PrelimLetterSR123.pdf

PDF 25 KB Posted

Attached to
WA PRA-MORA 10(11), SR 123-2 & SR 410-1C
Solicitation number
DTFH70-08-B-00001
Issued by

About this file

NOTICE TO PROSPECTIVE BIDDERS

View the file

Other files

File Type Posted
SF30pg1_pg2 1.pdf PDF
AMD_A0002_WAPRAMORA10(11).pdf PDF
AMDa001.pdf PDF
PlanRequestforInternet.pdf PDF
PhysicalDataRequestFormforInternet.pdf PDF
IFB_Electronic_PRA-MORA_SR123_H1.pdf PDF
IFB_Electronic_PRA-MORA_SR123_I.pdf PDF
http //www.wfl.fhwa.dot.gov/edi/plans/mora1011/ —
IFB_Electronic_PRA-MORA_SR123_Sol.pdf PDF
IFB_Electronic_PRA-MORA_SR123_H2.pdf PDF
fbo_synopsis.pdf PDF
Call_For_HUBZone.pdf PDF
PrelimPlans_SR123.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

610 East Fifth Street Vancouver, WA 98661-3801

(360) 619-7520 FAX: (360) 619-7932

Western Federal Lands Highway Division

NOTICE TO PROSPECTIVE BIDDERS

WA PRA-MORA 10(11) SR 123-2 and SR 410-1c

Solicitation No. DTFH70-08-B-00001

The attached preliminary plans are being furnished to aid prospective bidders in identifying the location and type of work for this project. The project will be advertised during a period when viewing of the project is not possible due to snow. Therefore, prospective bidders are encouraged to view the project during the fall as conditions permit. No Federal Highway Administration personnel will be available for show-me tours.

While it is not required, we highly recommend that you videotape the entire project for your use during the estimating phase. We have received good feedback from contractors who have done this in the past.

This project begins at approximately milepost 10.50 on State Route 123 and continues north, approximately to the intersection of State Route 123 and State Route 410 (Cayuse Pass) Project work then continues east on State Route 410 for approximately 1.2 miles, milepost 67.0. Work also includes pedestrian improvements at the Tipsoo Lake View Point area adjacent to State Route 410 at approximately milepost 68.8. State Route 123 is located approximately 8 miles north of Packwood, in Pierce County, Washington. The project consists of subexcavation, grading, drainage, base, paving, and structures. It was designed using customary measurement and references the Standard Specifications for Roads and Bridges on Federal Highway Projects, FP-03, US Customary Units.

Requests for technical information about this project will only be accepted in writing. Send written questions to:

Fax: 360.619.7932; OR Email: plans_spec@fhwa.dot.gov (plans_spec@fhwa.dot.gov); OR Mail to: FHWA-Western Federal Lands Highway Division

Contracts Section 610 East Fifth Street Vancouver, WA 98661-3801

Should you have general questions, please contact our office at contracts@mail.wfl.fhwa.dot.gov or at 360.619.7520.

Solicitation documents will be available on FedBizOpps during the winter of 2007/2008. Please monitor FedBizOpps or our Western Federal Lands Webpage http://www.wfl.fhwa.dot.gov/edi/construction.htm for actual date of solicitation release. To receive automatic notification through FedBizOpps, select the “register to receive notification” feature and follow the steps.

Thank you for your interest in our projects.

October 2, 2007

File details come from the government source that posted it. Updated .