AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
N/A
PAGE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)
A004 5/13/2014 N/A AK DEN 2010(3)
TUNUNAK COMMUNITY STREETS
6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A
Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
X
DTFH70-13-B-00013
9B. DATED (SEE ITEM 11)
3/25/2014
10A. MODIFICATION OF CONTRACT/ORDER NO.
N/A
10B. DATED (SEE ITEM 13)
CODE: N/A FACILITY CODE: N/A N/A
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers (_) is extended, ( x ) is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
N/A
B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
N/A
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
N/A
D OTHER (Specify type of modification and authority) N/A
E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
AK DEN 2010(3), TUNUNAK COMMUNITY STREETS
See page 2.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Amendment No. A004, dated 05/13/14 AK DEN 2010(3) Solicitation No. DTFH70-13-B-00013 Tununak Community Streets
REVISIONS ARE AS FOLLOWS:
SPECIAL CONTRACT REQUIREMENTS
Page Section/Table Revision G-9 723.01(b) Geocell cellular block mat system connection Revises thickness
PLANS
Plan sheet #C.1 – Replaces C.1 from Amendment A003; Revises Board Road Sections 1 and 2
Plan sheet #D.1 - Replaces D.1 from Amendment A003; Revises quantities and deletes Seeding, Hydraulic Method
Plan sheet #F-1 – Replaces F.1 from Amendment A003; Revises Note
ENCLOSURES
Pages: G-9
Plan Sheets:
C.1 D.1 F.1
G-9
Special Contract Requirements Project: AK DEN 2010(3), Tununak Community Streets
03USC10/04/07
Section 723. — GEOCELL CELLULAR MAT SYSTEM
(ADDED SECTION)
723.01. Geocell Cellular Mat System. Furnish a geocell cellular mat at each ramp access to the board road and a geocell cellular mat system for ATV trail with corrosion resistant connectors capable of providing support to all-terrain vehicles over the ramp access and over very soft and uneven ground. The Geoterra® structural Mat system and a stainless steel PadLoc Connection Device manufactured by Presto Geosystems, P.O. Box 2399, Appleton, Wisconsin 54912-2399 (800-548-3424), www.prestogeo.com, are acceptable products.
Identification by brand name is intended to be descriptive, not restrictive, and is intended to indicate the qualities and characteristics of products that will be satisfactory.
The following lists salient characteristics that must be met by other products to be acceptable:
(a) Mat Units. Furnish open cell blocks composed of long chain synthetic polymers with at least 85 percent by mass of polypropylene that conform to the following:
(1) Carbon Black for Ultraviolet Light Stabilization: 1.5 to 2.0 percent by weight.
(2) Minimum Crush Strength at 21 degrees C (70° F): 2,900 kPa (420 psi).
(3) Flexural Modulus at 23 degrees C (73° F): 240,000 kPa (35,000 psi).
(4) Nominal Depth: 50 mm (2.0 inches).
(5) Nominal Coverage Area: 0.46 m2 (4.95 square feet).
(6) Top Open Area per Unit: 87 percent.
(7) Bottom Open Area per Unit: 41 percent.
(b) Geocell cellular block mat system connection. Connect individual geocell cellular blocks to each other with zinc clear trivalent chromate plate, .0003 minimum thickness connection clips that clamp the blocks together cell to cell. Space the connectors a minimum 0.25m (9 inches) from each other. Do not provide self tapping or wood screws, or plastic connectors.
(c) Turning and expansion joint tie system. Furnish a stainless steel wire tie system or a stainless steel nut and bolt system that ties the cellular mats together as shown on the Typical Section Details” sheet in the “Turning Radius Connector Detail” and in the “Expansion Joint Detail.” Design each tie and geocell block connections to resist a minimum 200 lbs pull out force from the geocell blocks.
(d) Anchoring system. Furnish an anchoring system that ties the cellular mat system to the ground according to the followings or manufacturer’s recommendations for the existing ground conditions and as approved by the CO:
Revised by Amendment A004
C.1
STATE PROJECT
NUMBER
SHEET
D
A T
E
P
A T
H
C h e c k e d b y
D e s ig n e d b y
AK AK DEN 2010(3)
TYPICAL SECTIONS
1' 1'
4" X 12" Planks
BOARD ROAD SECTION 1
BOARD ROAD SECTION 2
8'
STA 100+50.00 to 122+21.10
Existing Stream Channel
+ Toe of Slope Elev. 3'
8'
High water mark
STA 122+21.10 to 123+95.83
STA 100+00.00 to 100+50.00
Evenly Spaced
3" X 12" Planks
4"x12" crib wall
3" X 12" planks evenly spaced of one plank
Bury a minimum@ 7'-6" O.C., bury 4'
8" x 8" Wood Post
@ 7'-6" O.C., bury 4'
8" x 8" Wood Post
+ Top of Slope Elev. 9'
6' one each side
4"x12", minimum
Geotextile Type III-A
6" (Min)
Existing ground may be needed to level the board road.
as more than one longitudinal plank height of 12"
NOTE: Minimum one 4"x12" crib plank per side, 2'
Existing Bank
24" max height (omit at pathways)
3"x12" back wall where required
Type I-A
Geotextile
Type I-A
Geotextile
Varies
4"x12" sleeper @ 24" O.C.
Type III-A
Geotextile
LEGEND
Roadway Excavation
(Depth Varies)
Select Borrow
Select Borrow (12")
Select Borrow
(Buried)
Riprap Class 4
Geotextile Type III-A
Backfill, Permeable
C le a r in g l im it s
C le a r in g l im it s
Varies
Varies
C le a r in g l im it s
C le a r in g l im it s
4 Revised by Amendment A004
D.1
NUMBER
SHEET
D
A T
E
P
A T
H e c k e d b y s ig n e d b y
AK AK DEN 2010(3)
CLEARING AND GRUBBING
ITEM 20101-0000
PLACED RIPRAP, CLASS 4
ITEM 25101-4000
HARDWARE, PREFABRICATED ALUMINUM RAMP
ITEM 55707-1000
2,574 LNFT
1.73 ACRE
403 CUYD
TUNUNAK BOARD ROAD
TUNUNAK BOARD ROAD
TUNUNAK BOARD ROAD
TUNUNAK BOARD ROAD
TUNUNAK BOARD ROAD
TUNUNAK BOARD ROAD
TUNUNAK BOARD ROAD
TUNUNAK BOARD ROAD
TUNUNAK BOARD ROAD
TUNUNAK BOARD ROAD
TUNUNAK BOARD ROAD
TABULATION OF QUANTITIES
1,172 CUYD
TUNUNAK BOARD ROAD 0.47 ACRE
TUNUNAK BOARD ROAD
132 CUYD
70 LF
SEEDING, HYDRAULIC METHOD
ITEM 62510-2000
12 EACH
TREATED TIMBER CRIB RETAINING WALL
ITEM 25410-0000 (SECTION 1)
TUNUNAK BOARD ROAD
STRUCTURAL TIMBER AND LUMBER,TREATED
ITEM 55706-2000 (SECTION 1)
STRUCTURAL TIMBER AND LUMBER,TREATED
ITEM 55706-2000 (SECTION 2)
TUNUNAK BOARD ROAD
TREATED TIMBER CRIB RETAINING WALL
ITEM 25410-0000 (SECTION 2)
EARTHWORK GEOTEXTILE, TYPE III-A
ITEM 20701-1000
TUNUNAK BOARD ROAD
EARTHWORK GEOTEXTILE, TYPE I-A
ITEM 20701-0100
FIXTURE, HANDRAIL
ITEM 64604-1000
1 LPSM
1 LPSM
TUNUNAK BOARD ROAD 15 SQYD
4,228 SQYD
3,497 SQYD
1,648 CUYD
SEDIMENT WATTLE (SAND BAGS)
SOIL EROSION CONTROL
ITEM 15705-1500
ROADWAY EXCAVATION
ITEM 20401-0000
SELECT BORROW
ITEM 20410-0000
ROADSIDE CLEANUP (REMOVE TRASH)
ITEM 20214-0000
1 LPSM
BACKFILL, PERMEABLE
ITEM 20435-2500
GEOCELL
ITEM 20707-0000
450 SQFT
13,315 SQFT
Revised by amendment A004
F.1
NUMBER
SHEET
D
A T
E
P
A T
H e c k e d b y s ig n e d b y
AK AK DEN 2010(3)
RIPRAP DETAILS
NOTE:
RIPRAP DETAILS
6' Existing ground
Varies
2.5' Type III-A
Geotextile
Class 4 Riprap
Type III-A
Geotextile
Type I-A
Geotextile
2' Backfill, Permeable
Class 4 Riprap
CLASS 4 RIPRAP (Above OHW) CLASS 4 RIPRAP (Below OHW)
2.5'
FOOTNOTE:
1 For width less than 2', use backfill, permeable
4 Revised by amendment A004 placed riprap, class 4.
and other locations as directed by the CO. This work is subsidiary to pay item 25101-4000, Place 6" of stockpiled native soil, vegetation, and seed on top of placed class 4 riprap
| AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT |
| A004 |
File details come from the government source that posted it. Updated .