PROJECT DESCRIPTION_.Enaville_Thompsonpdf.pdf
PDF 14 KB Posted
- Attached to
- ID PFH 9(5), Enaville-Thompson Pass Road
- Solicitation number
- DTFH70-08-B-00008
About this file
Project Description
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ID PFH 9(5), Enaville-Thompson Pass Road, Idaho Panhandle National Forest, Shoshone County, Idaho
The work consists of Subexcavation, base and paving and other small items of work.
Project length: 12.9 Miles
Fixed Completion Date: October 31, 2009
Estimated Price Range: $7 Million to $10 million
Location: 32 miles East of Couer d’Alene, ID
DESCRIPTION OF WORK in US CUSTOMARY UNITS
DIVISION 150 – Project Requirements 152 Construction Survey & Staking X YES NO 153 Contractor Quality Control and Assurance X YES NO 154 Contractor Sampling & Testing X YES NO 155 Schedules for Construction Contracts (construction schedules) X YES NO 157 Soil Erosion Control Devices (erosion control devices) 24.5 ACRE
DIVISION 200 – Earthwork 201 Clearing & Grubbing (Clearing) 24.5 ACRE 204 Excavation & Embankment (Subexcavation)
(Select Borrow)
5756 CUYD
8164 TON
207 Earthwork Geotextiles (geotextiles) 70600 SQYD
DIVISION 300 – Aggregate Courses 303 Road Reconditioning (Ditch Reconditioning) 43000 LNFT 308 Minor Crushed Aggregate (crushed aggregate) 3000 TON 310 Recycled Aggregate Course (asphalt pavement recycling) 7134 SQYD
DIVISION 400 – Asphalt Pavements & Surface Treatments 401 Superpave Hot Asphalt Concrete Pavement 39934 TON 404 Minor Hot Asphalt Concrete (asphalt concrete pavement) 4055 TON 411 Asphalt Prime Coat (asphalt surface treatment) 10 TON 412 Asphalt Tack Coat (asphalt surface treatment) 100 TON 413 Asphalt Pavement Milling 300 SQYD 416 Continuous Cold Recycled Asphalt Base Course
(asphalt pavement recycling) 200000 SQYD
DIVISION 600 – Incidental Construction 605 Underdrains, Sheet Drains & Pavement Edge Drains
(culverts & drains) (indicate which) 3100 LNFT 617 Guardrail 2050 LNFT 622 Rental Equipment X YES NO 625 Turf Establishment (indicate seeding or mulching separately) 49 SLRY 633 Permanent Traffic Control Devices (Sign System)
(Delineator, Type 4F White) (Delineator, Type 4F Yellow)
75 SQFT
104 EACH
2 EACH
634 Permanent Pavement Markings (Type A, Solid Yellow) (Type A, Broken Yellow) (Type A, Solid White)
210000 LNFT
53000 LNFT
275000 LNFT
635 Temporary Traffic Control (Cone, Type 36-Inch) (Drum) (Pavement Markings) (Construction Sign) (Traffic And Safety Supervisor)
700 EACH
100 EACH
210000 LNFT
207 SQFT
70 DAY
Pilot Car: Hours:600 Flagger Hours: 600
File details come from the government source that posted it. Updated .