PROJECT_DESCRIPTION_Tunanak.pdf

PDF 15 KB Posted

Attached to
AK DEN 2010(3), TUNUNAK COMMUNITY STREETS
Solicitation number
DTFH70-13-B-00013
Issued by

About this file

Project Description

View the file

Other files

File Type Posted
A004_Tununak.pdf PDF
A003__Tununak.pdf PDF
Physical_Data_Request_Form_Tununak_A003.pdf PDF
A002_Tununak.pdf PDF
A001_Tununak.pdf PDF
Physical_Data_Request_Form_Tununak.pdf PDF
IFB_TUNUNAK_reduced.pdf PDF
Plan_Request__Tununak.pdf PDF
Tununak_Plan_Set_-_Final.pdf PDF
Preliminary_Letter_AK_DEN_2010(3).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AK DEN 2010(3), TUNANAK COMMUNITY STREETS, BETHEL CENSUS

AREA, ALASKA.

The work consists of construction of timber board road, rip rap placement and other small items of work.

Project length: .50 Miles

Tentative Fixed Completion Date:

(Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Estimated Price Range: $1 million to $2 million

Location: Tununak, Alaska. The village is located on Nelson Island, which is approximately 115 miles northwest of Bethel, Alaska

DESCRIPTION OF WORK in US CUSTOMARY UNITS

O ne

S ch ed ul e Sc h N am e

A

DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes 153 Contractor Quality Control and Assurance

(yes/no) Yes

154 Contractor Sampling & Testing (yes/no) No 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes 157 Soil Erosion Control Devices

Sediment Waddle 2,700 lnft

DIVISION 200 – Earthwork 201 Clearing & Grubbing 1.8 acre 202 Additional Clearing & Grubbing Roadside Cleanup 1.48 acre 204 Excavation & Embankment Embankment Construction

Backfill, granular 150 cuyd

1,300 cuyd 207 Earthwork Geotextiles (geotextiles) 2,500 sqyd DIVISION 250 – Slope Reinforcement and Retaining Walls 251 Riprap Class 3 Class 4

600 cuyd 1,300 cuyd

254 Crib Walls Treated Timber Retaining Wall 13,500 sqyd DIVISION 550 – Bridge Construction 557 Timber Structures Structural Timber and Lumber, Treated

Hardware, Prefabricated Aluminum Ramp 78 mfbm 3 each

DIVISION 600 – Incidental Construction 609 Curb & Gutter Curb Timber 2,225 lnft 623 General Labor 40 hour 625 Turf Establishment

Seeding Dry Method

.5 acre 637 Facilities & Services Residential Housing

Vehicle 1 each 1 each