About this file

Amendment A002

View the file

Other files

File Type Posted
BidSum_HCRH.pdf PDF
A004_HCRH.pdf PDF
Q A.pdf PDF
A003_HCRH.pdf PDF
Q A.pdf PDF
Q A.pdf PDF
A001_HCRH.pdf PDF
Q A.pdf PDF
COMPLETE_PLAN_SET_HCRH.pdf PDF
GR_12_14__Geotech_Report_Segment_D.pdf PDF
Plan_Request_HCRH.pdf PDF
GR_10-15_Rockfall_Report_Segments_A-D_(2).pdf PDF
GR_11-14_Geotech_Report_Segment_A-E.pdf PDF
of16319_XS.pdf PDF
ESCP_-HISTORIC_COLUMBIA_RIVER_RD.pdf PDF
of16319_earthwork.pdf PDF
IFB__HCR.pdf PDF
GM_20_15_HCRH_Seg_D_Station_198_Rockfall_Recom_Memo.pdf PDF
PROJECT_DESCRIPTION_OR_PFH_163(19) _Historic_Columbia_River_Highway_Lindsey_Creek_to_Starvation_Creek_Trailhead_.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

N/A

PAGE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)

A002 10/5/15 N/A OR PFH 163(19)

Historic Columbia River Highway Lindsey Creek to Starvation Creek Trailhead

6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A

Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.

X

DTFH70-15-B-00012

9B. DATED (SEE ITEM 11)

9/10/15

10A. MODIFICATION OF CONTRACT/ORDER NO.

N/A

10B. DATED (SEE ITEM 13)

CODE: N/A FACILITY CODE: N/A N/A

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers (__ ) is extended, ( x ) is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN

ITEM 10A.

N/A

B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

N/A

C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

N/A

D OTHER (Specify type of modification and authority) N/A

E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

OR PFH 163(19), Historic Columbia River Highway, Lindsey Creek to Starvation Creek Trailhead

See page 2 for revisions.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

N/A

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)

40-01-152-8070

PREVIOUS EDITION NOT USABLE

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Amendment No. A002, dated 10-5-15 OR PFH 163(19) Solicitation No. DTFH70-15-B-00012 Historic Columbia River Highway Page 2 Lindsey Creek to Starvation Creek Trailhead

REVISIONS ARE AS FOLLOWS:

SPECIAL CONTRACT REQUIREMENTS

Page Section/Table Revision F-12-13 253.03 General Adds requirements to match the rock placement of the existing gabion baskets and to build a test section prior to installation

ENCLOSURES

Pages:

F-12-13

F-12 DIVISION 250

Special Contract Requirements Project: OR PFH 163(19), Historic Columbia River Highway State Trail, Lindsey Creek to Starvation Creek Trailhead

Section 253. — GABIONS AND REVET MATTRESSES

08/01/14– FP-14

Material

253.02 Add the following:

Weathering Agent 725.20

Construction Requirements

253.03 General. Add the following:

Prepare a sample section to match the requirements of this specification and the rock placement in the existing gabion baskets constructed for the ODOT HCRH State Trail: JB Yeon – Moffett Creek Sec located between I-84 M.P. 37.52 and 39.02.

Stain all steel products with a weathering agent in accordance with Section 563.

253.04 Basket Assembly. Delete the first paragraph and substitute with the following:

Furnish welded wire baskets. Do not damage wire coatings during basket assembly, structure erection, cell filling, or backfilling. Rotate the basket panels into position and join the vertical edges with fasteners according to Subsection 253.05. Temporary fasteners may be used for basket assembly if they are supplemented during structure erection with permanent fasteners according to Subsection 253.05.

Fabricate gabions so that the sides, ends, lid and diaphragms can be assembled at the construction site into rectangular baskets of the specified sizes. Dimensions for heights, lengths and widths of gabion baskets will be as indicated on the plans with a tolerance of plus or minus 3 percent. Gabions will be of single unit construction. Connect the base, lid, ends and sides into a single unit or connect one edge of these members to the base section of the gabion in such a manner that strength and flexibility at the point of connection is at least equal to that of the mesh.

The diaphragm material will be of the same mesh and size as the body of the gabions. Furnish the gabion with the necessary diaphragms secured in proper position on the base such that no additional tying at this juncture will be necessary. Assemble the wire mesh panels (base, ends, sides, diaphragms and lid) so strength and flexibility at connections is at least equal to that of a single panel.

253.06 Cell Filling. Delete the last two paragraphs and substitute with the following:

Fill the cells in a row or layer to ensure no cell is filled more than 12 inches above an adjacent cell. Repeat this process until the basket is full and the lid bears the final rock layer. Completely fill cells so that the lid will bear on the rock when it is secured. Secure the lid so that no more than a 1-inch gap remains at any connection.

Secure lid to the sides, ends, and diaphragms according to Subsection 253.05. Make exposed basket surfaces smooth and neat with no sharp rock edges projecting through the wire mesh.

Revised by Amendment A002

F-13 DIVISION 250

Special Contract Requirements Project: OR PFH 163(19), Historic Columbia River Highway State Trail, Lindsey Creek to Starvation Creek Trailhead

Gabion rows or layers not completed at the end of each shift, will have the last gabion filled with rock tied internally as an end gabion.

Construct gabions to match the character of the rock placement in the approved sample section.

Revised by Amendment A002

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
A002