DENA_10(27)_F_Sheets_MatSource.pdf

PDF 403 KB Posted

Attached to
RECOVERY, AK PRA DENA 10(27), Rehab Unsafe Road Sections of the Denali Park Road
Solicitation number
DTFH70-09-B-00013
Issued by

About this file

Preliminary Plans

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F.1

STATE PROJECT

TOKLAT PIT

OPERATION PLAN

SHEET

NUMBER

AK

PRA-DENA 10(27)

F

E B

I P

P

W P

:d m s 02/2009

R. Johnson C h e c k e d b y

5/2005 W. McQuiston

D e s ig n e d b y

T o k la t R iv e r

Contractor housing/office trailer area

Existing jersey barrier

Silt fence

NOTE:

Equipment

Staging Area

QUANTITIES

ITEM DESCRIPTION QUANTITY

Based on 1.9 t/cuyd

Based on 1.9 t/cuyd

15705-0100

31101-0000

31101-0000

1200 lnft

23640 ton

15760 ton

Soil Erosion Control, Silt fence

Stockpiled aggregate, aggregate surfacing

Stockpiled aggregate, select borrow

Approximate location of existing sheet pile wall.

Approximate location of government furnished material stockpile.

Pitrun stockpile site

Aggregate surfacing stockpile site

S e le c t b o r r o w s to c k p il e s it e

R e je c t s to c k p il e s it e

NPS Pkg. No. 101156A, B, C, &D NPS Drwg. Nos. 184/80251

Scale in feet

50 100 150 200050

N

1.

2.

The final location of all stockpiles and equipment staging will be determined by the CO.

Large stockpiles for mixing fines will be available throughout construction.

ESTIMATING VALUE REMARK

Includes 8165 tons for Aggregate Surface Course

See Sheet E.2 for details

Prelim inary Plans

Not F or C onstr uctio n

F.2

SHEET

F

E B

I P

P

W P

:d m s 02/2009

R. Johnson C h e c k e d b y

5/2005 W. McQuiston

D e s ig n e d b y

: Equipment Staging AreaSilt fence

Existing fence and approximate pit boundary

ExistingNPSconcreteExisting cleandrain rock Existingpit run Existing waste pile Water tanks

Existingpit run Existing waste pile

Existing fines pile Existing pitrun pile

Processed select borrow stockpile

R e je c t s to c k p ileApproximate locationof unprocessed stockpiled material.

QUANTITIES

ITEM DESCRIPTION QUANTITY

Based on 1.9 t/cuyd

Based on 1.9 t/cuyd

15705-0100

31101-0000

31101-0000

550 lnft

0 ton

37000 ton

Soil Erosion Control, Silt fence

Stockpiled aggregate, aggregate surfacing

Stockpiled aggregate, select borrow

NOTE:

NPS Pkg. No. 101156A, B, C, &D NPS Drwg. Nos. 184/80251

020 20 40 60 80

Scale in feet

The final location of all stockpiles and equipment staging will be determined by the CO.

1.

N

Bench to accomodate grubbing debris

70 MILE PIT

(BEAVER POND PIT)

OPERATION PLAN

ESTIMATING VALUE REMARK

See Sheet E.2 for details

Prelim inary Plans

Not F or C onstr

F.3

Curve= BM83

D = 56%%d 30’ 41" (LT)

R= 105.00’

T= 56.43’

L= 103.56’

S 54% d 20’ 03" W

P C

.1

P T

.6

P O

T

.8

MP

4.8

SHEET

F

E B

I P

P

W P

:d m s

C h e c k e d b y

5/2005

W. McQuiston D e s ig n e d b y

Equipment

Staging Area

Silt fence

Existingfence

Processed select borrow stockpile siteApproximate location of existing government furnished material stockpile.

QUANTITIES

ITEM DESCRIPTION QUANTITY

NOTE:

NPS Pkg. No. 101156A, B, C, &D NPS Drwg. Nos. 184/80251

Scale in feet

20 0 20 40 60 80

The final location of all stockpiles and equipment staging will be determined by the CO.

1.

500 lnft

4797 ton

Soil Erosion Control, Silt fence

Stockpiled aggregate, borrow material

15705-0100

31101-0000

N

Rejectstockpilesite

MOOSE CREEK PIT

(MILE 74.8 PIT)

OPERATION PLAN

ESTIMATING VALUE

See Sheet E.2 for details

Based on 1.9 t/cuyd

REMARK

Prelim inary Plans

Not F or C onstr

de1027ty
de1027tz
de1027ua
de1027ub
dena1027ma
dena1027mb
dena1027mc
dena1027eb

File details come from the government source that posted it. Updated .