A002_Chickaloon.pdf
PDF 29 KB Posted
- Attached to
- AK DOT 135(2), Glenn Highway Chickaloon Bridge Federal contract opportunity
- Solicitation number
- DTFH70-14-B-00019
About this file
Amendment A002
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A003_AK_DOT_135(2).pdf | ||
| A001_Chickaloon_River_Bridge.pdf | ||
| http //www.wfl.fhwa.dot.gov/contracting/construction/plans/chickaloon/ | — | |
| IFB_Chickaloon.pdf | ||
| Physical_Data_Request_Form_AK_DOT_135(2).pdf | ||
| Plan_Request_AK_DOT_135(2).pdf | ||
| Prelim_Letter_AK_DOT_135(2).pdf | ||
| PROJECT_DESCRIPTION_AK_DOT_135(2).pdf | ||
| Preliminary_Plans_AK_DOT_135(2).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
N/A
PAGE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)
A002 03/30/2015 N/A AK DOT 135(2)
Glenn Highway Chickaloon Bridge
6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A
Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
X
DTFH70-14-B-00019
9B. DATED (SEE ITEM 11)
03/09/2015
10A. MODIFICATION OF CONTRACT/ORDER NO.
N/A
10B. DATED (SEE ITEM 13)
CODE: N/A FACILITY CODE: N/A N/A
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers (__ ) is extended, ( x ) is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
N/A
B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
N/A
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
N/A
D OTHER (Specify type of modification and authority) N/A
E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
AK DOT 135(2), GLENN HIGHWAY CHICKALOON BRIDGE
SPECIAL CONTRACT REQUIREMENTS
Page E-20, Subsection 108.01, Commencement, Prosecution, and Completion of Work.
Revises Subsection.
Enclosure:
Page E-20
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
E-20
Special Contract Requirements Project: AK DOT 135(2), Glenn Highway Chickaloon Bridge
(d) Suspend all work for the winter shutdown at the site, including crushing operations, from November 1, 2015 to April 1, 2016, both dates inclusive.
(e) Comply with the requirements of Subsection 107.10.
(f) Accommodate traffic as provided in Subsection 156.03.
(g) Limit construction as provided in Subsection 156.06.
108.01A Labor. (Added Subsection).
Follow the requirements of FAR Clause 52.222-6 Davis Bacon Act.
Adjacent or virtually adjacent work sites, as used in FAR Clause 52.222-6, are defined to be work sites within ½ mile of the project. Application of the Davis-Bacon Act for work sites beyond ½ mile of the project will be determined by the CO.
108.02 Subcontracting. Amend as follows:
Delete the first paragraph and substitute the following:
Follow the requirements of FAR clauses 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns, 52.222-11 Subcontracts (Labor Standards), and 52.236-1, Performance of Work by the Contractor.
Delete the fourth paragraph and substitute the following:
In FAR Clauses 51.219-8, Utilization of Small Business Concerns and 52.232-27, Prompt Payment for Construction Contracts, the subcontracts include both on-site work and supply contracts.
Evaluate the percentage of the cost of contract performance incurred for personnel in FAR Clause 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns, according to the following formula:
P = H / T where:
P = Percent of the cost of contract performance incurred for personnel working for HUBZone firms.
T = Total wages/benefits paid during the life of the contract. Certified payrolls will be used to determine Davis-Bacon wages and benefits paid. Submit certified statements at least monthly declaring the wages and benefits paid to non-Davis Bacon personnel under this contract.
H = Total wages/benefits paid to employees working for HUBZone firms (prime and Subcontractors).
Revised by Amendment A002
| AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT |
| A002 |
File details come from the government source that posted it. Updated .