YELLOWSTONE, GRAND TETON, & SURROUNDING AREA MATOC

TASK ORDER REQUEST FOR PROPOSALS

Solicitation No. DTFH70-14-R-00003

WY PLD GRTE 700(2)

GRAND TETON PARK PATHWAYS, PHASE III

Solicitation, Offer & Award, Bid Schedule, Contract Clauses, Minimum Wage Schedule, Special Contract Requirements, and Plans

This solicitation cites Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-03 - US Customary

ISSUING OFFICE:

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

610 EAST FIFTH STREET

VANCOUVER, WA 98661-3801

Phone: (360) 619-7520 – FAX: (360) 619-7932 Web site: http://www.wfl.fhwa.dot.gov/contracting/ e-mail: wfl.contracts@dot.gov

QUICK INDEX

Page Item --- Special Notice --- Offer Submittal Checklist --- Authority to Sign --- Bid Bond --- Table of Contents A-1 Notice to Offerors A-3 SF 1442, Solicitation, Offer and

Award A-6a Subcontracting Plan A-7 Bid Schedule B-1 Solicitation Provisions C-1 Contract Clauses D-1 Davis-Bacon Wage Rates E-1 Special Contract Requirements H-1 Permits

PROPOSAL REMINDERS

Electronic proposals will not be accepted. Submit printed copy to the address listed on the enclosed SF 1442.

Before submitting your proposal, please review the following:

• Have you rechecked your figures?

• Have you completed the bid schedule?

• Have you completed and signed the SF 1442, Solicitation, Offer & Award?

• Have you acknowledged all amendments?

• Have you completed the Representations &

Certifications (Page B-1)?

• Is your bid guarantee enclosed in proper form and amount (see FAR Clause 52.228-1), including Power of Attorney affidavit?

• Does the lower left corner of the proposal envelope state “Proposal Enclosed”?

• Does the lower left corner include DTFH70-14-R- 00003 and the project number/name?

A-1 Notice to Offerors

Proposal Due Date:

See page A-3, Block 13A http://www.wfl.fhwa.dot.gov/contracting/ mailto:wfl.contracts@dot.gov

PROJECT NAME WY PLD GRTE 700(2)

BEGINNING AT 719+22.00

ENDING AT 782+12.08

LENGTH 1.25 MILES

NATIONAL PARK GRAND TETON

COUNTY TETON

STATE WYOMING

FIXED COMPLETION DATE See FAR Clause 52.211-10 (FAR Clauses begin on page C-1)

SPECIAL NOTICE

Solicitation No.: DTFH70-14-R-00003

THIS “TASK ORDER REQUEST FOR PROPOSAL” IS SOLELY FOR THE

FOLLOWING CONTRACTS AND CONTRACTORS:

Contract Number Contractor Name Contractor Number DTFH7014D00003 Knife River Corporation – Northwest 208.362.6152 DTFH7014D00004 HK Contractors, Inc. 208.523.6600 DTFH7014D00005 Eagle Peak Rock & Paving, Inc. 530.233.4568 DTFH7014D00006 Riverside Contracting, Inc. 406.721.9267 DTFH7014D00007 Granite Construction Company 831.724.1011 DTFH7014D00008 Oftedal Construction, Inc. 307.232.2303 DTFH7014D00009 Skanska USA Civil West Rocky 970.565.8000

Mountain District Inc.

THIS PROJECT IS BEING ADVERTISED ON THE FEDERAL BUSINESS

OPPORTUNITIES WEBSITE TO ANNOUNCE THE UPCOMING PROJECT

AND ASSIST POTENTIAL SUBCONTRACTORS BY PUBLICIZING

OPPORTUNITIES. A PROPOSAL WILL ONLY BE ACCEPTED FROM THE

ABOVE PRIME CONTRACTORS.

Additional information may be found on our web pages:

Construction Projects:http://www.wfl.fhwa.dot.gov/contracting/construction/upcoming.htm Description: This web page contains links to access upcoming (synopsized) projects, advertised (solicitation) projects, bids and proposals received, awarded projects, awarded IDIQ contracts, bid tabs, and bid history.

Advertised Projects: www.wfl.fhwa.dot.gov/contracting/construction/advertised.htm

Description: This web page contains projects that are out for bid with links to the Federal Business Opportunities project page, question submittals, and a link to the project Question and Answers.

Yellowstone/Grand Teton MATOC1: http://www.wfl.fhwa.dot.gov/contracting/construction/idiq/ygt.htm

Description: This web page contains the contractor’s information, a description of the contract and the projects that have been awarded under the contract.

1 A Multiple Award Task Order Contract (MATOC) is a group of contracts awarded to several contractors for upcoming work in a certain geographical area (in this case, work in Yellowstone and Grand Teton National Parks).

The contracts allow the contractor to compete for upcoming highway/bridge construction projects.

http://www.wfl.fhwa.dot.gov/contracting/construction/upcoming.htm http://www.wfl.fhwa.dot.gov/contracting/construction/advertised.htm http://www.wfl.fhwa.dot.gov/contracting/construction/idiq/ygt.htm

Offer Submittal Checklist

Grand Teton Park Pathways, Phase III

Before submitting your offer, please review the following: Done?

Is this in the envelope?

Offer Envelope

Did I correctly address the envelope? (See page A-3, blocks 7 & 8) Does the lower left corner of the envelope include the Solicitation Number and the project name/number?

Pages A-3 & A-4 (SF 1442, Solicitation Offer & Award) Did I include our firm name and address in block 14?

Did I include our firm’s phone number in block 15?

Did I include our firm’s remittance address in block 16?

(Use when different than block 14)

Did I include my DUNS number?

Did I include the number & date of all amendments in block 19?

Did the appropriate official sign/date in block 20A, 20B & 20C?

Bid Schedule (see page A-7) Did I insert “Unit Bid Price” and “Amount Bid” for each bid item?

Did the appropriate official initial corrections?

Did I include the “Total” on the last page of each bid schedule?

Did I include the firm’s name on the last page of each bid schedule?

When applicable, did I include the totals for each schedule in the summary page? (See last page of bid schedules.)

Bid Bond (Standard Form 24) Offers received without a valid bid bond will be rejected.

Did I complete my bid bond correctly?

Did I attach the Power of Attorney to the bid bond?

Authority to Sign Did I include a completed form for each person signing the SF1442 and Bid Bond?

Representations & Certifications & FAR Clause Did I include the completed B-pages (beginning on B-1)?

Did I include the completed clause 1252.228-73 Notification of Miller Act Payment Bond Protection (See page C-102)?

System for Award Management (SAM) https://www.sam.gov/portal/public/SAM/ Do we have up-to-date data in SAM?

Vets100 Reporting http://www.dol.gov/vets/vets100filing.htm If applicable, did I ensure our firm has completed this annual report?

NOTE: The Contractor is fully responsible to verify that all data is correct each time a offer package is submitted. Failure to properly input and/or update your data may cause the offer to be rejected.

https://www.sam.gov/portal/public/SAM/ http://www.dol.gov/vets/vets100filing.htm

Driving Directions to our Vancouver Washington Office:

See our web page at http://www.wfl.fhwa.dot.gov/about/directions.htm http://www.wfl.fhwa.dot.gov/about/directions.htm

WY PLD GRTE 700 (2),

INSTRUCTIONS: When the offeror/principal is a corporation, include this certification with your offer/bid.

Corporate Certificate

I, ____________________________________________ (name), certify that I am the

________________________________________(title), of the corporation named as the Offeror/Principal herein;

that _________________________________________(name), who signed this offer and/or bid bond on behalf of ___________________________ (company name) is

________________________________________ (title) of this corporation;

that the offer was duly signed for and on behalf of said corporation by authority and scope of its governing body, and within the scope of its corporate powers.

_____________________________________ (signature) Affix Corporate Seal

_____________________________________ (title)

BID BOND

( See instructions on reverse)

DATE BOND EXECUTED (Must not be later than bid opening date) OMB Number: 9000-0045

Expiration Date: 6/30/2016 Public reporting burden for this collection of information is estimated to average 25 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspects of this collection of information, including suggestions for reducing this burden, to the FAR Secretariat (MVR), Federal Acquisition Policy Division, GSA, Washington, DC 20405.

PRINCIPAL (Legal name and business address) TYPE OF ORGANIZATION ("X" one)

INDIVIDUAL

JOINT VENTURE

PARTNERSHIP

CORPORATION

STATE OF INCORPORATION

SURETY(IES) (Name and business address)

PERCENT

OF BID

PRICE

PENAL SUM OF BOND

AMOUNT NOT TO EXCEED

MILLION (S) THOUSAND(S) HUNDRED(S) CENTS

BID IDENTIFICATION

BID DATE

FOR (Construction, supplies, or Services)

INVITATION NO.

OBLIGATION

We, the Principal and Surety (ies) are firmly bound to the United States of America (hereinafter call the Government) in the above penal sum. For payment of the penal sum, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally. However, where the sureties are corporations acting as co-sureties, we, the Sureties, bind ourselves in such sum "jointly and severally" as well as "severally" only for the purpose of allowing a joint action or actions against any or all of us. For all other purposes, each Surety binds itself, jointly and severally with the Principal, for the payment of the sum shown opposite the name of the Surety. If no limit of liability is indicated, the limit or liability is the full amount of the penal sum.

CONDITIONS:

The principal has submitted the bid identified above.

THEREFORE:

The above obligation is void if the Principal - (a) upon acceptance by the Government of the bid identified above, within the period specified therein for acceptance (sixty (60) days if no period is specified), executes the further contractual documents and gives the bond(s) required by the terms of the bid as accepted within the time specified (ten (10 days if no period is specified) after receipt of the forms by the principal; or (b) in the event of failure to executes such further contractual documents and give such bonds, pays the Government for any cost of procuring the work which exceeds the amount of the bid.

Each surety executing this instrument agrees that its obligations is not impaired by any extension(s) of the time for acceptance of the bid that the principal may grand to the Government. Notice to the surety (ies) of extensions (s) are waived. However, waiver of the notice applies only to extensions aggregating not more than sixty (60) calendar days in addition to the periods originally allowed for acceptance of the bid.

WITNESS

The principal and Surety (ies) executed this bid bond and affixed their seals on the above date.

PRINCIPAL

SIGNATURE(S)

NAME(S) &

TITLE(S)

(Typed)

1.

1. 2.

2.

3.

3.

(Seal) (Seal) (Seal) Corporate Seal

INDIVIDUAL SURETY(IES)

SIGNATURE(S)

NAME(S)

(Typed)

1.

1.

2.

2.

(Seal) (Seal)

CORPORATE SURETY(IES)

SU

R

ET

Y

A

NAME &

ADDRESS

STATE OF INC. LIABILITY LIMIT ($)

SIGNATURE(S)

NAME(S) &

TITLE(S)

(Typed)

1.

1.

2.

2. Corporate Seal

AUTHORIZED FOR LOCAL REPRODUCTION

Pervious edition is usable

STANDARD FORM 24 (REV. 10/1998)

Prescribed by GSA - FAR (48 CFR) 53.228(a)

DTFH70-14-R-00003

WY PLD GRTE 700(2),

SU

R

ET

Y

B

NAME &

ADDRESS

STATE OF INC. LIABILITY LIMIT ($)

SIGNATURE(S)

NAME(S) &

TITLE(S)

(Typed)

1.

1.

2.

2. Corporate Seal

Corporate Seal

LIABILITY LIMIT ($)STATE OF INC.

2.

2.

1.

1.NAME(S) &

TITLE(S)

(Typed)

SIGNATURE(S)

NAME &

ADDRESS

SU

R

ET

Y

C

Corporate Seal

LIABILITY LIMIT ($)

2.

2.

STATE OF INC.

1.

1.

NAME(S) &

TITLE(S)

(Typed)

SIGNATURE(S)

NAME &

ADDRESS

SU

R

ET

Y

D

Corporate Seal

LIABILITY LIMIT ($)

2.

2.

STATE OF INC.

1.

1.

NAME(S) &

TITLE(S)

(Typed)

SIGNATURE(S)

NAME &

ADDRESS

SU

R

ET

Y

E

Corporate Seal

LIABILITY LIMIT ($)

2.

2.

STATE OF INC.

1.

1.

NAME(S) &

TITLE(S)

(Typed)

SIGNATURE(S)

NAME &

ADDRESS

SU

R

ET

Y

F

Corporate Seal

LIABILITY LIMIT ($)

2.

2.

STATE OF INC.

1.

1.

NAME(S) &

TITLE(S)

(Typed)

SIGNATURE(S)

NAME &

ADDRESS

SU

R

ET

Y

G

INSTRUCTIONS

1. This form is authorized for use when a bid guaranty is required. any deviation from this form will require the written approval of the Administrator of General Services.

2, Insert the full legal name and business address of the Principal in the space designated "Principal" on the face of the form. An authorized person shall sign the bond. Any person signing in a representative capacity (e.g., ab attorney-in-fact) must furnish evidence of authority if that representative is not a member of the firm, partnership, or joint venture, or an officer of the corporation involved.

3. The bond may express penal sum as a percentage of the bid price. In these cases, the bond may state a maximum dollar limitation (e.g., 20% of the bid price but the amount not to exceed dollars).

4. (a) Corporation executing the bond as sureties must appear on the Department of the Treasury's list of approved sureties and must act within the limitation listed therein. where more than one corporate surety is involved, their names and address shall appear in the spaces (Surety A, Surety B, etc.) headed "CORPORATE SURETY (IES)." In the space designed "SURETY (IES)" on the face of the form, insert only the letter identification of the sureties.

(b) Where individual sureties are involved, a completed Affidavit of Individual surety (Standard Form 28), or each individual surety, shall accompany the bond. The Government may require the surety to furnish additional substantiating information concerning its financial capability.

5. Corporations executing the bond shall affix their corporate seals. Individuals shall execute the bond opposite the word " Corporate Seal";

and shall affix an adhesive seal if executed in Maine, New Hampshire, or any other jurisdiction requiring adhesive seals.

6. Type the name and title of each person signing this bond in the space provided.

7. In its application to negotiated contracts, the terms "bid" and "bidder" shall include "proposal" and "Offeror."

STANDARD FORM 24 (REV. 10/1998) BACK

Table of Contents Project: WY PLD GRTE 700 (2), Grand Teton Park Pathways, Phase III

03USC03/19/14

TABLE OF CONTENTS

DESCRIPTION PAGE

Notice to Offeror .................................................................................................................... A-1

Solicitation, Offer, and Award (SF 1442) .............................................................................. A-3

Bid Schedule .......................................................................................................................... A-7

Solicitation Provisions ........................................................................................................... B-1

Contract Clauses .................................................................................................................... C-1

Minimum Wage Schedule ...................................................................................................... D-1

SCRs Table of Contents

SPECIAL CONTRACT REQUIREMENTS (SCRs)

The following Special Contract Requirements amend and supplement the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-03) U.S. Customary Version, U.S. Department of Transportation, Federal Highway Administration.

Division 100..................................................................................................................... E-1 Division 150..................................................................................................................... E-38

Division 200..................................................................................................................... F-1 Division 250..................................................................................................................... F-16 Division 300..................................................................................................................... F-22 Division 400..................................................................................................................... F-28 Division 550..................................................................................................................... F-36 Division 600..................................................................................................................... F-37

Division 700..................................................................................................................... G-1

Permits .................................................................................................................................... H-1

Table of Contents Project: WY PLD GRTE 700 (2), Grand Teton Park Pathways, Phase III

(This page intentionally left blank.)

A-1

Notice to Offeror Project: WY PLD GRTE 700(2), Grand Teton Park Pathways, Phase III

03USC04/01/13

NOTICE TO OFFERORS

I. Project Location.

The project work is located approximately 12.3 miles north of Jackson, Wyoming along Highway 89 (Outside Highway) in Teton County. Approximate Global Positioning System (GPS) coordinates for the beginning of the project are N=1476592.17, E=2459353.69, EL=6501.32.

Signs have not been erected to identify the project limits. No Government personnel will be available for show-me tours.

II. Pre-proposal Information.

This solicitation is solicited under the Yellowstone, Grand Teton, and Surrounding Area Multiple Award Task Order Contract (MATOC). Selection of the successful offer is based on price

Electronic Plans. This solicitation includes electronic plan sheets available at http://www.wfl.fhwa.dot.gov/contracting/construction/plans/grand-teton/. The plan sheets can be viewed or downloaded by individual sections, or by the entire plan set. A paper copy of the plan sheets is available by submitting the form posted with this solicitation.

Physical Data. Geotechnical, hydraulic, environmental, and design data applicable to this project is listed in FAR Clause 52.236-4 Physical Data. A CD of the physical data is available by submitting the form posted with this solicitation.

REPS & CERTS. Submit or update Representations and Certifications online at https://www.sam.gov/portal/public/SAM/ before bid submittal. For more details go to FAR Provision 52.204-8 Annual Representations and Certifications (see page B-2). If you have previously registered on-line and the NAICS code for this solicitation is different than the code listed in your online file, please note the amended changes on the lines provided in FAR 52.204-8.

Requests for technical information (Plan and Division 100 – 700 Specification questions only) about this project will only be accepted in writing (see Block 9 on page A-5).

TECHNICAL QUESTIONS REGARDING PROPOSED WORK FOR THIS

PROJECT WILL BE ACCEPTED UNTIL CLOSE-OF-BUSINESS ON JULY 3, 2014.

Questions can be submitted and answers viewed by going to project information at:

http://www.wfl.fhwa.dot.gov/contracting/construction/advertised.htm Every attempt to respond to questions will be made. However, response to questions received after the above posted date is not guaranteed.

http://www.wfl.fhwa.dot.gov/contracting/construction/plans/grand-teton/ http://www.wfl.fha.dot.gov/edi/current.htm

A-2

Particular attention should be paid to Standard Form l442, Solicitation, Offer and Award, to assure that Blocks 14, 15, 16, 19, 20A, and 20C are completed correctly. Sign Block 20B according to the instructions in Subsection 102.02. You must submit a completed ‘Authority to Sign’ document. You must also complete the representations and certifications contained in the Contract Provisions beginning on page B-1. Failure to furnish or complete any of the above may result in your bid being considered nonresponsive and being rejected.

Facsimile and email offers are not authorized for this solicitation. Offers may be modified or withdrawn by facsimile, if such notice is received by the time specified for receipt of offers. The Government will not be responsible for any failure attributable to the transmission or receipt of facsimile data. See FAR Provision 52.215-1, Instructions to Offerors – Competitive Acquisition.

FAX 360-619-7932.

Surety Bond Guarantee Program. Small businesses that need surety bonds can qualify for U.S.

Small Business Administration (SBA) backed surety bonds of up to $5,000,000. SBA assistance in locating a participating surety company or agent, and completing application forms is available online. For more information on the U.S. SBA’s Surety Bond Guarantee program, go online to http://www.sba.gov/aboutsba/sbaprograms/osg/index.html or call 1-800-U-ASK-SBA.

Current and potential U.S. Department of Transportation (DOT) Contractors have recently been receiving fraudulent letters purporting to be issued by DOT. These fraudulent letters request that the Contractors resubmit their banking information to DOT. If you receive such a letter, please DO NOT complete the requested worksheet that is attached to the letters and DO NOT release any information. To register or update information, Contractors are required to go directly through the System for Award Management (SAM) website and never through a third party. You can access SAM at https://www.sam.gov/portal/public/SAM/.

III. Post Award Information.

Insurance requirements are set forth in Subsection 107.05.

Contractor Performance Evaluations. This office posts performance evaluations in the Contractor Performance Assessment Reporting System (CPARS) at:

http://www.cpars.gov/index.htm. Upon receiving an email notice of evaluation availability, you will have 30 days to review the evaluation online and submit comments. If you are unable to access the system, call 360.619.7520 for assistance or for a copy of the evaluation.

EEBACS. Use the Government’s web-based system, Engineer’s Estimating, Bidding, Award, and Construction System (EEBACS), to prepare all Contractor’s Daily Report of Construction Operations (CDR’s) and measurement notes (pay notes).

Submit a user account form to gain access to the EEBACS system. See Subsection 108.01.

A user guide, “EEBACS for Construction Contractors”, is available. An electronic version can be found at http://flh.fhwa.dot.gov/resources/pse/estimate/guide.htm http://www.sba.gov/aboutsba/sbaprograms/osg/index.html http://www.cpars.gov/index.htm http://flh.fhwa.dot.gov/resources/pse/estimate/guide.htm

A-2a

IV. Specifications and Permits.

This solicitation and subsequent contract are governed by the Federal Acquisition Regulation (FAR), agency supplemental regulations, and the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-03 U.S. Customary Units. Obtain paper copies of the FP-03 by calling 360-619-7520, e-mailing at plans_spec@dot.gov, or writing Federal Highway Administration, 610 East Fifth Street, Vancouver, WA 98661. An electronic version may be found at http://flh.fhwa.dot.gov/resources/pse/specs/

NPDES Permits. Carefully review Sections 107 and 157 in the Special Contract Requirements. New requirements are included relating to National Pollutant Discharge Elimination System (NPDES) permitting and the Storm Water Pollution Prevention Plan (SWPPP), that substantially change the work required under these Sections as compared to previous versions. Work on the SWPPP may begin before the Notice to Proceed is given (see Subsection 107.01A(b)).

Carefully review Section 155 Schedules for Construction Contracts in the Special Contract Requirements. New requirements are included that change the work required under this section as compared to previous versions. A change to the progress payment approval concerning schedule submissions has also been included in this contract. See Subsections 155.03 and 155.05.

Section 255, Mechanically-Stabilized Earth Walls, specifies a proprietary product. See FAR Provision 52.211-6, Brand Name or Equal, when opting to use alternate products.

Bid Item 25501-1000 Mechanically Stabilized Earth Wall, Welded Wire Face includes a Weathering Agent that has been identified as “Brand Name or Equal”. If your offer is based on a brand name different than that listed in the Special Contract Requirements, the proposed “equal” must be identified in the space provided on the Bid Schedule. Include with your offer all documentation needed by the Government to determine if the proposed product meets the requirements listed in the appropriate Section. The evaluation of offers and the determination as to equality of the product offered is the responsibility of the Government and will be based on information furnished by the Offeror as well as other information reasonably available to the contracting office. If the proposed “equal” is determined by the government to be “not equal”, the bid will be considered nonresponsive.

http://flh.fhwa.dot.gov/resources/pse/specs/

A-2b

(This page intentionally left blank.)

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

Federal Highway Administration

Western Federal Lands Highway Div.

610 East Fifth Street Vancouver WA 98661-3801

WFLHD

Attn: Contracts

See Page A-5 360-619-7520

1x 06/09/2014

DTFH70-14-R-00003

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

This solicitation is being offered under the Yellowstone, Grand Teton, & Surrounding

Area MATOC and is designated WY PLD GRTE 700(2), Grand Teton Park Pathways, Phase

III, Grand Teton National Park, Teton County, Wyoming

IN STRICT ACCORDANCE WITH:

Bid Schedule

Federal Acquisition Regulations (FAR) and Transportation Acquisition Regulations

(TAR)

General Wage Decision

Special Contract Requirements

Standard Specifications for Construction of Roads and Bridges on Federal Highway

Projects, FP-03 US Customary

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 calendar days and complete it within ________________ ________________ calendar days after receiving

07/09/2014

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

Angy.Liljedahl Typewritten Text WY PLD GRTE 700(2), Grand Teton Park Pathways, Phase III

Angy.Liljedahl Typewritten Text

Angy.Liljedahl Typewritten Text

Angy.Liljedahl Typewritten Text Page A-5

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

Federal Highway Administration Western Federal Lands Highway Div.

610 East Fifth Street Vancouver WA 98661-3801

WFLHD

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

Angy.Liljedahl Typewritten Text See Bid Schedule

Angy.Liljedahl Typewritten Text All Items on bid schedule

Angy.Liljedahl Typewritten Text See Page A-5

Angy.Liljedahl Typewritten Text Federal Highway Administration Western Federal Lands Highway Div.

610 East Fifth Street Vancouver WA 98661-3801 Attn: Finance

Angy.Liljedahl Typewritten Text

Angy.Liljedahl Typewritten Text Attn: Construction Office

Angy.Liljedahl Typewritten Text

Angy.Liljedahl Typewritten Text

Angy.Liljedahl Typewritten Text Angy Liljedahl

Angy.Liljedahl Typewritten Text

DUNS:

A-5

Continuation SF 1442 WY PLD GRTE 700(2), Grand Teton Park Pathways, Phase III

Block 9 FOR GENERAL INFORMATION, call 360.619.7520 from the hours of 8:00 a.m. to 4:00 p.m. local time or e-mail us at wfl.contracts@dot.gov. You can also submit questions online from our Western Federal Lands webpage as described below.

FOR TECHNICAL INFORMATION (plan and specification questions only), requests for technical information about this project will only be accepted in writing.

Submit questions via fax (360.619.7932) or e-mail at plans_spec@dot.gov (plans_spec@dot.gov).

QUESTIONS/ANSWERS POSTED ONLINE. You can view questions and answers on our Western Federal Lands website http://www.wfl.fhwa.dot.gov/contracting/construction/advertised.htm.

• In “Advertised Projects”

• Scroll to the project.

• Click on “View all answered Questions”.

FOR DAVIS-BACON WAGE RATE INFORMATION call the Department of Labor at 972.850.2627 (DRBA – Southwest Region).

FOR PHYSICAL DATA, See FAR Contract Clause 52.236-4, Physical Data, (clauses begin on page C-1) for a listing of available data. To obtain copies of Physical Data, submit a written request to the Contracts Section, FAX 360.619-7932 or e-mail us at wfl.contracts@dot.gov. Requests should be made early to assure timely arrival.

Block 11 COMPLETION DATE: Work shall be completed on or before the date specified in FAR Clause 52.211-10, Commencement, Prosecution, and Completion of Work, subject to such extensions as may be authorized by the terms of the contract and the specifications made a part thereof. Contract Clauses begin on pages C-1.

Block 12A PERFORMANCE & PAYMENT BONDS: See FAR Clause, 52.228-15, Performance and Payment Bonds - Construction (clauses begin on page C-1) and Subsection 102.06 of the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-03 U.S. Customary Units

Block 13B BID BOND AMOUNT: See FAR Clause 52.228-1, Bid Guarantee (clauses begin on page C-1).

ADDITIONAL INFORMATION: See Subsections 102.03 and 102.04 of Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP- 03 U.S. Customary Units

Block 24 SUBMITTING INVOICES: See Subsection 109.08 of the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects FP-03 U.S. Customary Units mailto:plans_spec@dot.gov http://www.wfl.fhwa.dot.gov/contracting/construction/advertised.htm

A-6

Continuation SF 1442

ESTIMATED PRICE RANGE. The price range of the project work is between $2,000,000 and $3,000,000.

SUBCONTRACTING PLAN. This Request for Proposals requires an offeror who is a LARGE business to submit an acceptable subcontracting plan prior to contract award. A large business is one whose average gross annual receipts over the past 3 years equal $33.5 million or more. For your information the subcontracting plan form is included beginning on page A-6a. This requirement does not apply to SMALL businesses

Subcontracting Plan – A-6a

For Information Only. Do not submit with your bid.

NOTES:

• Consider the following FHWA small business goals in development of Task Order

Subcontracting plans and efforts:

FHWA Small Business Goals (As of FY 2013) Business Size Goal (%)

SB 39.1%

SDB 14.1%

HUBzone 14.5%

WOSB 5.8%

SDVOSB 3.0%

• Where the offeror has an existing approved master subcontracting plan, those goals may be reflected in the proposed plan for this task order. Please note as such.

• Where subcontracting opportunities will not exist for this task order, furnish a statement to that effect signed by an authorized official.

• Offeror may use their subcontracting plan format provided the information remains clear, consistent, and meets the requirements of FAR Clause 52.219-9 Small Business Subcontracting Plan.

• Text lines may be added to this form as needed.

• In the first table, provide information expressed in terms of goal percentages of the total planned subcontracting dollars.

• If a subcontractor qualifies in more than one category, include the subcontract amount in each applicable category. If you have questions, contact the Contracting Officer. [Example: If ABC Inc is a small business, a certified HUBZone small business, and a Women-owned small business, then their subcontract amount of $100,000 would be included in the dollar values shown in rows d, g, and i.]

Subcontracting Plan – A-6b

• The following principal types of supplies and/or services are planned to be subcontracted under this task order. (Indicate if planned to subcontract to a LARGE, SB, VOSB, SDVOSB, HUBz, SDB, or WOSB business concern.)

Type of Supply/Service to be subcontracted

Company (if known)

Address (city/state)

Subcontractor type

LARGE, SB, VOSB,

SDVOSB, HUBz, SDB, WOSB

(enter one or more as applicable)

TASK ORDER SUBCONTRACTING PLAN

a. Total prime task order amount $

Ratio Goals

Percent

b. Total planned subcontract awards $

c. Total planned subcontract awards to Large Business concerns (LARGE) $

d. Total planned subcontract awards to all Small

Business concerns (SB) $ (d/b) %

e. Total planned subcontract awards to Veteran-Owned

Small Business concerns (VOSB) $ (e/b) %

f. Total planned subcontract awards to Service-Disabled

Veteran-Owned Small Business concerns (SDVOSB) $ (f/b) %

g. Total planned subcontract awards to certified

HUBZone Small Business concerns (HUBz) $ (g/b) %

h. Total planned subcontract awards to Small Disadvantaged Business concerns (SDB) (includes ANCs and Indian Tribes) $ (h/b) %

i. Total planned subcontract awards to Women-Owned Small Business concerns (WOSB) $ (i/b) %

Subcontracting Plan – A-6c

• The following methods were used to develop the subcontract percentage goals:

• The following methods were used to identify potential subcontract sources for solicitation purposes.

(What source lists were used, such as the System for Award Management (SAM), Veterans service organizations, the National Minority Purchasing Council Vendor Information Service, the Research and Information Division of the Minority Business Development Agency in the Department of Commerce, or small, HUBZone, small disadvantaged, and women-owned small business trade associations, and what organizations were contacted to identify potential SB, VOSB, SDVOSB, HUBz, SDB, and WOSB subcontractors.):

• (Check one) Indirect costs (_)were (__)were not included in establishing the subcontracting goals specified in the table above.

• If indirect costs were included, the following method was used to determine the proportionate share of indirect costs to be incurred with SB, SDVOSB, HUBz, SDB, and WOSB subcontractors:

• The following individual will administer the subcontracting program:

Name:_______________________________________________ Title:________________________________________________ Telephone & e-mail:____________________________________________________________

This individual's specific duties, as they relate to the subcontracting program, are as follows:

• The following efforts will be taken to ensure that SB, VOSB, SDVOSB, HUBz, SDB, and WOSB business concerns will have an equitable opportunity to compete for subcontracts:

Subcontracting Plan – A-6d

• It is agreed that: a) FAR Clause 52.219-8, Utilization of Small Business Concerns, will be included in all subcontracts that offer further subcontracting opportunities; and b) All subcontractors (except small business concerns) at all tiers below the prime contractor who receive subcontracts in excess of $650,000 ($1,500,000 if construction) will be required to adopt and comply with a subcontracting plan in accordance with FAR Clause 52.219-9 Small Business Subcontracting Plan.

• The Contractor agrees to:

a. Cooperate in any studies or surveys as may be required.

b. Submit periodic reports as may be required so that the Government can determine the extent of compliance by the Contractor with the subcontracting plan.

c. Submit Subcontracting Report for Individual Contracts and Summary Subcontract Report, to the following Electronic Subcontract Reporting System (eSRS) web site: http://esrs.gov/

d. Ensure that its large business subcontractors with subcontracting plans agree to submit eSRS documents online as required.

e. Provide its prime task order number, its DUNS number, and the email address of the offeror/bidder’s official responsible for reviewing reports to all first-tier subcontractors with a subcontracting plan.

f. Require that each subcontractor with a subcontracting plan provide the prime task order number, its own DUNS number, and the email address of the subcontractor official responsible for reviewing the reports to its subcontractors.

• The following types of records concerning procedures that have been adopted to comply with the requirements and goals in the plan shall be maintained through task order completion:

a. Source lists, guides, and other data used to identify SB, VOSB, SDVOSB, HUBz, SDB, and

WOSB concerns.

b. Organizations contacted in an attempt to locate sources that are SB, VOSB, SDVOSB, HUBz, SDB, and WOSB concerns.

c. Records on each subcontract award of more than $150,000 indicating:

i. whether Small businesses were solicited, and if not, why not;

ii. whether VOSB were solicited, and if not, why not:

iii. whether SDVOSB were solicited, and if not, why not:

iv. whether HUBz's were solicited, and if not, why not;

v. whether SDB's were solicited, and if not, why not;

vi. whether WOSB's were solicited, and if not, why not; and

vii. if applicable, the reason award was not made to a small business concern.

d. Records of outreach efforts to contact the following in an attempt to locate SB, VOSB, SDVOSB, HUBz, SDB, and WOSB sources:

i. trade associations,

ii. business development organizations,

iii. conferences, and trade fairs

iv. veterans service organizations http://esrs.gov/

Subcontracting Plan – A-6e

e. Records of internal guidance and encouragement provided to buyers through:

i. Workshops, seminars, training programs, etc.

ii. Monitoring performance to evaluate compliance with the program’s requirements.

f. On a task order-by-task order basis, records to support award data submitted by the Contractor to the Government, including the name, address and business size of each subcontractor.

• In order to effectively implement this plan, the contractor agrees to perform the functions listed in paragraph (e) of FAR Clause 52.219-9 Small Business Subcontracting Plan.

• The Contractor acknowledges that a failure of the Contractor or subcontractor to comply in good faith with clause 52.219-8, Utilization of Small Business Concerns, or this approved subcontracting plan shall be considered a material breach of the task order.

Contractor

Signed Date

Printed Name Title

Company Name and Address

Email address

Federal Highway Administration

Accepted by: _______________________________________ __________________ Angy Liljedahl, Contracting Officer Date

Subcontracting Plan – A-6f

Reserved

A - 7

Offeror please note: Before preparing the bid, carefully read the Solicitation Provisions.

Insert a unit bid price, in figures, for each pay item for which a quantity appears in the bid schedule. Multiply the unit price by the quantity for each pay item and show the amount bid. Should any mathematical check made by the Government show a mistake in the amount bid, the corrected unit price extension shall govern.

When the word "LPSM" (Lump Sum) appears as a unit bid price, insert an amount for each lump sum pay item.

When a sum based on a fixed rate appears for any pay item in the amount bid column, include the Government inserted amount bid for the item in the total bid amount.

Total all of the amounts bid for each pay item and show the total bid amount.

BRAND NAME OR EQUAL NOTIFICATION

If providing other than the brand name product listed in Section 725.24A, complete the following: (See FAR Provision 52.211-6, Brand Name or Equal)

For Section 563, Painting, which is incidental to pay item 25501-1000 Mechanically Stabilized Earth Wall, Welded Wire Face, our firm offers in lieu of the brand name in Subsection 725.24A Weathering Agent:

Brand: __________________________________________

Manufacturer's Name: _____________________________

Include with your bid all documents needed by the Government to determine if the proposed product meets the requirements listed in the appropriate Section. The determination as to the equality of the product offered is the responsibility of the Government and will be based on the information furnished by the bidder as well as other information reasonably available to the contracting office.

If proposed "equal" is determined by the government to be "not equal", bid will be considered nonresponsive.

Bid Schedule

Project No:WY PLD GRTE 700(2)

Project Name:Grand Teton Park Pathways, Phase III

A - 8

Contract Quantity Pay Items

20101-0000 CLEARING AND GRUBBING

20302-0300 REMOVAL OF CURB AND GUTTER, CONCRETE

20302-2600 REMOVAL OF PAVEMENT MARKINGS (4-INCH SANDBLAST)

20303-1600 REMOVAL OF PAVEMENT, ASPHALT

20315-0000 SAWCUTTING PAVEMENT

21101-1000 ROADWAY OBLITERATION, METHOD 1

25501-1000 MECHANICALLY STABILIZED EARTH WALL, WELDED WIRE FACE

30502-0300 AGGREGATE-TOPSOIL COURSE, 2-INCH DEPTH

30502-0700 AGGREGATE-TOPSOIL COURSE, 4-INCH DEPTH

41301-1000 ASPHALT PAVEMENT MILLING, 4-INCH DEPTH

60101-0000 CONCRETE

61501-0500 SIDEWALK, EXPOSED AGGREGATE CONCRETE (VISITOR CENTER)

62405-0100 PLACING CONSERVED TOPSOIL, 2-INCH DEPTH

62406-0350 PLACING CONSERVED TOPSOIL, 5-INCH DEPTH

62501-0000 TURF ESTABLISHMENT

64704-1600 MITIGATION, STREAMBED CHANNEL RECONSTRUCTION

Item No. Pay Item No. Description Quantity Unit Unit Price Amount

A0020 15101-0000 MOBILIZATION

ALL LPSM $___LPSM_____ $____________

A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING

ALL LPSM $___LPSM_____ $____________

A0060 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE

ALL LPSM $___LPSM_____ $____________

A0080 15401-0000 CONTRACTOR TESTING

ALL LPSM $___LPSM_____ $____________

A0100 15501-0000 CONSTRUCTION SCHEDULE

ALL LPSM $___LPSM_____ $____________

A0120 15702-1000 SOIL EROSION CONTROL, TEMPORARY DIVERSION CHANNEL (LOWER

DITCH CREEK)

ALL LPSM $___LPSM_____ $____________

A0140 15702-1000 SOIL EROSION CONTROL, TEMPORARY DIVERSION CHANNEL (UPPER

DITCH CREEK)

ALL LPSM $___LPSM_____ $____________

Bid Schedule Schedule:A Schedule Type:Base

A - 9

A0160 15702-2000 SOIL EROSION CONTROL, TURBIDITY MONITORING (UPPER DITCH CREEK)

ALL LPSM $___LPSM_____ $____________

A0180 15702-2000 SOIL EROSION CONTROL, TURBIDITY MONITORING (LOWER DITCH CREEK)

ALL LPSM $___LPSM_____ $____________

A0200 15705-0100 SOIL EROSION CONTROL, SILT FENCE

405 LNFT $____________ $____________

A0220 15705-1500 SOIL EROSION CONTROL, SEDIMENT WATTLE

2,730 LNFT $____________ $____________

A0240 15706-1600 SOIL EROSION CONTROL, STABILIZED CONSTRUCTION ENTRANCE (TIMBER

MAT SYSTEM)

7 EACH $____________ $____________

A0260 15802-0000 WATERING FOR DUST CONTROL

ALL LPSM $___LPSM_____ $____________

A0280 20101-0000 CLEARING AND GRUBBING

5.3 ACRE $____________ $____________

A0300 20301-0100 REMOVAL OF BOLLARD

32 EACH $____________ $____________

A0320 20301-0700 REMOVAL OF DELINEATOR

30 EACH $____________ $____________

A0340 20301-2400 REMOVAL OF SIGN

1 EACH $____________ $____________

A0360 20302-0300 REMOVAL OF CURB AND GUTTER, CONCRETE

22 LNFT $____________ $____________

A0380 20302-2600 REMOVAL OF PAVEMENT MARKINGS (4-INCH SANDBLAST)

210 LNFT $____________ $____________

A0400 20303-1600 REMOVAL OF PAVEMENT, ASPHALT

418 SQYD $____________ $____________

Bid Schedule Schedule:A Schedule Type:Base

A - 10

A0420 20310-1000 PLUG, EXISTING PIPE

1 EACH $____________ $____________

A0440 20315-0000 SAWCUTTING PAVEMENT

687 LNFT $____________ $____________

A0460 20401-0000 ROADWAY EXCAVATION

18,750 CUYD $____________ $____________

A0480 20465-0000 CONSERVE AND PLACE BOULDER

7 EACH $____________ $____________

A0500 20811-0000 SHORING AND BRACING

1,360 SQFT $____________ $____________

A0520 21101-1000 ROADWAY OBLITERATION, METHOD 1

58 SQYD $____________ $____________

A0540 25101-4000 PLACED RIPRAP, CLASS 4 (GOVERNMENT FURNISHED)

35 CUYD $____________ $____________

A0560 25125-0000 BOULDER (GOVERNMENT FURNISHED)

7 EACH $____________ $____________

A0580 25501-1000 MECHANICALLY STABILIZED EARTH WALL, WELDED WIRE FACE

2,127 SQFT $____________ $____________

A0600 30502-0300 AGGREGATE-TOPSOIL COURSE, 2-INCH DEPTH

5,890 SQYD $____________ $____________

A0620 30502-0700 AGGREGATE-TOPSOIL COURSE, 4-INCH DEPTH

1,246 SQYD $____________ $____________

A0640 30606-0000 MAGNESIUM CHLORIDE

40 TON $____________ $____________

A0660 30802-1000 ROADWAY AGGREGATE, METHOD 1

2,900 TON $____________ $____________

A0680 40301-0000 HOT ASPHALT CONCRETE PAVEMENT

2,450 TON $____________ $____________

Bid Schedule Schedule:A Schedule Type:Base

A - 11

A0700 40920-1000 FOG SEAL, EMULSIFIED ASPHALT GRADE CSS-1 OR CSS-1H, SS-1 OR SS-1H

23 TON $____________ $____________

A0720 41105-0000 BLOTTER

30 TON $____________ $____________

A0740 41201-1000 TACK COAT GRADE CSS-1, CSS-1H, SS-1, OR SS-1H

2.4 TON $____________ $____________

A0760 41301-1000 ASPHALT PAVEMENT MILLING, 4-INCH DEPTH

5,620 SQYD $____________ $____________

A0780 60101-0000 CONCRETE

20 CUYD $____________ $____________

A0800 60201-0100 4-INCH PIPE CULVERT

445 LNFT $____________ $____________

A0820 60201-0800 24-INCH PIPE CULVERT

40 LNFT $____________ $____________

A0840 60501-0000 STANDARD UNDERDRAIN SYSTEM

420 LNFT $____________ $____________

A0860 60706-0000 CLEANING DRAINAGE STRUCTURE

1 EACH $____________ $____________

A0880 60901-1000 CURB, CONCRETE, 12-INCH DEPTH (EXPOSED AGGREGATE)

22 LNFT $____________ $____________

A0900 60902-1000 CURB AND GUTTER, CONCRETE, 12-INCH DEPTH

30 LNFT $____________ $____________

A0920 61501-0100 SIDEWALK, CONCRETE (4-INCH DEPTH)

230 SQYD $____________ $____________

A0940 61501-0500 SIDEWALK, EXPOSED AGGREGATE CONCRETE

350 SQYD $____________ $____________

A0960 61501-0500 SIDEWALK, EXPOSED AGGREGATE CONCRETE (VISITOR CENTER)

6 SQYD $____________ $____________

Bid Schedule Schedule:A Schedule Type:Base

A - 12

A0980 61509-0000 DETECTABLE WARNING PANELS

123 SQYD $____________ $____________

A1000 61701-2000 GUARDRAIL SYSTEM G4, TYPE 4, CLASS B WOOD POSTS

500 LNFT $____________ $____________

A1020 61709-4000 REMOVE AND RESET, TERMINAL SECTION

1 EACH $____________ $____________

A1040 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY

20 HOUR $____________ $____________

A1060 62201-0600 BACKHOE LOADER, 8 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET,

30-INCH WIDTH

20 HOUR $____________ $____________

A1080 62201-0850 WHEEL LOADER, 1 CUBIC YARD MINIMUM RATED CAPACITY

25 HOUR $____________ $____________

A1100 62201-1300 BULLDOZER, 160HP MINIMUM FLYWHEEL POWER

20 HOUR $____________ $____________

A1120 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE

40 HOUR $____________ $____________

A1140 62201-3000 HYDRAULIC EXCAVATOR (RUBBER-TRACKED, 4-7 CUBIC FOOT RATED

CAPACITY WITH THUMB ATTACHMENT)

40 HOUR $____________ $____________

A1160 62201-3500 LOADER, WHEEL, SKID STEER, 40HP MINIMUM

20 HOUR $____________ $____________

A1180 62301-0000 GENERAL LABOR

200 HOUR $____________ $____________

A1200 62405-0100 PLACING CONSERVED TOPSOIL, 2-INCH DEPTH

1,891 SQYD $____________ $____________

A1220 62406-0350 PLACING CONSERVED TOPSOIL, 5-INCH DEPTH

2.3 ACRE $____________ $____________

Bid Schedule Schedule:A Schedule Type:Base

A - 13

A1240 62407-0000 PLACING CONSERVED TOPSOIL (18-INCH DEPTH)

1,210 CUYD $____________ $____________

A1260 62501-0000 TURF ESTABLISHMENT

0.5 ACRE $____________ $____________

A1280 63301-1000 SIGN SYSTEM, GOVERNMENT FURNISHED SIGN (TYPE II)

1 EACH $____________ $____________

A1300 63301-1000 SIGN SYSTEM, GOVERNMENT FURNISHED SIGN (TYPE I)

8 EACH $____________ $____________

A1320 63302-0000 SIGN SYSTEM

115 SQFT $____________ $____________

A1340 63316-1000 REMOVE AND RESET SIGN

6 EACH $____________ $____________

A1360 63318-1000 SNOWPOLE HOLDER (TYPE…