Schedule A Bid Tabs
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| OptionX_Bid_Tabs.pdf | ||
| Bid_Opening_Summary_11.8.2016.pdf | ||
| Site_Visit_Agenda_ _Notes_ _Sign_In.pdf | ||
| Final_Geotech_Report_Feb-2015.pdf | ||
| NM_IRR_85(1)_Peralta_Wash_Pavement_Reccomendations_11-14-14.pdf | ||
| Final_Hydraulics_Report.pdf | ||
| A002.pdf | ||
| A001.pdf | ||
| NM_IRR_85(1)_Final_Cross_Sections.pdf | ||
| DTFH6816R00011_NM_IRR_85(1) _Peralta_Wash_IFB.pdf | ||
| NM_IRR_85(1)_Final_Plans.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T A B U L A T I O N O F B I D S
Schedule A Total of Bid Items: 1,610,050.00$ -33.5% 1,071,322.00$ -5.2% 1,525,775.00$ -24.3% 1,218,220.00$ -29.6% 1,132,892.90$ -13.0% 1,399,980.00$ -20.1% 1,285,827.50$ Project No: NM NM IRR 85(1)
Project Name: Peralta Wash
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
15101-0000 Line A0010 ALL LPSM 185,000.00$ 185,000.00$ 115,500.00$ 164,000.00$ 108,000.00$ 110,000.00$ 135,000.00$ 138,895.00$
15214-1000 Line A0030 ALL LPSM 9,000.00$ 9,000.00$ 16,480.00$ 50,000.00$ 27,000.00$ 22,096.00$ 15,000.00$ 15,560.00$
15301-0000 Line A0050 ALL LPSM 65,000.00$ 65,000.00$ 42,417.00$ 90,000.00$ 55,000.00$ 62,902.00$ 75,000.00$ 60,540.00$
15401-0000 Line A0070 ALL LPSM 65,000.00$ 65,000.00$ 13,307.00$ 103,000.00$ 24,000.00$ 24,912.00$ 50,000.00$ 23,580.00$
15501-0000 Line A0090 ALL LPSM 7,500.00$ 7,500.00$ 3,390.00$ 13,000.00$ 12,000.00$ 951.00$ 1,650.00$ 1,860.00$
15705-0100 Line A0110 900 LNFT 7.00$ 6,300.00$ 1,980.00$ 5,400.00$ 3,150.00$ 3,060.00$ 5,400.00$ 2,340.00$
20101-0000 Line A0130 0.3 ACRE 7,000.00$ 2,100.00$ 1,920.00$ 3,450.00$ 750.00$ 2,841.90$ 4,500.00$ 2,482.50$
20302-1200 Line A0150 570 LNFT 5.00$ 2,850.00$ 1,995.00$ 6,840.00$ 4,560.00$ 6,840.00$ 5,130.00$ 2,109.00$
20401-0000 Line A0170 1,500 CUYD 30.00$ 45,000.00$ 22,500.00$ 18,000.00$ 30,000.00$ 7,800.00$ 67,500.00$ 54,900.00$
20801-0000 Line A0190 90 CUYD (CQ) 80.00$ 7,200.00$ 2,025.00$ 7,200.00$ 5,400.00$ 5,130.00$ 6,750.00$ 26,550.00$
55201-0200 Line A0210 69 CUYD (CQ) 1,200.00$ 82,800.00$ 59,754.00$ 103,500.00$ 89,700.00$ 96,186.00$ 217,350.00$ 69,345.00$
55302-3300 Line A0230 990 LNFT (CQ) 475.00$ 470,250.00$ 297,000.00$ 376,200.00$ 321,750.00$ 277,200.00$ 282,150.00$ 379,665.00$
55401-1000 Line A0250 15,200 LB (CQ) 1.50$ 22,800.00$ 18,240.00$ 22,800.00$ 19,760.00$ 22,800.00$ 22,040.00$ 19,000.00$
56401-1000 Line A0270 16 EACH (CQ) 1,000.00$ 16,000.00$ 2,752.00$ 2,960.00$ 2,400.00$ 10,192.00$ 15,760.00$ 3,456.00$
56401-1000 Line A0290 8 EACH (CQ) 1,200.00$ 9,600.00$ 3,152.00$ 11,200.00$ 1,200.00$ 5,736.00$ 10,400.00$ 6,800.00$
56501-0400 Line A0310 330 LNFT 750.00$ 247,500.00$ 185,790.00$ 173,250.00$ 202,950.00$ 191,070.00$ 226,050.00$ 197,340.00$
56501-0500 Line A0330 330 LNFT 950.00$ 313,500.00$ 221,100.00$ 206,250.00$ 275,550.00$ 250,140.00$ 252,450.00$ 234,300.00$
62201-0200 Line A0350 5 HOUR 100.00$ 500.00$ 555.00$ 700.00$ 600.00$ 555.00$ 525.00$ 675.00$
62201-0950 Line A0370 5 HOUR 140.00$ 700.00$ 795.00$ 850.00$ 600.00$ 420.00$ 625.00$ 675.00$
62201-2850 Line A0390 5 HOUR 160.00$ 800.00$ 995.00$ 1,150.00$ 750.00$ 550.00$ 750.00$ 800.00$
62301-0000 Line A0410 20 HOUR 40.00$ 800.00$ 780.00$ 1,300.00$ 700.00$ 580.00$ 800.00$ 620.00$
62302-1000 Line A0430 5 HOUR 190.00$ 950.00$ 645.00$ 575.00$ 1,150.00$ 945.00$ 775.00$ 1,000.00$
62302-1100 Line A0450 5 HOUR 140.00$ 700.00$ 750.00$ 1,150.00$ 1,250.00$ 1,005.00$ 875.00$ 1,000.00$
63501-0000 Line A0470 ALL LPSM 48,200.00$ 48,200.00$ 57,500.00$ 163,000.00$ 30,000.00$ 28,981.00$ 3,500.00$ 42,335.00$
CONTRACTOR TESTING
13,307.00$ 103,000.00$ 24,000.00$ 24,912.00$ 50,000.00$ 23,580.00$
MOBILIZATION
SURVEY AND STAKING, BRIDGE
CONTRACTOR QUALITY CONTROL
DRILLED SHAFT, 36-INCH DIAMETER
DRILLED SHAFT, 42-INCH DIAMETER
DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY
CLEARING AND GRUBBING
REMOVAL OF GUARDRAIL
ROADWAY EXCAVATION
STRUCTURE EXCAVATION
STRUCTURAL CONCRETE, CLASS A (AE)
PRECAST, PRESTRESSED CONCRETE AASHTO GIRDER (TYPE III)
WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY
MOTOR GRADER, 12 FOOT MINIMUM BLADE
GENERAL LABOR
SPECIAL LABOR, HIRED TECHNICAL SERVICES
SPECIAL LABOR, HIRED SURVEY SERVICES
TEMPORARY TRAFFIC CONTROL
CONSTRUCTION SCHEDULE
SOIL EROSION CONTROL, SILT FENCE
REINFORCING STEEL
BEARING DEVICE, ELASTOMERIC (FIXED)
BEARING DEVICE, ELASTOMERIC (EXPANSION)
164,000.00$ 108,000.00$ 110,000.00$
Victor CorporationStructures, Inc. Stormwater Plans LLC Meridian Inc. Groundhog Excavating, Inc. Monitor Construction Company, Inc.
16,480.00$
115,500.00$
3,390.00$ 13,000.00$ 12,000.00$ 951.00$ 1,650.00$ 1,860.00$
135,000.00$ 138,895.00$
50,000.00$ 27,000.00$ 22,096.00$ 15,000.00$ 15,560.00$
42,417.00$ 90,000.00$ 55,000.00$ 62,902.00$ 75,000.00$ 60,540.00$
3.50$ 12.00$ 8.00$ 12.00$ 9.00$ 3.70$
6,400.00$ 11,500.00$ 2,500.00$ 9,473.00$ 15,000.00$ 8,275.00$
2.20$ 6.00$ 3.50$ 3.40$ 6.00$ 2.60$
22.50$ 80.00$ 60.00$ 57.00$ 75.00$ 295.00$
15.00$ 12.00$ 20.00$ 5.20$ 45.00$ 36.60$
300.00$ 380.00$ 325.00$ 280.00$ 285.00$ 383.50$
866.00$ 1,500.00$ 1,300.00$ 1,394.00$ 3,150.00$ 1,005.00$
172.00$ 185.00$ 150.00$ 637.00$ 985.00$ 216.00$
1.20$ 1.50$ 1.30$ 1.50$ 1.45$ 1.25$
563.00$ 525.00$ 615.00$ 579.00$ 685.00$ 598.00$
394.00$ 1,400.00$ 150.00$ 717.00$ 1,300.00$ 850.00$
111.00$ 140.00$ 120.00$ 111.00$ 105.00$ 135.00$
670.00$ 625.00$ 835.00$ 758.00$ 765.00$ 710.00$
199.00$ 230.00$ 150.00$ 110.00$ 150.00$ 160.00$
159.00$ 170.00$ 120.00$ 84.00$ 125.00$ 135.00$
129.00$ 115.00$ 230.00$ 189.00$ 155.00$ 200.00$
39.00$ 65.00$ 35.00$ 29.00$ 40.00$ 31.00$
57,500.00$ 163,000.00$ 30,000.00$ 28,981.00$ 3,500.00$ 42,335.00$
150.00$ 230.00$ 250.00$ 201.00$ 175.00$ 200.00$
Engineer's Estimate