AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
N/A
PAGE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)
A001 4/10/08 N/A WA PRA-MORA 10(11)
SR 123-2 & SR 410-1C
6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A
Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
X
DTFH70-08-B-00001
9B. DATED (SEE ITEM 11)
3/17/08
10A. MODIFICATION OF CONTRACT/ORDER NO.
N/A
10B. DATED (SEE ITEM 13)
CODE: N/A FACILITY CODE: N/A N/A
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers (__ ) is extended, ( x ) is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
N/A
B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
N/A
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
N/A
D OTHER (Specify type of modification and authority) N/A
E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
WA PRA-MORA 10(11), SR 123-2 & SR 410-1C
See page 2 for revisions.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Amendment No. A001, dated 04/10/08 WA PRA-MORA 10(11) Solicitation No. DTFH70-08-B-00001 SR 123-2 and SR 410-1c
REVISIONS ARE AS FOLLOWS:
SPECIAL CONTRACT REQUIREMENTS
Page G-3, Subsection 703.20 Aggregate Topsoil. Delete this subsection.
Page G-10, Subsection 713.01 Topsoil. Add (b) Conserved topsoil.
Page G-10, Subsection 713.03 Fertilizer. Change Tackifier to Fertilizer
PLANS - PEN AND INK CHANGES ONLY
Please make the following pen & ink changes:
Plan sheets H.1, H.2, and H.3 Add Pay Item Number 25101 4000, Placed Riprap in the fifth column above Class 4.
ENCLOSURES
Pages: G-3 and G-10
Plan Sheets not included due to Pen and Ink changes:
Plan sheets: H.1, H.2 & H.3
G-3
Special Contract Requirements Project: WA PRA-MORA 10(11), SR 123-2 and SR 410-1c
Delete Table 703-13 and substitute with the following:
Table 703-13 Allowable Deviations for Target Value Gradations
Gradation Range (percent passing)
Minimum Maximum
Allowable Deviation (percent)
70.1 89.9 4
60.1 70.0 5
55.1 60.0 6
45.1 55.0 7
40.1 45.0 6
30.1 40.0 5
21.1 30.0 4
8.1 21.0 3
0 8.0 2
Revised by Amendment A001
G-10
Special Contract Requirements Project: WA PRA-MORA 10(11), SR 123-2 and SR 410-1c
Section 713.— ROADSIDE IMPROVEMENT MATERIAL
713.01 Topsoil. Delete the text of this Subsection and substitute with the following:
(a) Manufactured topsoil must be certified weed-free and conform to the following specifications:
Alberta Sphagnum Peat 10% Pumice Slo #7 (Mt. Mazama) 15% Fine bark #2 (Western, WA) 10% Washed bank sand (Ind.) 35% Loamy fine sand 30%
Nutrients added: Lbs/Yd Treble Superphosphate (0-45-0) 0.57 Ferrous Sulphate (20% Fe) 0.50 Apex 19-6-12 (8-9 Mo.) 1.0 Dolomite Lime (MgCaCo3) 2.0 Fritted micro nutrients (Fe, Mn, Zn, Cu, B, Mo); Oz/Yd 1.8
(b) Conserved topsoil. See Subsection 204.02
713.02 Agricultural Limestone. Delete the text of this Subsection.
713.03 Fertilizer. Delete the text of this Subsection and substitute with the following:
Fertilizer will be Government Furnished.
713.04 Seed. Delete the text of this Subsection and substitute with the following:
Use Government furnished seed for all seeding within the project limits. Notify the CO three weeks before the seed is needed. Store seed in a secure container that protects seed from damage including moisture, insects and animals.
713.05 Mulch. Delete the text of this Subsection and substitute with the following:
Furnish 100 percent virgin wood fiber for all mulching within the project limits meeting the following requirements:
(a) Colored with a green dye noninjurious to plant growth;
(b) Readily dispersible in water;
(c) Nontoxic to seed or other plant material;
(d) Free of growth or germination inhibiting substances;
(e) Free of weed seed;
Revised by Amendment A001