PROJECT_DESCRIPTION.pdf

PDF 15 KB Posted

Attached to
MT DOT 236(1), MT 236 South of Big Sandy
Solicitation number
DTFH70-15-B-00028
Issued by

About this file

Project Description

View the file

Other files

File Type Posted
Bid_Summary_South_of_Big_Sandy.pdf PDF
Q A_8-12.pdf PDF
A002_Sandy.pdf PDF
A001_Sandy.pdf PDF
SWPPP_MT_DOT_236(1)_South_of_Big_Sandy.pdf PDF
IFB__Sandy.pdf PDF
Revised_GM13-15_South_of_Big_Sandy_Preliminary_Geotechnical_Memorandum.pdf PDF
Geopak_Earthwork_Combined_Big_Sandy.pdf PDF
Plans_BigSandy.pdf PDF
Plan_Request_form__South_of_Big_Sandy.pdf PDF
XS_Layout100.pdf PDF
bigsandy-70_-set.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MT DOT 236(1), MT 236 South of Big Sandy, Chouteau County, Montana

The work consists of aggregate based paving, striping, signing, and other small items of work.

Project length: 14.05 Miles

Tentative Fixed Completion Date: Fall 2016 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Estimated Price Range: Between $7 million and $10 million.

Location: This project is located approximately13.9 Miles SE of Big Sandy, Montana.

DESCRIPTION OF WORK IN US CUSTOMARY

UNITS FP-14

Base Schedule

DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes 153 Contractor Quality Control and Assurance (yes/no) Yes 154 Contractor Sampling & Testing (yes/no) Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes 157 Soil Erosion & Sediment Control (erosion control devices) Soil Erosion control, Silt Fence 4,300 lnft

DIVISION 200 – Earthwork 204 Excavation & Embankment Road Excavation Select Borrow

2,380 cuyd 74,700 cuyd

205 Rock Blasting: Controlled Blast Hole (rock blasting) N/A 205 Blasting Consultant (Consultant/Engineering Services) (yes/no) No 207 Earthwork Geosynthetics 306,000 sqyd

DIVISION 300 – Aggregate and Base Courses 301 Untreated Aggregate Courses (crushed aggregate) 126,500 ton

DIVISION 400 – Asphalt Pavements & Surface Treatments 403 Asphalt Concrete 50,600 ton 412 Asphalt Tack Coat (asphalt surface treatment) 100 ton 413 Asphalt Pavement Milling 135 sqyd

DIVISION 600 – Incidental Construction 617 Guardrail Guard System G4, Type 2 Terminal Section Type Tangent

4,100 lnft 8 each

621 Monuments & Markers (construction survey & staking) (yes/no) Yes 622 Rental Equipment (yes/no) Yes 623 General Labor (yes/no) Yes 625 Turf Establishment (indicate seeding or mulching separately) 12.0 acre 633 Permanent Traffic Control (traffic control devices) Sign System 80 sqft 634 Permanent Pavement Markings (traffic pavement markings) Type B, Solid Type B, Broken

313,000 lnft 389,000 lnft

635 Temporary Traffic Control – Flagger 310 day 635 Temporary Traffic Control – Barricade, Type 3 Cone Drum Warning Light Type A Construction Sign Traffic Control Supervisor

2 each 20 each 70 each 40 each 80 sqft 100 day