QnA_11.21.17.pdf
PDF 87 KB Posted
- Attached to
- AZ FTNP GRCA 11(4), Desert View Drive
- Solicitation number
- DTFH6817B00017
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Tabs.pdf | ||
| AZ_FTNP_GRCA_11(4)_Bid_Opening_Summary.pdf | ||
| QnA_11.14.17.pdf | ||
| AZ_GRCA_11(4)_Final_Plans.pdf | ||
| DTFH6817B00017.pdf | ||
| AZ_FTNP_GRCA_11(4)_Desert_View_Drive_Pavement_Report.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers during Advertisement for
AZ FTNP GRCA 11(4) DESERT VIEW DRIVE
November 7, 2017
Questions Answers
1 625.03 General.
Apply topsoil, seed and mulch (containing tackifier and fertilizer) to finished slopes as project areas are complete, in coordination with Park Vegetation staff.
Question: what is the fertilizer and application rate?
Fertilizer is not required.
625.03 General
Conserved topsoil placed at 3” to 4” depth in areas identified on the plans for conserving topsoil, seeding and hydromulching (Schedule A). Place conserved topsoil to the extent it is available.
625.08 Seeding.
See FP-14 625.07 Seeding (b) Hydraulic Method and 625.08 SCR’s
Application rate for Hydroseeding is up to 10 pounds per acre, seed is provided by Park. Include 400 lbs per acre for tracer material.
625.08 Mulching.
The application rate is 2000 lbs per acre.
2 We have the following question for the DTFH6817B00017 AZ FTNP
GRCA 11(4), Desert View Drive project, is railroad insurance required for work near the Grand Canyon Railway, if so what are the insurance requirements?
No railway insurance is required since the items of work for this project don’t disturb or work within the railway ROW zone.
November 14, 2017
3 After reviewing the FP14 specifications 601.03 representing mix designs for minor concrete structures, FNF has concern that the allowable approval time of the mix design composition materials may not be completed by the necessary time frame on when we expect to pour concrete in order to meet the schedule constraints for Options X and the reinforced concrete pavement in Schedule A. Would the
FHWA consider accepting local agencies as well as previously approved ADOT mix designs?
A local agency design or ADOT design is acceptable provided these designs meet the mix requirements in Section 601 and the aggregate requirements of Section 703.
4 Section 401 specifies the binder to be PG 76-22NV. Historically, PG
64-28 or PG 58-28 has been utilized at the South Rim.
Will the Government change the binder to either PG 64-28 or PG 58-
28?
No. PG76-22NV is the specified binder grade.
5 Is a Material Transfer Vehicle (MTV) required? If so, will the
Government add a Bid Item? If so, is a MTV required for the test
An MTV is required. Under the FP-14 there is no longer a separate bid item for an MTV.
strip(s)?
6 Can the salvaged stone curb (Item 20302-0600) be utilized in the construction of the new stone curb (Item 60901-1100 and/or 60901-
5000).
Yes, provided it meets Subsection 609.04.
7 Would the Government consider postponing the bid opening 1 week, due to the close proximity of Thanksgiving? We would like the spend the time with our families, just like you are able to.
There will be no extension to the bid opening date at this time.
November 21, 2017
8 Is a Material Transfer Vehicle required for the test strip(s)?
Yes, an MTV is required for the test strip. According to FP-14, Subsection 401.12(b) Control Strip. Construct the control strip using asphalt concrete mix production, lay-down, and compaction procedures intended for the entire mix.
9 What is the anticipated Notice of Award date? The award will be made as soon as possible, pending available funding;
however, it can take up to 60 calendar days after the bid due date.
10 What is the anticipated Notice to Proceed date?
The NTP should be issued once acceptable bonds and insurance are furnished to FHWA.