Bid_Opening_Summary_11.8.2016.pdf

PDF 14 KB Posted

Attached to
NM IRR 85(1), Peralta Wash
Solicitation number
DTFH6816B00032
Issued by

About this file

Bid Opening Summary All bids are subject to verification.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Opening Summary

Project Name: Peralta Wash Project Number: NM IRR 85(1)

Bid Opening Date: 11/8/16 Time: 2:00 p.m.

Bid Opening Location: Lakewood, CO Bid Opening Officer: Sheri Muehl For Jeremiah Rogers Amendments: (1) A001 (2) A002

**APPARENT LOW BIDDER

Bidder’s Name Bid Total

1. Structures, Inc. ** Englewood, CO

A $1,071,322.00 X $ 937,706.00 Total: $2,009,028.00

2. Victor Corporation Bernalillo, NM

A $ 1,285,827.50 B $ 1,110,488.50 Total: $ 2,396,316.00

3. Monitor Construction Co. Inc.

Sonoita, AZ

A $ 1,399,980.00 B $ 1,498,494.00 Total: $ 2,898,474.00

4. Groundhog Excavating, Inc.

Albuquerque, NM

A $ 1,132,892.90 B $ 1,002,027.00 Total: $ 2,134,919.90

5.Meridian Contracting, Inc.

Albuquerque, NM

A $ 1,218,220.00 B $ 1,057,413.00 Total: $ 2,275,633.00

6. Stormwater Plans, LLC Glendale, AZ

A $ 1,525,775.00 B $ 1,555,545.00 Total: $ 3,081,320.00

7.

A $ B $ Total: $

8.

9.

10. Engineers Estimate

A $ 1,610,050.00 B $ 1,353,905.00 Total: $2,963,955.00

All bids subject to verification

Bid Opening Summary
Bid Opening Date: 11/8/16 Time: 2:00 p.m.

File details come from the government source that posted it. Updated .