AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

N/A

PAGE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)

A001 12/8/2011 N/A AK PRA DENA 10(31)

PORCUPINE FOREST ROAD REPAIR

6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A

Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.

X

DTFH70-11-B-00012

9B. DATED (SEE ITEM 11)

11/01/2011

10A. MODIFICATION OF CONTRACT/ORDER NO.

N/A

10B. DATED (SEE ITEM 13)

CODE: N/A FACILITY CODE: N/A N/A

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers ( X ) is extended, ( ) is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN

ITEM 10A.

N/A

B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

N/A

C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

N/A

D OTHER (Specify type of modification and authority) N/A

E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

AK PRA DENA 10(31) PORCUPINE FOREST ROAD REPAIR

See page 2 for revisions.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

N/A

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION NOT USABLE

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Amendment No. A001, dated 12/8/11 AK PRA DENA 10(31) Solicitation No. DTFH70-11-B-00012 Porcupine Forest Road Repair

REVISIONS ARE AS FOLLOWS:

SF 1442, SOLICITATION, OFFER, AND AWARD (Pen & Ink change)

Page A-3, Block 13A. Revises bid opening date from 12/13/11 to 12/16/11.

BID SCHEDULE

Page A-9. Revises Quantity of Bid Item 30419-0000 Bentonite

CONTRACT CLAUSES

SPECIAL CONTRACT REQUIREMENTS

Page Section/Table Revision F-16 311.03 Material Adds Bentonite F-16 311.04 Production Adds paragraph F-16 311.04A Mixing Adds subsection F-17 311.07 Acceptance Adds Bentonite F-17 311.08 Measurement Adds Bentonite F-18 Table 311-1 Revises table G-1 703.05(d) Subbase, Base, and Surface Course

Aggregate Adds (3) and (4)

G-4 704.07 Select Borrow Revises (b)

PLANS

Plan sheet #B.1 Revises quantity of Bid Item 30419-0000 Plan sheet #F.1 Adds Bentonite to Quantity table

ENCLOSURES

Pages:

A-7 through A-11 F-16 through F-18 G-1 G-4

Plan Sheets:

B.1 F.1

Page(s) not included due to Pen and Ink change(s):

A-3

Notice to Bidders: Please submit revised pages A-7 through A-11 with your bid.

New bid opening date: 12-16-11

Project: AK PRA-DENA 10(31)

PORCUPINE FOREST ROAD REPAIR

Bidder please note: Before preparing the bid, carefully read the Solicitation Provisions.

Insert a unit bid price, in figures, for each pay item for which a quantity appears in the bid schedule. Multiply the unit price by the quantity for each pay item and show the amount bid.

Should any mathematical check made by the Government show a mistake in the amount bid, the Amount Bid for the item will be based on the Unit Bid Price.

When "LPSM" (Lump Sum) appears as a unit bid price, insert an amount for each lump sum pay item.

When a sum based on a fixed rate appears for any pay item in the amount bid column, include the Government inserted amount bid for the item in the total bid amount.

Total the amounts bid for all pay items and insert the total bid amount.

A- 7

Bid Schedule

Pay Item No.

Estimated Quantity Unit Bid Price Amount Bid

15101-0000 MOBILIZATION

ALL Lump Sum $___________________

15201-0000 CONSTRUCTION SURVEY AND STAKING

ALL Lump Sum $___________________

15301-0000 CONTRACTOR QUALITY CONTROL

ALL Lump Sum $___________________

15401-0000 CONTRACTOR TESTING

ALL Lump Sum $___________________

15501-0000 CONSTRUCTION SCHEDULE

ALL Lump Sum $___________________

Project: AK PRA-DENA 10(31)

Bid Schedule A

Pay Item No.

Estimated Quantity Unit Bid Price Amount Bid

A- 8

15702-1000 SOIL EROSION CONTROL, TEMPORARY DIVERSION CHANNEL

ALL Lump Sum $___________________

15705-1500 SOIL EROSION CONTROL, SEDIMENT WATTLE

13,960

LNFT $_______________ $___________________

15801-0000 WATERING FOR DUST CONTROL

MGAL $_______________ $___________________

20101-0000 CLEARING AND GRUBBING

3.2

ACRE $_______________ $___________________

20301-1900 REMOVAL OF PIPE CULVERT

EACH $_______________ $___________________

20401-0000 ROADWAY EXCAVATION

10,600

CUYD $_______________ $___________________

20411-0000 SELECT BORROW

21,000

TON $_______________ $___________________

20701-0300 EARTHWORK GEOTEXTILE, TYPE I-C

11,100

SQYD $_______________ $___________________

20701-1000 EARTHWORK GEOTEXTILE, TYPE III-A

9,400

SQYD $_______________ $___________________

20701-1400 EARTHWORK GEOTEXTILE, TYPE IV-C

SQYD $_______________ $___________________

20703-0000 GEOGRID

10,840

SQYD $_______________ $___________________

25101-2000 PLACED RIPRAP, CLASS 2

CUYD $_______________ $___________________

Project: AK PRA-DENA 10(31)

Estimated Quantity Unit Bid Price Amount Bid

A- 9

25101-4000 PLACED RIPRAP, CLASS 4

CUYD $_______________ $___________________

30110-0000 AGGREGATE SURFACE COURSE

7,800

TON $_______________ $___________________

30302-1000 DITCH RECONDITIONING

LNFT $_______________ $___________________

30419-0000 BENTONITE

TON $_______________ $___________________

31102-0000 STOCKPILED AGGREGATE (AGGREGATE SURFACING)

5,560

CUYD $_______________ $___________________

31102-0000 STOCKPILED AGGREGATE (SELECT BORROW)

2,370

CUYD $_______________ $___________________

31102-0000 STOCKPILED AGGREGATE (RIPRAP, CLASS 5)

3,500

CUYD $_______________ $___________________

60201-0400 12-INCH PIPE CULVERT

LNFT $_______________ $___________________

60201-0800 24-INCH PIPE CULVERT

LNFT $_______________ $___________________

60201-0900 30-INCH PIPE CULVERT

LNFT $_______________ $___________________

60201-1000 36-INCH PIPE CULVERT

LNFT $_______________ $___________________

60201-1600 72-INCH PIPE CULVERT

LNFT $_______________ $___________________

Project: AK PRA-DENA 10(31)

PORCUPINE FOREST ROAD REPAIR

Bid Schedule A

Leeann.Bush Typewritten Text Revised by

Leeann.Bush Typewritten Text Amend A001

Leeann.Bush Typewritten Text

Estimated Quantity Unit Bid Price Amount Bid

A- 10

60203-0200 6-INCH SLOTTED DRAIN PIPE

LNFT $_______________ $___________________

60501-0000 STANDARD UNDERDRAIN SYSTEM

1,310

LNFT $_______________ $___________________

62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY

HOUR $_______________ $___________________

62201-1000 WHEEL LOADER, 4 CUBIC YARD MINIMUM RATED CAPACITY

HOUR $_______________ $___________________

62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE

HOUR $_______________ $___________________

62201-3200 HYDRAULIC EXCAVATOR, CRAWLER MOUNTED, 1.5 CUBIC YARD

MINIMUM CAPACITY

HOUR $_______________ $___________________

62301-0000 GENERAL LABOR

HOUR $_______________ $___________________

63502-1250 TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER, TYPE 42-INCH

EACH $_______________ $___________________

63502-1500 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE A

EACH $_______________ $___________________

63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

SQFT $_______________ $___________________

63509-1000 TEMPORARY TRAFFIC CONTROL, FLAGGER

FIX HR RATE 74.00 29,600.00

63701-0000 FIELD OFFICE

EACH $_______________ $___________________

Project: AK PRA-DENA 10(31)

Estimated Quantity Unit Bid Price Amount Bid

A- 11

63703-0000 RESIDENTIAL HOUSING

EACH $_______________ $___________________

63704-0000 VEHICLE

EACH $_______________ $___________________

$_____________________TOTAL

Submitted by:

Name of Bidder

Project: AK PRA-DENA 10(31)

F-16

Special Contract Requirements Project: AK PRA DENA 10(31), Porcupine Forest Road Repair

Section 311. — STOCKPILED AGGREGATE

(ADDED SECTION)

Description

311.01 This work consists of crushing material from a Government-provided material source and constructing stockpiles of the processed select borrow and aggregate surface course at designated sites prepared by the Contractor.

This work also consists of providing riprap material from a Contractor-located material source and constructing a stockpile of the material at a Contractor-prepared designated site within the Toklat Pit.

Material

311.02 Definitions.

(a) Waste. Unsuitable aggregate surface course and select borrow material.

311.03 Conform to the following Subsections:

Surface Course Aggregate 703.05 (a) and (d) Select Borrow 704.07 Riprap Rock 705.02 Bentonite 725.23

Construction Requirements

311.04 Production. Produce aggregate surface course as specified under Section 703. Produce select borrow as specified in Section 704. Produce class 5 riprap as specified in Section 705.

After a representative quantity of aggregate is produced, determine the amount (percent by mass) of bentonite to be added to the crushed surface course aggregate to meet the plasticity index requirement in Subsection 703.05.

311.04A Mixing. Incorporate the amount of bentonite required to meet the plasticity index requirement in Subsection 703.05 into the surface course aggregate as follows:

Use a stationary pugmill with weighing or metering equipment capable of accurately controlling the material entering the mixer. Interlock the metering controls for the aggregate feed with those of the bentonite to ensure uniform introduction of material into the mixer.

Maintain the accuracy of the amount of bentonite added to within 0.5 percent by mass of the target rate determined under Subsection 311.04.

311.05 Stockpiling. Prepare existing sites as necessary to accommodate the quantity of select borrow, aggregate surface course, and riprap to be stockpiled and provide a uniform cross-section that drains.

Revised by Amendment A001

F-17

Obtain site approval before stockpiling aggregates, select borrow, or riprap. Construct the stockpiles neat and regular in shape, with sideslopes no flatter than 1.5:1. Build the stockpiles in layers not to exceed 4 feet in thickness. Construct stockpile layers by spreading materials with trucks or other approved pneumatic-tired equipment. Complete each layer before beginning subsequent layers.

Do not push aggregates into piles. Do not dump the aggregate so any part of it runs down and over the lower layers in the stockpile. Do not drop aggregates from a bucket or spout in one location to form a cone-shaped pile.

Do not stockpile aggregate where traffic runs through the piles. When operating trucks on stockpiles, use plank runways, where required, to avoid tracking dirt or other foreign matter onto the stockpiled material.

Space stockpiles far enough apart or separate stockpiles by suitable walls or partitions to prevent the mixing of the different aggregate gradations.

After completion of the project, process the remainder of the Government furnished stockpile at Toklat Pit to consist of 70 percent aggregate surface course and 30 percent select borrow.

311.06 Waste Material. Dispose of processing waste material according to Section 105 and as directed by the CO. Aggregate surface course waste material may be combined with select borrow waste material.

311.07 Acceptance. See Table 311-1 for sampling and testing requirements.

Aggregate will be evaluated under Subsections 106.02, 106.04, and Table 311-1.

Select borrow will be evaluated under Subsections 106.02, 106.04, and Table 311-1.

Riprap rock will be evaluated under Subsections 106.02, 106.04, and Table 311-1.

Bentonite will be evaluated under Subsection 106.03.

Measurement

311.08. Measure the Section 311 items listed in the bid schedule according to Subsection 109.02 and this Subsection.

Measure stockpiled aggregate designated to remain in place at Toklat Pit upon completion of the project by the cubic yard in its final stockpiled position.

Measure stockpiled select borrow designated to remain in place at Toklat Pit by the cubic yard in its final stockpiled position.

Measure bentonite by the ton.

Inform the CO one day prior to measurement of a stockpile.

Do not add to a stockpile that has been measured. Start subsequent stockpile(s) if needed.

F-18

Payment

311.09 The accepted quantities, measured as provided in Subsection 109.02 and above, will be paid at the contract price per unit of measurement for the Section 311 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.

Table 311-1 Sampling, Testing and Acceptance Requirements

Section 311 - Stockpiled Aggregates

Type of

Acceptance (Subsection)

Material or

Product

Characteristic

Category Test Methods /

Specifications Tolerance Sampling

Frequency Point of

Sampling Split

Sample

Reporting

Time Remarks

Measured and tested for conformance (Subsection 106.04)

Surface Course Aggregate

Gradation

Fractured faces

Liquid Limit

Plasticity Index

AASHTO T 11 and

AASHTO T 27

ASTM D 5821

AASHTO T 89,

Method A

& T 87

AASHTO T 90

Subsections 703.05

1 for each 1,000 metric tons or fraction thereof

Flowing aggregate stream (bin or belt) or conveyor belt

Yes when requested

End of shift conformance (Subsection 106.04)

Select Borrow

Gradation

Liquid Limit

AASHTO T27 &

AASHTO T 11

AASHTO T 89,

Method A

& T 87

Subsection 704.07

1 per soil type but not less than 2 for each day of production

Flowing aggregate stream (bin or belt) or conveyor belt, Source of material

Yes, when requested

End of shift conformance (Subsection 106.04)

Riprap Subsection 705.02

Apparent specific gravity & absorption

Coarse durability index

AASHTO T 85

AASHTO T 210

1 per material type

Source of material

Yes

Before using in work.

G-1

03USC04/26/10

Section 703. — AGGREGATE

703.05 Subbase, Base, and Surface Course Aggregate. Amend as follows:

Delete paragraph (a) and substitute the following:

Furnish a material that is free from organic matter and lumps or balls of clay. Do not use material that breaks up when alternately frozen and thawed or wetted and dried.

Obtain the aggregate gradation and plasticity index by crushing, screening, and blending processes as necessary. Fine aggregate, material passing the No. 4 sieve, shall consist of natural or crushed sand and fine mineral particles.

Delete the text in paragraph (c) and substitute the following:

(c) Surface course aggregate. In addition to (a) above, conform to the following:

(1) Gradation Table 703-3A

(2) Fractured faces, ASTM D 5821 50% min.

(3) Liquid limit, AASHTO T 89, Method A & T 87 35 max.

(4) Plasticity index, AASHTO T 90 6 min.

Add the following paragraph:

(d) Surface course aggregate, stockpiled. In addition to (a) above, conform to the following:

(1) Gradation Table 703-3A

(2) Fractured faces, ASTM D 5821 50% min.

(3) Liquid limit, AASHTO T 89, Method A & T 87 35 max.

(4) Plasticity index, AASHTO T 90 6 min.

G-4

704.07 Select Borrow. Delete the text of this Subsection and substitute the following:

Furnish granular material, well graded from coarse to fine, free of excess moisture, muck, frozen lumps, roots, sod, or other deleterious material conforming to the following:

(a) Gradation Table 704-1

(b) Liquid limit, AASHTO T 89, Method A and T87 30 max.

Table 704-1 Select Borrow Gradation

Sieve Size Percent by Mass Passing

Designated Sieve

(AASHTO T 27 & T 11)

3-inch 100

1-inch 60-90

No. 4 20-50

No. 200 0-5

S U

M M

A R

Y O

F Q

U A

N

TI

TI

ES

--/---- Susan Pobar8/2011

R e v i s e d b y A

910910

OPERATION PLAN

TOKLAT PIT

To kl at R iv er trailer area

Contractor housing/office barrier

Existing jersey

NOTE:

Staging Area

Equipment

QUANTITIES

ITEM DESCRIPTION QUANTITY

of existing sheet pile wall.

Approximate location material stockpile.

of government furnished

Approximate location stockpile site

Pitrun stockpile site

Aggregate surfacing st oc kp ile s it e

S el ec t bo rr ow sit esto ck pil eRe jec t

Scale in feet

50 100 150 200050

N

2.

1.

throughout construction.

Large stockpiles for mixing fines will be available will be determined by the CO.

The final location of all stockpiles and equipment staging

REMARK

F.1

STATE PROJECT

NUMBER

SHEET

AK PRA-DENA 10(31)

d e fa .d g n

U

S I n t2

D

R J o h n s o n

C h e c k e d b y

W

M c

Q u is to n

D e s ig n e d b y

NPS Pkg. No. 100633 & 90935A NPS Drwg. No. 184/80269 by others.

Berm to be constructed

Sediment wattle

Sediment wattle sit e sto ck pil e

Rip ra p

Aggregate surfacing convervsion factor: 1.90 ton/cuyd

(Aggregate Surfacing) .

Bentonite est’d at 1.5% of Item 31102 Stockpiled Aggregate

See Sheet E.6 for details.

31102-0000

31102-0000

31102-0000

30419-0000

15705-1500

3500 cuyd

11753 cuyd

4235 cuyd

158 ton

300 lnft

1 Amendment #001

Stockpiled Aggregate (Riprap, class5)

Stockpiled Aggregate (Select Borrow)

Stockpiled Aggregate (Aggregate Surfacing)

Bentonite

Soil Erosion Control, Sediment Wattle