AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

N/A

PAGE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)

A001 March 31, 2010 N/A AK PRA DENA 10(27)

Rehab Unsafe Sections of the Denali

Park Road

6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A

Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.

X DTFH70-09-B-00013

9B. DATED (SEE ITEM 11)

March 5, 2010

10A. MODIFICATION OF CONTRACT/ORDER NO.

N/A

10B. DATED (SEE ITEM 13)

CODE: N/A FACILITY CODE: N/A

N/A

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

(__ ) is extended, ( x ) is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN

ITEM 10A.

N/A

B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

N/A

C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

N/A

D OTHER (Specify type of modification and authority) N/A

E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

AK PRA DENA 10(27), REHAB UNSAFE ROAD SECTIONS OF THE DENALI PARK ROAD

See page 2 for revisions

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

N/A

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION NOT USABLE

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Amendment No. A001, dated March 31, 2010 AK PRA DENA 19(27) Solicitation No. DTFH70-09-B-00013 Rehab Unsafe Road Sections Page 2 of the Denali Park Road

REVISIONS ARE AS FOLLOWS:

BID SCHEDULE

Page A-10 and A-14. Revises, 63509-1000, Bid Schedules A and B.

CONTRACT CLAUSES

MINIMUM WAGE SCHEDULE

Page D-1 through D-10. Updates Davis-Bacon General Wage Decision Number AK6 to current effective date of March 19, 2010.

ENCLOSURES

Pages:

A-7 through A-14 D-1 through D-10

Notice to Bidders: Please submit revised pages A-7 through A-14 with your bid.

Project: AK PRA-DENA 10(27)

REHAB UNSAFE ROAD SECTIONS OF THE DENALI PARK ROAD

Bidder please note: Before preparing the bid, carefully read the Solicitation Provisions.

Insert a unit bid price, in figures, for each pay item for which a quantity appears in the bid schedule. Multiply the unit price by the quantity for each pay item and show the amount bid.

Should any mathematical check made by the Government show a mistake in the amount bid, the Amount Bid for the item will be based on the Unit Bid Price.

When "LPSM" (Lump Sum) appears as a unit bid price, insert an amount for each lump sum pay item.

When a sum based on a fixed rate appears for any pay item in the amount bid column, include the Government inserted amount bid for the item in the total bid amount.

Total the amounts bid for all pay items and insert the total bid amount.

The quantity for the following item of work is a Contract Quantity (see FP-03, Subsection 109.02):

20103-0000

A- 7

Bid Schedule

Pay Item No.

Estimated Quantity Unit Bid Price Amount Bid

15101-0000 MOBILIZATION

ALL Lump Sum $___________________

15201-0000 CONSTRUCTION SURVEY AND STAKING

ALL Lump Sum $___________________

15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE

ALL Lump Sum $___________________

Project: AK PRA-DENA 10(27)

Bid Schedule A

Pay Item No.

Estimated Quantity Unit Bid Price Amount Bid

A- 8

15401-0000 CONTRACTOR TESTING

ALL Lump Sum $___________________

15501-0000 CONSTRUCTION SCHEDULE

ALL Lump Sum $___________________

15701-0000 SOIL EROSION CONTROL , TEMPORARY POND BARRIER (4322+70)

ALL Lump Sum $___________________

15702-1000 SOIL EROSION CONTROL, TEMPORARY DIVERSION CHANNEL (4308+78)

ALL Lump Sum $___________________

15705-0100 SOIL EROSION CONTROL, SILT FENCE

7,500

LNFT $_______________ $___________________

15801-0000 WATERING FOR DUST CONTROL

1,563

MGAL $_______________ $___________________

20103-0000 CLEARING AND GRUBBING

1,997

SQYD $_______________ $___________________

20301-1900 REMOVAL OF PIPE CULVERT

EACH $_______________ $___________________

20304-1000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS

ALL Lump Sum $___________________

20401-0000 ROADWAY EXCAVATION

5,700

CUYD $_______________ $___________________

20410-0000 SELECT BORROW

2,800

CUYD $_______________ $___________________

25101-4000 PLACED RIPRAP, CLASS 4

CUYD $_______________ $___________________

30110-0000 AGGREGATE SURFACE COURSE

10,000

TON $_______________ $___________________

30301-4000 ROADBED RECONDITIONING

75.00

STA $_______________ $___________________

Project: AK PRA-DENA 10(27)

Estimated Quantity Unit Bid Price Amount Bid

A- 9

30419-0000 BENTONITE

TON $_______________ $___________________

31102-0000 STOCKPILED AGGREGATE , AGGREGATE SURFACING

22,500

CUYD $_______________ $___________________

31102-0000 STOCKPILED AGGREGATE , SELECT BORROW

21,093

CUYD $_______________ $___________________

60201-0800 24-INCH PIPE CULVERT

LNFT $_______________ $___________________

60201-1000 36-INCH PIPE CULVERT

LNFT $_______________ $___________________

60201-1200 48-INCH PIPE CULVERT

LNFT $_______________ $___________________

60201-1600 72-INCH PIPE CULVERT

LNFT $_______________ $___________________

60403-0000 INLET (BEAVER DETERRENT DEVICE)

EACH $_______________ $___________________

62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY

HOUR $_______________ $___________________

62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE

HOUR $_______________ $___________________

62201-3200 HYDRAULIC EXCAVATOR, CRAWLER MOUNTED, 1.5 CUBIC YARD

MINIMUM CAPACITY (WITH THUMB ATTACHMENT)

HOUR $_______________ $___________________

62301-0000 GENERAL LABOR

HOUR $_______________ $___________________

Project: AK PRA-DENA 10(27)

Estimated Quantity Unit Bid Price Amount Bid

A- 10

63316-1000 REMOVE AND RESET SIGN

EACH $_______________ $___________________

63502-1250 TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER, TYPE 42-INCH

EACH $_______________ $___________________

63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B

EACH $_______________ $___________________

63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

SQFT $_______________ $___________________

63506-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC AND SAFETY SUPERVISOR

HOUR $_______________ $___________________

63509-1000 TEMPORARY TRAFFIC CONTROL, FLAGGER

FIX HR RATE 68.00 27,200.00

63703-0000 RESIDENTIAL HOUSING (INCLUDES FIELD OFFICE)

EACH $_______________ $___________________

63704-0000 VEHICLE

EACH $_______________ $___________________

$_____________________TOTAL

Submitted by:

Name of Bidder

Project: AK PRA-DENA 10(27)

REHAB UNSAFE ROAD SECTIONS OF THE DENALI PARK ROAD

Bid Schedule A leeann.bush Typewritten Text Revised by leeann.bush Typewritten Text Amend A001

Project: AK PRA-DENA 10(27)

Bidder please note: Before preparing the bid, carefully read the Solicitation Provisions.

Insert a unit bid price, in figures, for each pay item for which a quantity appears in the bid schedule. Multiply the unit price by the quantity for each pay item and show the amount bid.

Should any mathematical check made by the Government show a mistake in the amount bid, the Amount Bid for the item will be based on the Unit Bid Price.

When "LPSM" (Lump Sum) appears as a unit bid price, insert an amount for each lump sum pay item.

When a sum based on a fixed rate appears for any pay item in the amount bid column, include the Government inserted amount bid for the item in the total bid amount.

Total the amounts bid for all pay items and insert the total bid amount.

The quantity for the following item of work is a Contract Quantity (see FP-03, Subsection 109.02):

20103-0000

A- 11

Bid Schedule

Pay Item No.

Estimated Quantity Unit Bid Price Amount Bid

15101-0000 MOBILIZATION

ALL Lump Sum $___________________

15201-0000 CONSTRUCTION SURVEY AND STAKING

ALL Lump Sum $___________________

15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE

ALL Lump Sum $___________________

Project: AK PRA-DENA 10(27)

Bid Schedule B

Estimated Quantity Unit Bid Price Amount Bid

A- 12

15401-0000 CONTRACTOR TESTING

ALL Lump Sum $___________________

15501-0000 CONSTRUCTION SCHEDULE

ALL Lump Sum $___________________

15701-0000 SOIL EROSION CONTROL , TEMPORARY POND BARRIER (4322+70)

ALL Lump Sum $___________________

15702-1000 SOIL EROSION CONTROL, TEMPORARY DIVERSION CHANNEL (4308+78)

ALL Lump Sum $___________________

15705-0100 SOIL EROSION CONTROL, SILT FENCE

8,500

LNFT $_______________ $___________________

15801-0000 WATERING FOR DUST CONTROL

1,980

MGAL $_______________ $___________________

20103-0000 CLEARING AND GRUBBING

4,603

SQYD $_______________ $___________________

20301-1900 REMOVAL OF PIPE CULVERT

EACH $_______________ $___________________

20304-1000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS

ALL Lump Sum $___________________

20401-0000 ROADWAY EXCAVATION

9,600

CUYD $_______________ $___________________

20410-0000 SELECT BORROW

3,200

CUYD $_______________ $___________________

25101-4000 PLACED RIPRAP, CLASS 4

CUYD $_______________ $___________________

30110-0000 AGGREGATE SURFACE COURSE

15,700

TON $_______________ $___________________

30301-4000 ROADBED RECONDITIONING

110.00

STA $_______________ $___________________

Project: AK PRA-DENA 10(27)

Estimated Quantity Unit Bid Price Amount Bid

A- 13

30419-0000 BENTONITE

TON $_______________ $___________________

31102-0000 STOCKPILED AGGREGATE , AGGREGATE SURFACING

22,500

CUYD $_______________ $___________________

31102-0000 STOCKPILED AGGREGATE , SELECT BORROW

18,092

CUYD $_______________ $___________________

60201-0800 24-INCH PIPE CULVERT

1,097

LNFT $_______________ $___________________

60201-1000 36-INCH PIPE CULVERT

LNFT $_______________ $___________________

60201-1200 48-INCH PIPE CULVERT

LNFT $_______________ $___________________

60201-1600 72-INCH PIPE CULVERT

LNFT $_______________ $___________________

60403-0000 INLET (BEAVER DETERRENT DEVICE)

EACH $_______________ $___________________

62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY

HOUR $_______________ $___________________

62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE

HOUR $_______________ $___________________

62201-3200 HYDRAULIC EXCAVATOR, CRAWLER MOUNTED, 1.5 CUBIC YARD

MINIMUM CAPACITY (WITH THUMB ATTACHMENT)

HOUR $_______________ $___________________

62301-0000 GENERAL LABOR

HOUR $_______________ $___________________

Project: AK PRA-DENA 10(27)

Estimated Quantity Unit Bid Price Amount Bid

A- 14

63316-1000 REMOVE AND RESET SIGN

EACH $_______________ $___________________

63502-1250 TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER, TYPE 42-INCH

EACH $_______________ $___________________

63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B

EACH $_______________ $___________________

63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

SQFT $_______________ $___________________

63506-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC AND SAFETY SUPERVISOR

HOUR $_______________ $___________________

63509-1000 TEMPORARY TRAFFIC CONTROL, FLAGGER

FIX HR RATE 68.00 34,000.00

63703-0000 RESIDENTIAL HOUSING (INCLUDES FIELD OFFICE)

EACH $_______________ $___________________

63704-0000 VEHICLE

EACH $_______________ $___________________

$_____________________TOTAL

Submitted by:

Name of Bidder

Project: AK PRA-DENA 10(27)

REHAB UNSAFE ROAD SECTIONS OF THE DENALI PARK ROAD

Bid Schedule B leeann.bush Typewritten Text Revised by leeann.bush Typewritten Text Amend A001

D-1

Revised by Amendment A001

Wage Determinations

AK PRA DENA 10(27), REHAB UNSAFE SECTIONS OF THE DENALI PARK RD.

General Decision Number: AK100006 03/19/2010 AK6

Superseded General Decision Number: AK20080006

State: Alaska

Construction Type: Highway

Counties: Aleutians East, Aleutians West, Anchorage, Bethel, Bristol Bay, Dillingham, Fairbanks North Star, Kenai Peninsula, Kodiak Island, Matanuska-Susitna, Nome, North Slope, Northwest Artic, Southeast Fairbanks, Valdez-Cordova, Wade Hampton and Yukon-Koyukuk Counties in Alaska.

Highway Construction Projects

Modification Number Publication Date 0 03/12/2010 1 03/19/2010

CARP1243-004 07/01/2009

North of the 63rd Parallel

Rates Fringes

CARPENTER........................$ 34.33 18.55

CARP1281-006 07/01/2009

South of the 63rd Parallel

Rates Fringes

CARPENTER........................$ 34.33 18.23

CARP2520-004 07/01/2009

Rates Fringes

Piledriver Carpenter...................$ 34.33 18.23 Piledriver, Skiff operator, Rigger............$ 33.33 18.23 Sheet Stabber...............$ 34.33 18.23 Welder......................$ 35.33 18.23

* ELEC1547-004 12/28/2009

Rates Fringes

CABLE SPLICER....................$ 47.85 3%+23.00

Electrician;Technician...........$ 36.47 3%+$18.15

D-2

Wage Determinations

AK PRA DENA 10(27), REHAB UNSAFE SECTIONS OF THE DENALI PARK RD.

* ELEC1547-005 12/28/2009

Line Construction

Rates Fringes

CABLE SPLICER....................$ 47.85 3%+23.00

Line Construction: (Tree Trimmer Shredder)................$ 33.40 3%+$20.65 Linemen (Including Equipment Operators, Technician)...........$ 46.10 3%+22.15 Powderman........................$ 44.10 3%+23.00

TREE TRIMMER.....................$ 44.60 3%+$20.65

ENGI0302-002 01/01/2010

Rates Fringes

Power equipment operators:

GROUP 1.....................$ 36.23 16.95

GROUP 1A....................$ 37.99 16.95

GROUP 2.....................$ 35.46 16.95

GROUP 3.....................$ 34.74 16.95

GROUP 4.....................$ 28.53 16.95

TUNNEL WORK

GROUP 1....................$ 39.85 16.95

GROUP 1A...................$ 41.79 16.95

GROUP 2....................$ 39.01 16.95

GROUP 3....................$ 38.21 16.95

GROUP 4....................$ 31.83 16.95

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Asphalt Roller; Back Filler; Barrier Machine (Zipper); Batch Plant Operator: Batch and Mixer over 200 yds.; Beltcrete with power pack and similar conveyors;

Bending Machine; Boat Coxwains; Bulldozers; Cableways, Highlines and Cablecars; Cleaning Machine; Coating Machine;

Concrete Hydro Blaster; Cranes-45 tons and under or 150 foot boom and under (including jib and attachments): (a) Shovels, Backhoes, Draglines, Clamshells; Gradalls-3 yards and under; (b) Hydralifts or Transporters, all track or truck type,(c) Derricks; Crushers; Deck Winches-Double Drum; Ditching or Trenching Machine (16 inch or over);

Drilling Machines, core, cable, rotary and exploration;

Finishing Machine Operator, concrete paving, Laser Screed, sidewalk, curb and gutter machine; Helicopters; Hover Craft, Flex Craft, Loadmaster, Air Cushion, All Terrain Vehicle, Rollagon, Bargecable, Nodwell Sno Cat; Hydro Ax:

Feller Buncher and similar; Loaders: Forklifts with power boom and swing attachment, Overhead and front end, 2 1/2 yards through 5 yards, Loaders with forks or pipe clamps, Loaders, elevating belt type, Euclid and similar types;

Mechanics, Bodyman; Micro Tunneling Machine; Mixers: Mobile type w/hoist combination; Motor Patrol Grader; Mucking

D-3

Wage Determinations

AK PRA DENA 10(27), REHAB UNSAFE SECTIONS OF THE DENALI PARK RD.

Machines: Mole, Tunnel Drill, Horizontal/Directional Drill Operator, and/or Shield; Operator on Dredges; Piledriver Engineers, L. B. Foster, Puller or similar Paving Breaker;

Power Plant, Turbine Operator, 200 k.w. and over (power plants or combination of power units over 300 k.w.);

Sauerman-Bagley; Scrapers-through 40 yards; Service Oiler/Service Engineer; Sidebooms-under 45 tons; Shot Blast Machine; Spreaders, Blaw Knox, Cedarapids, Barber Greene, Slurry Machine; Sub-grader (Gurries, C.M.I. and C.M.I. Roto Mills and similar types); Tack tractor; Truck mounted Concrete Pumps, Conveyor, Creter; Water Kote Machine;

Unlicensed off road hauler; Welder; Electrical Mechanic, Camp Maintenance Engineer

GROUP 1A: Cranes-over 45 tons or 150 foot (including jib and attachments): (a) Shovels, backhoes, draglines, clamshells-over 3 yards, (b) Tower cranes; Loaders over 5 yds.; Motor Patrol Grader, Dozer, Grade Tractor (finish:

when finishing to final grade and/or to hubs, or for asphalt); Power Plants: 1000 k.w. and over; Quad; Screed;

Sidebooms over 45 tons; Slip Form Paver C.M.I. and similar types; Scrapers over 40 yards; Camera/Tool/Video Operator (Slipline).

GROUP 2: Batch Plant Operators: Batch and Mixer 200 yds. per hour and under; Boiler-fireman; Cement Hog and Concrete Pump Operator; Conveyors (except as listed in group 1);

Hoist on steel erection; Towermobiles and Air Tuggers;

Horizontal/Directional Drill Locator; Loaders, Elevating Grader, Dumor and similar; Locomotives: rod and geared engines; Mixers; Screening, Washing Plant; Sideboom (cradling rock drill regardless of size); Skidder; Trencing Machine under 16 inches.

GROUP 3: "A" Frame Trucks, Deck Winches: single power drum;

Bombardier (tack or tow rig); Boring Machine; Brooms-power;

Bump Cutter; Compressor; Farm tractor; Forklift, industrial type; Gin Truck or Winch Truck with poles when used for hoisting; Grade Checker and Stake Hopper; Hoist, Air Tuggers, Elevators; Loaders: (a) Elevating-Athey, Barber Green and similar types (b) Forklifts or Lumber Carrier (on construction job site) (c) Forklifts with Tower (d) Overhead and Front-end, under 2 1/2 yds. Locomotives:Dinkey (air, steam, gas and electric) Speeders; Mechanics (light duty); Mixers: Concrete Mixers and Batch 200 yds. per hour and under; Oil, Blower Distribution; Post Hole Diggers, mechanical; Pot Fireman (power agitated); Power Plant, Turbine Operator, under 300 k.w.; Pumps-water; Rig oiler/assistant engineer, over 45 ton, over 3 yards or over 150 foot boom; Roller-other than Plantmix; Saws, concrete;

Straightening Machine; Tow Tractor

GROUP 4: Rig Oiler/Assistant Engineer (Advances to Group III if over 45 tons or 3 yards or 150 ft. boom); Swamper (on trenching machines or shovel type equipment); Spotter;

D-4

Wage Determinations

AK PRA DENA 10(27), REHAB UNSAFE SECTIONS OF THE DENALI PARK RD.

Steam Cleaner

FOOTNOTE: Groups 1-4 receive 10% premium while performing tunnel or underground work. Rig Oiler/Assistant Engineer shall be required on cranes over 85 tons or over 100 feet of boom.

IRON0751-003 08/01/2009

Rates Fringes

Ironworkers:

BRIDGE, STRUCTURAL,

ORNAMENTAL, REINFORCING

MACHINERY MOVER, RIGGER,

SHEETER, STAGE RIGGER,

BENDER OPERATOR.............$ 33.25 19.64

FENCE, BARRIER AND

GUARDRAIL INSTALLERS........$ 29.75 19.39

GUARDRAIL LAYOUT MAN........$ 30.49 19.64

HELICOPTER, TOWER...........$ 34.25 19.64

* LABO0341-007 07/01/2009

Rates Fringes

Laborers: North of the 63rd Parallel & East of Longitude 138 Degrees

GROUP 1.....................$ 28.74 16.65

GROUP 2.....................$ 29.67 16.65

GROUP 3.....................$ 30.50 16.65

GROUP 3A....................$ 33.52 16.65

GROUP 3B....................$ 34.29 16.65

GROUP 4.....................$ 19.13 16.65

TUNNELS, SHAFTS, AND RAISES

GROUP 1....................$ 31.57 16.65

GROUP 2....................$ 32.60 16.65

GROUP 3....................$ 33.52 16.65

GROUP 3A...................$ 36.84 16.65

GROUP 3B...................$ 37.69 16.65

Laborers: South of the 63rd Parallel & West of Longitude 138 Degrees

GROUP 1.....................$ 27.41 14.25

GROUP 2.....................$ 28.27 14.25

GROUP 3.....................$ 29.04 14.25

GROUP 3A....................$ 31.82 14.25

GROUP 3B....................$ 32.53 14.25

GROUP 4.....................$ 18.55 14.25

TUNNELS, SHAFTS, AND RAISES

GROUP 1....................$ 30.11 14.25

GROUP 2....................$ 31.05 14.25

GROUP 3....................$ 31.90 14.25

GROUP 3A...................$ 34.95 14.25

D-5

Wage Determinations

AK PRA DENA 10(27), REHAB UNSAFE SECTIONS OF THE DENALI PARK RD.

GROUP 3B...................$ 35.75 14.25

LABORERS CLASSIFICATIONS

GROUP 1: Asphalt Workers (shovelman, plant crew); Brush Cutters; Camp Maintenance Laborer; Carpenter Tenders; Choke Setters, Hook Tender, Rigger, Signalman; Concrete Laborer(curb and gutter, chute handler, grouting, curing, screeding); Crusher Plant Laborer; Demolition Laborer;

Ditch Diggers; Dump Man; Environmental Laborer (asbestos (limited to nonmechanical systems), hazardous and toxic waste, oil spill); Fence Installer; Fire Watch Laborer;

Flagman; Form Strippers; General Laborer; Guardrail Laborer, Bridge Rail Installers; Hydro-Seeder Nozzleman;

Laborers (building); Landscape or Planter; Laying of Decorative Block (retaining walls, flowered decorative block 4 feet and below); Material Handlers; Pneumatic or Power Tools; Portable or Chemical Toilet Serviceman; Pump Man or Mixer Man; Railroad Track Laborer; Sandblast, Pot Tender; Saw Tenders; Scaffold Building and Erecting; Slurry Work; Stake Hopper; Steam Point or Water Jet Operator;

Steam Cleaner Operator; Tank Cleaning; Utiliwalk, Utilidor Laborer and Conduit Installer; Watchman (construction projects); Window Cleaner

GROUP 2: Burning and Cutting Torch; Cement or Lime Dumper or Handler (sack or bulk); Choker Splicer; Chucktender (wagon, airtrack and hydraulic drills); Concrete Laborers (power buggy, concrete saws, pumpcrete nozzleman, vibratorman);

Culvert Pipe Laborer; Cured in place Pipelayer;

Environmental Laborer (marine work, oil spill skimmer operator, small boat operator); Foam Gun or Foam Machine Operator; Green Cutter (dam work); Gunnite Operator; Hod Carriers; Jackhammer or Pavement Breakers (more than 45 pounds);Laying of Decorative Block (retaining walls, flowered decorative block above 4 feet); Mason Tender and Mud Mixer (sewer work); Pilot Car; Plasterer, Bricklayer and Cement Finisher Tenders; Power Saw Operator; Railroad Switch Layout Laborer; Sandblaster; Sewer Caulkers; Sewer Plant Maintenance Man; Thermal Plastic Applicator; Timber Faller, chain saw operator, filer; Timberman

GROUP 3: Alarm Installer; Bit Grinder; Guardrail Machine Operator; High Rigger and tree topper; High Scaler;

Multiplate; Slurry Seal Squeegee Man

GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);

Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers

GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)

D-6

Wage Determinations

AK PRA DENA 10(27), REHAB UNSAFE SECTIONS OF THE DENALI PARK RD.

GROUP 4: Final Building Cleanup

TUNNELS, SHAFTS, AND RAISES CLASSIFICATIONS

GROUP 1: Brakeman; Muckers; Nippers; Topman and Bull Gang;

Tunnel Track Laborer

GROUP 2: Burning and Cutting Torch; Concrete Laborers;

Jackhammers; Nozzleman, Pumpcrete or Shotcrete.

GROUP 3: Miner; Retimberman

GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);

Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers.

GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)

Tunnel shaft and raise rates only apply to workers regularly employed inside a tunnel portal or shaft collar.

PLAS0867-004 02/01/2010

Rates Fringes

CEMENT MASON/CONCRETE FINISHER

North of the 63rd parallel..$ 34.29 16.40 South of the 63rd parallel..$ 34.04 16.40

TEAM0959-003 09/01/2009

Rates Fringes

TRUCK DRIVER

GROUP 1.....................$ 36.78 14.30

GROUP 1A....................$ 38.02 14.30

GROUP 2.....................$ 35.56 14.30

GROUP 3.....................$ 34.76 14.30

GROUP 4.....................$ 34.21 14.30

GROUP 5.....................$ 33.46 14.30

GROUP 1: Semi with Double Box Mixer; Dump Trucks (including rockbuggy and trucks with pups) over 40 yards up to and including 60 yards; Deltas, Commanders, Rollogans and similar equipment when pulling sleds, trailers or similar equipment; Boat Coxswain; Lowboys including attached trailers and jeeps, up to and including 12 axles; Ready-mix over 12 yards up to and including 15 yards); Water Wagon (250 Bbls and above); Tireman, Heavy Duty/Fueler

GROUP 1A: Dump Trucks (including Rockbuggy and Trucks with pups) over 60 yards up to and including 100 yards; Jeeps

D-7

Wage Determinations

AK PRA DENA 10(27), REHAB UNSAFE SECTIONS OF THE DENALI PARK RD.

(driver under load)

GROUP 2: Turn-O-Wagon or DW-10 not self-loading; All Deltas, Commanders, Rollogans, and similar equipment; Mechanics;

Dump Trucks (including Rockbuggy and Trucks with pups) over 20 yards up to and including 40 yards; Lowboys including attached trailers and jeeps up to and including 8 axles;

Super vac truck/cacasco truck/heat stress truck; Ready-mix over 7 yards up to and including 12 yards;

GROUP 3: Dump Trucks (including Rockbuggy and Trucks with pups) over 10 yards up to and including 20 yards; batch trucks 8 yards and up; Oil distributor drivers; Partsman;

Oil Distributor Drivers; Trucks/Jeeps (push or pull);

Traffic Control Technician

GROUP 4: Buggymobile; Semi or Truck and trailer; Dumpster;

Tireman (light duty); Dump Trucks (including Rockbuggy and Truck with pups) up to and including 10 yards; Track Truck Equipment; Stringing Truck; Grease Truck; Flat Beds, dual rear axle; Hyster Operators (handling bulk aggregate);

Lumber Carrier; Water Wagon, semi; Water Truck, dual axle;

Gin Pole Truck, Winch Truck, Wrecker, Truck Mounted "A" Frame manufactured rating over 5 tons; Bull Lifts and Fork Lifts with Power Boom and Swing attachments, over 5 tons;

Front End Loader with Forks; Bus Operator over 30 passengers; All Terrain Vehicles; Boom Truck/Knuckle Truck over 5 tons; Foam Distributor Truck/dual axle;

Hydro-seeders, dual axle; Vacuum Trucks, Truck Vacuum Sweepers; Loadmaster (air and water); Air Cushion or similar type vehicle; Fire Truck/Ambulance Driver;

Combination Truck-fuel and grease; Compactor (when pulled by rubber tired equipment); Rigger (air/water/oilfield);

Ready Mix, up to and including 7 yards;

GROUP 5: Gravel Spreader Box Operator on Truck; Flat Beds, single rear axle; Boom Truck/Knuckle Truck up to and including 5 tons; Pickups (Pilot Cars and all light duty vehicles); Water Wagon (Below 250 Bbls); Gin Pole Truck, Winch Truck, Wrecker, Truck Mounted "A" Frame, manufactured rating 5 tons and under; Bull Lifts and Fork Lifts (fork lifts with power broom and swing attachments up to and including 5 tons); Buffer Truck; Tack Truck; Farm type Rubber Tired Tractor (when material handling or pulling wagons on a construction project); Foam Distributor, single axle; Hydro-Seeders, single axle; Team Drivers (horses, mules and similar equipment); Fuel Handler (station/bulk attendant); Batch Truck, up to and including 7 yards;

Gear/Supply Truck; Bus Operator, Up to 30 Passengers;

Rigger/Swamper

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

D-8

Wage Determinations

AK PRA DENA 10(27), REHAB UNSAFE SECTIONS OF THE DENALI PARK RD.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

D-9

Wage Determinations

AK PRA DENA 10(27), REHAB UNSAFE SECTIONS OF THE DENALI PARK RD.

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

D-10

Wage Determinations

AK PRA DENA 10(27), REHAB UNSAFE SECTIONS OF THE DENALI PARK RD.

RESERVED