOTE:
1.
roadway profile to match with existing roadway elevation
Design profile provided is for illustration purpose. Construct
Remove pipe culvert see Sheet J.2
33.5° skew
Install culvert
36+32.77
0 15 30 4515
.1
P T
.2
P O
T
.3
POT
+00 .0
PC 44+20.20
P T
.4
P C
.8
P T
.9
5 PT 45+
80.12
P C
.5
Due South
PO
T
.5
70 1
C
,3
.1
.5
0%
-4.6252%
192' VC
K = 10
,3
.0
,3
.7
CUYD
EXC.
CUYD
EMB.
45+0044+00
1366 1366
46+00
Curve= C400 D
R= 110.00' T= 21.88'
L= 43.20'
Curve= C402
D
R= 45.00'
T= 28.73'
L= 51.14' Curve= C401
R= 50.00'
T= 10.98'
L= 21.62'
D
L= 89.17' T= 44.91'
D
R= 300.00'
Curve= C5
CP
15104
N
I.3
STATE PROJECT
BLM MED 2015(1)
a r c h
I n t_ ft m y fi le s p w p r o d u c ti o n d o r e b fc .d g
C h e c k e d b y
D e s ig n e d b y
S e e S h e e t J .3 f o r d e ta il s
I n s ta ll c u lv e r t
R e m o v e e x is ti n g c u lv e r t
.2
Profile grade
Existing ground
ERFO Approach Road
BEGIN WORK
(Approach road) 44+09.00
QUARTZ CREEK CULVERTS
(Approach road) 46+00.00
QUARTZ CREEK CULVERTS
END WORK
class 5 see Section J
Placed riprap mainline See Sheet I.2
Quartz Creek Culverts
Line to be constructed
Remove existing culvert
See Sheet D.2
(riprap ditch) 3' width, 28' long
Placed riprap class 2
See Sheet D.2
(riprap ditch) 5' width, 70' long
Placed riprap class 2
Clearing/construction limits
El= 1383.13
E= 4122798.82
N= 349,107.23
El= 1377.37
E= 4122706.12
N= 349,224.57
See Sheet J.3
3.5° skew
Install culvert.
45+19.25 roadway profile to match with existing roadway elevation
Design profile provided is for illustration purpose. Construct1.
NOTE:
0 15 30 4515
STATE PLANE COORDINATES GEO COORDINATES
POINT
NUMBER NORTH EAST ELEVATION LATITUDE LONGITUDE ELLIPSOID
HEIGHT
COMBINED
FACTOR DESCRIPTION NOTE:
15101 350182.759 4123273.356 1541.295 42°35'19.597890"N 123°27'50.286576"W 1462.1611 0.99987558 5/8" IR w/FHWA alum Cap 1.
15102 350039.865 4123096.259 1536.036 42°35'18.125300"N 123°27'52.585044"W 1456.8956 0.9998759 5/8" IR w/FHWA alum Cap
15103 349891.960 4122937.226 1505.626 42°35'16.609545"N 123°27'54.639772"W 1426.479 0.99987743 5/8" IR w/FHWA alum Cap
15104 349313.714 4122681.751 1391.316 42°35'10.811630"N 123°27'57.779236"W 1312.1428 0.99988318 5/8" IR w/FHWA alum Cap
15105 349066.176 4122711.483 1356.772…