Project Description
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A003_AK_DOT_135(2).pdf | ||
| A002_Chickaloon.pdf | ||
| A001_Chickaloon_River_Bridge.pdf | ||
| Physical_Data_Request_Form_AK_DOT_135(2).pdf | ||
| Plan_Request_AK_DOT_135(2).pdf | ||
| IFB_Chickaloon.pdf | ||
| http //www.wfl.fhwa.dot.gov/contracting/construction/plans/chickaloon/ | — | |
| Preliminary_Plans_AK_DOT_135(2).pdf | ||
| Prelim_Letter_AK_DOT_135(2).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AK DOT 135(2), Glenn Highway Chickaloon Bridge, Matanuska-Susitna Borough, Alaska
The project includes grading, minor drainage, base, paving, construction of a 3 span, 350-foot long pre-stressed concrete girder bridge with cast-in-place concrete deck. Abutments are founded on drilled shaft. Piers are supported on drilled shaft.
The work includes demolition of the existing steel girder bridge upon completion of the new structure and other small items of work.
Project length: .46 Miles
Tentative Fixed Completion Date: Summer 2016 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range: $7 million to $10 million
Location: 31 Miles NE of Palmer, Alaska
DESCRIPTION OF WORK in US CUSTOMARY
UNITS FP-03
O ne
Sc he du le h A
DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes 153 Contractor Quality Control and Assurance
(yes/no) Yes 154 Contractor Sampling & Testing (yes/no) Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes 157 Soil Erosion Control Devices (Silt Fence) 2500 LNFT 158 Watering for Dust Control 100 MGAL DIVISION 200 – Earthwork 201 Clearing & Grubbing 1.90 ACRE 203 Removal of Structures & Obstructions (structures, demolition) Removal of Bridge Removal of Sign
1 EACH
1 EACH
204 Excavation & Embankment Unclassified Borrow Select Borrow
30,000 CUYD
22,500 TON
207 Earthwork Geotextiles (geotextiles) 350 SQYD 208 Structure Excavation 500 CUYD DIVISION 250 – Slope Reinforcement and Retaining Walls 251 Riprap 500 TON DIVISION 300 – Aggregate Courses 308 Minor Crushed Aggregate (crushed aggregate) 4,000 TON
DESCRIPTION OF WORK in US CUSTOMARY
UNITS FP-03
O ne he du le h
A
DIVISION 400 – Asphalt Pavements & Surface Treatments 403 Hot Asphalt Concrete Pavement (asphalt concrete pavement) 3,600 TON 412 Asphalt Tack Coat (asphalt surface treatment) 70.0 TON DIVISION 550 – Bridge Construction 552 Structural Concrete (concrete – major structures) Class A (AE) Class D (AE) Class D (AE), Approach Slabs
515 CUYD
620 CUYD
180 SQYD
553 Prestressed Concrete (concrete prestressed) 74” Girder 1,711 LNFT 554 Reinforcing Steel Reinforcing Steel Reinforcing Steel, Epoxy Coated
56,700 LB
135,655 LB
556 Bridge Railing 600 LNFT 559 Waterproofing (concrete – major structures) 1,665 SQYD 565 Drilled Shafts 120-Inch Diameter (Pier) 60-Inch Diameter (Abutment)
142 LNFT
252 LNFT
DIVISION 600 – Incidental Construction 617 Guardrail G4, Type 2 CRG, Type 2 Terminal, Type g4-CRT Terminal, Tangent Structure Transition Railing
880 LNFT
45 LNFT
1 EACH
2 Each
82 LNFT
622 Rental Equipment (yes/no) Yes 625 Turf Establishment (indicate seeding or mulching separately) 2.5 ACRE 633 Permanent Traffic Control Devices (traffic control devices) Sign System Remove and Reset Sign
125 SQFT
17 EACH
634 Permanent Pavement Markings (traffic pavement markings) Solid (White) Solid (Double Yellow) Solid (Stop Bar)
9,000 LNFT
4,130 LNFT
100 SQFT
635 Temporary Traffic Control Cone Warning Light Signal System Concrete Barrier Pavement Markings Construction Sign Flagger
100 EACH
2 EACH
1 EACH
1,250 LNFT
20,600 LNFT
148 SQFT
1,040 HOUR