MT PRA GLAC 10(40) Going-to-the-Sun Road Rehabilitation, Rising Sun to St Mary, Phase 13, Glacier National Park, Glacier County, Montana

Work:

• Going-to-the-Sun-Road, St. Mary Bridge to Divide Creek Bridge - Grading, minor drainage, base, paving, minor bridge work, masonry, pullouts, a cattle guard and other smaller items of work.

• Sun Point Parking Lot - Reconstructing existing parking lot, reconstruction or repointing of existing masonry, drainage, paving, and striping.

Project length: 0.96 miles

Tentative Fixed Completion Date: Fall 2016 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Estimated Price Range: $3 million to $5 million

Location: 0.1 mile northwest of St. Mary, Montana

DESCRIPTION OF WORK in US CUSTOMARY UNITS, FP-03

Item of work Quantity DIVISION 150 – Project Requirements 152 Construction Survey & Staking Yes 153 Contractor Quality Control and Assurance Yes 154 Contractor Sampling & Testing Yes 155 Schedules for Construction Contracts (construction schedules) Yes 157 Soil Erosion Control Devices silt fence sidement wattle 2,000 lnft;

3,200 lnft

158 Watering for Dust Control Lump sum DIVISION 200 – Earthwork 202 Additional Clearing & Grubbing (clearing & grubbing) Remove 1 tree 203 Removal of Structures & Obstructions (structures, demolition) Remove 20 boulders;

Remove 1 cattle guard;

Remove 3 pipe culverts;

Remove 1 sign & stone foundation;

Remove 4 wheelstops;

Remove of 54 lnft curb stone;

Remove 118 lnft fence;

Plug 3 existing pipes

204 Excavation & Embankment roadway excavation ditch excavation berm construction

11,000 cuyd 412 cuyd 15 lnft

207 Earthwork Geotextiles (geotextiles) 97 sqyd of geotextiles 211 Roadway Obliteration, method 1 2,250 sqyd

DIVISION 250 – Slope Reinforcement and Retaining Walls 251 Riprap class 1 class 2 Boulders

7 cuyd 13 cuyd 156 ea

258 Reinforced Concrete Retaining Walls (retaining walls) 42 sqft DIVISION 300 – Aggregate Courses 305 Aggregate-Topsoil Course 275 cuyd 308 Minor Crushed Aggregate (crushed aggregate) 11,300 Tons of method 2 DIVISION 400 – Asphalt Pavements & Surface Treatments 403 Hot Asphalt Concrete Pavement (asphalt concrete pavement) 3,500 Ton 412 Asphalt Tack Coat (asphalt surface treatment) 1 Ton DIVISION 500 – Rigid Pavement 501 Portland Cement Concrete Pavement 72 sqyd DIVISION 550 – Bridge Construction 559 Waterproofing (concrete – major structures) 594 sqyd 575 Minor Bridge Work $25,000 lpsm DIVISION 600 – Incidental Construction 601 Minor Concrete Structures

Concrete headwall for 72-inch diameter pipe Concrete planks

4 each 53 each

602 Culverts & Drains (indicate one or both) 12-inch pipe culvert 30-inch pipe culvert

6 feet span, 4 feet rise precast reinforced concrete box culvert

222 lnft 78 lnft 99 lnft

604 Manholes, Inlets, & Catch Basins(culverts & drains) catch basin, type 1 2 ea

605 Underdrains, Sheet Drains & Pavement Edge Drains (culverts & drains) 4-inch pvc pipe 10 lnft

607 Cleaning, Reconditiong, and Repairing Existing Drainage Structures Cleaning culverts in place 132 lnft

609 Curb & Gutter (concrete – minor structures) (indicate which) Curb, concrete, 18-inch depth

Reset curb, 18-inch stone Concrete wheelstops (log pattern)

550 lnft 445 lnft 48 each

611 Water Systems 4-inch waterline (HDPE) 6-inch waterline (HDPE) 8-inch waterline (HDPE)

10-inch waterline (HDPE) Valve blow-off

4-inch valve gate 6-inch valve gate

6-inch tee Bends Tie-ins

1,385 lnft 1,989 lnft 252 lnft 83 lnft 1 ea 1 ea 1 ea 1 ea 7 ea 3 ea

615 Sidewalks, Drive Pads & Paved Medians sidewalk, exposed aggregate concrete 953 sqyd 619 Fences, Gates & Cattle Guards 2-rail log fence

Jack-leg fence 24-foot cattle guard

32 lnft;

100 lnft;

1 ea

620 Stone Masonry Stone Masonry (combined) Stone masonry steps

Remove and reset stone masonry retaining wall veneer

Lump sum 17 lnft 8 sqyd

622 Rental Equipment Yes 624 Topsoil (landscaping & related items)

Furnishing and placing topsoil 4,400 sqyd 633 Permanent Traffic Control Devices (traffic control devices) 10 sqft 634 Permanent Pavement Markings (traffic pavement markings) 19,500 lnft 635 Temporary Traffic Control – Flagger 300 hrs 646 Buildings and Fixtures (use pay item description)

Fixture, Wayside Exhibit (Entrance Sign) 1 each

DIVISION 200 – Earthwork
DIVISION 250 – Slope Reinforcement and Retaining Walls
DIVISION 300 – Aggregate Courses
DIVISION 400 – Asphalt Pavements & Surface Treatments
DIVISION 500 – Rigid Pavement
DIVISION 550 – Bridge Construction