PROJECT_DESCRIPTION.pdf

PDF 27 KB Posted

Attached to
WA PRA MORA 14(7), Nisqually to Paradise Road, Phase II
Solicitation number
DTFH70-15-B-00019
Issued by

About this file

Project Description

View the file

Other files

File Type Posted
BidSum_Nisqually.pdf PDF
Q A_0330.pdf PDF
A001_WA_PRA_MORA_14(7).pdf PDF
Geotech_Report _PH-II _GM05-14.pdf PDF
Q A_0328.pdf PDF
Geotech_Report _PH-II _GM05-14.pdf PDF
Q A_0324.pdf PDF
Geotechnical_Physical_Data_R.pdf PDF
SWPPP_Nisqually_to_Paradise_Road_Phase_II _WA_PRA-MORA_14(7).pdf PDF
Plans_Nisqually.pdf PDF
Plan_Request_form_Nisqually.pdf PDF
IFB_Nisqually.pdf PDF
Preliminary-Letter-NPII.pdf PDF
WA_PRA_MORA_14(7)_Plan_Set_Aug_27_2015.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WA PRA MORA 14(7), Nisqually to Paradise Road, Phase II, Mount Rainer National Park, Pierce and Lewis County, Washington

This work consists of mill and overlay, grading, base, paving, roadway stabilization, utilities, stone masonry, bridge repair, drainage, and other small items of work.

The project includes the repair of two bridges, Glacier Bridge and Edith Creek Bridge. Work includes concrete repair, sealing concrete surface expansion joint repair, bridge deck joint repair, and painting and repairing of steel bridge railing.

Project length: 12.24 Miles.

Tentative Fixed Completion Date: Fall 2017 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Estimated Price Range: $7 million - $10 million

Location: This project is located approximately 11.8 miles E of Ashford, WA.

DESCRIPTION OF WORK in US

CUSTOMARY UNITS

FP-14

One Schedule Sch Name

A

DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes 153 Contractor Quality Control and Assurance

(yes/no) Yes 154 Contractor Sampling & Testing (yes/no) Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes 157 Soil Erosion & Sediment Control (erosion control devices)

Wood Strand – 1 ACRE Slit Fence - 2,500 LNFT Fiber Roll – 4,000 LNFT

158 Watering for Dust Control 400 MGAL

DIVISION 200 – Earthwork 203 Removal of Structures & Obstructions (structures, demolition)

Removal of Pipe – 10 Each Removal of Curb and Gutter – 570 LNFT Removal of Curb, Asphalt – 538 LNFT

Removal of Pavement, 6-inch depth – 405 SQYD Removal of Sidewalk, Asphalt – 373 SQFT

204 Excavation & Embankment Subexcavation – 2,550 CUYD Select Borrow – 1,380 CUYD

207 Earthwork Geosynthetics Geotextile, Class2, Type C - 4,142 SQYD Geogrid – 11,677 SQYD

A

DIVISION 250 – Slope Reinforcement and Retaining Walls 251 Riprap Riprap, Method A, Class 4 – 150 CUYD 252 Rockery, Special Rock Embankment, and Rock Buttress Rocker Wall (Rock Buttress) – 480 SQFT

DIVISION 300 – Aggregate and Base Courses 301 Untreated Aggregate Courses (crushed aggregate) Aggregate Base Grading D – 150 TON 303 Road Reconditioning Ditch Reconditioning 25,000 LNFT 304 Full Depth Reclamation Full depth reclamation, Method 1, 8-inch depth 15,510 SQYD 308 Recycled Aggregate Base Recycle Aggregate Base, 8-inch depth – 8,268 SQYD 313 Aggregate-Topsoil Course Aggregate Topsoil Course - 1,300 CUYD

DIVISION 400 – Asphalt Pavements & Surface Treatments 401 Asphalt Concrete Pavement By Gyratory Mix Design Method

Asphalt Concrete Pavement – 21,000 TON Antistrip Additive, Type 3 – 210 TON

403 Asphalt Concrete Asphalt Concrete Pavement, Type 2 - 1,800 TON Asphalt Concrete Pavement, Type 2, Wedge and Leveling –

7,600 TON

412 Asphalt Tack Coat (asphalt surface treatment) Tack Coat – 95 TON 413 Asphalt Pavement Milling Asphalt Pavement Milling, 1 to 3-inch Depth 16,366 SQYD

Asphalt Pavement Milling, 12-inch Depth – 5,092 SQYD Asphalt Pavement Milling, 4-inch Depth – 2,000 SQYD

DIVISION 550 – Bridge Construction 552 Structural Concrete (concrete – major structures)

Structural Concrete, Class A (AE) – 50 CUYD Seal Concrete Surface – 796 SQYD

Expansion Joints – LPSM

DIVISION 600 – Incidental Construction 602 Culverts & Drains (indicate one or both) 18-inch Pipe Culvert – 400 LNFT

24-inch Pipe Culvert – 300 LNFT 36-inch Pipe Culvert – 150 LNFT

A

604 Manholes, Inlets, & Catch Basins(culverts & drains) (indicate which)

Inlet (Guardwall) - 1 EACH Inlet , FLH type 6 B - 2 EACH

Catch Basin – 4 EACH Manhole Adjustment – 9 Each

Inlet Adjustment – 12 Each 605 Underdrains, Sheet Drains & Pavement Edge Drains (culverts & drains) (indicate which) Standard Underdrain System – 600 LNFT 607 Cleaning, Relaying, & Repairing Existing Drainage Structures

Cleaning Culvert in Place – 127 EACH Cleaning Drainage Structure, Masonry Headwall – 50 Each

609 Curb & Gutter (concrete – minor structures) (indicate which)

Curb, Asphalt, 6-inch Depth – 427 LNFT Curb, Stone, Type 1 18-inch Depth – 25 LNFT Curb and Gutter, 12-inch Depth – 537 LNFT

615 Sidewalks, Pads & Paved Medians (concrete – minor structures)

Sidewalk, Concrete – 189 SQYD Sidewalk, Asphalt – 240 SQYD

Accessibility Ramp, Concrete – 27 SQYD 619 Fences, Gates, Cattle Guards & Bollard Posts Remove and Reset Bollard Post – 19 EACH 620 Stone Masonry Stone Masonry (Ashlar Wall Stone) – 10 CUYD

Stone Masonry (Repair) – 44 SQYD Stone Masonry (Ricksecker Guardwall) – 44 CUYD

Headwall for 18-inch Pipe Culvert – 2 EACH Headwall for 24-inch Pipe Culvert – 3 EACH Headwall for 36-inch Pipe Culvert – 2 EACH

Remove and Reset Stone Masonry Curb – 337 LNFT Remove and Reset Stone Masonry Guardwall – 72 LNFT Remove and Reset Stone Masonry Headwall – 20 Each

Repoint Stone Masonry – 1,650 SQFT 622 Rental Equipment (yes/no) Yes 623 General Labor (yes/no) Yes 625 Turf Establishment (indicate seeding or mulching separately) Mulching, Hydraulic Method – 20,000 SQYD 633 Permanent Traffic Control (traffic control devices)

Sign System – 530 SQFT Snow Pole Holder – 250 EACH

634 Permanent Pavement Markings (traffic pavement markings)

Pavement Markings, Striping – 289,086 LNFT Type B (Crosswalk and Stop Bar) - 398 SQFT

Type B, Straight Arrow – 28 EACH Type B, Accessibility Symbol – 21 EACH

635 Temporary Traffic Control – Flagger 15,000 HOURS 635 Temporary Traffic Control – Pilot Car 1,800 HOURS

A

635 Temporary Traffic Control – Barricade Type 3 – 8 EACH Drum - 200 EACH

Tubular Marker – 500 EACH Warning Light Type A – 16 EACH Warning Light Type B – 30 EACH

Concrete Barrier – 1,000 LNFT Moving Concrete Barrier – 1,500 LNFT

Plastic Fence – 1,000 LNFT Construction Sign 550 SQFT

Pavement Markings – 11.3 MILE Portable Changeable Message Sign – 1,000 DAY

Traffic Control Supervisor – 320 DAY 646 Roadside Development (use pay item description)

Remove and Reset Historic Marker (Pavement Medallion) –