DENA_10(27)_C_Sheets_Typicals.pdf
PDF 559 KB Posted
- Solicitation number
- DTFH70-09-B-00013
About this file
Preliminary Plans
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C.1
STATE PROJECT
Maintain Existing Road Width
(varies)
VariesVaries
Construction limits1:2
Construction limits
Existing ground
FOOTNOTE:
Roadway Reconditioning, 2 inch depth
CL
TYPICAL SECTION "A"
RECONDITIONED ROADWAY AREAS
Do not remove more than 2" of existing roadway aggregate to achieve superelevation improvements.
TABULATION OF
QUANTITIES/ROADWAY
TYPICAL SECTION A
ITEM DESCRIPTION ESTIMATING
VALUE
20103-0000 6798 sqyd
15801-0000
ROADWAY STRUCTURE QUANTITIES
Clearing and Grubbing
QUANTITY
Roadway Excavation20401-0000
20410-0000 4656 cuyd
30801-1000 8165 cuyd
30303-3000 7670 sqydRoadway Reconditioning
Watering for Dust Control
SHEET
NUMBER
AK
PRA-DENA 10(27)
F
E B
I P
P
W P
:d m s Date
C h e c k e d b y
Bill McQuiston
D e s ig n e d b y
4191+70 to 4194+20
4197+80 to 4200+50
4202+00 to 4203+40
4206+75 to 4207+70
4211+75 to 4215+25
4222+50 to 4225+00
4226+70 to 4235+70
4238+60 to 4240+60
4245+50 to 4249+55
4252+50 to 4254+00
4259+50 to 4262+00
4269+50 to 4272+10
4273+75 to 4275+65
4279+25 to 4281+00
4282+50 to 4283+75
4285+25 to 4287+00
4288+50 to 4290+00
4291+25 to 4292+50
4293+40 to 4296+25
4305+25 to 4311+40
4317+80 to 4320+60
4329+90 to 4332+25
4339+30 to 4341+65
4343+15 to 4344+45
4346+05 to 4349+10
4353+30 to 4357+00
1.9 ton/cuyd
1.9 ton/cuyd
NPS Pkg. No. 101156A, B, C, &D NPS Drwg. Nos. 184/80251
NOTES
6617 cuyd Quantity for information only
Select Borrow
4358+05 to 4359+30
4360+75 to 4362+60
4373+90 to 4376+25
4377+65 to 4380+50
4386+50 to 4392+70
4395+05 to 4396+70
4398+15 to 4400+00
4401+20 to 4405+90
4410+00 to 4413+15
4414+25 to 4415+40
4420+40 to 4422+60
4424+40 to 4426+05
4428+80 to 4432+10
62201-0250 Dump Truck, 10 cuyd minimum capacity 65 hour
62201-3200 65 hour
Hydraulic Excavator, crawler mounted, 1 1/2 cuyd minimum capacity
14080 Mgal
9475 cuyd
Processed & stockpiled at 70 Mile Pit
Processed & stockpiled at Toklat
Haul to 70 Mile pit for processing into select borrow.
62201-2050 35 hourRoller
62201-2850 35 hourMotor Grader, 12ft minimum blade
62301-0000 130 hourGeneral Labor
Quantity includes 1961 cuyd excavation for sliver fills.
4 Quantity includes an additional 20% for blending road surface between Typical Sections "A" and Typical Sections "B".
Roadway Aggregate, Method 1
Roadway Aggregate, Method 1
2 inch compacted depth
Embankment
Assumes 11 miles of roadway, watered 2 times per day from 6/11 to 10/13.
See Sheet C.3 for locations.
For Typical Section "A" areas only.
Quantity includes embankment for sliver fills.
Prelim inary Plans
Not fo r C onstr uctio n
Select Borrow
C.2
STATE PROJECT
:1
.5
Varies
(varies)
LC
Varies :1
.5
Existing ground
Construct slopes as shown in the staking report
(See FAR 52.236-4).
in the curve data shown on the plan profile.
Superelevate roadway on curves at the rate "e" as indicated
FOOTNOTE:
TYPICAL SECTION "B"
WIDENED AREAS
SLIVER FILL DETAIL
ROADWAY
TYPICAL SECTION B
SHEET
NUMBER
AK
PRA-DENA 10(27)
F
E B
I P
P
W P
:d m s 02/2009
R. Johnson C h e c k e d b y
02/2009 W. McQuiston
D e s ig n e d b y
4249+55 to 4252+50
4254+00 to 4259+50
4262+00 to 4269+50
4272+10 to 4273+75
4275+65 to 4279+25
4281+00 to 4282+50
4283+75 to 4285+25
4287+00 to 4288+50
4290+00 to 4291+25
4292+50 to 4293+40
4296+25 to 4305+50
4311+40 to 4317+80
4320+60 to 4329+90
4332+25 to 4339+30
4341+65 to 4343+15
4344+45 to 4346+05
4349+10 to 4353+30
4357+00 to 4358+05
4359+30 to 4360+75
Road Width
1:2 1:3
3877+80 to 3880+50
3881+85 to 3883+75
3896+50 to 3898+75
3901+00 to 3903+35
3905+10 to 3909+30
4100+00 to 4104+00
4106+15 to 4107+85
4165+80 to 4169+10
4170+00 to 4171+40
4175+75 to 4181+00
4183+00 to 4191+70
4194+20 to 4197+80
4200+50 to 4202+00
4203+40 to 4206+75
4207+70 to 4211+75
4215+25 to 4222+50
4225+00 to 4226+70
4235+70 to 4238+60
4240+60 to 4245+50
18" max lift
4362+60 to 4373+90
4376+25 to 4377+65
4380+50 to 4386+50
4392+70 to 4395+05
4396+70 to 4398+15
4400+00 to 4401+20
4405+90 to 4410+00
4413+15 to 4414+25
4415+40 to 4420+40
4422+60 to 4424+40
4426+05 to 4428+80
4432+10 to 4434+20
4448+90 to 4450+90
4452+90 to 4454+60
4462+80 to 4467+00
4472+30 to 4477+10
4486+55 to 4492+50
4497+30 to 4499+30
4502+30 to 4504+50
Bench into existing embankment slope according to 204.09 (d)
Sliver fill, see detail
Proposed
Profile
Grade
Select Borrow
Embankment
Roadway Aggregate, Method 1
4 inch compacted depth
Construction/clearing limits
Construction/clearing limits
NPS Pkg. No. 101156A, B, C, &D NPS Drwg. Nos. 184/80251
Prelim inary Plans
Not fo r C onstr uctio n
| dena1027ad |
| dena1027cb |
| dena1027cb1 |
| de1027fa |
| de1027fb |
| de1027fc |
| de1027fd |
| de1027fe |
| de1027ff |
| de1027fg |
| de1027fh |
| de1027fi |
| de1027fj |
| de1027fk |
| de1027fl |
| de1027fm |
| de1027fn |
| de1027fo |
| de1027fp |
File details come from the government source that posted it. Updated .