SPECIFICATION:
PROJECT MANAGER
VANCOUVER, WASHINGTON
WESTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PLANS PREPARED BY
COMMITMENT TO EXCELLENCE
FEDERAL LANDS HIGHWAY
Project Location
BRITISH COLUMBIA
I D
A H
O
OREGON
UNITED STATES
CANADA
P
A C I F I C
O C
A E
N tS rait ofJuan deFuca
OC
LU
MBIA R
IV
ER
A
SN
KE
R
VERI
M
COLU B
I A
V R I
E R
Lakes
Banks
Lakes
Moses
Reservoir
Potholes
OLYMPIC
NATIONAL
PARK
MOUNT
RAINIER
N.P.
MOUNT
ST. HELENS
NAT'L VOLC.
MON.
NORTH
CASCADES
NATIONAL
PARK
BELLINGHAM
Forks
Aberdeen
Chehalis
Longview
OLYMPIA
TACOMA
SEATTLE
EVERETT
Wenatchee
Lake
Moses
SPOKANE
Pullman
Pasco
RICHLAND
Kennewick Walla Walla
ANGELES
PORT
Townsend
Port Vernon
Mt.
VANCOUVER
WASHINGTON KEY MAP
YAKIMA
u n d o S t e g u
P
MOUNT RAINIER NATIONAL PARK
NATIONAL PARK SERVICE
U. S. DEPARTMENT OF THE INTERIOR
PLANS FOR PROPOSED PROJECT
N
Pass
Cayuse Pass
Chinook
Enumclaw
Buckley
Carbonado
Ashford
Packwood
Cliffdell
PIERCE
LEWIS
YAKIMA
FOREST
NATIONAL
WENATCHEE
PARK
NATIONAL
MT. RAINIER
25201510505
SCALE IN MILES
NATIONAL
PARK
SERVICE
Department of the Interior
END PROJECT
Longmire
Paradise
K. Loftsgaarden
BEGIN PROJECT
936+70 (MP 17.70)
344+80 (MP 6.50)
PHASE II
NISQUALLY TO PARADISE ROAD
NPS PMIS NO. 204771
WA PRA MORA 14(7)
WASHINGTON
PIERCE AND LEWIS COUNTIES
TYPE OF CONSTRUCTION:
DESIGN DESIGNATION:
e (max)
V
SADT 2012
0.060
40 MPH
<3,000
Roadway Stabilization, Stone Masonry, and Drainage.
Mill and Overlay, Grading, Base, Paving, A.1
STATE PROJECT
NUMBER
SHEET
WA
PRA MORA 14(7)
m o r a a a .d g n
U
S S u r
D
C h e c k e d b y o u g a r T e a m e s ig n e d b y
APPROVED:
DATE
DATE
National Park Service
Regional Director, Pacific West Region, DATE
Western Federal Lands Highway Division
Director, Project Delivery, Mount Rainier National Park
Superintendent, Index to Sheets
See Sheet A.2 for
LENGTH 12.24 MILES
NPS PMIS No. 204771 NPS Drwg. No. 105/100684
Projects, FP-14 of Roads and Bridges on Federal Highway
Standard Specifications for Construction
/s/ Robert B. Lale III 9/21/15
/s/ Randy King 8/26/15
/s/ Martha J. Lee 9/18/15
INDEX TO SHEETS
INDEX TO SHEETS
A.2
STATE PROJECT
WA PRA MORA 14(7)
m o r a a b .d g n
U
S I n t2 e c k e d b y u g a r T e s ig n e d b y
F. SOIL AND EROSION CONTROL
E. TURNOUTS AND PARKING AREAS
D. PLAN SHEETS
C. TYPICAL SECTIONS
B. SUMMARY OF QUANTITIES
A. GENERAL INFORMATION
J. PERMANENT TRAFFIC CONTROL
I. TEMPORARY TRAFFIC CONTROL
H. BRIDGE
G. DRAINAGE
F.3
F.2
F.1
E.12-14
E.11
E.9-10
E.6-8
E.5
E.4
E.3
E.2
E.1
D.2-23
D.1
C.6-7
C.5
C.4
C.3
C.2
C.1
B.1-5
A.4-5
A.3
A.2
A.1
SILT FENCE DETAILS
COIR LOG SEDIMENT BARRIER
TABULATION OF QUANTITIES
PARKING AREA DETAILS
STONE MASONRY GUARDWALL DETAILS
RICKSECKER POINT LOOP ROAD GUARDWALL
PARADISE COMPLEX PARKING AREAS
NUHUNTA FALLS PARKING AREA
NARADA FALLS PARKING AREA
CHRISTINE FALLS EAST PARKING AREA
TURNOUT SUMMARY
TABULATION OF QUANTITIES
PLAN SHEETS
TABULATION OF QUANTITIES
TYPICAL SECTION SUBEXCAVATION DETAILS
TYPICAL SECTION BASE REINFORCEMENT DETAILS
ROCK BUTTRESS DETAILS
TYPICAL SECTION DETAILS
TYPICAL SECTION
TYPICAL SECTION SUMMARY OF QUANTITIES
SUMMARY OF QUANTITIES
VICINITY MAPS
PLAN SYMBOLS AND ABBREVIATIONS
INDEX TO SHEETS
TITLE SHEET
J.9
J.8
J.7
J.6
J.5
J.3-4
J.1-2
I.4-10
I.2-3
I.1
H.7-9
H.2-6
H.1
G.15
G.9-14
G.8
G.7
G.6
G.1-5
PERMANENT SIGN INSTALLATION WOOD POSTS
PARADISE COMPLEX LODGE PARKING AREA
PARADISE COMPLEX MAIN PARKING AREA
PARADISE COMLEX LOWER PARKING AREA
NARADA FALLS PARKING AREA
PAVEMENT MARKING DETAILS
TABULATION OF QUANTITIES
WORK ZONE TRAFFIC CONTROL DETAILS
TEMPORARY TRAFFIC CONTROL PROJECT SIGNING
TABULATION OF QUANTITIES
EDITH CREEK BRIDGE DETAILS
NISQUALLY GLACIER BRIDGE DETAILS
GENERAL NOTES
STANDARD UNDERDRAIN
STANDARD DRAWINGS (602-1, 2, 3)
GUARDWALL DROP INLET
STONE MASONRY HEADWALL DETAILS
DRAINAGE DETAILS
TABULATION OF DRAINAGE QUANTITIES
PMIS Pkg. No. 204771 NPS Drwg. No. 105/100684
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 11/2001
REVISED: 9/2005 1/2007 10/2009 10/2014
W101-1
AND ABBREVIATIONS
PLAN SYMBOLS
W west drwg(s).
dist.
diaph.
diag.
dia.
DHV
D exp. jt.
exc.
EW
ER
EQ or eq.
EP
emb.
elev.
El. 94.16 ft e
E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east drawing(s) distance diaphragm diagonal diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge)
HW
hex.
hdwl.
high water hexagon headwall jt.
ID
joint inside diameter
LW
lt. or LT
Ls
LPSM
long.
LNFT
lat.
lam.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve
NC
N normal crown north
OG
OD
o. to o.
o. c.
original ground outside diameter out to out on center pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W
R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed yd3 yd2 cubic yard(s) square yard sym.
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sec.
SC
SADT
S symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
monument minimum thousand gallon maximum material ftg.
ft3 ft2 fin.
FDBM
footing cubic foot (feet) square foot finish field design by Marty
NPS PMIS. No. 204771 NPS Drwg. 105/100684
P
M
S e p te m b e r
U c m y fi le s p w p r o d u c ti o n d m s D e t.
W .d g n
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
STATE PROJECT
NUMBER
A.3 PRA MORA 14(7) WA
BH
CP GPS
JH
TP
DI
36 31
6 1
36 31
6 1
SEC.
SEC.
EL. 1234.56
N
E
RIP
G G
W W
DI
T T
NOTE:
NO SCALE
on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend 1.
Property Line w/Found Property Corner
Section Corner (Found, Projected)16
Section Line16
Section Corner (Found, Projected)4
Section Line4
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
Trail
Lake, Pond or Reservoir; Marshland
Spring or Seep
Material Source; Bore Hole; Test Pit
Section Line
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Section Corner (Found, Projected)
Large Creek or River
Spot Elevation; Coordinate Grid Tick
Above Ground Tank; Underground Tank
Treeline; Individual Trees
Boulder; Well; Satellite Dish; Grave
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
Silt Fence
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
BLM Lands Boundary
Railroad
Intermittent Drainage or Small Creek
Control Point (Terrestrial and GPS); Jump Hub θs Ø
∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.
AH
ADT
abut.
bearing bridge balance point bench mark back brg.
br.
BP
BM
BK
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center mile post main line
M.P.
M.L.
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use,
- no symbol -
EXISTING PROPOSED
Transition
Toe of Fill
Top of Cut wall face
CL
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Concrete Barrier
Slope Stake Limits
Pipe Culvert with Drop Inlet
Box Culvert
Delineators
Underground Utilities
Overhead/Above Ground Utilities
Signs (single, double post; portable)
Miscellaneous Utility Features
Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
Fiber Roll or Wattle
VICINITY MAP
Entrance Nisqually Longmire
Ohanapecosh
Entrance White River
White River
R O
A D
M O U N T R A I N I E R
C O W L I T
Z
D I V I D
E
N A T I O N A L F O R E S T
G I F F O R D P I N C H O T
F O R E S T
N A T I O N A L
S N O Q U A L M I E
Canyon Box
Lake Tipsoo
N
.5
Scale in miles
1 0 1 2 3 4
R.9.E R.10.E
M O U N T R A I N I E R N A T I O N A L P A R K T.15.N
T .1
.N m ile s
To Y ak am a m il e s
T o P a ck w o o d
14 miles
To Elbe
ESIRNUS
KR
AP
DA
OR
S N O Q U A L M E
N A T I O N A L
F O R E S T
M O U N T R A I N
I E R N A T I O
N A L P A R K
N A T I O N A L F O R E S T
G I F F O R D P I N C H O T
N A T I O N A L F O R E S T
S N O Q U A L M I E
N A T I O N A L
P A R K
M O U N T
R A I N I
R m il e s
T o E n u m c la w
Gate Entrance Canyon Stevens
T.14.N
R .9 .E
R .1
.E
R .9 .E
R .1
.E
T.15.N
T.14.N
Stevens Canyon Road
BEGIN PROJECT
344+80 (MP 6.50)
END PROJECT
936+70 (MP 17.7)
EDITH CREEK BRIDGE
A.4
STATE PROJECT
m o r a a c .d g n
U
S S u r
D e c k e d b y u g a r T e s ig n e d b y
(stockpile-storage site, see Sheet A.4) Kautz Creek Service Area
(stockpile-storage site, see Sheet D.23) Ricksecker Point Loop Road
(stockpile-storage site, see Sheet E.5) Nahunta Falls Parking Area Paradise
(stockpile-storage site, see Sheet D.6) Cougar Rock Picnic Area
E
DI
S T
S E
W
NPS PMIS. No. 204771 NPS Drwg. No. 105/100684
Sheet and Description
Section C Section D Section E Section F Section G Section H Section I Section J
Typical Section
Plan & Profile
Turnouts & Parking Areas
Erosion Control Drainage Bridge
Temporar y Traffic Control
Permanen t Traffic Control
ALLOWANCE Bid Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND
STAKING LPSM ALL
A0060 15301-0010 CONTRACTOR QUALITY CONTROL
AND ASSURANCE LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15703-3000 SOIL EROSION CONTROL, WOOD
STRAND ACRE 1.0 1.0
A0140 15705-0100 SOIL EROSION CONTROL, SILT
FENCE LNFT 2,500 2,500
A0160 15705-1400 SOIL EROSION CONTROL, FIBER
ROLL LNFT 4,000 4,000
A0180 15801-0000 WATERING FOR DUST CONTROL MGAL 400 400
A0200 20301-1700 REMOVAL OF MANHOLE EACH 1 1
A0220 20301-1900 REMOVAL OF PIPE CULVERT EACH 3 10 13
A0240 20302-0300 REMOVAL OF CURB AND GUTTER,
CONCRETE LNFT 570 570
A0260 20302-0400 REMOVAL OF CURB, ASPHALT LNFT 538 538
A0280 20303-2900 REMOVAL OF PAVEMENT,
CONCRETE, 6-INCH DEPTH SQYD 405 405
A0300 20303-3000 REMOVAL OF SIDEWALK, ASPHALT SQYD 373 373
A0320 20310-1000 PLUG, EXISTING PIPE(CULVERT) EACH 3 3
A0340 20402-0000 SUBEXCAVATION CUYD 2,205 148 197 2,550
A0360 20410-0000 SELECT BORROW CUYD 1,223 80 77 1,380
A0380 20701-0800 SEPARATION-STABILIZATION
GEOTEXTILE, CLASS 2, TYPE C SQYD 3,662 480 4,142
A0400 20703-2000 GEOGRID, STABILIZATION SQYD 11,197 480 11,677
A0420 25101-0200 PLACED RIPRAP, METHOD A,
CLASS 2 CUYD 150 150
A0440 25110-0500 GROUTED RIPRAP, METHOD A,
CLASS 5 CUYD 8 8
A0460 25210-0000 ROCKERY(BUTTRESS) SQFT 480 480
A0480 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 150 150
A0500 30302-1000 DITCH RECONDITIONING LNFT 25,000 25,000
A0520 30402-1500 FULL DEPTH RECLAMATION,
METHOD 1, 8-INCH DEPTH SQYD 15,510 15,510
A0540 30801-2000 RECYCLED AGGREGATE BASE,
8-INCH DEPTH SQYD 8,119 239 8,358
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
-F eb -2
:4
A M c:
\m yf ile s\ pw
_p ro du ct io n\ dm s9
Es tim at e-
.x ls x] Sh ee t
STATE PROJECT
B.1PRA MORA 14(7)WA
SHEET
NUMBER
NPS PMIS No. 204771 NPS Drawing No. 105/100684
Typical Section
Plan & Profile
Turnouts & Parking Areas
Erosion Control Drainage Bridge
Temporar y Traffic Control
Permanen t Traffic Control
ALLOWANCE Bid Schedule
A0560 31303-0000 AGGREGATE-TOPSOIL COURSE CUYD 1,218 82 1,300
A0580 40101-5600 ASPHALT CONCRETE PAVEMENT,
GYRATORY MIX, 1/2-INCH OR
3/4-INCH NOMINAL MAXIMUM SIZE
AGGREGATE, 0.3 TO <3 MILLION
ESAL TON 16,291 4,762 47 21,100
A0600 40105-3000 ANTISTRIP ADDITIVE, TYPE 3 TON 163 43 4 210
A0620 40301-0200 ASPHALT CONCRETE PAVEMENT,
TYPE 2 TON 1,759 41 1,800
A0640 40303-0200 ASPHALT CONCRETE PAVEMENT,
TYPE 2, WEDGE AND LEVELING
COURSE TON 7,525 75 7,600
A0660 41201-0000 TACK COAT TON 76 15 4 95
A0680 41301-0000 ASPHALT PAVEMENT MILLING, 1
TO 3-INCH DEPTH SQYD 8,218 8,148 16,366
A0700 41301-0000 ASPHALT PAVEMENT MILLING,
12-INCH DEPTH SQYD 5,092 5,092
A0720 41301-1000 ASPHALT PAVEMENT MILLING,
4-INCH DEPTH SQYD 2,000 2,000
A0740 55201-0200 STRUCTURAL CONCRETE, CLASS A
(AE) CUYD 20 20
A0760 55220-0000 REPAIR CONCRETE SQYD 10 10
A0780 55221-0000 REPAIR CONCRETE CUYD 50 50
A0800 55224-0000 SEAL CONCRETE SURFACE SQYD 1,024 1,024 Contract Quantity
A0820 55227-0000 CLEAN CONCRETE SURFACE LPSM ALL ALL
A0840 55235-0000 EXPANSION JOINTS LNFT 210 210
A0860 60201-0600 18-INCH PIPE CULVERT LNFT 400 400
A0880 60201-0800 24-INCH PIPE CULVERT LNFT 600 600
A0900 60201-1000 36-INCH PIPE CULVERT LNFT 150 150
A0920 60403-0000 INLET(GUARDWALL) EACH 1 1
A0940 60403-1900 INLET, FLH TYPE 6B EACH 1 1
A0960 60404-1000 CATCH BASIN, FLH TYPE 1 EACH 4 4
A0980 60405-0000 MANHOLE ADJUSTMENT EACH 6 6
A1000 60406-0000 INLET ADJUSTMENT EACH 13 13
A1020 60409-0200 INLET TOP, METAL FRAME AND
GRATE, FLH TYPE B EACH 4 4
A1040 60501-0000 STANDARD UNDERDRAIN SYSTEM LNFT 600 600
A1060 60704-0000 CLEANING CULVERT IN PLACE EACH 120 120
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
-F eb -2
:4
A M c:
\m yf ile s\ pw
_p ro du ct io n\ dm s9
Es tim at e-
.x ls x] Sh ee t
(2
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B.2PRA MORA 14(7)WA
SHEET
NUMBER
Typical Section
Plan & Profile
Turnouts & Parking Areas
Erosion Control Drainage Bridge
Temporar y Traffic Control
Permanen t Traffic Control
ALLOWANCE Bid Schedule
A1080 60706-0000 CLEANING DRAINAGE STRUCTURE,
STONE MASONRY HEADWALL EACH 51 51
A1100 60901-2300 CURB, ASPHALT, 6-INCH DEPTH LNFT 427 427
A1120 60901-4200 CURB, STONE, TYPE 1, 18-INCH
DEPTH LNFT 25 25
A1140 60902-1000 CURB AND GUTTER, CONCRETE,
12-INCH DEPTH LNFT 537 537
A1160 61501-0100 SIDEWALK, CONCRETE SQYD 189 189
A1180 61501-1100 SIDEWALK, ASPHALT SQYD 240 240
A1200 61504-1000 ACCESSIBILITY RAMP, CONCRETE SQYD 27 27
A1220 61920-1000 REMOVE AND RESET BOLLARD POST EACH 19 19
A1240 62001-0000 STONE MASONRY(ASHLAR WALL
REPLACEMENT STONE) CUYD 5 5 10
A1260 62011-0300 STONE MASONRY HEADWALL FOR
18-INCH PIPE CULVERT EACH 7 7
A1280 62011-0500 STONE MASONRY HEADWALL FOR
24-INCH PIPE CULVERT EACH 9 9
A1300 62011-0700 STONE MASONRY HEADWALL FOR
36-INCH PIPE CULVERT EACH 9 9
A1320 62013-2000 STONE MASONRY WALL(REPAIR) SQYD 44 44
A1340 62013-2000 STONE MASONRY WALL(RICKSECKER
POINT LOOP ROAD GUARDWALL) SQYD 44 44
A1360 62027-0000 REMOVE AND RESET STONE
MASONRY, CURB LNFT 337 337
A1380 62027-1000 REMOVE AND RESET STONE
MASONRY GUARDWALL(NARADA
FALLS PARKING AREA) LNFT 72 72
A1400 62028-1000 REMOVE AND RESET STONE
MASONRY HEADWALL EACH 20 20
A1420 62031-0000 REPOINT STONE MASONRY SQFT 1,500 150 1,650
A1440 62201-0250 DUMP TRUCK, 10 CUBIC YARD
MINIMUM CAPACITY HOUR 400 400
A1460 62201-3400 HYDRAULIC EXCAVATOR, 1 CUBIC
YARD MINIMUM CAPACITY WITH
THUMB ATTACHMENT HOUR 200 200
A1480 62301-0000 GENERAL LABOR HOUR 400 400
A1500 62516-2000 MULCHING, HYDRAULIC METHOD SQYD 20,000 20,000
A1520 63302-0000 SIGN SYSTEM SQFT 493 37 530
A1540 63318-1000 SNOW POLE HOLDER EACH 250 250
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
-F eb -2
:4
A M c:
\m yf ile s\ pw
_p ro du ct io n\ dm s9
Es tim at e-
.x ls x] Sh ee t
(3
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B.3PRA MORA 14(7)WA
SHEET
NUMBER
Typical Section
Plan & Profile
Turnouts & Parking Areas
Erosion Control Drainage Bridge
Temporar y Traffic Control
Permanen t Traffic Control
ALLOWANCE Bid Schedule
A1560 63401-0300 PAVEMENT MARKINGS, TYPE B,
SOLID RED LNFT 1,200 1,200
A1580 63401-0300 PAVEMENT MARKINGS, TYPE B,
SOLID WHITE LNFT 245,304 196 245,500
A1600 63401-0300 PAVEMENT MARKINGS, TYPE B,
SOLID YELLOW LNFT 261,130 370 261,500
A1620 63401-0400 PAVEMENT MARKINGS, TYPE B,
BROKEN WHITE LNFT 19,146 854 20,000
A1640 63401-0400 PAVEMENT MARKINGS, TYPE B,
BROKEN YELLOW LNFT 11,898 602 12,500
A1660 63403-0200 PAVEMENT MARKINGS, TYPE
B(CROSSWALK AND STOP BAR) SQFT 398 398
A1680 63405-0550 PAVEMENT MARKINGS, TYPE B,
STRAIGHT ARROW EACH 28 28
A1700 63405-0850 PAVEMENT MARKINGS, TYPE B,
ACCESSIBILITY SYMBOL EACH 21 21
A1720 63502-0600 TEMPORARY TRAFFIC CONTROL,
BARRICADE TYPE 3 EACH 8 8
A1740 63502-1250 TEMPORARY TRAFFIC CONTROL,
TUBULAR MARKER, TYPE 42-INCH EACH 500 500
A1760 63502-1300 TEMPORARY TRAFFIC CONTROL,
DRUM EACH 200 200
A1780 63502-1500 TEMPORARY TRAFFIC CONTROL,
WARNING LIGHT TYPE A EACH 16 16
A1800 63502-1600 TEMPORARY TRAFFIC CONTROL,
WARNING LIGHT TYPE B EACH 30 30
A1820 63503-0400 TEMPORARY TRAFFIC CONTROL,
CONCRETE BARRIER LNFT 1,000 1,000
A1840 63503-0500 TEMPORARY TRAFFIC CONTROL,
MOVING CONCRETE BARRIER LNFT 1,500 1,500
A1860 63503-1000 TEMPORARY TRAFFIC CONTROL,
PLASTIC FENCE LNFT 1,000 1,000
A1880 63504-1000 TEMPORARY TRAFFIC CONTROL,
CONSTRUCTION SIGN SQFT 596 54 650
A1900 63505-1000 TEMPORARY TRAFFIC CONTROL,
PAVEMENT MARKINGS MILE 11.3 11.3
A1920 63506-0600 TEMPORARY TRAFFIC CONTROL,
PILOT CAR HOUR 1,800 1,800
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
-F eb -2
:4
A M c:
\m yf ile s\ pw
_p ro du ct io n\ dm s9
Es tim at e-
.x ls x] Sh ee t
(4
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B.4PRA MORA 14(7)WA
SHEET
NUMBER
Typical Section
Plan & Profile
Turnouts & Parking Areas
Erosion Control Drainage Bridge
Temporar y Traffic Control
Permanen t Traffic Control
ALLOWANCE Bid Schedule
A1940 63507-0700 TEMPORARY TRAFFIC CONTROL,
TRAFFIC CONTROL SUPERVISOR DAY 260 260
A1960 63507-0800 TEMPORARY TRAFFIC CONTROL,
PORTABLE CHANGEABLE MESSAGE
SIGN DAY 1,100 1,100
A1980 63509-1000 TEMPORARY TRAFFIC CONTROL,
FLAGGER FXHR 10,000 10,000
A2000 64620-1000 REMOVE AND RESET HISTORIC
MARKER EACH 14 14
Remarks and/or Determination of Estimated
Quantity
-F eb -2
:4
A M c:
\m yf ile s\ pw
_p ro du ct io n\ dm s9
Es tim at e-
.x ls x] Sh ee t
(5
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B.5PRA MORA 14(7)WA
SHEET
NUMBER
TABULATION OF QUANTITIES
FOOTNOTE:
C.1
STATE PROJECT
m o r a c a .d g n
U
S I n t2
D e c k e d b u g a r T e s ig n e d b y
2 Quantity shown includes curve widening.
Quantities shown include turnouts.
LC
Shoulder Travel lane Travel lane Shoulder
1' 1'11'
C o n s tr u c ti o n l im it s
Existing ground
Existing ground
FOOTNOTE:
Profile grade this sheet
See safety edge detail on
11'
TYPICAL SECTION
ROAD
NISQUALLY TO PARADISE
Var ies
346+00 to 936+70
MAINLINE TYPICAL SECTION
LC
Profile grade
C o n s tr u c ti o n l im it s
Va rie s at STONE MASONRY GUARDWALL
MAINLINE TYPICAL SECTION
3'
Extend to face of wall width varieswidth varies
Existing ground
Taper mill
Existing stone masonry guardwall
C.2
STATE PROJECT
m o r a c b .d g n
U
S I n t2
D e c k e d b y
C o u g a r T e s ig n e d b
Varies
-inch compacted depth2
10.3 to < 3 Million ESAL, 1
-inch Nominal Maximum Size Aggregate, 4 3-inch or 2
Asphalt Concrete Pavement, gyratory mix, -inch compacted depth2
10.3 to < 3 Million ESAL, 1
-inch Nominal Maximum Size Aggregate, 4 3-inch or 2
Asphalt Concrete Pavement, gyratory mix, surface prior to overlay
Tack coat, apply to existing surface prior to overlay
Tack coat, apply to existing
C o n s tr u c ti o n l im it s
LC
-inch compacted depth2
10.3 to < 3 Million ESAL, 1
-inch Nominal Maximum Size Aggregate, 4 3-inch or 2
Asphalt Concrete Pavement, gyratory mix, Existing stone masonry guardwall
Travel lane Travel laneExisting stone masonry curb milled surface prior to overlay
Tack coat, apply to existing
Use equipment for pavement milling per 413.02(a).
taper to existing grade 3 feet out from wall. Pay Item 41301-0000.
-inch depth at the wall and 2 1mill and remove pavement to a 1
At all masonry guardwall wall locations, as directed by the CO, flush to pavement surface.
Shoulder foreslope varies. Place compacted aggregate topsoil placement or to the extents of ditch cleaning, when directed by CO.
Construction limits are to the extents of shoulder aggregate
Aggregate topsoil course (typ.)
Apply mulching a depth of 4" as directed by CO
Mill existing pavement full width to width varies width varies at STONE MASONRY CURB
MAINLINE TYPICAL SECTION
6"
SAFETY EDGE/SHOULDER SLOPE DETAIL
detail this Sheet
See safety edge/shoulder slope NPS PMIS. No. 204771 NPS Drwg. No. 105/100684
NO SCALE
LC
C.3
STATE PROJECT
PRA-MORA 14(7)
m o r a c c .d g n
U
S I n t2
D e c k e d b y u g a r T e s ig n e d b y
Repair width varies
DETAILS
TYPICAL SECTION
Existing pavement structure
Tack coat
PAVEMENT CONNECTION DETAIL
B e g in t a p e r
S a w c u t jo in t pavement
Existing
10'
Typical Section
See Mainline existing pavement or milled pavement
Tack coat, apply to width varies
M a in li n e s h o u ld e r
Turnout
TURNOUT SECTION
FOOTNOTE:
(Locations, as directed by CO)
PAVEMENT REPAIR TYPICAL SECTION
Va ri es
Existing ground
Existing stone masonry guardwall surface prior to overlay
Tack coat, apply to existing
TYPICAL SECTION
RICKSECKER POINT LOOP ROAD
Width varies
3'
Var ies
Sawcut
1' min.
Varies
LC
Existing pavement width varies o f p a v e m e n t
E x is ti n g e d g e
Recycled aggregate base, 8" compacted depth
Existing ground
Existing pavement
(See D Sheets for locations)
CURVE WIDENED SECTION
0.3 to <3 Million ESAL, 1-1/2" compacted depth
1/2-inch or 3/4-inch Nominal Maximum Size Aggregate, Asphalt Concrete Pavement, gyratory mix, Asphalt Concrete
Pavement
-inch compacted depth2
10.3 to < 3 million ESAL, 1
-inch nominal maximum size aggregate,4 3-inch or 2
Asphalt Concrete Pavement, gyratory mix, For Locations
See Sheet E.2
-inch compacted depth 2
10.3 to < 3 Million ESAL, 1
-inch Nominal Maximum Size Aggregate,4 3-inch or 2
Asphalt Concrete Pavement, gyratory mix, through transition
" depth2 1Taper mill to 1
Hot Asphalt Concrete Pavement, Type 2, 4" depth structure as directed by CO
Mill up to a depth of 3" of pavement
Aggregate topsoil course
Existing tapered milled section included in overlay.
Pavement connections are incidental to paving.
Use equipment for pavement milling per 413.02(a).
milled section Existing taper
See safety edge/shoulder slope detail on Sheet C.2 slope detail on Sheet C.2
See safety edge/shoulder
NPS PMIS. No. 204771 NPS Drwg. No. 105/100684 between pavement lifts
Tack coat, apply
Tack coat
Wedge and Leveling Course, depth and location varies
Hot Asphalt Concrete Pavement, Type 2, paved surface prior to overlay Tack coat, apply to existing
Top of milled pavement slope detail on Sheet C.2 See safety edge/shoulder
0.3 to < 3 Million ESAL, 1-1/2-inch compacted depth
-inch Nominal Maximum Size Aggregate,4 3-inch or2
1Asphalt Concrete Pavement, gyratory mix, NO SCALE
C.4
STATE PROJECT
PRA-MORA 14(7)
m o r a c g .d g n
U
S I n t2
D e c k e d b y u g a r T e s ig n e d b y
5 5 5
CROSS SECTION
CONSTRUCTION DETAIL
NOTES:
(NOT TO SCALE)
AVERAGE LONGEST DIMENSIONSTONE CLASS
(NOT TO SCALE)
48" - 54"
36" - 48"
28" - 36"
18" - 28"
12" - 18"
5 5 5 5
4.
3.
2.
1.
DETAILS
ROCKERY BUTTRESS
Rockery backfill is incidental to rockery buttress.
in the field by the CO.
Wall location and dimensions will be established gaps over 6".
stones as needed to maintain spacing and eliminate on at least two stones beneath it. Use smaller
Each larger stone (size 4-5) should bear firmly axis perpendicular to wall.
Place larger stones (size 4-5) with longest
NPS PMIS. No. 204771 NPS Drwg. No. 105/100684
LC
W a ll h t.
v a r ie s to
Granular rock backdrain
NOTE:
Travel lane Travel lane Shoulder
Super %Super %
S h o u ld e r
11' 11' 1'
LC
1.
Existing subgrade
Finish grade
Mainline Typical Section
See Sheet C.2 for
BASE REINFORCEMENT
TYPICAL SECTIONS
PAVEMENT SECTION DETAIL
BASE REINFORCEMENT
Width varies - See table
BASE REINFORCEMENT
TYPICAL SECTION
C.5
STATE PROJECT
m o r a c d .d g n
U
S I n t2
D e c k e d b y u g a r T e s ig n e d b y
4-inch compacted depth
Hot Asphalt Concrete Pavement, Type 2, -inch compacted depth.2 1 5. Place Final pavement, 1 depth as temporary driving surface.
4. Place Hot Asphalt Concrete Pavement, 4-inch compacted
3. Place 8-inch of conserved recycled aggregate base.
2. Install geogrid.
recycled aggregate base.
1. Mill and conserve top 12-inch of pavement structure as follows:
Construction sequence for subgrade reinforcement areas as
Geogrid, stabilization
Geogrid, stabilization
8-inch Compacted Depth
Recycled Aggregate Base, detail on Sheet C.2
See safety edge/shoulder slope
NPS PMIS. No. 204771 NPS Drwg. No. 105/100684
"-inch compacted depth2 -1 0.3 to <3 Million ESAL, 1
3/4-inch Nominal Maximum Size Aggregate, Asphalt Concrete Pavement, Gyratory mix, 1/2-inch or
Includes a portion of the right lane and turnout.
Adjust slope to fit existing topography.
Match existing superelevation, or crown at 2%.
Place geogrid according to Section 207.
C.6
STATE PROJECT
m o r a c e .d g n
U
S I n t2
D e c k e d b u g a r T e s ig n e d b y
TABULATION OF QUANTITIES
SUBEXCAVATION
SUBEXCAVATION TRANSITION DETAIL
FOOTNOTE:
PROFILE
C.7
STATE PROJECT
m o r a c f.
d g n
U
S I n t2
D e c k e d b y u g a r T e s ig n e d b y
DETAILS
SUBEXCAVATION
Super Super Existing ground
LC
Select Borrow, 15" compacted depth
1 1
Profile grade
S u b e x c a v a ti o n d e p th
Existing pavement grade
2:
1 2:1
15" compacted depth
Select Borrow, TaperTaper
1.
B E
G I N S
U B
E X
C A
V A
T I O
N
E N
D S
U B
E X
C A
V A
T I O
N
Width varies
Super Super Existing ground
LC
Select Borrow, 15" compacted depth
1 1
Profile grade
S u b e x c a v a ti o n d e p th
Width varies
TYPICAL SECTION
TYPE 1 SUBEXCAVATION
TYPICAL SECTION
TYPE 2 SUBEXCAVATION
Wrap Geogrid
" compacted depth 2
10.3 to <3 Million ESAL, 1
-inch Nominal Maximum Size Aggregate, 4 3-inch or 2
Asphalt Concrete Pavement, gyratory mix, " compacted depth 2
10.3 to <3 Million ESAL, 1
-inch Nominal Maximum Size Aggregate, 4 3-inch or 2
Asphalt Concrete Pavement, gyratory mix, Pay LimitsPay Limits
Geogrid, Stabilization
Geotextile, Class 2, Type C
Separation-Stabilization
Geotextile, Class 2, Type C
Separation-Stabilization
Geogrid, Stabilization
Geotextile, Class 2, Type C
Separation-Stabilization Geogrid, Stabilization
8-inch compacted depth
Recycled aggregate base, 8-inch compacted depth
Recycled aggregate base, Place Geogrid according to Section 207.
Match existing superelevation.
geotextile is used.
Line all sides of excavation wherever separation-stabilization stream and culvert outfall.
install sediment logs every 10 feet downgrade of work until reaching
Where subexcavation work is within 50 feet of surface waters (streams), Saw cut all pavement joints.
quantities.
Quantities carried forward to typical section tabulation of
Transition tapers included in lengths shown for subexcavation.
5.
4.
3.
2.
edge/shoulder slope detail See Sheet C.2 for safety edge/shoulder slope detail See Sheet C.4 for safety
NPS PMIS. No. 204771 NPS Drwg. No. 105/100684
Type 2, 4" compacted depth
Asphalt Concrete Pavement, Type 2, 4" compacted depth
Asphalt Concrete Pavement, TABULATION OF QUANTITIES
D.1 m o r a fa .d g n
U
S I n t2
D e c k e d b y u g a r T e s ig n e d b y
FOOTNOTE:
NPS PMIS. No. 204771 NPS Drwg. No. 105/100684 be as directed by the CO. Stone for repairs are contractor located.
Locations for stone masonry wall repair and repointing to
P ip e c u lv e rt
P ip e c u lv e rt
344+80 to 355+00
PLAN
N
BEGIN PROJECT
344+80
PHASE II
NISQUALLY TO PARADISE ROAD
WA PRA MORA 14(7)
Zone 5
Soil Isolation
Zone 4
Soil Isolation
348+48
FOOTNOTE:
PLAN LEGEND:
w/Stationing Existing Road Centerline
Existing Underground Power
Wetland Ditch
Stone Masonry Wall
Existing utility vault
Ditch reconditioning
Final ditch reconditioning locations to be determined by CO.
NPS PMIS. No. 204771 NPS Drwg. No. 105/100684
D.2
STATE PROJECT
A
A u g u s t
U
S S u r
D c m y fi le s p w p r o d u c ti o n d m s m o r a fb .d g n u g a r T e
C h e c k e d b y
D e s ig n e d b y
Amphibian Protection Zone
Pavement connection
P ip e c u lv e r t
" P ipe cu lve rt
6+
P ip e c u lv e rt
30" Pipe culvert
378+17
P ip e c u lv e r t
?" Pipe culvert
369+
P ip e c u lv e rt
P ip e c u lv e r t
P ip e c u lv e r t p a r a lle l to r o a d
U n d e r d r in
355+00 to 390+00
PLAN
N
N
Existing utility vaults (2)
Existing utility vaults (2)
Ditch reconditioning 1
FOOTNOTE:
Ditch reconditioning 1
Ditch reconditioning 1
Turnout T-22
Turnout T-23 widening dimensions to be marked out by the CO.
See Sheet C.4 for curve widening typical section. Final curve
Final ditch reconditioning locations to be determined by CO.
259+40 to 361+90, RT
Construct 2' curve widening
NPS PMIS. No. 204771 NPS Drwg. No. 105/100684
D.3
STATE PROJECT
A u g u s t
U
S S u r
D c m y fi le s p w p r o d u c ti o n d m s m o r a fc .d u g a r T e
C h e c k e d b y
D e s ig n e d b y with 24" dia. culvert
Replace existing culvert
383+42
P ip e c u lv e r t
" Pip e cu lvert
" P ip e cu lv e rt
0 3
P ip e c u lv e r t
P ip e c u lv e r t
390+00 to 420+00
PLAN
N
N
Turnout T-24
Turnout T-25
Amphibian Protection Zone
FOOTNOTE:
1 See Section 107 for requirements.
Existing utility vaults
Unnamed perennial stream with 24" dia. culvert
Replace existing culvert
393+54
NPS PMIS. No. 204771 NPS Drwg. No. 105/100684
D.4
STATE PROJECT
A u g u s t
U
S S u r
D c m y fi le s p w p r o d u c ti o n d m s m o r a fd .d u g a r T e
C h e c k e d b y
D e s ig n e d b
420+00 to 450+00
PLAN
N
N
Turnout T-26
Turnout T-28
Turnout T-27Zone 6
Soil Isolation
438+24
Zone 5
Soil Isolation
Amphibian Protection Zone
FOOTNOTE:
1 See Section 107 for requirements.
Unnamed perennial stream
Existing utility vaults
Existing utility vaults
NPS PMIS. No. 204771 NPS Drwg. No. 105/100684
D.5
STATE PROJECT
A u g u s t
U
S S u r
D c m y fi le s p w p r o d u c ti o n d m s m o r a fe .d u g a r T e
C h e c k e d b y
D e s ig n e d b y
P ip e c u lv e r t
P ip e c u lv e rt
" P ip e c u lv e rt
P ip e c u lv e r t
P ip e c u lv e r t
5 4
P ip e c u lv e rt
" P ip e c u lv e rt
48" Pipe culvert
447+33
P ip e c u lv e rt
P ip e c u lv e rt
?" Pipe culvert
466+04
P ip e c u lv e r t
" P ip e c u lv e rt
P ip e c u lv e r t
450+00 to 480+00
PLAN
N
N
Turnout T-30
Turnout T-29
Turnout T-31
NOTE:
1.
CAMPGROUND
COUGAR ROCK
PICNIC AREA
COUGAR ROCK
Pavement connection
Existing utility vault
Ditch reconditioning
Ditch reconditioning 1
FOOTNOTE:
Final ditch reconditioning locations to be determined by CO.
Ditch reconditioning
Existing utility vaults cable present in culvert Existing communications
Picnic Area to be determined by the CO.
Location of the stockpile-storage site at the Cougar Rock
NPS PMIS. No. 204771 NPS Drwg. No. 105/100684
See detail Sheet C.3 Pavement connection
D.6
STATE PROJECT
e p te m b e r
U
S S u r
D c m y fi le s p w p r o d u c ti o n d m s m o r a ff .d u g a r T e
C h e c k e d b y
D e s ig n e d b
P ip e c u lv e r t
" P ip e cu lv e rt
0 4
480+00 to 505+00
PLAN
N
N
Existing utility vault
Turnout T-32
Ditch reconditioning 1
FOOTNOTE:
widening dimensions to be marked out by the CO.
See Sheet C.3 for curve widening typical section. Final curve
Final ditch reconditioning locations to be determined by the CO.
Unnamed perennial stream
495+60 to 500+90, LT
Construct 2' curve widening headwall.
Construct stone masonry and install 24" dia. culvert.
Remove existing culvert
NPS PMIS. No. 204771 NPS Drwg. No. 105/100684
D.7
STATE PROJECT
A u g u s t
U
S S u r
D c m y fi le s p w p r o d u c ti o n d m s m o r a fg .d u g a r T e
C h e c k e d b y
D e s ig n e d b
P ip e c u lv e r t
24" Pipe culvert
513+
Pi pe c ul ve rt
7+
24" Pip e c ulv ert
+57
505+00 to 525+00
PLAN
N
Turnout T-33
Existing utility vault
TRUMP CURVE
UPPER VAN
FOOTNOTE:
Ditch reconditioning 1 utility vault
Existing widening dimensions to be marked out by the CO.
See Sheet C.3 for curve widening typical section. Final curve
Final ditch reconditioning locations to be determined by CO.
NPS PMIS. No. 204771 NPS Drwg. No. 105/100684
D.8
STATE PROJECT
A u g u s t
U
S S u r
D c m y fi le s p w p r o d u c ti o n d m s m o r a fh .d u g a r T e
C h e c k e d b y
D e s ig n e d b y
513+75 to 518+30, LT
Construct curve widening, 3' wide
" P ip e cu lve rt
5+
18" Pip e c ulv ert
+49
" P ip e cu lve rt
3+
6724" Pipe culvert 537+2224" Pipe culvert
540+57
P ip e c u lv e r t
P ip e c u lv e r t
P ip e c u lv e r t
18" Pipe culv ert529+
P ip e c u lv e r t
P ip e c u lv e r t
P ip e c u lv e r t
P ip e c u lv e r t
P ip e c u lv e r t
24" Pipe culvert
566+
525+00 to 565+00
PLAN
N
N
Existing utility vault
Existing utility vault
TR ,03+265 ot 63+755
TL ,52+735 ot 00+525
Amphibian Protection Zone
FOOTNOTE:
Existing stone masonry guardwall
Ditch reconditioning 1
Ditch reconditioning 1
Comet Falls Trailhead Parking Turnout T-34
)ediw '01( noitavacxe buS 1 epyT
Type 1 Subexcavation (10' wide)
547+77 to 548+17, RT
Type 1 Subexcavation (10' wide)
549+79 to 550+50, RT
Type 1 Subexcavation (10' wide)
549+79 to 550+50, RT
Type 1 Subexcavation(10' wide)
552+50 to 553+50, RT
Type 1 Subexcavation (15' wide)
553+50 to554+10, RT
)ediw '01( noitavacxebuS 1 epyT
Type 2 Subexcavation (9' wide)
564+45 to 565+20, RT of rock buttress Approximate location stream
Unnamed perennial widening dimensions to be marked out by the CO.
See Sheet C.3 for curve widening typical section. Final curve
See Sheet C.4 for details.
Final location of rock buttress to be determined by the CO.
See Section 107 for requirements.
Final ditch reconditioning locations to be determined by CO. NPS PMIS. No. 204771 NPS Drwg. No. 105/100684
538+40 to 541+60, RT Construct curve widening, 3' wide
D.9
STATE PROJECT
e p te m b e r
U
S S u r
D c m y fi le s p w p r o d u c ti o n d m s m o r a fi .d u g a r T e
C h e c k e d b y
D e s ig n e d b
24" Pip e cu lver t
+24
24" Pip e cu lver t
+46
" P ip e cu lv e rt
P ip e c u lv e rt
P ip e c u lv e rt
P ip e c u lv e r t
P ip e c u lv e r t
24" Pipe culvert
581+33
" P ip e cu lv e rt
P ip e c u lv e r t
P ip e c u lv e r t
565+00 to 595+00
PLAN
N
N
CHRISTINE FALLS
Turnout T-35
Existing utility vault
Existing utility vault
Turnout T-37 t o
R T Base reinforcement (15' wide)
568+80 to 569+70, RT
Amphibian Protection Zone
FOOTNOTE:
1 See Section 107 for requirements.
See Sheet E.3
Christine Falls East Parking Lot
Turnout T-36
T y p e S u b e x c a v a ti o n w id e
Type 1 Subexcavation (10' wide)
569+80 to 570+95, RT
Type 1 Subexcavation (10' wide)
577+67 to 579+38, RT
Type 1 Subexcavation (10' wide)
579+77 to 580+85, RT
Type 1 Subexcavation (10' wide)
579+77 to 580+85, RT
591+16 to 592
+43, RT
Type 1 Su bexcavati on (10' w ide)
Creek
Van Trump
NPS PMIS. No. 204771 NPS Drwg. No. 105/100684
D.10
STATE PROJECT
A u g u s t
U
S S u r
D c m y fi le s p w p r o d u c ti o n d m s m o r a fj .d u g a r T e
C h e c k e d b y
D e s ig n e d b y for details
Sheet G.7 inlet. See
Install
P ip e c u lv e r t
P ip e c u lv e r t
P ip e c u lv e r t
P ip e c u lv e r t
P ip e c u lv e r t
595+00 to 620+00
PLAN
N
N
(See H Sh eets)NISQUALLY GLACIER BRIDGE
Amphibian Protection Zone
Amphibian Protection Zone
FOOTNOTE:
See Section 107 for requirements.1
See Sheet E.5
PARKING AREA
NAHUNTA FALLS
D.11
STATE PROJECT
J u n e
U
S S u r
D c m y fi le s p w p r o d u c ti o n d m s m o r a fk .d u g a r T e
C h e c k e d b y
D e s ig n e d b y
Unnamed perennial stream
Unnamed perennial stream
Nisqually River
P ip e c u lv e r t
P ip e c u lv e r t
P ip e c u lv e r t
R e p la c e w ith
P ip e c u lv e r t
P ip e c u lv e r t
R e p la c e w ith
P ip e c u lv e r t
0 6
620+00 to 650+00
PLAN
N
N
Turnout T-38
Existing utility vault
Existing utility vault
Amphibian Protection Zone
FOOTNOTE:
1 See Section 107 for requirements.
Base reinforcement (10' wide)
623+00 to 623+50, RT Base reinforcement (10' wide)
624+90 to 625+15, RT
626+28 to 627+90, RT
Base reinforce ment (10' wide)
Base reinforcement (10' wide)
628+30 to 628+90, RT
D.12
STATE PROJECT
A u g u s t
U
S S u r
D c m y fi le s p w p r o d u c ti o n d m s m o r a fl .d u g a r T e
C h e c k e d b y
D e s ig n e d b y
P ip e c u lv e r t
R e p la c e w ith
P ip e c u lv e r t
P ip e c u lv e r t
R e p la c e w ith
P ip e c u lv e r t
" P ip e c u lv e rt
" P ip e c u lv e rt
R e p la c e w ith
" P ip e c u lv e rt p ip e c u lv e r t
R e p la c e w ith
P ip e c u lv e r t
P ip e c u lv e rt
R e p la c e w ith
P ip e c u lv e rt
650+00 to 675+00
PLAN
N
N
RICKSECKER POINT
Existing utility vault
Existing utility vault
Road, see Sheet D.23 Point Loop Ricksecker
Ditch reconditioning 1
Ditch reconditioning 1
Ditch reconditioning 1
FOOTNOTE:
1 Final ditch reconditioning locations to be determined by CO.
D.13
STATE PROJECT
A u g u s t
U
S S u r
D c m y fi le s p w p r o d u c ti o n d m s m o r a fm .d u g a r T e
C h e c k e d b y
D e s ig n e d b y
P ip e c u lv e r t
18" Pip e c ulv ert
+60
P ip e c u lv e r t
P ip e c u lv e r t
" P ip e c u lv e rt
0 6
675+00 to 705+00
PLAN
N
N
Base reinforcement (10' wide)
697+10 to 698+90, RT
Road, see Sheet D.23 Point Loop Ricksecker
Base reinforcement (20' wide)
692+35 to 695+00
Base reinforcement (20' wide)
696+40 to 697+10
Existing utility vaults
Base Reinforcement (20' wide)
705+00 to 705+50
Ditch reconditioning 1
FOOTNOTE:
new drop inlet.
Reshape adjacent ditch to achieve positive drainage to the
Final ditch reconditioning locations to be determined by CO.
NPS PMIS. No. 204771 NPS Drwg. No. 105/100684
D.14
STATE PROJECT
A u g u s t
U
S S u r
D c m y fi le s p w p r o d u c ti o n d m s m o r a fn .d u g a r T e
C h e c k e d b y
D e s ig n e d b y
See Sheet G.9
Install catch basin, type 1.
See Sheet G.9
Install catch basin, type 1.
P ip e c u lv e r t
P ip e c u lv e r t
P ip e c u lv e rt
P ip e c u lv e rt
" P ip e c u lv e rt
705+00 to 735+00
PLAN
N N
Turnout T-40
Turnout T-39
Zone 8
Soil Isolation
Zone 7
Soil Isolation
733+92
Existing utility vaults (2)
Ditch reconditioning 1
Ditch reconditioning 1
FOOTNOTE:
new catch basin.
Reshape adjacent ditch to achieve positive drainage to the
Final ditch reconditioning locations to be determined by CO.
D.15
STATE PROJECT
A u g u s t
U
S S u r
D c m y fi le s p w p r o d u c ti o n d m s m o r a fo .d u g a r T e
C h e c k e d b y
D e s ig n e d b y
NPS PMIS. No. 204771 NPS Drwg. No. 105/100684
See Sheet G.9
Install catch basin, type 1.
See Sheet G.9
Install catch basin, type 1.Base reinforcement (20' wide) 705+00 to 705+50 paving. See Sheet C.2.
Taper mill along gutterline prior to
Existing stone masonry guardwall.
24" Pipe culvert
738+55
" P ip e c u lv e rt
24" Pipe culvert
749+30
18" Pipe culvert
749+87
" P ip e c u lv e rt
P ip e c u lv e rt
24" Pipe culvert 756+91
18" Pipe culv ert
760+01
735+00 to 760+00
PLAN
N
N
Turnout T-44
Turnout T-43
Turnout T-44
Turnout T-42
Turnout T-41 t o
R T
B a s e r e in fo rc e m e n t w id e
B as e re in fo rc em en t (2
0' w id e)
16+557 ot 54 +357 tnemecrofnier esaB
)ediw '02(
Base reinforcement (20' wide)
756+48 to 757+30
Base reinforcement (10' wide)
757+45 to 758+06, LT
Existing utility vaults (2)
Existing utility vaults (2)
FOOTNOTE:
Ditch reconditioning 1 and extend culvert
Relocate headwall
Final ditch reconditioning locations will be determined by CO.
stream
Unnamed perennial
NPS PMIS. No. 204771 NPS Drwg. No. 105/100684
D.16
STATE PROJECT
A u g u s t
U
S S u r
D c m y fi le s p w p r o d u c ti o n d m s m o r a fp .d u g a r T e
C h e c k e d b y
D e s ig n e d b y
9+ t o
3+ R T
Includes a portion of the right lane and turnout.
Pi pe c ul ve rt
6+
Pi pe c ul ve rt
0+
P ip e c u lv e r t
4 1 P ip e c u lv e r t
18" Pipe culvert
769+
P ip e c u lv e rt
P ip e c u lv e r t
P ip e c u lv e r t
" P ip e c u lv e rt
P ip e c u lv e r t
(Perennial flow)
24" Pipe culvert
784+90
P e r e n n ia l flo w
P ip e c u lv e r t
760+00 to 785+00
PLAN
N
N
Turnout T-45
(See Sheet E.4)
PARKING AREA
NARADA FALLS
Turnout T-46
Amphibian Protection Zone
" d e p th
B e g in fu ll w id th m illin g
Base reinforcement (10' wide)
776+75 to 777+50, RT d e p th
E n d fu ll w id th m illin g
Existing utility vaults (2)
Existing utility vault
Existing utilities present in culvert
Existing utility vaults
FOOTNOTE:
of existing utility trench and place asphalt concrete, 4" compacted depth.
After milling operation, remove material in top 4"
See Sheet C.2 for typical section.
See Section 107 for requirements.
D.17
STATE PROJECT
A u g u s t
U
S S u r
D c m y fi le s p w p r o d u c ti o n d m s m o r a fq .d u g a r T e
C h e c k e d b y
D e s ig n e d b y
P ip e c u lv e r t
P ip e c u lv e r t
Pi pe c ul ve rt
2+
Pi pe c ul ve rt
2+
P ip e c u lv e r t
" P ipe cu lve rt
5+
Pi pe c ul ve rt
8+
(Perennial flow)
24" Pipe culvert
784+90
P ip e c u lv e r t
P ip e c u lv e rt
P ip e c u lv e r t
P ip e c u lv e r t
" P ip e c u lv e rt
P ip e c u lv e rt
36" Pipe culv ert822+
24" Pipe cu lvert
826+04
823+68
Zone 9
Soil Isolation
Zone 8
Soil Isolation
D.18
STATE PROJECT
e p te m b e r
U
S S u r
D c m y fi le s p w p r o d u c ti o n d m s m o r a fr .d u g a r T e
C h e c k e d b y
D e s ig n e d b y
N
N
NPS PMIS. No. 204771 NPS Drwg. No. 105/100684
785+00 to 835+00
PLAN
Turnout T-50
Turnout T-47
Turnout T-48
Turnout T-49
Amphibian Protection Zone
Amphibian Protection Zone
FOOTNOTE:
connection
Pavement a d
C a n y o n
S te v e n s
Existing utility vaults (2)
Existing utility vaults (2)
Existing utility vaults (2)
2Construct ditch side underdrain
3Ditch reconditioning
3Ditch reconditioning
3Ditch reconditioning and extend culvert
Relocate headwall by CO.
Final ditch reconditioning locations to be determined
Sheet G.6-15 for details.
Final underdrain location to be determined by CO. See
See Section 107 for requirements.
Bas e re info rce ment (2
0' w ide
+13 to 8 35+
P ip e c u lv e r t
P ip e c u lv e r t
P ip e c u lv e r t
P ip e c u lv e r t
P ip e c u lv e r t
" P ip e cu lv e rt
(P e re n n ia l flo w
" P ip e cu lv e rt
835+00 to 860+00
PLAN
N
Turnout T-51
Existing utility vaults (2)
Existing utility vaults (2)
NPS PMIS. No. 204771 NPS Drwg. No. 105/100684
D.19
STATE PROJECT
A u g u s t
U
S S u r
D c m y fi le s p w p r o d u c ti o n d m s m o r a fs .d u g a r T e
C h e c k e d b y
D e s ig n e d b
P ip e c u lv e r t
P ip e c u lv e rt
P ip e c u lv e r t
P ip e c u lv e r t
(Pe ren nia l flo w)
36" Pip e c ulv ert
+93
860+00 to 890+00
PLAN
N
Turnout T-52
Turnout T-53
Turnout T-54
05+368 ot 02+068
T R , 8 ot 00 +688 e di w '
1( t n e mecrofnier esaB
)edi w '02
( tne mecrofnier esaB
Pavement connection
Existing utility vaults (2)
Existing utility vault
Existing utility vaults (2)
D.20
STATE PROJECT
J u n e
U
S S u r
D c m y fi le s p w p r o d u c ti o n d m s m o r a ft .d u g a r T e
C h e c k e d b y
D e s ig n e d b y
" P ip e c u lv e rt
P ip e c u lv e r t
P ip e c u lv e r t
P ip e c u lv e r t
P ip e c u lv e r t
" P ip e c u lv e rt
18" Pipe culvert
917+25
890+00 to 915+00
PLAN
N
N
Turnout T-55
Pavement connection
Pavement connection
Existing utility vaults (2)
Existing utility vaults (2)
Existing utility vaults (2)
Unnamed perennial stream
NPS PMIS. No. 204771 NPS Drwg. No. 105/100684
D.21
STATE PROJECT
A u g u s t
U
S S u r
D c m y fi le s p w p r o d u c ti o n d m s m o r a fu .d u g a r T e
C h e c k e d b y
D e s ig n e d b
18" Pip e culve rt
912+42
24" Pipe culvert
915+92
P ip e c u lv e r t
P ip e c u lv e r t
P ip e c u lv e r t
P ip e c u lv e r t
915+00 to 936+70
PLAN
N
N
Pad mount tranformer
Zone 9
Soil Isolation
929+28
Zone 10
Soil Isolation
936+70
PHASE II
NISQUALLY TO PARADISE ROAD
WA PRA MORA 14(7)
END PROJECT
Existing utility vault
Existing utility vault
Existing utility vault
Existing utility vaults (2)
See Sheet E.6
LOWER PARKING AREA
PARADISE COMPLEX
See Sheet E.7
LODGE PARKING AREA
PARADISE COMPLEX
Type 2 Subexcavation(15' wide)
935+24 to 935+45, LT
NPS PMIS. No. 204771 NPS Drwg. No. 105/100684
See Sheet C.3.
Pavement connection.
D.22
STATE PROJECT
e p te m b e r
U
S S u r
D c m y fi le s p w p r o d u c ti o n d m s m o r a fv .d u g a r T e
C h e c k e d b y
D e s ig n e d b
Paved turnout
Paved turnout
Paved turnout
N
Existing stone masonry guardwall
0+00
POINT LOOP ROAD
RICKSECKER
54+44
POINT LOOP ROAD
RICKSECKER
BEGIN
END
turnout
Paved masonry guardwall stone End of existing masonry guardwall
End existing stone masonry guardwall
Begin existing stone
LOOP ROAD
RICKSECKER POINT
See Sheets E.9-10
Construct Ashlar guardwall.
stockpile location.
Ashlar stone masonry wall
Paved turnout.
NPS PMIS. No. 204771 NPS Drwg. No. 105/100684
D.23
STATE PROJECT
A u g u s t
U
S S u r
D c m y fi le s p w p r o d u c ti o n d m s m o r a fw .d u g a r T e
C h e c k e d b y
D e s ig n e d b y
NOTE:
1.
See Subsection 105.02(a).
subsoil and in the production of aggregate-topsoil.
Ricksecker Loop Road. Material to be used for conserved
Approximately 700 cubic yards of material is stockpiled along
JH
JH
JH
QUANTITIES
TURNOUT and PARKING AREA
TABULATION OF
See Sheet E.2
Quantity included in mainline quantities.
NPS PMIS. No. 204771 NPS Drwg. No. 105/100684
E.1
STATE PROJECT
m o r a o b .d g n
U
S S u r ft
D e c k e d b u g a r T e s ig n e d b
TURNOUT SUMMARY
2. Total quantities shown on Sheet E.1
1. All turnout locations subject to field verification.
E.2
STATE PROJECT
m o r a o c .d g n
U
S S u r ft
D e c k e d b u g a r T e s ig n e d b
EAST PARKING AREA
CHRISTINE FALLS
Existing roadway centerline
Existing edge of pavement
Existing trail
N guardwall
Existing stone masonry
Remove and reset stone masonry curb
Sidewalk pavement joint
E.3
STATE PROJECT
J u n e
U
S S u r ft c m y fi le s p w p r o d u c ti o n d m s m o r a o f.
d u g a r T e
C h e c k e d b y
D e s ig n e d b y
See Sheet E.12 for details.
Construct sidewalk ramp.
Sheet E.12 for details.
Construct new asphalt sidewalk, see
Remove existing asphalt sidewalk.
Scale in feet
0 1010 20 30
Edge of travel lane
Edge of travel lane
NPS PMIS. No. 204771 NPS Drwg. No. 105/100684
NOTE:
Saw cut all pavement.
See sheet C.2 for pavement structure.
E.4 m o r a a .d g n
U
S S u r ft
D e c k e d b u g a r T e s ig n e d b y
PARKING AREA
NARADA FALLS
FOOTNOTE:
NOTE:
1- 1/ in ch d ep th
M ill p av em en t, -1 /2 i n ch d e p th
M ill p a v e m e n t, yrnosam enots teser dna evomeR llawdraug ralhsa
Pavement joint
Remove and reset stone masonry curb
4.
3.
2.
1.
12" CMP culvert.
with Type 6B inlet. Connect to existing Existing drop inlet, remove and replace
See Sheet J.4 for pavement marking details.
Concrete color to be "dark gray".
Saw cut all pavement.
before construction begins.
Submit final grading plan for approval by CO 7 days Confirm that all grades can be constructed as shown.
Remove existing asphalt sidewalk
Construct new asphalt sidewalk concrete sidewalk ramp parking stalls, accessible
Construct accessible
1-1/2 inch depth
Mill pavement, N
Scale in feet
0 2525 50 75 100
NPS PMIS. No. 204771 NPS Drwg. No. 105/100684 to existing grade 3-feet out.
-inch depth at the existing feature and taper2 by the CO, mill and remove pavement to a and connections to existing pavement, as directed At existing stone mason wall, curbing locations, See Sheet E.11 for details.
See Sheet E.12 for details.
not to exceed 1.8% slope in any direction.
Accessible parking stall and adjacent access aisle
WV
DI
WV
WF
E.5 m o r a o g .d g n
U
S S u r
D e c k e d b u g a r T e s ig n e d b y
N
PARKING AREA
NAHUNTA FALLS
0 6
Edge of pavement and gutter to remain
Existing concrete curb in the field by the CO.
Extents of work to be determined
Type 2 Subexcavation area.
NOTE:
adjust to finish grade Existing drop inlet, Remove existing Asphalt sidewalk
Scale in feet
0 2525 50 75 100
4.
3.
2.
1.
NPS PMIS. No. 204771 NPS Drwg. No. 105/100684 by the CO.
Location for stockpile-storage to be determined prior to overlay.
feet from edge. Taper mill along mainline to provide transition Mill existing asphalt 1-1/2 inch depth and taper to existing grade 3
CO.
Place aggregate topsoil in sidewalk removal area, as directed by taper to existing grade 3 feet out from existing curb.
Inch depth and 2
Along existing concrete curb and gutter, mill to 1
LOWER PARKING AREA
PARADISE COMPLEX
E.6
STATE PROJECT
m o r a e e .d g n
U
S S u r
D e c k e d b
M a d r s ig n e d b y
NPS PMIS. No. 204771 NPS Drwg. No.
concrete, 6-inch depth
Removal of pavement, Removal of curb and gutter, concrete
Full depth reclamation, method 1, 8-inch depth
Curb and gutter, concrete, 12-inch depth
Manhole adjustment
Inlet adjustment
Standard underdrain system
(taper for connection to curb and gutter) Asphalt pavement milling, 1 inch depth
ESAL
maximum size aggregate, 0.3 TO <3 million gyratory mix, 1/2-inch or 3/4-inch nominal 4 inches - Asphalt concrete pavement, ESAL maximum size aggregate, 0.3 TO <3 million gyratory mix, 1/2-inch or 3/4-inch nominal 2 inches - Asphalt concrete pavement, Scale in feet
0 4040 80 120
NOTE:
6 inches - Minor crushed aggregate
R = 35'
Length = 77'
R= 29'
Length= 101'
3.
2.
1.
See Sheet E.14 for pavement joint detail.
See Sheet J.6 for pavement marking details.
Saw cut all pavement and concrete curbing.
31 45
31 45
E.7 m o r a e f.
d g n
U
S S u r
D e c k e d b y
.M a d s ig n e d b y
N
UPPER PARKING AREA
PARADISE COMPLEX
NPS PMIS. No. 204771 NPS Drwg. No.
Inlet adjustment
Manhole adjustment
Sidewalk, concrete
Remove and reset bollard post, see detail sheet E.13
Full depth reclamation, method 1, 8-inch depth
Removal of pavement, concrete, 6-inch depth
SEE SHEET E.
Remove and reset historic markers
Scale in feet
0 4040 80 120
ENTE
R
JA
CKSON
VI
SI
TOR
Remove manhole and culverts (3)
Area of 2" milling (adjacent to visitor center)= 11,203 sqft
ESAL
maximum size aggregate, 0.3 TO <3 million gyratory mix, 1/2-inch or 3/4-inch nominal 4 inches - Asphalt concrete pavement, ESAL maximum size aggregate, 0.3 TO <3 million gyratory mix, 1/2-inch or 3/4-inch nominal 2 inches - Asphalt concrete pavement, Asphalt pavement milling, 2 inch depth prior to paving.
Sawcut pavement. Tack vertical surface
See Sheet E.14 for pavement joint details.
See Sheet J.7 for pavement marking details.
Saw cut all pavement and concrete curbing.
3.
2.
1.
38 38
E.8 m o r a e g .d g n
U
S S u r
D e c k e d b y
M a d s ig n e d b y
N
Scale in feet
0 4040 80
LODGE PARKING AREA
PARADISE COMPLEX
SEE SHEET E.
Pavement connection
Pavement connection
PARADISE LODGE
island Existing
NOTE:
NPS PMIS. No. 204771 NPS Drwg. No. 105/100684
ESAL
maximum size aggregate, 0.3 TO <3 million gyratory mix, 1/2-inch or 3/4-inch nominal 2 inches - Asphalt concrete pavement, Asphalt pavement milling, 2 inch depth
Area to mill and pave=35,669 sqft
3.
2.
1.
See Sheet E.14 for pavement joint details.
See Sheet J.8 for pavement marking details.
Saw cut all pavement and concrete curbing.
E L
E V
JH
SET M
AG N
AIL
W/
FHWA W
ASHER
E.9 m o r a o v .d g n
U
S I n t2
D e c k e d b u g a r T e s ig n e d b y
NO SCALE
Edge of pavement
Existing ground
1020LEMCP_SG
Existing Ashlar guardwall concrete block barrier
Existing temporary
2.5' 2 .5
LC
of pavement
Existing edge
B e g in G u a r d w a ll
E n d G u a r d w a ll
FOOTNOTE:
GUARDWALL
LOOP ROAD
RICKSECKER POINT
Existing Ashlar guardwall
Temporary concrete barrier
MSE WALL W/ASHLAR GUARDWALL
in
V r ie s
DETAIL A
Grade
Finished
Wire Tie (typ.) Mortar
Existing welded wire forms
Existing pavement structure
Existing MSE wall
Construct…