AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
N/A
PAGE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)
A001 March 31, 2010 N/A AK PRA DENA 10(27)
Rehab Unsafe Sections of the Denali
Park Road
6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A
Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
X DTFH70-09-B-00013
9B. DATED (SEE ITEM 11)
March 5, 2010
10A. MODIFICATION OF CONTRACT/ORDER NO.
N/A
10B. DATED (SEE ITEM 13)
CODE: N/A FACILITY CODE: N/A
N/A
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
(__ ) is extended, ( x ) is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
N/A
B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
N/A
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
N/A
D OTHER (Specify type of modification and authority) N/A
E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
AK PRA DENA 10(27), REHAB UNSAFE ROAD SECTIONS OF THE DENALI PARK ROAD
See page 2 for revisions
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Amendment No. A001, dated March 31, 2010 AK PRA DENA 19(27) Solicitation No. DTFH70-09-B-00013 Rehab Unsafe Road Sections Page 2 of the Denali Park Road
REVISIONS ARE AS FOLLOWS:
BID SCHEDULE
Page A-10 and A-14. Revises, 63509-1000, Bid Schedules A and B.
CONTRACT CLAUSES
MINIMUM WAGE SCHEDULE
Page D-1 through D-10. Updates Davis-Bacon General Wage Decision Number AK6 to current effective date of March 19, 2010.
ENCLOSURES
Pages:
A-7 through A-14 D-1 through D-10
Notice to Bidders: Please submit revised pages A-7 through A-14 with your bid.
Project: AK PRA-DENA 10(27)
REHAB UNSAFE ROAD SECTIONS OF THE DENALI PARK ROAD
Bidder please note: Before preparing the bid, carefully read the Solicitation Provisions.
Insert a unit bid price, in figures, for each pay item for which a quantity appears in the bid schedule. Multiply the unit price by the quantity for each pay item and show the amount bid.
Should any mathematical check made by the Government show a mistake in the amount bid, the Amount Bid for the item will be based on the Unit Bid Price.
When "LPSM" (Lump Sum) appears as a unit bid price, insert an amount for each lump sum pay item.
When a sum based on a fixed rate appears for any pay item in the amount bid column, include the Government inserted amount bid for the item in the total bid amount.
Total the amounts bid for all pay items and insert the total bid amount.
The quantity for the following item of work is a Contract Quantity (see FP-03, Subsection 109.02):
20103-0000
A- 7
Bid Schedule
Pay Item No.
Estimated Quantity Unit Bid Price Amount Bid
15101-0000 MOBILIZATION
ALL Lump Sum $___________________
15201-0000 CONSTRUCTION SURVEY AND STAKING
ALL Lump Sum $___________________
15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE
ALL Lump Sum $___________________
Project: AK PRA-DENA 10(27)
Bid Schedule A
Pay Item No.
Estimated Quantity Unit Bid Price Amount Bid
A- 8
15401-0000 CONTRACTOR TESTING
ALL Lump Sum $___________________
15501-0000 CONSTRUCTION SCHEDULE
ALL Lump Sum $___________________
15701-0000 SOIL EROSION CONTROL , TEMPORARY POND BARRIER (4322+70)
ALL Lump Sum $___________________
15702-1000 SOIL EROSION CONTROL, TEMPORARY DIVERSION CHANNEL (4308+78)
ALL Lump Sum $___________________
15705-0100 SOIL EROSION CONTROL, SILT FENCE
7,500
LNFT $_______________ $___________________
15801-0000 WATERING FOR DUST CONTROL
1,563
MGAL $_______________ $___________________
20103-0000 CLEARING AND GRUBBING
1,997
SQYD $_______________ $___________________
20301-1900 REMOVAL OF PIPE CULVERT
EACH $_______________ $___________________
20304-1000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS
ALL Lump Sum $___________________
20401-0000 ROADWAY EXCAVATION
5,700
CUYD $_______________ $___________________
20410-0000 SELECT BORROW
2,800
CUYD $_______________ $___________________
25101-4000 PLACED RIPRAP, CLASS 4
CUYD $_______________ $___________________
30110-0000 AGGREGATE SURFACE COURSE
10,000
TON $_______________ $___________________
30301-4000 ROADBED RECONDITIONING
75.00
STA $_______________ $___________________
Project: AK PRA-DENA 10(27)
Estimated Quantity Unit Bid Price Amount Bid
A- 9
30419-0000 BENTONITE
TON $_______________ $___________________
31102-0000 STOCKPILED AGGREGATE , AGGREGATE SURFACING
22,500
CUYD $_______________ $___________________
31102-0000 STOCKPILED AGGREGATE , SELECT BORROW
21,093
CUYD $_______________ $___________________
60201-0800 24-INCH PIPE CULVERT
LNFT $_______________ $___________________
60201-1000 36-INCH PIPE CULVERT
LNFT $_______________ $___________________
60201-1200 48-INCH PIPE CULVERT
LNFT $_______________ $___________________
60201-1600 72-INCH PIPE CULVERT
LNFT $_______________ $___________________
60403-0000 INLET (BEAVER DETERRENT DEVICE)
EACH $_______________ $___________________
62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY
HOUR $_______________ $___________________
62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE
HOUR $_______________ $___________________
62201-3200 HYDRAULIC EXCAVATOR, CRAWLER MOUNTED, 1.5 CUBIC YARD
MINIMUM CAPACITY (WITH THUMB ATTACHMENT)
HOUR $_______________ $___________________
62301-0000 GENERAL LABOR
HOUR $_______________ $___________________
Project: AK PRA-DENA 10(27)
Estimated Quantity Unit Bid Price Amount Bid
A- 10
63316-1000 REMOVE AND RESET SIGN
EACH $_______________ $___________________
63502-1250 TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER, TYPE 42-INCH
EACH $_______________ $___________________
63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B
EACH $_______________ $___________________
63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
SQFT $_______________ $___________________
63506-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC AND SAFETY SUPERVISOR
HOUR $_______________ $___________________
63509-1000 TEMPORARY TRAFFIC CONTROL, FLAGGER
FIX HR RATE 68.00 27,200.00
63703-0000 RESIDENTIAL HOUSING (INCLUDES FIELD OFFICE)
EACH $_______________ $___________________
63704-0000 VEHICLE
EACH $_______________ $___________________
$_____________________TOTAL
Submitted by:
Name of Bidder
Project: AK PRA-DENA 10(27)
REHAB UNSAFE ROAD SECTIONS OF THE DENALI PARK ROAD
Bid Schedule A leeann.bush Typewritten Text Revised by leeann.bush Typewritten Text Amend A001
Project: AK PRA-DENA 10(27)
Bidder please note: Before preparing the bid, carefully read the Solicitation Provisions.
Insert a unit bid price, in figures, for each pay item for which a quantity appears in the bid schedule. Multiply the unit price by the quantity for each pay item and show the amount bid.
Should any mathematical check made by the Government show a mistake in the amount bid, the Amount Bid for the item will be based on the Unit Bid Price.
When "LPSM" (Lump Sum) appears as a unit bid price, insert an amount for each lump sum pay item.
When a sum based on a fixed rate appears for any pay item in the amount bid column, include the Government inserted amount bid for the item in the total bid amount.
Total the amounts bid for all pay items and insert the total bid amount.
The quantity for the following item of work is a Contract Quantity (see FP-03, Subsection 109.02):
20103-0000
A- 11
Bid Schedule
Pay Item No.
Estimated Quantity Unit Bid Price Amount Bid
15101-0000 MOBILIZATION
ALL Lump Sum $___________________
15201-0000 CONSTRUCTION SURVEY AND STAKING
ALL Lump Sum $___________________
15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE
ALL Lump Sum $___________________
Project: AK PRA-DENA 10(27)
Bid Schedule B
Estimated Quantity Unit Bid Price Amount Bid
A- 12
15401-0000 CONTRACTOR TESTING
ALL Lump Sum $___________________
15501-0000 CONSTRUCTION SCHEDULE
ALL Lump Sum $___________________
15701-0000 SOIL EROSION CONTROL , TEMPORARY POND BARRIER (4322+70)
ALL Lump Sum $___________________
15702-1000 SOIL EROSION CONTROL, TEMPORARY DIVERSION CHANNEL (4308+78)
ALL Lump Sum $___________________
15705-0100 SOIL EROSION CONTROL, SILT FENCE
8,500
LNFT $_______________ $___________________
15801-0000 WATERING FOR DUST CONTROL
1,980
MGAL $_______________ $___________________
20103-0000 CLEARING AND GRUBBING
4,603
SQYD $_______________ $___________________
20301-1900 REMOVAL OF PIPE CULVERT
EACH $_______________ $___________________
20304-1000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS
ALL Lump Sum $___________________
20401-0000 ROADWAY EXCAVATION
9,600
CUYD $_______________ $___________________
20410-0000 SELECT BORROW
3,200
CUYD $_______________ $___________________
25101-4000 PLACED RIPRAP, CLASS 4
CUYD $_______________ $___________________
30110-0000 AGGREGATE SURFACE COURSE
15,700
TON $_______________ $___________________
30301-4000 ROADBED RECONDITIONING
110.00
STA $_______________ $___________________
Project: AK PRA-DENA 10(27)
Estimated Quantity Unit Bid Price Amount Bid
A- 13
30419-0000 BENTONITE
TON $_______________ $___________________
31102-0000 STOCKPILED AGGREGATE , AGGREGATE SURFACING
22,500
CUYD $_______________ $___________________
31102-0000 STOCKPILED AGGREGATE , SELECT BORROW
18,092
CUYD $_______________ $___________________
60201-0800 24-INCH PIPE CULVERT
1,097
LNFT $_______________ $___________________
60201-1000 36-INCH PIPE CULVERT
LNFT $_______________ $___________________
60201-1200 48-INCH PIPE CULVERT
LNFT $_______________ $___________________
60201-1600 72-INCH PIPE CULVERT
LNFT $_______________ $___________________
60403-0000 INLET (BEAVER DETERRENT DEVICE)
EACH $_______________ $___________________
62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY
HOUR $_______________ $___________________
62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE
HOUR $_______________ $___________________
62201-3200 HYDRAULIC EXCAVATOR, CRAWLER MOUNTED, 1.5 CUBIC YARD
MINIMUM CAPACITY (WITH THUMB ATTACHMENT)
HOUR $_______________ $___________________
62301-0000 GENERAL LABOR
HOUR $_______________ $___________________
Project: AK PRA-DENA 10(27)
Estimated Quantity Unit Bid Price Amount Bid
A- 14
63316-1000 REMOVE AND RESET SIGN
EACH $_______________ $___________________
63502-1250 TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER, TYPE 42-INCH
EACH $_______________ $___________________
63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B
EACH $_______________ $___________________
63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
SQFT $_______________ $___________________
63506-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC AND SAFETY SUPERVISOR
HOUR $_______________ $___________________
63509-1000 TEMPORARY TRAFFIC CONTROL, FLAGGER
FIX HR RATE 68.00 34,000.00
63703-0000 RESIDENTIAL HOUSING (INCLUDES FIELD OFFICE)
EACH $_______________ $___________________
63704-0000 VEHICLE
EACH $_______________ $___________________
$_____________________TOTAL
Submitted by:
Name of Bidder
Project: AK PRA-DENA 10(27)
REHAB UNSAFE ROAD SECTIONS OF THE DENALI PARK ROAD
Bid Schedule B leeann.bush Typewritten Text Revised by leeann.bush Typewritten Text Amend A001
D-1
Revised by Amendment A001
Wage Determinations
AK PRA DENA 10(27), REHAB UNSAFE SECTIONS OF THE DENALI PARK RD.
General Decision Number: AK100006 03/19/2010 AK6
Superseded General Decision Number: AK20080006
State: Alaska
Construction Type: Highway
Counties: Aleutians East, Aleutians West, Anchorage, Bethel, Bristol Bay, Dillingham, Fairbanks North Star, Kenai Peninsula, Kodiak Island, Matanuska-Susitna, Nome, North Slope, Northwest Artic, Southeast Fairbanks, Valdez-Cordova, Wade Hampton and Yukon-Koyukuk Counties in Alaska.
Highway Construction Projects
Modification Number Publication Date 0 03/12/2010 1 03/19/2010
CARP1243-004 07/01/2009
North of the 63rd Parallel
Rates Fringes
CARPENTER........................$ 34.33 18.55
CARP1281-006 07/01/2009
South of the 63rd Parallel
Rates Fringes
CARPENTER........................$ 34.33 18.23
CARP2520-004 07/01/2009
Rates Fringes
Piledriver Carpenter...................$ 34.33 18.23 Piledriver, Skiff operator, Rigger............$ 33.33 18.23 Sheet Stabber...............$ 34.33 18.23 Welder......................$ 35.33 18.23
* ELEC1547-004 12/28/2009
Rates Fringes
CABLE SPLICER....................$ 47.85 3%+23.00
Electrician;Technician...........$ 36.47 3%+$18.15
D-2
Wage Determinations
AK PRA DENA 10(27), REHAB UNSAFE SECTIONS OF THE DENALI PARK RD.
* ELEC1547-005 12/28/2009
Line Construction
Rates Fringes
CABLE SPLICER....................$ 47.85 3%+23.00
Line Construction: (Tree Trimmer Shredder)................$ 33.40 3%+$20.65 Linemen (Including Equipment Operators, Technician)...........$ 46.10 3%+22.15 Powderman........................$ 44.10 3%+23.00
TREE TRIMMER.....................$ 44.60 3%+$20.65
ENGI0302-002 01/01/2010
Rates Fringes
Power equipment operators:
GROUP 1.....................$ 36.23 16.95
GROUP 1A....................$ 37.99 16.95
GROUP 2.....................$ 35.46 16.95
GROUP 3.....................$ 34.74 16.95
GROUP 4.....................$ 28.53 16.95
TUNNEL WORK
GROUP 1....................$ 39.85 16.95
GROUP 1A...................$ 41.79 16.95
GROUP 2....................$ 39.01 16.95
GROUP 3....................$ 38.21 16.95
GROUP 4....................$ 31.83 16.95
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Asphalt Roller; Back Filler; Barrier Machine (Zipper); Batch Plant Operator: Batch and Mixer over 200 yds.; Beltcrete with power pack and similar conveyors;
Bending Machine; Boat Coxwains; Bulldozers; Cableways, Highlines and Cablecars; Cleaning Machine; Coating Machine;
Concrete Hydro Blaster; Cranes-45 tons and under or 150 foot boom and under (including jib and attachments): (a) Shovels, Backhoes, Draglines, Clamshells; Gradalls-3 yards and under; (b) Hydralifts or Transporters, all track or truck type,(c) Derricks; Crushers; Deck Winches-Double Drum; Ditching or Trenching Machine (16 inch or over);
Drilling Machines, core, cable, rotary and exploration;
Finishing Machine Operator, concrete paving, Laser Screed, sidewalk, curb and gutter machine; Helicopters; Hover Craft, Flex Craft, Loadmaster, Air Cushion, All Terrain Vehicle, Rollagon, Bargecable, Nodwell Sno Cat; Hydro Ax:
Feller Buncher and similar; Loaders: Forklifts with power boom and swing attachment, Overhead and front end, 2 1/2 yards through 5 yards, Loaders with forks or pipe clamps, Loaders, elevating belt type, Euclid and similar types;
Mechanics, Bodyman; Micro Tunneling Machine; Mixers: Mobile type w/hoist combination; Motor Patrol Grader; Mucking
D-3
Wage Determinations
AK PRA DENA 10(27), REHAB UNSAFE SECTIONS OF THE DENALI PARK RD.
Machines: Mole, Tunnel Drill, Horizontal/Directional Drill Operator, and/or Shield; Operator on Dredges; Piledriver Engineers, L. B. Foster, Puller or similar Paving Breaker;
Power Plant, Turbine Operator, 200 k.w. and over (power plants or combination of power units over 300 k.w.);
Sauerman-Bagley; Scrapers-through 40 yards; Service Oiler/Service Engineer; Sidebooms-under 45 tons; Shot Blast Machine; Spreaders, Blaw Knox, Cedarapids, Barber Greene, Slurry Machine; Sub-grader (Gurries, C.M.I. and C.M.I. Roto Mills and similar types); Tack tractor; Truck mounted Concrete Pumps, Conveyor, Creter; Water Kote Machine;
Unlicensed off road hauler; Welder; Electrical Mechanic, Camp Maintenance Engineer
GROUP 1A: Cranes-over 45 tons or 150 foot (including jib and attachments): (a) Shovels, backhoes, draglines, clamshells-over 3 yards, (b) Tower cranes; Loaders over 5 yds.; Motor Patrol Grader, Dozer, Grade Tractor (finish:
when finishing to final grade and/or to hubs, or for asphalt); Power Plants: 1000 k.w. and over; Quad; Screed;
Sidebooms over 45 tons; Slip Form Paver C.M.I. and similar types; Scrapers over 40 yards; Camera/Tool/Video Operator (Slipline).
GROUP 2: Batch Plant Operators: Batch and Mixer 200 yds. per hour and under; Boiler-fireman; Cement Hog and Concrete Pump Operator; Conveyors (except as listed in group 1);
Hoist on steel erection; Towermobiles and Air Tuggers;
Horizontal/Directional Drill Locator; Loaders, Elevating Grader, Dumor and similar; Locomotives: rod and geared engines; Mixers; Screening, Washing Plant; Sideboom (cradling rock drill regardless of size); Skidder; Trencing Machine under 16 inches.
GROUP 3: "A" Frame Trucks, Deck Winches: single power drum;
Bombardier (tack or tow rig); Boring Machine; Brooms-power;
Bump Cutter; Compressor; Farm tractor; Forklift, industrial type; Gin Truck or Winch Truck with poles when used for hoisting; Grade Checker and Stake Hopper; Hoist, Air Tuggers, Elevators; Loaders: (a) Elevating-Athey, Barber Green and similar types (b) Forklifts or Lumber Carrier (on construction job site) (c) Forklifts with Tower (d) Overhead and Front-end, under 2 1/2 yds. Locomotives:Dinkey (air, steam, gas and electric) Speeders; Mechanics (light duty); Mixers: Concrete Mixers and Batch 200 yds. per hour and under; Oil, Blower Distribution; Post Hole Diggers, mechanical; Pot Fireman (power agitated); Power Plant, Turbine Operator, under 300 k.w.; Pumps-water; Rig oiler/assistant engineer, over 45 ton, over 3 yards or over 150 foot boom; Roller-other than Plantmix; Saws, concrete;
Straightening Machine; Tow Tractor
GROUP 4: Rig Oiler/Assistant Engineer (Advances to Group III if over 45 tons or 3 yards or 150 ft. boom); Swamper (on trenching machines or shovel type equipment); Spotter;
D-4
Wage Determinations
AK PRA DENA 10(27), REHAB UNSAFE SECTIONS OF THE DENALI PARK RD.
Steam Cleaner
FOOTNOTE: Groups 1-4 receive 10% premium while performing tunnel or underground work. Rig Oiler/Assistant Engineer shall be required on cranes over 85 tons or over 100 feet of boom.
IRON0751-003 08/01/2009
Rates Fringes
Ironworkers:
BRIDGE, STRUCTURAL,
ORNAMENTAL, REINFORCING
MACHINERY MOVER, RIGGER,
SHEETER, STAGE RIGGER,
BENDER OPERATOR.............$ 33.25 19.64
FENCE, BARRIER AND
GUARDRAIL INSTALLERS........$ 29.75 19.39
GUARDRAIL LAYOUT MAN........$ 30.49 19.64
HELICOPTER, TOWER...........$ 34.25 19.64
* LABO0341-007 07/01/2009
Rates Fringes
Laborers: North of the 63rd Parallel & East of Longitude 138 Degrees
GROUP 1.....................$ 28.74 16.65
GROUP 2.....................$ 29.67 16.65
GROUP 3.....................$ 30.50 16.65
GROUP 3A....................$ 33.52 16.65
GROUP 3B....................$ 34.29 16.65
GROUP 4.....................$ 19.13 16.65
TUNNELS, SHAFTS, AND RAISES
GROUP 1....................$ 31.57 16.65
GROUP 2....................$ 32.60 16.65
GROUP 3....................$ 33.52 16.65
GROUP 3A...................$ 36.84 16.65
GROUP 3B...................$ 37.69 16.65
Laborers: South of the 63rd Parallel & West of Longitude 138 Degrees
GROUP 1.....................$ 27.41 14.25
GROUP 2.....................$ 28.27 14.25
GROUP 3.....................$ 29.04 14.25
GROUP 3A....................$ 31.82 14.25
GROUP 3B....................$ 32.53 14.25
GROUP 4.....................$ 18.55 14.25
TUNNELS, SHAFTS, AND RAISES
GROUP 1....................$ 30.11 14.25
GROUP 2....................$ 31.05 14.25
GROUP 3....................$ 31.90 14.25
GROUP 3A...................$ 34.95 14.25
D-5
Wage Determinations
AK PRA DENA 10(27), REHAB UNSAFE SECTIONS OF THE DENALI PARK RD.
GROUP 3B...................$ 35.75 14.25
LABORERS CLASSIFICATIONS
GROUP 1: Asphalt Workers (shovelman, plant crew); Brush Cutters; Camp Maintenance Laborer; Carpenter Tenders; Choke Setters, Hook Tender, Rigger, Signalman; Concrete Laborer(curb and gutter, chute handler, grouting, curing, screeding); Crusher Plant Laborer; Demolition Laborer;
Ditch Diggers; Dump Man; Environmental Laborer (asbestos (limited to nonmechanical systems), hazardous and toxic waste, oil spill); Fence Installer; Fire Watch Laborer;
Flagman; Form Strippers; General Laborer; Guardrail Laborer, Bridge Rail Installers; Hydro-Seeder Nozzleman;
Laborers (building); Landscape or Planter; Laying of Decorative Block (retaining walls, flowered decorative block 4 feet and below); Material Handlers; Pneumatic or Power Tools; Portable or Chemical Toilet Serviceman; Pump Man or Mixer Man; Railroad Track Laborer; Sandblast, Pot Tender; Saw Tenders; Scaffold Building and Erecting; Slurry Work; Stake Hopper; Steam Point or Water Jet Operator;
Steam Cleaner Operator; Tank Cleaning; Utiliwalk, Utilidor Laborer and Conduit Installer; Watchman (construction projects); Window Cleaner
GROUP 2: Burning and Cutting Torch; Cement or Lime Dumper or Handler (sack or bulk); Choker Splicer; Chucktender (wagon, airtrack and hydraulic drills); Concrete Laborers (power buggy, concrete saws, pumpcrete nozzleman, vibratorman);
Culvert Pipe Laborer; Cured in place Pipelayer;
Environmental Laborer (marine work, oil spill skimmer operator, small boat operator); Foam Gun or Foam Machine Operator; Green Cutter (dam work); Gunnite Operator; Hod Carriers; Jackhammer or Pavement Breakers (more than 45 pounds);Laying of Decorative Block (retaining walls, flowered decorative block above 4 feet); Mason Tender and Mud Mixer (sewer work); Pilot Car; Plasterer, Bricklayer and Cement Finisher Tenders; Power Saw Operator; Railroad Switch Layout Laborer; Sandblaster; Sewer Caulkers; Sewer Plant Maintenance Man; Thermal Plastic Applicator; Timber Faller, chain saw operator, filer; Timberman
GROUP 3: Alarm Installer; Bit Grinder; Guardrail Machine Operator; High Rigger and tree topper; High Scaler;
Multiplate; Slurry Seal Squeegee Man
GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);
Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers
GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)
D-6
Wage Determinations
AK PRA DENA 10(27), REHAB UNSAFE SECTIONS OF THE DENALI PARK RD.
GROUP 4: Final Building Cleanup
TUNNELS, SHAFTS, AND RAISES CLASSIFICATIONS
GROUP 1: Brakeman; Muckers; Nippers; Topman and Bull Gang;
Tunnel Track Laborer
GROUP 2: Burning and Cutting Torch; Concrete Laborers;
Jackhammers; Nozzleman, Pumpcrete or Shotcrete.
GROUP 3: Miner; Retimberman
GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);
Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers.
GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)
Tunnel shaft and raise rates only apply to workers regularly employed inside a tunnel portal or shaft collar.
PLAS0867-004 02/01/2010
Rates Fringes
CEMENT MASON/CONCRETE FINISHER
North of the 63rd parallel..$ 34.29 16.40 South of the 63rd parallel..$ 34.04 16.40
TEAM0959-003 09/01/2009
Rates Fringes
TRUCK DRIVER
GROUP 1.....................$ 36.78 14.30
GROUP 1A....................$ 38.02 14.30
GROUP 2.....................$ 35.56 14.30
GROUP 3.....................$ 34.76 14.30
GROUP 4.....................$ 34.21 14.30
GROUP 5.....................$ 33.46 14.30
GROUP 1: Semi with Double Box Mixer; Dump Trucks (including rockbuggy and trucks with pups) over 40 yards up to and including 60 yards; Deltas, Commanders, Rollogans and similar equipment when pulling sleds, trailers or similar equipment; Boat Coxswain; Lowboys including attached trailers and jeeps, up to and including 12 axles; Ready-mix over 12 yards up to and including 15 yards); Water Wagon (250 Bbls and above); Tireman, Heavy Duty/Fueler
GROUP 1A: Dump Trucks (including Rockbuggy and Trucks with pups) over 60 yards up to and including 100 yards; Jeeps
D-7
Wage Determinations
AK PRA DENA 10(27), REHAB UNSAFE SECTIONS OF THE DENALI PARK RD.
(driver under load)
GROUP 2: Turn-O-Wagon or DW-10 not self-loading; All Deltas, Commanders, Rollogans, and similar equipment; Mechanics;
Dump Trucks (including Rockbuggy and Trucks with pups) over 20 yards up to and including 40 yards; Lowboys including attached trailers and jeeps up to and including 8 axles;
Super vac truck/cacasco truck/heat stress truck; Ready-mix over 7 yards up to and including 12 yards;
GROUP 3: Dump Trucks (including Rockbuggy and Trucks with pups) over 10 yards up to and including 20 yards; batch trucks 8 yards and up; Oil distributor drivers; Partsman;
Oil Distributor Drivers; Trucks/Jeeps (push or pull);
Traffic Control Technician
GROUP 4: Buggymobile; Semi or Truck and trailer; Dumpster;
Tireman (light duty); Dump Trucks (including Rockbuggy and Truck with pups) up to and including 10 yards; Track Truck Equipment; Stringing Truck; Grease Truck; Flat Beds, dual rear axle; Hyster Operators (handling bulk aggregate);
Lumber Carrier; Water Wagon, semi; Water Truck, dual axle;
Gin Pole Truck, Winch Truck, Wrecker, Truck Mounted "A" Frame manufactured rating over 5 tons; Bull Lifts and Fork Lifts with Power Boom and Swing attachments, over 5 tons;
Front End Loader with Forks; Bus Operator over 30 passengers; All Terrain Vehicles; Boom Truck/Knuckle Truck over 5 tons; Foam Distributor Truck/dual axle;
Hydro-seeders, dual axle; Vacuum Trucks, Truck Vacuum Sweepers; Loadmaster (air and water); Air Cushion or similar type vehicle; Fire Truck/Ambulance Driver;
Combination Truck-fuel and grease; Compactor (when pulled by rubber tired equipment); Rigger (air/water/oilfield);
Ready Mix, up to and including 7 yards;
GROUP 5: Gravel Spreader Box Operator on Truck; Flat Beds, single rear axle; Boom Truck/Knuckle Truck up to and including 5 tons; Pickups (Pilot Cars and all light duty vehicles); Water Wagon (Below 250 Bbls); Gin Pole Truck, Winch Truck, Wrecker, Truck Mounted "A" Frame, manufactured rating 5 tons and under; Bull Lifts and Fork Lifts (fork lifts with power broom and swing attachments up to and including 5 tons); Buffer Truck; Tack Truck; Farm type Rubber Tired Tractor (when material handling or pulling wagons on a construction project); Foam Distributor, single axle; Hydro-Seeders, single axle; Team Drivers (horses, mules and similar equipment); Fuel Handler (station/bulk attendant); Batch Truck, up to and including 7 yards;
Gear/Supply Truck; Bus Operator, Up to 30 Passengers;
Rigger/Swamper
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
D-8
Wage Determinations
AK PRA DENA 10(27), REHAB UNSAFE SECTIONS OF THE DENALI PARK RD.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
D-9
Wage Determinations
AK PRA DENA 10(27), REHAB UNSAFE SECTIONS OF THE DENALI PARK RD.
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
D-10
Wage Determinations
AK PRA DENA 10(27), REHAB UNSAFE SECTIONS OF THE DENALI PARK RD.
RESERVED