PRA-DENA 10(31) D.7AK
N
2750 2752+50 2755 2757+50 2760 2762+50 2765
Profile grade
Existing ground
Line to be staked and constructed
Construction limits
Line to be staked and constructed
EXC.
CUYD
EMB.
CUYD
STATE PROJECT
SHEET
NUMBER
A p r
A
M d e d g .d g n
D a n S te r le y
C h e c k e d b y
K ti e S w e n s o n e s ig n e d b y
22’ 22’-24’24’24’-22’ 22’ 22’-24’ 24’ 24’-20’ 20’ 20’-24’ 24’24’-22’ 22’ 22’-24’ 24’24’-22’ 22’
LEGEND
D
R= 700.00’
T= 99.43’
L= 197.54’
D
R= 320.00’
T= 97.46’
L= 189.22’
D
R= 199.00’
T= 61.53’
L= 119.35’
Intervisible Passing Pullout 2752+40 to 2752+60 (Taper In) 2752+60 to 2753+05 (Belly) 2753+05 to 2753+25 (Taper Out)
Intervisible Passing Pullout 2754+55 to 2754+75 (Taper In) 2754+75 to 2755+20 (Belly) 2755+20 to 2755+60 (Taper Out)
Intervisible Passing Pullout 2757+90 to 2758+30 (Taper In) 2758+30 to 2758+75 (Belly) 2758+75 to 2758+95 (Taper Out)
Intervisible Passing Pullout 2760+75 to 2760+95 (Taper In) 2760+95 to 2761+40 (Belly) 2761+40 to 2761+60 (Taper Out)
Surfacing Section A See Sheet C.3 for details.
Surfacing Section B See Sheet C.3 for details.
Special Ditch Section, 0" RT See Sheet C.5 for details.
NPS Pkg. No. 100633 & 90935A NPS Drwg. No. 184/80269 emax = 3.0% emax = 4.0% emax = 6.0% existing culvert outlet ditch new culvert outlet ditch
Special Ditch Section, 6" RT See Sheet C.5 for details.
418 248 25
03115
CP
CP
CP
P T
.5
P C
.6
P T
.0
P C
.8
P C
.6
P T
.1
-10.5589%
,1
.5
300’ VC
K = 35
,1
.0
-1.9810%
-7.5112%
125’ VC
K = 23
SSD = 258’
I n s ta ll p ip e c u lv e r t
I n s ta ll c a tc h b a s in
C o n s tr u c t c u lv e r t o u tl e t d it c h
I n s ta ll p ip e c u lv e r t
I n s ta ll e n e r g y d is s ip a to r
R e m o v e o f e x is ti n g c u lv e r t fr o m i n le t, p lu g r e m a in d e r
,1
.1
70’ VC
K = 53
,1
.4
-6.1852%
-8.0000%
90’ VC
K = 50
SSD = 640’
,1
.8
-5.8506%
155’ VC
K = 72
PRELIM
IN
ARY
Not fo r C onstr ucti on
PRA-DENA 10(31) D.8AK
N
2765 2767+50
EXC.
CUYD
EMB.
CUYD
A p r
A
M d e d h .d g n n S te r e c k e d b y ti e S w e n s s ig n e d b y
END PROJECT
AK PRA DENA 10(31)
2768+99.58 N = 3477747.862 E = 1638578.992
EL = 3092.60
Existing ground
Profile grade
Line to be staked and constructed
Construction limits
22’ 22’-23’ 23’
D
R= 2,000.00’
T= 25.44’
L= 50.87’
Surfacing Section A See sheet C.3 for details.
NPS Pkg. No. 100633 & 90935A NPS Drwg. No. 184/80269 emax = 3.0%
GPS
RAY1
P C
.1
P T
.7
P O
T
.5
I n s ta ll p ip e c u lv e r t
,1
.3
-2.9292%
235’ VC
K = 80
,0
.6
.5
8 PRELIM
IN
ARY
Not fo r C onstr
AK PRA-DENA 10(31) D.9
NPS Pkg. No. 100633 & 90935A NPS Drwg. No. 184/80269
STANDARD PULLOUT DETAILS
PARKING PULLOFF
INTERVISIBLE PASSING PULLOUT
50’56’50’
24’
Tape r @ 1
:5
Taper @ 1:10
Taper @ 1:5
Taper @ 1:10
Parking pulloff
Intervisible Passing Pulloff
10’
Varies45’Varies
FOOTNOTE:
Length of belly of intervisible passing pullout = 100 feet.
Taper length out of intervisible passing pullout decreased to avoid wetland ahead. Taper out at 1:5.
Taper length out of intervisible passing pullout increased to match existing road curvature. Taper out at 1:30.
Varies, 2’ to 4’
24’ DENALI PARK ROAD
DENALI PARK ROAD
Edge of road
Edge of road
2683+30 to 2684+86 LT 2707+25 to 2708+81 RT
2692+16 to 2693+56 LT 2714+15 to 2715+00 LT 2718+90 to 2719+75 LT 2721+15 to 2722+00 LT 2725+50 to 2726+35 LT 2728+95 to 2729+80 LT 2731+40 to 2732+25 LT 2734+25 to 2735+20 LT 2736+50 to 2738+15 LT 2748+40 to 2749+25 LT 2752+40 to 2753+25 LT 2754+55 to 2755+60 LT 2757+90 to 2758+95 LT 2760+75 to 2761+60 RT
A p r
A
M d e d i.
d g n n S te r e c k e d b y ti e S w e n s s ig n e d b y
PRELIM
IN
ARY
Not fo r C onstr
TEMPORARY
DIVERSION CHANNELS
157-5
2’2’2’2’ Do not construct with longitudinal joints if using a plastic liner. Bury the upstream edge of the liner a minimum of 6" deep and secure with riprap or sandbags.
AK PRA-DENA 10(31)
STANDARD NO SCALE
U.S. CUSTOMARY STANDARD
SHEET
NUMBER
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FEDERAL LANDS HIGHWAY
STATE
E.7
PROJECT
d e e g .d g n
A p r
A
M
STANDARD APPROVED FOR USE 6/2005
REVISED: 6/2007
Bury plastic liner 6" deep and secure with sandbags (typ.)
NPS Pkg. No. 100633 & 90935A NPS Drwg. No. 184/80269
A
A
B B
Flow
SECTION A-A SECTION B-B
SECTION A-A
SECTION B-B
W
SS
SS
B
D
Flow
Flow
Flow
Roadway embankment
Roadway embankment
NOTE:
W
SS
SS
B
D
PLASTIC LINED DIVERSION CHANNEL
RIPRAP LINED DIVERSION CHANNEL
W
B
DSS SS
Flow
SSSS D
B
W
T
Riprap lining
Geotextile, type IV-E
Sandbags
SECTION B-B
TEMPORARY CULVERT
PLAN
DIVERSION CHANNEL
Silt fence (typ.
when scheduled)
Plastic linerSandbagsPlastic liner
Use sandbags to construct temporary barrier
Permanent culvert
Roadway centerline
Silt fence (typ.
when scheduled)
Permanent natural channel
Use sandbags to prevent backflow into natural channel
Earthwork limits
Subgrade
Temporary culvert backfill
Bedding
Natural ground
Geotextile, type IV-E Riprap lining
Temporary diversion channel with plastic liner or riprap
Silt fence (typ.
when scheduled)
T
See Note 5
Ø
See Erosion Control Section for temporary culvert diameter, riprap class, channel dimensions and quantities.
Use plastic liner or riprap along the entire length and width of the temporary diversion channel.
Construct channel at a minimum grade of
0.5 percent.
When specified replace the portion of the diversion channel through the roadway embankment with temporary culvert.
Compact temporary culvert backfill using one of the methods listed in Subsection
204.11(a).
1.
2.
3.
4.
5.
PRELIM
IN
ARY
Not fo r C onstr
910910
OPERATION PLAN
TOKLAT PIT
To kl at R iv er trailer area
Contractor housing/office barrier
Existing jersey
NOTE:
Staging Area
Equipment
QUANTITIES
ITEM DESCRIPTION QUANTITY
of existing sheet pile wall.
Approximate location material stockpile.
of government furnished
Approximate location stockpile site
Pitrun stockpile site
Aggregate surfacing st oc kp ile s it e
S el ec t bo rr ow sit esto ck pil eRe jec t
Scale in feet
50 100 150 200050
N
2.
1.
throughout construction.
Large stockpiles for mixing fines will be available will be determined by the CO.
The final location of all stockpiles and equipment staging
REMARK
F.1
STATE PROJECT
AK PRA-DENA 10(31)
d e fa .d g n
U
S I n t2
D
R J o h n s e c k e d b
W
M c
Q u is to s ig n e d b y
See Sheet E.6 for details.
NPS Pkg. No. 100633 & 90935A NPS Drwg. No. 184/80269 by others.
Berm to be constructed
Sediment wattle
Sediment wattle sit e sto ck pil e
Rip ra p
3500 cuyd
11753 cuyd
4235 cuyd
300 lnft
31102-0000
31102-0000
31102-0000
15705-1500
Stockpiled Aggregate (Riprap, class5)
Stockpiled Aggregate (Select Borrow)
Stockpiled Aggregate (Aggregate Surfacing)
Soil Erosion Control, Sediment Wattle
PRELIM
IN
ARY
Not fo r C onstr
10.4 x 16 20301 20411 20701 20701 25101 25101 60203 60501 -1900 -0000 -0300 -1400 -2000 -4000 -0400 -0800 -0900 -1000 -1600 -0200 -0000
Skew (degrees)
DIAMETER or SPAN x RISE (inch) 12" 24" 30" 36" 72"
2687+06 4 3 3 13 32 P 2688+06 3 2 3 13 31 P 2688+86 3 2 3 11 28 P
Placed Riprap, Class 2
(CUYD)
REMARKS / FOOTNOTES
See below for numbered footnotes
Pipe Culvert
(LNFT)
60201 Allow.
Pipe
Material
(See key below)
Standard Underdrain
(LNFT)
6-inch Slotted
Drain Pipe
(LNFT)
Placed Riprap, Class 4
(CUYD)
Catch Basin
(EACH)
PAY ITEM NUMBER
STATION
EST
MAX
COVER
(FT)
STR EXC
(CUYD)
Earthwork Geotextile, Type IV-C
(SQYD)
Earthwork Geotextile, Type I-C
(SQYD)
Select Borrow
(TON)
Select Borrow
(foundation preparation)
(TON)
Removal of Pipe Culvert
(EACH)
TABULATION OF DRAINAGE QUANTITIES
Note: The quantities shown hereon are approximate and are subject to field adjustments.
STATE PROJECT
G.1
D an
S te rl ey
/2
NUMBER
SHEET
PRA DENA 10(31)AK
2688+86 3 2 3 11 28 P
2688+86 3 32 X 32 5 2 37 X GS
2689+60 3 1 3 11 27 P 2690+35 3 1 3 11 27 P 2691+21 3 1 3 11 27 P
2691+21 5 43 X 35 5 2 40 X GS
2692+00 to 2704+66 3 1272 1266 P Install underdrain system right.
2692+06 3 2 3 12 30 P 2692+91 to 2693+77 3 39 86 P Install blanket drain collector pipe left.
2692+91 3 1 2 10 24 P 2693+77 3 1 2 9 22 P 2693+77 3 3 10 11 P Blanket drain outlet pipe.
2693+77 6 16 16 37 P Underdrain outlet pipe.
2693+77 4 46 X 33 38 X GS Clean culvert outlet ditch and grade to drain. 5 2694+93 3 2 3 13 33 P +34 2694+93 6 19 18 42 P +34 Underdrain outlet pipe.
TABULATION OF DRAINAGE QUANTITIES
Note: The quantities shown hereon are approximate and are subject to field adjustments.
STATE PROJECT
G.1
M at t H a a p a la
/2
D an
S te rl ey
/2
C h ec ke d b y:
NUMBER
SHEET
PRA DENA 10(31)AK
2694+93 3 35 37 42 X GS +34 Clean culvert outlet ditch and grade to drain. 5 2695+80 to 2697+60 3 81 180 P Install blanket drain collector pipe left.
2695+80 3 1 2 11 26 P +34 2696+70 3 1 2 11 26 P +34 2697+60 3 2 3 12 29 P +34 2697+60 3 3 6 14 P +34 Blanket drain outlet pipe.
2697+60 6 23 20 47 P +34 Underdrain outlet pipe.
2697+60 4 48 X 42 48 X GS +34 Clean culvert outlet ditch and grade to drain. 5 2698+33 to 2699+37 3 47 104 P Install blanket drain collector pipe left.
2698+33 3 2 3 12 29 P +34 2699+37 3 2 3 12 29 P +34 2699+37 3 4 6 14 P +34 Blanket drain outlet pipe.
CUMULATIVE TOTAL 1735 0 41 255 172 10 4 0 535 205 0 0 0 420 1266
NOTES: Allowable pipe culvert material 1 Steel pipe culvert minimum wall thickness is the larger of 0 064" or the thickness required A Aluminum
TABULATION OF DRAINAGE QUANTITIES
Note: The quantities shown hereon are approximate and are subject to field adjustments.
STATE PROJECT
G.1
-A p r-
:0
M at t H a a p a la
/2
D an
S te rl ey
/2
D es ig n ed b y:
C h ec ke d b y:
NUMBER
SHEET
PRA DENA 10(31)AK
1. Steel pipe culvert minimum wall thickness is the larger of 0.064" or the thickness required A Aluminum by the Std. 602-1 fill height table. AS Aluminized steel
2. Aluminized steel pipe culvert minimum wall thickness is the larger of 0.064" or the GS Galvanized steel thickness required by the Std. 602-1 fill height table (steel). P Plastic
3. Aluminum pipe culvert minimum wall thickness is the larger of 0.060" or the thickness required by the Std. 602-1 fill height table.
4. Structural excavation quantities are provided for information only.
Historically 30% of culvert structure excavation is unsuitable material. See sheet G.9 for structural excavation detail.
5. Where insufficient existing ground topographic information is available the invert elevation, outlet elevation, and culvert length for pipe culverts is approximate.
6. The symbol "X" denotes for information only locations.
FOOTNOTES:
1 For information only.
2 Install Energy Dissipator.
3 Construct Riprap headwall.
4 Install Blanket Drain.
5 Locations of culvert outlet ditches shown in plan sheets are approximate.
TABULATION OF DRAINAGE QUANTITIES
Note: The quantities shown hereon are approximate and are subject to field adjustments.
STATE PROJECT
G.1 ro j\
W
FL
H D
\3 Po rc u p in eF or es \3
-D es ig n E le m en ts \0
-A p r-t H a a p a la
/2
D an
S te rl ey
/2
D es ig n ed b y:
C h ec ke d b y:
NUMBER
SHEET
PRA DENA 10(31)AK
5 Locations of culvert outlet ditches shown in plan sheets are approximate.
NPS Pkg. No. 100633 & 90935A NPS Drwg. No. 184/80269
TABULATION OF DRAINAGE QUANTITIES
Note: The quantities shown hereon are approximate and are subject to field adjustments.
STATE PROJECT
G.1 m in er
\p ro j\ W
FL
H
D \3
Po rc u p in eF or es \3
-D es ig n E le m en ts \0
-A p r-t H a a p a la
/2
D an
S te rl ey
/2
D es ig n ed b y:
C h ec ke d b y:
NUMBER
SHEET
PRA DENA 10(31)AK
PRELIM
IN
ARY
Not fo r C onstr
10.4 x 16 20301 20411 20701 20701 25101 25101 60203 60501 -1900 -0000 -0300 -1400 -2000 -4000 -0400 -0800 -0900 -1000 -1600 -0200 -0000
Skew (degrees)
DIAMETER or SPAN x RISE (inch) 12" 24" 30" 36" 72" 1735 0 41 255 172 10 4 0 535 205 0 0 0 420 1266
2699+37 6 26 21 48 P +34 Underdrain outlet pipe.
2699+37 4 57 42 48 X GS +34 Clean culvert outlet ditch and grade to drain. 5 2701+25 7 68 21 49 P +34 Underdrain outlet pipe
REMARKS / FOOTNOTES
See below for numbered footnotes
STATION
EST
MAX
COVER
(FT)
STR EXC
(CUYD)
PAY ITEM NUMBER
Standard Underdrain
(LNFT)
60201
Select Borrow
(TON)
Placed Riprap, Class 4
(CUYD)
PREVIOUS SHEET TOTAL
Pipe Culvert
(LNFT)
6-inch Slotted
Drain Pipe
(LNFT)
Allow.
Pipe
Material
(See key below)
Catch Basin
(EACH)
Earthwork Geotextile, Type IV-C
(SQYD)
Earthwork Geotextile, Type I-C
(SQYD)
Select Borrow
(foundation preparation)
(TON)
Removal of Pipe Culvert
(EACH)
Placed Riprap, Class 2
(CUYD)
TABULATION OF DRAINAGE QUANTITIES
Note: The quantities shown hereon are approximate and are subject to field adjustments.
STATE PROJECT
G.2
D an
S te rl ey
/2
NUMBER
SHEET
PRA DENA 10(31)AK
2701+25 7 68 21 49 P +34 Underdrain outlet pipe.
2701+25 5 59 43 49 GS +34 Construct culvert outlet ditch and grade to drain.
2703+77 7 65 18 42 P Underdrain outlet pipe.
2703+77 5 58 X 37 42 GS
2704+66 5 57 16 36 P Underdrain outlet pipe.
2708+07 6 728 X 170 202 165 65 A/AS +5 See sheet G.3 for details. 2 3
2713+10 3 27 30 35 GS Construct culvert outlet ditch and grade to drain.
2716+57 4 63 X 34 39 X GS
2718+74 4 55 33 38 X GS
2721+21 3 66 40 37 GS
2722+82 5 100 X 40 46 X GS
2725+19 4 98 1 Remove existing culvert with installation at 2725+29.
2725+29 6 88 38 44 GS +28 Clean culvert outlet ditch and grade to drain. 5
2727+78 6 199 X 55 6 2 51 X GS
2730+69 7 214 X 42 48 GS
2732+75 4 55 34 39 X GS
TABULATION OF DRAINAGE QUANTITIES
Note: The quantities shown hereon are approximate and are subject to field adjustments.
STATE PROJECT
G.2
M at t H a a p a la
/2
D an
S te rl ey
/2
C h ec ke d b y:
NUMBER
SHEET
PRA DENA 10(31)AK
2735+39 2 31 X 26 30 GS -5
2738+24 4 53 X 34 5 2 39 X GS
2743+11 4 249 X 103 25 12 79 A/AS +31 See sheet G.4 for details.
2744+37 2 179 123 113 GS +70 Grade outlet to drain.
2746+44 2 58 39 36 GS
2749+41 6 246 X 55 5 2 63 GS
2753+76 4 135 78 90 X GS +65 Construct culvert outlet ditch and grade to drain.
2759+94 3 94 X 40 6 2 37 GS Remove/plug existing culvert per CO
2766+10 3 67 31 36 GS
PROJECT TOTAL 4930 1 41 1498 172 259 24 165 710 891 274 79 65 420 1266
NOTES: Allowable pipe culvert material 1 Steel pipe culvert minimum wall thickness is the larger of 0 064" or the thickness required A Aluminum
TABULATION OF DRAINAGE QUANTITIES
Note: The quantities shown hereon are approximate and are subject to field adjustments.
STATE PROJECT
G.2 -A p r-
:0 P
M M at t
H a a p a la
/2
D an
S te rl ey
/2
D es ig n ed b y:
C h ec ke d b y:
NUMBER
SHEET
PRA DENA 10(31)AK
1. Steel pipe culvert minimum wall thickness is the larger of 0.064" or the thickness required A Aluminum by the Std. 602-1 fill height table. AS Aluminized steel
2. Aluminized steel pipe culvert minimum wall thickness is the larger of 0.064" or the GS Galvanized steel thickness required by the Std. 602-1 fill height table (steel). P Plastic
3. Aluminum pipe culvert minimum wall thickness is the larger of 0.060" or the thickness required by the Std. 602-1 fill height table.
4. Structural excavation quantities are provided for information only.
Historically 30% of culvert structure excavation is unsuitable material. See sheet G.9 for structural excavation detail.
5. Where insufficient existing ground topographic information is available the invert elevation, outlet elevation, and culvert length for pipe culverts is approximate.
6. The symbol "X" denotes for information only locations.
FOOTNOTES:
1 For information only.
2 Install Energy Dissipator.
3 Construct Riprap headwall.
4 Install Blanket Drain.
5 Locations of culvert outlet ditches shown in plan sheets are approximate.
TABULATION OF DRAINAGE QUANTITIES
Note: The quantities shown hereon are approximate and are subject to field adjustments.
STATE PROJECT
G.2 p ro j\ W
FL
H
D \3
Po rc u p in eF or es \3
-D es ig n E le m en ts \0
-A p r-
:0 P
M M at t
H a a p a la
/2
D an
S te rl ey
/2
D es ig n ed b y:
C h ec ke d b y:
NUMBER
SHEET
PRA DENA 10(31)AK
5 Locations of culvert outlet ditches shown in plan sheets are approximate.
NPS Pkg. No. 100633 & 90935A NPS Drwg. No. 184/80269
TABULATION OF DRAINAGE QUANTITIES
Note: The quantities shown hereon are approximate and are subject to field adjustments.
STATE PROJECT
G.2 m in er \p ro j\
W
FL
H D
\3 Po rc u p in eF or es \3
-D es ig n E le m en ts \0
-A p r-
:0 P
M M at t
H a a p a la
/2
D an
S te rl ey
/2
D es ig n ed b y:
C h ec ke d b y:
NUMBER
SHEET
PRA DENA 10(31)AK
PRELIM
IN
ARY
Not fo r C onstr
-50 -25 0 25 50
AK PRA DENA 10(31) G.3
STATE PROJECT
A p r
P
M d e g c .d g n n S te r e c k e d b y tt H a a p la s ig n e d b y
STRUCTURE EXCAVATION
STRUCTURE BACKFILL
9.6%
N
2708+07
NPS Pkg. No. 100633 & 90935A NPS Drwg. No. 184/80269
Culvert invert
Existing road grade Finished grade @ culvert centerline
New channel profile grade
Existing stream grade
Skew 95 degrees
Line to be staked and constructed
Remove existing 48" pipe culvert
20%
New channel flow line
New channel edge
B
B
2708+07
CULLERS CREEK CULVERT
PLAN AND PROFILE
For Information Only
SECTION A-A
A
880 CUYD
655 CUYD
HYDRAULIC INFORMATION
Q2 : 16 cfs OHW: NA
Q50:73 cfs HW50: 3299.45
FISH SPECIES: NA
INSTREAM WORK WINDOW: NA
ACTIVE CHANNEL WIDTH: NA
PIPE
TYPE: CMP PIPE-ROUND SPAN: 72 IN RISE: 72 IN
LENGTH: 65’ WALL THICKNESS: 0.064 IN
PIPE SLOPE: 9.6% FLOWLINE SLOPE: 9.6%
INFILL TYPE: NA SBM TYPE: NA
LC
New road
1 1 2 2
Existing grade
New channel edge
15’-0"
15’-0"
72" x 65’ Culvert
1:1.5
1:
1.
18.7%
Bevel culvert end to fit slope (approx 28°)
8’
SECTION B-B
1 1 4 4
Existing grade
New channel edge
3’
SECTION C-C
1 1 4 4
Existing grade
New channel edge
8’
25’-0"
OUTLET
INV. E/N: 1643668.24/3476155.73
IE: 3289.77
FLOWLINE EL: 3289.77
HEAD WALL: RIPRAP
BEVEL: 1:1.9
New culvert and channelLC
Earthwork geotextile, type IV-C
Construct headwall Riprap, class 4
Construct headwall Riprap, class 4
Install energy dissipator Riprap, class 4
Install energy dissipator Riprap, class 4
Construct headwall Riprap, class 4
Construct headwall Riprap, class 4
’-0
1’-0"
Earthwork geotextile, type IV-C
Buried riprap toe
Buried riprap toe
INLET
INV. E/N: 1643679.57/3476217.55
IE: 3296.01
FLOWLINE EL: 3296.01
HEAD WALL: RIPRAP
BEVEL: SQUARE
Structure excavation includes removal of existing 48" pipe culvert, as shown per hatching this sheet.
FOOTNOTE:
Includes 91 CUYD for foundation preparation and 23 CUYD for culvert bedding.
12’-0"
PRELIM
IN
ARY
Not fo r C onstr
32503250
32503250
-50 -25 0 25 50
AK PRA DENA 10(31) G.4
Line to be staked and constructed
C
New road
LC
6.1%
N
Remove existing 30" pipe culvert
2743+11
Skew 121 degrees
NPS Pkg. No. 100633 & 90935A NPS Drwg. No. 184/80269
Remove and reinstall existing culvert inlet grate
A p r
P
M d e g d .d g n n S te r e c k e d b y tt H a a p la s ig n e d b y
Existing stream grade
New channel profile grade
Finished grade @ culvert centerline
Existing road grade
Culvert invert 36" x 79’ Culvert
13’-0"
1’-0"
Existing ground @ culvert centerline
16%
New culvert and channel L
New channel flow line
New channel edge
2743+11
BUGSTUFFER CREEK CULVERT
PLAN AND PROFILE
STRUCTURE EXCAVATION
STRUCTURE BACKFILL
249 cy
231 cy
8’
1 1
Existing grade
New channel edge
SECTION A-A
For Information Only
HYDRAULIC INFORMATION
Q2 : 12 cfs OHW: NA
Q50: 32 cfs HW50: 3240.03
FISH SPECIES: NA
INSTREAM WORK WINDOW: NA
ACTIVE CHANNEL WIDTH: NA
PIPE
TYPE: CMP PIPE-ROUND SPAN: 36 IN RISE: 36 IN
LENGTH: 79 FT WALL THICKNESS: 0.064 IN
PIPE SLOPE: 6.1% FLOWLINE SLOPE: 6.1%
INFILL TYPE: NA SBM TYPE: NA
INLET
INV. E/N: 1641036.01/3477096.02
IE: 3237.34
FLOWLINE EL: 3237.34
HEAD WALL: NA
BEVEL: SQUARE
OUTLET
INV. E/N: 1640973.15/3477047.74
IE: 3232.56
FLOWLINE EL: 3232.56
HEAD WALL: NA
BEVEL: SQUARE
1:2.5
1:3 .6
10.5%
Earthwork geotextile, Type IV-C
FOOTNOTE:
Includes 53 CUYD for foundation preparation and 9 CUYD for culvert bedding.
Structure excavation includes removal of existing 30" pipe culvert, as shown per hatching this sheet.
15’-0"
Install energy dissipator Riprap, class 2
Install energy dissipator Riprap, class 2
PRELIM
IN
ARY
Not fo r C onstr
File details come from the government source that posted it. Updated .