T A B U L A T I O N O F B I D S
Schedule A Total of Bid Items: 6,374,865.00$ 12.2% 7,151,542.40$ 45.5% 9,273,000.00$ Project No: Hawaii HI STP HI(1)
Project Name: HALONA STREET BRIDGE
CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount
15101-0000
Line A0020 ALL LPSM 770,000.00$ 770,000.00$ 1,100,000.00$ 520,000.00$
15201-0000
Line A0040 ALL LPSM 38,980.00$ 38,980.00$ 80,000.00$ 30,000.00$
15301-0000
Line A0060 ALL LPSM 175,000.00$ 175,000.00$ 210,000.00$ 235,000.00$
15401-0000
Line A0080 ALL LPSM 125,000.00$ 125,000.00$ 30,000.00$ 170,000.00$
15501-0000
Line A0100 ALL LPSM 25,000.00$ 25,000.00$ 10,000.00$ 60,000.00$
15705-1500
Line A0120 180 LNFT 12.00$ 2,160.00$ 28,800.00$ 2,160.00$
15706-1000
Line A0140 8 EACH 325.00$ 2,600.00$ 2,800.00$ 3,200.00$
15706-1500
Line A0160 6 EACH 350.00$ 2,100.00$ 3,600.00$ 2,400.00$
15802-0000
Line A0180 ALL LPSM 65,000.00$ 65,000.00$ 105,400.00$ 220,000.00$
20301-1500
Line A0200 1 EACH 4,500.00$ 4,500.00$ 1,400.00$ 3,500.00$
20301-1700
Line A0220 1 EACH 1,800.00$ 1,800.00$ 4,000.00$ 1,500.00$
20302-2100
Line A0240 40 LNFT 150.00$ 6,000.00$ 8,000.00$ 1,000.00$
20302-2210
Line A0260 170 LNFT 40.00$ 6,800.00$ 5,100.00$ 5,100.00$
20302-2300
Line A0280 185 LNFT 100.00$ 18,500.00$ 9,250.00$ 14,800.00$
20304-1000
Line A0300 ALL LPSM 51,120.00$ 51,120.00$ 50,000.00$ 60,000.00$
20304-2000
Engineer's Estimate
50,000.00$ 60,000.00$
50.00$ 80.00$
30.00$ 30.00$
200.00$ 25.00$
4,000.00$ 1,500.00$
1,400.00$ 3,500.00$
105,400.00$ 220,000.00$
600.00$ 400.00$
350.00$ 400.00$
160.00$ 12.00$
10,000.00$ 60,000.00$
30,000.00$
210,000.00$ 235,000.00$
Kiewit Infrastructure West Co. aiian Dredging Construction Company, 80,000.00$
1,100,000.00$ 520,000.00$
MOBILIZATION
CONSTRUCTION SURVEY AND STAKING
CONTRACTOR QUALITY CONTROL
REMOVAL OF BRIDGE
SOIL EROSION CONTROL, INLET PROTECTION
SOIL EROSION CONTROL, INLET PROTECTION TYPE E
WATERING FOR DUST CONTROL
REMOVAL OF LIGHT POLE
REMOVAL OF MANHOLE
REMOVAL OF PIPE CULVERT
CONSTRUCTION SCHEDULE
SOIL EROSION CONTROL, COMPOST SOCK
REMOVAL OF GAS LINE
REMOVAL OF WATERLINE
REMOVAL OF STRUCTURES AND OBSTRUCTIONS
CONTRACTOR TESTING
30,000.00$ 170,000.00$
11/15/2016 Page 1 of 6
Project No: Hawaii HI STP HI(1)
Project Name: HALONA STREET BRIDGE
CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount
Engineer's Estimate Kiewit Infrastructure West Co. aiian Dredging Construction Company, Line A0320 ALL LPSM 150,000.00$ 150,000.00$ 200,000.00$ 500,000.00$
20401-0000
Line A0340 575 CUYD 220.00$ 126,500.00$ 77,625.00$ 74,750.00$
20435-2000
Line A0360 138 CUYD (CQ) 90.00$ 12,420.00$ 41,400.00$ 55,200.00$
20720-0300
Line A0380 921 SQYD (CQ) 10.00$ 9,210.00$ 18,420.00$ 14,736.00$
20801-0000
Line A0400 1,870 CUYD (CQ) 140.00$ 261,800.00$ 18.70$ 439,450.00$
20803-0000
Line A0420 1,570 CUYD (CQ) 150.00$ 235,500.00$ 15.70$ 408,200.00$
20810-0000
Line A0440 ALL LPSM 60,000.00$ 60,000.00$ 30,000.00$ 17,000.00$
20815-0000
Line A0460 ALL LPSM 515,000.00$ 515,000.00$ 1,050,000.00$ 984,541.00$
25801-0300
Line A0480 198 SQFT (CQ) 150.00$ 29,700.00$ 49,500.00$ 69,300.00$
30202-2000
Line A0500 600 TON 110.00$ 66,000.00$ 32,400.00$ 54,000.00$
40301-0000
Line A0520 360 TON 365.00$ 131,400.00$ 79,200.00$ 72,000.00$
55101-0300
Line A0540 1,900 LNFT 325.00$ 617,500.00$ 950,000.00$ 1,425,000.00$
55104-1000
Line A0560 4 EACH (CQ) 10,000.00$ 40,000.00$ 21,600.00$ 100,000.00$
55115-1000
Line A0580 840 LNFT 90.00$ 75,600.00$ 42,840.00$ 210,000.00$
55201-0100
Line A0600 350 CUYD (CQ) 1,900.00$ 665,000.00$ 875,000.00$ 1,137,500.00$
55235-0000
Line A0620 96 LNFT (CQ) 300.00$ 28,800.00$ 22,080.00$ 7,680.00$ 230.00$ 80.00$
2,500.00$ 3,250.00$
51.00$ 250.00$
5,400.00$ 25,000.00$
500.00$ 750.00$
220.00$ 200.00$
54.00$ 90.00$
250.00$ 350.00$
1,050,000.00$ 984,541.00$
30,000.00$ 17,000.00$
0.01$ 260.00$
0.01$ 235.00$
20.00$ 16.00$
300.00$ 400.00$
135.00$ 130.00$
200,000.00$ 500,000.00$
ROADWAY EXCAVATION
BACKFILL, GRANULAR
ROADWAY AGGREGATE, METHOD 2
ASPHALT CONCRETE PAVEMENT
PRECAST PRESTRESSED CONCRETE PILE, IN PLACE
DYNAMIC PILE LOAD TEST
PREBORING
REINFORCEMENT GEOSYNTHETIC, TYPE 3
STRUCTURE EXCAVATION
STRUCTURAL BACKFILL
SHORING AND BRACING
COFFERDAMS
REINFORCED CONCRETE RETAINING WALL, 8 FEET
STRUCTURAL CONCRETE, CLASS A
EXPANSION JOINTS
11/15/2016 Page 2 of 6
Project No: Hawaii HI STP HI(1)
Project Name: HALONA STREET BRIDGE
CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount
Engineer's Estimate Kiewit Infrastructure West Co. aiian Dredging Construction Company, 55302-0300
Line A0640 1,089 LNFT (CQ) 1,000.00$ 1,089,000.00$ 871,200.00$ 778,635.00$
55401-1000
Line A0660 61,400 LB (CQ) 3.50$ 214,900.00$ 110,520.00$ 122,800.00$
55601-0500
Line A0680 290 LNFT (CQ) 750.00$ 217,500.00$ 232,000.00$ 261,000.00$
60201-1200
Line A0700 50 LNFT 300.00$ 15,000.00$ 40,500.00$ 80,000.00$
60401-0000
Line A0720 2 EACH 4,000.00$ 8,000.00$ 25,000.00$ 100,000.00$
60412-2000
Line A0740 2 EACH 2,000.00$ 4,000.00$ 2,600.00$ 8,000.00$
60901-1700
Line A0760 200 LNFT 50.00$ 10,000.00$ 14,000.00$ 13,000.00$
60902-1100
Line A0780 50 LNFT 60.00$ 3,000.00$ 4,000.00$ 3,500.00$
61102-3250
Line A0800 230 LNFT 400.00$ 92,000.00$ 57,500.00$ 190,900.00$
61104-0200
Line A0820 2 EACH 3,500.00$ 7,000.00$ 9,600.00$ 8,000.00$
61104-0400
Line A0840 2 EACH 1,000.00$ 2,000.00$ 8,200.00$ 6,000.00$
61105-0000
Line A0860 2 EACH 1,000.00$ 2,000.00$ 3,200.00$ 2,000.00$
61108-4000
Line A0880 12 EACH 1,000.00$ 12,000.00$ 18,000.00$ 8,400.00$
61114-1000
Line A0900 17 EACH 1,000.00$ 17,000.00$ 22,100.00$ 17,000.00$
61114-6000
Line A0920 4 EACH 1,500.00$ 6,000.00$ 10,400.00$ 2,000.00$
61501-0100
2,600.00$ 500.00$
1,300.00$ 1,000.00$
1,500.00$ 700.00$
1,600.00$ 1,000.00$
4,100.00$ 3,000.00$
4,800.00$ 4,000.00$
250.00$ 830.00$
80.00$ 70.00$
70.00$ 65.00$
1,300.00$ 4,000.00$
12,500.00$ 50,000.00$
810.00$ 1,600.00$
800.00$ 900.00$
1.80$ 2.00$
800.00$ 715.00$
VALVE BOX
ADJUST VALVE BOX
WATER SYSTEM ACCESSORY, BEND
WATER SYSTEM ACCESSORY, CONCRETE THRUST COLLAR
SIDEWALK, CONCRETE
REMOVE AND RESET MANHOLE FRAME AND COVER
CURB, CONCRETE, 18-INCH DEPTH
CURB AND GUTTER, CONCRETE, 13-INCH DEPTH
8-INCH WATERLINE, DUCTILE IRON
VALVE, AIR RELEASE
VALVE, GATE
PRECAST, PRESTRESSED CONCRETE SLABS, 48-INCH NON-VOIDED
REINFORCING STEEL
BRIDGE RAILING, CONCRETE
48-INCH PIPE CULVERT
MANHOLE
11/15/2016 Page 3 of 6
Project No: Hawaii HI STP HI(1)
Project Name: HALONA STREET BRIDGE
CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount
Engineer's Estimate Kiewit Infrastructure West Co. aiian Dredging Construction Company, Line A0940 55 SQYD 250.00$ 13,750.00$ 11,825.00$ 8,250.00$
61505-1000
Line A0960 4 EACH 3,000.00$ 12,000.00$ 18,000.00$ 16,000.00$
61701-1200
Line A0980 75 LNFT 120.00$ 9,000.00$ 7,500.00$ 12,000.00$
61702-0800
Line A1000 1 EACH 10,000.00$ 10,000.00$ 4,700.00$ 4,700.00$
61707-0000
Line A1020 25 LNFT (CQ) 250.00$ 6,250.00$ 8,750.00$ 4,750.00$
61901-1300
Line A1040 19 LNFT (CQ) 50.00$ 950.00$ 1,938.00$ 893.00$
61901-2000
Line A1060 350 LNFT 60.00$ 21,000.00$ 37,800.00$ 16,450.00$
62101-0000
Line A1080 2 EACH 1,000.00$ 2,000.00$ 2,400.00$ 6,000.00$
62201-0200
Line A1100 20 HOUR 150.00$ 3,000.00$ 6,000.00$ 2,620.00$
62201-0900
Line A1120 20 HOUR 180.00$ 3,600.00$ 6,000.00$ 3,040.00$
62201-2850
Line A1140 20 HOUR 200.00$ 4,000.00$ 6,000.00$ 3,420.00$
62201-3350
Line A1160 20 HOUR 275.00$ 5,500.00$ 6,000.00$ 4,580.00$
62301-0000
Line A1180 20 HOUR 75.00$ 1,500.00$ 6,000.00$ 1,620.00$
62302-1000
Line A1200 20 HOUR 225.00$ 4,500.00$ 4,000.00$ 5,260.00$
62302-1100
Line A1220 20 HOUR 275.00$ 5,500.00$ 4,000.00$ 5,000.00$
62511-2000
Line A1240 300 SQYD 20.00$ 6,000.00$ 15,900.00$ 22,500.00$
200.00$ 250.00$
200.00$ 263.00$
300.00$ 81.00$
300.00$ 229.00$
300.00$ 171.00$
300.00$ 152.00$
300.00$ 131.00$
1,200.00$ 3,000.00$
108.00$ 47.00$
102.00$ 47.00$
350.00$ 190.00$
4,700.00$ 4,700.00$
100.00$ 160.00$
4,500.00$ 4,000.00$
215.00$ 150.00$
DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY
WHEEL LOADER, 2 CUBIC YARD MINIMUM RATED CAPACITY
MOTOR GRADER, 12 FOOT MINIMUM BLADE
HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY
GENERAL LABOR
SPECIAL LABOR, HIRED TECHNICAL SERVICES
GUARDRAIL SYSTEM G4, TYPE 2, CLASS A STEEL POSTS
TERMINAL SECTION TYPE TANGENT
STRUCTURE TRANSITION RAILING
FENCE, CHAIN LINK
FENCE, CHAIN LINK, 72-INCH HEIGHT
MONUMENT
ACCESSIBILITY RAMP, CONCRETE
SPECIAL LABOR, HIRED SURVEY SERVICES
SEEDING, HYDRAULIC METHOD
53.00$ 75.00$
11/15/2016 Page 4 of 6
Project No: Hawaii HI STP HI(1)
Project Name: HALONA STREET BRIDGE
CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount
Engineer's Estimate Kiewit Infrastructure West Co. aiian Dredging Construction Company, 62516-2000
Line A1260 300 SQYD 9.00$ 2,700.00$ 2,400.00$ 3,300.00$
63301-0000
Line A1280 5 EACH 1,000.00$ 5,000.00$ 6,000.00$ 2,000.00$
63401-1500
Line A1300 990 LNFT 2.50$ 2,475.00$ 3,960.00$ 5,940.00$
63405-2900
Line A1320 2 EACH 500.00$ 1,000.00$ 600.00$ 600.00$
63405-3050
Line A1340 2 EACH 500.00$ 1,000.00$ 900.00$ 900.00$
63405-3100
Line A1360 2 EACH 500.00$ 1,000.00$ 900.00$ 900.00$
63406-0100
Line A1380 40 EACH 20.00$ 800.00$ 280.00$ 280.00$
63406-0200
Line A1400 20 EACH 25.00$ 500.00$ 140.00$ 140.00$
63501-0000
Line A1420 ALL LPSM 100,000.00$ 100,000.00$ 300,000.00$ 450,000.00$
63610-1600
Line A1440 70 LNFT 75.00$ 5,250.00$ 1,330.00$ 39,200.00$
63610-1600
Line A1460 170 LNFT 50.00$ 8,500.00$ 3,400.00$ 17,000.00$
63610-2200
Line A1480 160 LNFT 50.00$ 8,000.00$ 4,800.00$ 4,800.00$
63610-2800
Line A1500 300 LNFT 75.00$ 22,500.00$ 12,900.00$ 9,000.00$
63611-0300
Line A1520 410 LNFT 6.00$ 2,460.00$ 2,050.00$ 820.00$
63611-0400
Line A1540 570 LNFT 7.00$ 3,990.00$ 3,420.00$ 1,140.00$
63620-0000
PAVEMENT MARKINGS, TYPE H, TURN ARROW
CONDUIT, 2-INCH, PVC
CONDUIT, 3-INCH, PVC
CONDUIT, 4-INCH, PVC
WIRE, ELECTRICAL CONDUCTORS, 10 AWG
WIRE, ELECTRICAL CONDUCTORS, 8 AWG
POLE(STATE HIGHWAY LIGHT STANDARD,150W LED, SINGLE 8FT BRACKET ARM, [POLE BASE, AND APPURTENANCES)
PAVEMENT MARKINGS, TYPE H, "ONLY" WORD MESSAGE
PAVEMENT MARKINGS, TYPE H, "STOP" WORD MESSAGE
RAISED PAVEMENT MARKER, NON-REFLECTIVE
RAISED PAVEMENT MARKER, NON-PLOWABLE, BI-DIRECTIONAL REFLECTIVE
TEMPORARY TRAFFIC CONTROL
CONDUIT, 2-INCH, PVC (ENCASED IN CONCRETE)
MULCHING, HYDRAULIC METHOD
SIGN SYSTEM
PAVEMENT MARKINGS, TYPE H, SOLID
1,200.00$ 400.00$
8.00$ 11.00$
300.00$ 300.00$
4.00$ 6.00$
450.00$ 450.00$
450.00$ 450.00$
7.00$ 7.00$
7.00$ 7.00$
19.00$ 560.00$
300,000.00$ 450,000.00$
30.00$ 30.00$
20.00$ 100.00$
5.00$ 2.00$
43.00$ 30.00$
6.00$ 2.00$
11/15/2016 Page 5 of 6
Project No: Hawaii HI STP HI(1)
Project Name: HALONA STREET BRIDGE
CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount
Engineer's Estimate Kiewit Infrastructure West Co. aiian Dredging Construction Company, Line A1560 2 EACH 10,000.00$ 20,000.00$ 46,000.00$ 26,000.00$
63621-1000
Line A1580 3 EACH 6,000.00$ 18,000.00$ 15,000.00$ 15,000.00$
63621-5000
Line A1600 2 EACH 6,000.00$ 12,000.00$ 6,000.00$ 6,000.00$
64604-3000
Line A1620 35 LNFT (CQ) 250.00$ 8,750.00$ 24,500.00$ 1,645.00$
64810-1000
Line A1640 240 LNFT 100.00$ 24,000.00$ 2,880.00$ 72,000.00$
UTILITY BOX, PULLBOX
UTILITY BOX, CONCRETE
FIXTURE, PEDESTRIAN RAILING
PIPELINE, NATURAL GAS 2-INCH
23,000.00$ 13,000.00$
3,000.00$ 3,000.00$
5,000.00$ 5,000.00$
12.00$ 300.00$
700.00$ 47.00$
11/15/2016 Page 6 of 6