AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

N/A

PAGE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)

A001 6/17/2014 N/A WY PLD GRTE 700(2), Grand Teton Park Pathways, Phase III

6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A

Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.

X

DTFH70-14-R-00003

9B. DATED (SEE ITEM 11)

6/9/2014

10A. MODIFICATION OF CONTRACT/ORDER NO.

N/A

10B. DATED (SEE ITEM 13)

CODE: N/A FACILITY CODE: N/A N/A

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers (__ ) is extended, ( x ) is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN

ITEM 10A.

N/A

B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

N/A

C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

N/A

D OTHER (Specify type of modification and authority) N/A

E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

WY PLD GRTE 700(2), Grand Teton Park Pathways, Phase III

See page 2 for revisions.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

N/A

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION NOT USABLE

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Amendment No. A001, dated 06/17/14 WY PLD GRTE 700(2) Solicitation No. DTFH70-14-R-00003 Grand Teton Park Pathways, Phase III

REVISIONS ARE AS FOLLOWS:

SPECIAL CONTRACT REQUIREMENTS

Page Section/Table Revision E-22 107.02 Protection and Restoration of Property and Landscape Revises (a)

E-23 Revises pagination F-44 622.01 Description Revises (b) F-44 622.02 Construction Requirements Deletes bid item numbers

PLANS

Plan sheet #D.3 Adds landscaping work

ENCLOSURES

Pages:

E-22 through E-23 F-44

Plan Sheets:

D.3

E-22

Special Contract Requirements Project: WY PLD GRTE 700(2), Grand Teton Park Pathways, Phase III

Park Facilities (Water, Power, Sewer, & Telecommunications):

Grand Teton National Park Contact: Mrs. Jessica Brown Park Landscape Architect PO Drawer 170 jessica_h_brown@nps.gov Moose, WY 83012-0170 Phone: 307-739-3578

(a) Utility Relocation Plan. In each case where relocations are necessary, develop a Utility Relocation Plan with the affected utility owner(s) that will specify in detail the schedule and responsibilities for the relocation of utility facilities and any other utility related actions for the life of the project. Include relocation schedule and activities in the initial construction schedule and all construction schedules for the project. Provide documentation from the utility owners of their concurrence of the plan. In the event that no utility relocations are necessary, provide documentation from the utility owner to support this fact. Obtain approval of the utility relocation plan from the CO before starting work that may affect utility facilities. Include the following in the plan:

(1) A plan to locate, protect, and relocate, as necessary, all utilities that are located within or immediately adjacent to the project limits.

(2) Utility notification and location schedule with responsible parties.

(3) Utility owner’s project superintendent’s name and emergency contact numbers.

(4) A protocol for advance notification of utility customers, Park Facilities Contact, and CO of planned outages, specifying affected areas, dates, and durations.

(5) An emergency plan to repair damaged utility facilities. Ensure a maximum response time of 4 hours for damaged utility factilities. Provide all labor, materials, equipment and/or services necessary to repair Park owned facilities. Ensure Park owned facilities are repaired within 8 hours of damage.

Submit the Utility Relocation Plan within 5 days of the Notice to Proceed.

(b) Construction requirements. Maintain as-built drawings according to Subsection 104.03(c).

Maintain an additional two sets of utility drawings showing existing facilities, installed facilities, abandoned facilities and modified facilities. Survey new locations of relocated utilities according to Section 152. Provide survey data to the government in electronic Comma Separated Value (CSV) format.

Add the following to the ninth paragraph:

Provided that such damage is not the result of an inadequate verification/location process or failure to perform all or any part of the defined process or not otherwise caused by the fault or negligence of the Contractor.

Grand Teton National Park. To prevent damage to existing asphalt concrete pavement, provide a plan for protecting the existing pavement surface on the Outside Highway, from the north end of the Moose Junction to a point parallel on the proposed pathway construction prior to performing hauling and excavation work on the Outside Highway, Antelope Flats Road, and the Teton Park Road.

Revised by Amendment A001

E-23

Address specific protection methods on submitted schedules and plans according to Section 155 and Section 156.

Repair pavement damage to all paved surfaces used during Contractor operations, Highway 89, Teton Park Road, Antelope Flats Road, Gros Ventre Road, and Grand Teton Park Pathways included. Damage to the pavement includes cracked or broken pavement, deformation of the existing pavement surface greater than 3/4-inch, and gouges and cuts greater than ¾-inch in depth.

Minimum repair for pavement damage will consist of removal and replacement of the full depth of pavement. Remove pavement from centerline to edge of pavement (width) and 3 feet on each side (length) of damaged area limits.

Submit a plan for pavement repair within 7 days after notification of required repair. Complete all pavement repairs within 14 days after approval of pavement repair plan.

Damage and repair will be evaluated under Subsection 106.02.

107.03A Public Notice. (Added Subsection).

Prior to beginning any roadway work each day, send an email with the following information:

Description of work and general operations planned, Location of work referenced to local landmarks and roadway stationing, Construction operations that will affect traffic, Expected delays including delay periods, durations and locations, and

Periods when the road is open to traffic without delay, etc.

Send this E-mail daily to the CO and Park Dispatch at grte_dispatch@nps.gov. The CO may provide a supplemental list of E-mail contacts to be copied.

107.08 Sanitation, Health, and Safety. Amend as follows:

Add the following after the first paragraph:

Submit an accident prevention plan for implementing safety and health standards at the Preconstruction Conference. Use the Government furnished Form WFLHD-28, Guide Outline of Contractor’s Accident Prevention Plan. In addition to Form WFLHD-28, include the following information in the Accident Prevention Plan:

(a) The schedule for weekly safety meetings with the hauling vehicle operators. Topics, such as;

defensive driving techniques, safe stopping distances, compliance with speed limits, and remaining alert, or any such item that possess a threat to safe operations.

(b) The method used to control the speed of hauling vehicles such as radar, timing, or pacing.

(c) The schedule for and type of safety inspections that will be performed on the hauling vehicles.

(d) A description of the type of communication system that will be used to communicate between hauling vehicles.

Pagination revised by Amendment A001

F-44

03USC01/01/04

Section 622. — RENTAL EQUIPMENT

Description

622.01 Delete the text of this Subsection and substitute the following:

This work consists of furnishing and operating equipment for the construction work listed below in addition to work ordered by the CO and not otherwise provided for within the original scope of the contract. Work under this Section does not include equipment time used to perform work provided for under any other pay item shown in the bid schedule. The work anticipated under this Section includes:

(a) Final grading of disposal site;

(b) Miscellaneous landscaping at 718+00 to 719+22 and various locations as directed by the

CO;

(c) Maintenance of NPS Staging Area access road and Kelly Staging Area access road according to Subsection 156.04; and

(d) Performance of minor grading along the project as directed by the CO.

Construction Requirements

622.02 Rental Equipment. Delete the text of the first paragraph and substitute the following:

Furnish and operate the following equipment:

Number of Units Type of Equipment

1 Dump truck, 10 cubic yard minimum capacity 1 Backhoe loader, 8 cubic foot minimum rated capacity bucket, 30-inch width 1 Wheel loader, 1 cubic yard minimum rated capacity 1 Bulldozer, 160HP minimum flywheel power 1 Motor grader, 12 foot minimum blade 1 Hydraulic excavator, Rubber-tracked, 4-7 cubic foot rated capacity with thumb attachment 1 Loader, wheel, skid steer, 40 HP minimum

Submit the model number and serial number for each piece of equipment before use. Make equipment available for inspection and approval before use.

Clean equipment according to Subsection 107.11.

Revised by Amendment A001

65106510

,4

.3

-0.1055%

N

BEGIN PROJECT

719+22.00

WY PLD GRTE 700(2)

PATHWAYS PHASE III

GRAND TETON PARK

NPS PMIS No. 198832 NPS Drwg. No. 136/112675

To Jackson

To Moran Junction

F

.0

F

Guardrail RT

Guardrail LT

Terminal section, type flared

Embankment = 8,059 CUYD

Total roadway Excavation = 15,422 CUYD

Conserved topsoil = 2,668 CUYD

Excavation = 12,754 CUYD

Project Earthwork Summary:

Profile grade

Existing ground

CUYD

EXC.

CUYD

EMB.

720+00718+75717+50716+25715+00

R O

A D

P A

R K

T E

T O

N

Existing pedestrian underpass limits stake

Slope

See sheet K.1 for details

Install guardrail

719+66 to 724+58.50 LT

HWY 89 (OUTSIDE HIGHWAY)

of pathway

Proposed edge

See sheet K.1 for details flared terminal at 724+58.50 LT

Remove and reset existing

719+66 LT

constructed

Line to be

El=6498.32

E= 2459559.87

N= 1476943.08

D.3

STATE PROJECT

NUMBER

SHEET

WY

PLD GRTE 700(2)

P

M

M a y

U

S S u r ft

D c m y fi le s p w p r o d u c ti o n d g r te fd .d g n

D

S la n in a

K

M il le r

C h e c k e d b y

D e s ig n e d b y

Topsoil (CUYD)

1 Revised by Amendment A001 topsoil back to existing grade.

6-inch depth, and install remove existing material, Per SCR Section 622, 718+00 to 719+22