NV_BLM_10(1)-Plans-Option_X-100_Per_Stamp.pdf
PDF 42 MB Posted
- Solicitation number
- DTFH6816B00020
About this file
Plans Option X
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DI
SPRING
U.S. CUSTOMARY
ABBREVIATIONS DRAINAGE SYMBOLS
GEOLOGIC SYMBOLS
FENCE & CATTLEGUARD SYMBOLS
Cattleguard (Existing, Proposed)
Fence w/ Gate (Existing, Proposed)
Fence (Existing, Proposed)
Material Source
Boring Location (Existing, Proposed)
Riprap Apron (Proposed)
Underdrain (Existing, Proposed)
With Drop Inlet (Existing, Proposed)
With Headwalls (Existing, Proposed)
With End Sections (Existing, Proposed)
Pipe Culvert (Existing, Proposed)
Box Culvert (Existing, Proposed)
Bridge (Existing, Proposed)
Spring
River
Wetland
Large Creek
Lake, Pond or Reservoir
Drainage or Small Creek
Flow Arrow
Ditch (Existing, Proposed)
D west vertical point of intersection vehicles per hour vertical design speed typical point of tangent to spiral transverse temporary construction easement temporary bench mark tangent township tangent length symmetrical structural straight stiffener standard station point of spiral to tangent street specification spacing, Spaces or Spaced shoulder section point of spiral to curve seasonal average daily traffic south route right reference hub retaining wall
Reservation reservoir required reinforcement reconstruction roadway road right-of-way range radius quantities pavement point of tangent pounds per square inch project point on tangent point on spiral point on curve plate point of intersection perforate point of compound curve point of curve outside diameter other face on centers number negative normal crown north mountain(s) monument minimum maximum material maintenance magnetic low water left lump sum longitudinal latitude lamination length of curve
WW
VPI
vph vert.
VV
typ.
TS
transv.
TCE
TBM
tan.
T.
TT
sym.
struc.
str.
stiff.
std.
sta.
ST
st.
spec.
spa.
shldr.
sec.
SC
SADT
SS
rte.
Rt. or RT
RH
ret. wall
Res.
res.
reqd.
reinf.
reconst.
rdwy.
rd.
R/W
R.
RR
quant., QtyQ pvmt.
PT
psi proj.
POT
POS
POC
pl.
PI
perf.
PCC
PCP
OD
o.f.
o.c.O
no. or # neg.
NC
NN
mtn(s).
mon.
min.
max.
matl.
maint.
mag.M
LW
Lt. or LT
LPSM
long.
lat.
lam.
LL
Wattle
Temporary Inlet Protection
Stabilized Construction Entrance
Silt Fence
Sediment Log
EROSION & SEDIMENT CONTROL SYMBOLS
Riprap
Erosion Control Mat
Diversion Berm
Check Dam
Bonded Fiber Matrix Mulching
SYMBOLS AND ABBREVIATIONS
CONVENTIONAL PLAN
Sheet 1 of 2 jt.J int.
incr.
incl.
IDI
hwy.
HW
horiz.
hex.
HES
hdwl.
HACPH
gdr.
galv.
ga.G ftg.
fin.
FES
Fed.
f.f.F ext.
exp. jt.
exc.
EW
et ux et al
ER
EQ or eq.
EOP
engr(s).
emb.
elev.
El. 94.066 e
EE
dwg(s).
DLC
Dist.
dist.
diaph.
diag.
dia. or D
DI
DHV
decr.D culv.
CTSM
ctrs.
CS
cr.
corr.
cont.
constr. jt.
constr.
conc.
col.
Co.
CMP
clr.
c-c
CBCC
brg.
br.
BP
BM
BK
beg.
b.f.B asph.
appr.
alt.
AH
aggr.
ADT
abut.A joint interior increment inclusive,including inside diameter highway high water horizontal hexagon homestead entry survey headwall girder galvanized gage (gauge) footing finish flared end section federal fill face exterior expansion joint excavation edge of water and wife and others edge of road equation edge of pavement
Engineer(s) embankment elevation elevation with number superelevation rate east drawing(s) donation land claim district distance diaphragm diagonal diameter drop inlet design hour volume decrement culvert contingent sum centers point of curve to spiral creek corrugated continuous construction joint construction concrete column county corrugated metal pipe clear center to center concrete box culvert bearing bridge balance point bench mark back beginning,begin both faces asphalt approach alternate ahead aggregate average daily traffic abutment curve delta centerline A2
P
M d e n p w p p w ic s jo b s A S y m R
R C
X .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r D
E N
P W
P
STATE PROJECT
NO.
SHEET
U.S. CUSTOMARY
NV NV BLM 10 (1)
36 31
36 31
6 1
ˆ
U.S. CUSTOMARY
SYMBOLS AND ABBREVIATIONS
CONVENTIONAL PLAN
Sheet 2 of 2
PROJECT SPECIFIC SYMBOLS
Landscape Area
Boulder
A3
Treeline
Tree
MAPPING SYMBOLS
LANDSCAPING & VEGETATION SYMBOLS
RIGHT-OF-WAY SYMBOLS
ROADWAY SYMBOLS
SIGN SYMBOLS
Retaining Wall (Existing, Proposed)
Median & Side Barrier (Existing, Proposed)
Guardwall (Existing, Proposed)
Guardrail (Existing, Proposed)
GUARDRAIL, BARRIER & WALL SYMBOLS
Post Mounted (Existing, Proposed)
Portable (Proposed)
Delineator (Existing, Proposed)
Commercial (Existing, Proposed)
Signs
Telephone
Power
Fiber Optic
CATV
Overhead Utility Line (Existing, Proposed)
Water
Telephone
Sanitary Sewer
Power
Oil
Gas
Fiber Optic
CATV
Underground Utility (Existing, Proposed)
Telephone Pedestal (Existing, Proposed)
Telephone Booth (Existing, Proposed)
Street Light (Existing, Proposed)
Support Pole Anchor (Existing, Proposed)
Support Pole (Existing, Proposed)
Surface (Existing, Proposed)
Underground (Existing, Proposed)
Irrigation Ditch
999.9
Roadway Obliteration
Roadway Centerline (With Station ticks)
Proposed
Existing
Edge of Roadway
Toe of Fill
Transition
Top of Cut
Slope Stake Limits
Clearing/Construction Limits
Survey Control Point
Trail
Spot Elevation
Double Track
Single Track
Railroad
North Arrow
Coordinate Grid Tick
Building (Existing, Proposed)
Section Corner (Found)
Section Corner (Found, Projected)
Section Corner (Found, Projected)
Right-of-Way Line (Proposed)
Right-of-Way Line (Existing)
Property Line
Parcel Number
Monument (As described)
Temporary (Proposed)
Permanent (Proposed)
Permanent (Existing)
Easements
National Wildlife Refuge
National Park
National Forest
Bureau of Land Management
Bureau of Indian Affairs
Section
Section
Section
Township or Range Line
City
County
State
National
Boundaries
UTILITY SYMBOLS
ABBREVIATIONS
Stabilized Construction Exit
VC
SSD
POE
Orig.
NDOT
MUTCD
K
Inv.
In
Grnd.
Ft
Des.
CO.
CMPA
BLM
ADA
Vertical Curve
Stopping Sight Distance
Point of Ending original
Nevada Department of Transportation
Manual on Uniform Traffic Control Devices
K value
Invert inch ground feet design
Contracting Officer
Corrugated Metal Pipe Arch
Bureau of Land Management
Americans with Disabilities Act
P
M d e n p w p p w ic s jo b s A S y m R
R C
X .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r D
E N
P W
P
STATE PROJECT
I
Note: For all SURVEY AND STAKING REQUIREMENTS, refer to the FP14, Section 152.02
PROJECT : Red Rock Loop, Las Vegas, NV
DATE OF FIELD WORK : MARC H 2014
DATE OF FINAL ADJUSTMENT : MARCH 2014
PROJECT UNITS : FEET
COORDINATE SYSTEM : NAD83 (2011); NV E 2701
BASED ON OPUS SOLUTIONS AT ALL STATIONS
IGSOB, EPOCH: 2014.23024
EPOCH DATE : MARCH 26
VERTICAL DATUM : NAVD88 (DIFFERENTIAL LEVELS BASED ON CLARK COUNTY
BENCHMARK 8C1813C41998 NOOT BRASS CAP IN CONCRETE
50' SOUTHEAST OF CENTERLINE OF STATE ROUTE 159 0.8
MILES NORTHEAST OF REDROCK OVERLOOK, NDOT STATION
519+59.49 (ELE=3693.526')
ALL COORDIANTES ARE IN US SURVEY FEET
STATE PLANE COORDINATES GEO COORDINATES
POINT
NORTH EAST ELEVATION LATITUDE LONGITUDE
ELLIPSOID MAPPING
NUMBER HEIGHT ANGLE
3001 26750069.45 703440.31 3699.59 36°7'58. 76423" 115°25'23.65843 3611.11 0°05'39"
3002 26762473.19 692128.64 4585.86 36°10'1.59700' 115°27'41.37579" 4498.97 0°04"18"
3003 26757633.14 684815.29 4445.38 36°9'13.81141" 115°29'10.63484 4356.66 0°03'26"
3004 26741842.59 690813.20 3905.79 3606'37. 58009" 115°27'57.72387 3818.00 0°04'08"
3005 26751653. 39 712791. 72 3497.43 36°8'14.26155" 115°23'29.61206 3408.50 0°06'47"
3006 26749172.86 715229.48 3380.12 36°7'49.68107" 115° 22'59.95273" 3290.96 0°07'04"
3007 26759529. 75 695186.25 4276.97 36°9'32.44747" 115°27'4.13143" 4189.71 0°04'40"
3008 26759546.56 694197.07 4295.32 36°9'32. 626 79" 115° 27'16.19479" 4207.98 0°04'33"
3009 26754799.94 687699.22 4183.13 36°8'45. 76168" 115°28'35.05371 4096.15 0°03'46"
3010 26753726.44 687673.69 4179.09 35°8'35.14522 115°28'35.82949" 4092.02 0°03'46"
Average 0°04'49"
NOTE:
TO PRECISELY CHECK DISTANCES BETWEEN POINTS AS MEASURED ON THE GROUND
�VEY� £
- �A
"I'. ..
i�=7 c1\ . _aJ AS.CJ.;
· . Alo. 1 � �'o�
6 'f/0· l'Z- � jt - /b
INVERSE THE STATE PLANE COORDINATES AND DIVIDE THE COMPUTED DISTANCE BY A
MEAN COMBINED FACTOR OF THE TWO POINTS.
TO COMPUTE GEODETIC AZIMUTHS USE THE FOLLOWING FORMULA
GEODETIC AZIMUTH = GRID AZIMUTH + MAPPING ANGLE
COMBINED JQ6282,GeK
FACTOR STATION
0.99972986 997+41.90
0.99968633 1201+32.33
0.99969259 1361+44.71
0.99971877 NA
0.99974066 NA
0.99974660 NA
0.99970137 1141+56.75
0.99970042 1152+44.66
0.99970525 1432+70.30
0.99970544 1444+28.98
0.99971273
OFFSET
223.87
63.63
-22.92
NA
NA
NA
37.91
-32.88
47.53
-44.04
STATE PROJECT
NV NV BLM 10 (1)
DESCRIPTION
FHWA ALUMINUM CAP STAMPED 3001
FHWA ALUMINUM CAP STAMPED 3002
FHWA ALUMINUM CAP STAMPED 3003
F HWA ALUMINUM CAP STAMPED 3004
FHWA ALUMINUM CAP STAMPED 3005
FHWA ALUMINUM CAP STAMPED 3006
FHWA ALUMINUM CAP STAMPED 3007
FHWA ALUMINUM CAP STAMPED 3008
FHWA ALUMINUM CAP STAMPED 3009
FHWA ALUMINUM CAP STAMPED 3010
U.S. OEPARTMENT OF TRANSPORTATION
FEOERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LAND S HIGHWAY DIVISION
U.S. CUSTOMARY
SURVEY CONTROL
SHEET
A4
P
M d e n p w p p w ic s jo b s A
M a p
R R
C
X .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r D
E N
P W
P
STATE PROJECT
Overlook
Point
High
O ak C re ek
6,000'3,000'0
Scale in Feet
1350+00
1000+00
1200+00
1300+00
+00
+00
To La s V eg as
En d o f P roj ect
3 M ile s F rom
Loop
Grand
Potential staging area staging area
Potential
D riv e
S ce n ic L o o p
Area
Overlook Parking
Red Rock Wash
Parking Area
Calico 1 Vista
Parking Area
Calico 2 Vista
Parking Area
Pine Creek Canyon
Parking Area
Ice Box Canyon
Parking Area
Lost Creek staging area)
Kiosk (Potential
Fee Station
Ca ny on R oa d
Re d
Ro ck
Mountain Road
White Rock
Road
Rocky G ap
M oenkopi R oad
Parking Area
Willow Springs
Area
Trailhead Parking
White Rock
Parking Area
Equestrian
White Rock
Parking Area
Sandstone Quarry area
Potential staging
Potential staging area o f
P ro je c t
F ro m E n d
M il e s
L a s V e g a s
T o
Visitor Center
A6
SITE MAP
+00
E 701989.29
N 26750447.50
End Return Route
NV BLM 10 (1)
2127+85.74
E 695125.30
N 26759421.32
Begin Return Route
NV BLM 10 (1)
2000+00.00
R e tu rn R o u te
5.
4.
3.
2.
1.
PLAN (SWPPP) NOTES:
STORMWATER POLLUTION PREVENTION
has been reduced by 50 percent or more.
Sediment must be removed when BMP design capacity the next anticipated storm event, whichever is earlier.
seven days after a stormwater runoff event or prior to
Accumulated sediment in BMPs shall be removed within
Section III.A.12.
General Permit for Construction Activity NVR100000, disturbance activities. Refer to the Nevada Stormwater inspections may apply, such as suspension of land
Plan as necessary. Some exceptions to weekly update or modify the Stormwater Pollution Prevention inches or more. The Contractor or his agent shall weekly, and within 24 hours after any rain event of 0.5 vehicle entrance and exit locations, and all BMPs and equipment that are exposed to precipitation, all disturbed areas, areas used for storage of materials
At a minimum, the Contractor or his agent shall inspect
Activity NVR100000, Section III.A.5.
Nevada Stormwater General Permit for Construction ceased. Some exceptions may apply; refer to the that portion of the site has temporarily or permanently no later than 14 days after the construction activity in installed on disturbed areas as soon as practicable and
Temporary or permanent stabilization practices will be
Vegas Valley Construction Site BMP Guidance Manual.
Project Development and Design Manual and the Las standards specified in the Federal Lands Highway submitted plan does not meet the performance agents due to unforeseen erosion problems or if the practices may be required of the owner and his or her
Additional construction site discharge best management system.
shall be prevented from entering the storm sewer development or construction project. Such materials of construction activities associated with this site
Interior Bureau of Land Management (BLM) as a result the public rights of way of the U.S. Department of the that may have been discharged to, or accumulated in, mud, construction debris, or other potential pollutants authorized agents shall each day remove all sediment, The Owner, Site Developer, Contractor, and/or their
NO SCALE
TYPICAL SECTIONS
ASPHALT CURB
SIDE TREATMENT WITH
See Detail 609-01
4-inch depth
Curb, Asphalt
1:4 8%
6" 2'
1:4
Base Course
4" Aggregate left sides of roadway) applies to both right and aggregate base (Detail
Shoulder up with roadway edge (safety edge)
Construct 30° pavement 30° concrete pavement
Hot asphalt
DETAIL A
A7
S C
H E
D U
L E A
Q
C S
U B
M I T
T A
L M a y
1:4
1:3
1:4
Course, 4" depth
Aggregate Base
Hinge point
2089+76.24 TO 2127+85.74
2031+26.89 TO 2088+73.76
2005+75.00 TO 2030+23.11
2000+00.00 TO 2004+75.00
RETURN ROUTE
PROPOSED TYPICAL SECTION
first asphalt lift)
(applied prior to
Prime Coat
12'
Traveled Way
Varies
12'
14.5' Subgrade
Topsoil
14.5' Subgrade
6'
6'
Clear Zone Clear Zone
Shldr asphalt lifts)
(applied between
Tack Coat pavement)
(top of
Profile grade
3Shldr
1:4
1:3
Course, 4" depth
Aggregate Base
Hinge point first asphalt lift)
(applied prior to
Prime Coat
12'
Varies
Topsoil
14.5' Subgrade and Seeding Limits
6'
Clear Zone asphalt lifts)
(applied between
Tack Coat pavement)
(top of
Profile grade
3Shldr Pullout AreaTraveled Way
Varies 14.5' - 39.5' Subgrade
2088+73.76 TO 2089+76.24
2030+23.11 TO 2031+26.89
2004+75.00 TO 2005+75.00
RETURN ROUTE
WITH PULLOUT AREA
PROPOSED TYPICAL SECTION
Concrete Pavement
3" Asphalt
Concrete Pavement
3" Asphalt
2%
2%
6'12'6'
Side Treatment or Asphalt Curb
See Detail A
1:4
1:3 Hinge point
1:3 Hinge point
Side Treatment or Asphalt Curb
See Detail A
10' and Seeding Limits
6' 12' 6' Varies 0'-25'
3Shldr
10'
Clearing and Construction Limits
Existing ground
F=1.5' 0.6'
B=1.5'
1:3
10'
Existing ground
F=1.5' 0.6'
B=1.5'
1:3
10'
Topsoil and Seeding Limits
6'
Slope stake limit
Varies cross sections for elevations.
for special ditch locations and
See plan and profile sheets
Varies limit stake
Slope
Clearing and Construction Limits
Topsoil and Seeding Limits cross sections for elevations.
for special ditch locations and
See plan and profile sheets
See plans for locations of curves and superelevations
METHOD OF SUPERELEVATION ON CURVES
Min. superelevation 2% grade
Profile superelevation
Pivot point for
8% Max. superele vation
Location
LENGTH OF PROJECT
TOTAL (mi)
TOTALS (ft)
Station to Station Option X
Return Route 2000+00.00 to 2127+85.74 12,786
Roadway (ft)
2.42
12,786
NOTES: (for all typical sections) access only.
use this area for temporary construction topsoil within the 10’ wide area and shall only
The contractor shall not remove vegetation or flaggers for 2-way traffic.
procedures using one lane traffic control with
See Detail 635-6 for temporary traffic control requirements.
time. See specifications for additional
635-6 and apply it to paving 12' of width at a
Drive and Rocky Gap Road paving see Detail
For temporary traffic control for Scenic Loop
Route see Detail 635-10.
For temporary traffic control for the Return markings are proposed here.
Shoulders are assumed. No pavement terrain, not to exceed 1:2.
Cut and fill slopes vary to match existing height.
the B and F dimensions to the actual cut slopes. For cut heights less than B, reduce
Round all earth slopes and all rippable rock
7.
6.
5.
4.
3.
2.
1.
P
M d e n p w p p w ic s jo b s A
T y p
R R
C
X .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r D
E N
P W
P
STATE PROJECT
Sheet and Description
B5 B4 B4, B8 B8 B6-B7 B8 S Series
Grading Surfacing Misc. Striping Drainage Traffic Control Structures Total Plan
Quantity ALLOWANCE Bid Schedule
X0020 15101-0000 MOBILIZATION LPSM ALL
X0040 15201-0000 CONSTRUCTION SURVEY AND
STAKING LPSM ALL
X0060 15206-0000 SLOPE, REFERENCE, AND
CLEARING AND GRUBBING STAKE MILE 2.420 2.420 2.420
X0080 15215-3000 SURVEY AND STAKING, DRAINAGE
STRUCTURE EACH 11 1 12 12
X0100 15216-2000 SURVEY AND STAKING, GRADE
FINISHING STAKES MILE 4.840 4.840 4.840
X0120 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
X0140 15401-0000 CONTRACTOR TESTING LPSM ALL
X0160 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
X0180 15705-1400 SOIL EROSION CONTROL, FIBER
ROLL LNFT 270 270 10 280
X0200 15706-0200 SOIL EROSION CONTROL, CHECK
DAM EACH 14 14 14
X0220 15706-1000 SOIL EROSION CONTROL, INLET
PROTECTION EACH 3 3 1 4
X0240 15706-1600 SOIL EROSION CONTROL,
STABILIZED CONSTRUCTION EXIT EACH 2 2 1 3
X0260 15802-0000 WATERING FOR DUST CONTROL LPSM ALL
X0280 20101-0000 CLEARING AND GRUBBING ACRE 24.1 24.1 0.8 24.8
X0300 20420-0000 EMBANKMENT CONSTRUCTION CUYD 32,370 32,370 1,630 34,000
X0320 20801-0000 STRUCTURE EXCAVATION CUYD 374 374 374 Contract Quantity
X0340 20803-0000 STRUCTURAL BACKFILL CUYD 411 411 411 Contract Quantity
X0360 25101-2200 PLACED RIPRAP, METHOD B,
CLASS 2 CUYD 2,316 2,316 234 2,550
X0380 25101-2300 PLACED RIPRAP, METHOD B,
CLASS 3 CUYD 322 322 28 350
X0400 25101-2400 PLACED RIPRAP, METHOD B,
CLASS 4 CUYD 145 145 5 150
X0420 25125-0000 BOULDER EACH 114 114 114
X0440 30803-0000 RECYCLED AGGREGATE BASE TON 8,411 8,411 489 8,900
X0460 40201-2600 ASPHALT CONCRETE PAVEMENT,
HVEEM MIX, CLASS B TON 6,809 6,809 691 7,500
X0480 40205-3000 ANTISTRIP ADDITIVE, TYPE 3 TON 68 68 7 75
X0500 41102-1000 PRIME COAT, METHOD 1 SQYD 34,734 34,734 2,266 37,000
X0520 41105-0000 BLOTTER TON 256 256 44 300
SUMMARY OF QUANTITIES - Option X
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of
Estimated Quantity
-J un -2
:5
A M c:
\p w _w or kd ir \d en
1\ hm or to n\ d0
0%
_R R C 1_
Es tim at e_
O pt io nX
_C
FL
_F or m at
_M od ifi ed
.x ls x] S he et
STATE PROJECT
B1NV BLM 10(1)NV
SHEET
NUMBER
NPS PMIS No. 136047 NPS Drwg No. 101/1168934
Grading Surfacing Misc. Striping Drainage Traffic Control Structures Total Plan
Quantity ALLOWANCE Bid Schedule
X0540 41201-0000 TACK COAT TON 15 15 5 20
X0560 55201-0200 STRUCTURAL CONCRETE, CLASS A Contract Quantity
(AE) CUYD 191 191 191
X0580 55401-1000 REINFORCING STEEL LB 26,500 26,500 26,500 Contract Quantity
X0600 56302-1000 PAINTING, CONCRETE STRUCTURE SQFT 1,404 1,404 96 1,500
X0620 60103-0240 CONCRETE, HEADWALL FOR
54-INCH PIPE CULVERT EACH 4 4 4
X0640 60201-0900 30-INCH PIPE CULVERT LNFT 103 103 7 110
X0660 60201-1000 36-INCH PIPE CULVERT LNFT 57 57 3 60
X0680 60201-1100 42-INCH PIPE CULVERT LNFT 68 68 2 70
X0700 60201-1300 54-INCH PIPE CULVERT LNFT 158 158 7 165
X0720 60202-0700 42-INCH EQUIVALENT DIAMETER
ARCH OR ELLIPTICAL PIPE
CULVERT LNFT 36 36 4 40
X0740 60210-0900 END SECTION FOR 30-INCH PIPE
CULVERT EACH 4 4 4
X0760 60210-1000 END SECTION FOR 36-INCH PIPE
CULVERT EACH 2 2 2
X0780 60210-1100 END SECTION FOR 42-INCH PIPE
CULVERT EACH 2 2 2
X0800 60211-1100 END SECTION FOR 42-INCH
EQUIVALENT DIAMETER ARCH OR
ELLIPTICAL PIPE CULVERT EACH 2 2 2
X0820 60601-0000 SPILLWAY ASSEMBLY EACH 3 3 3
X0840 60901-2100 CURB, ASPHALT, 4-INCH DEPTH LNFT 515 515 85 600
X0860 61901-3300 FENCE, TORTOISE BARRIER LNFT 27,196 27,196 1,404 28,600
X0880 62201-0200 DUMP TRUCK, 8 CUBIC YARD
MINIMUM CAPACITY HOUR 80 80 80
X0900 62201-0900 WHEEL LOADER, 2 CUBIC YARD
MINIMUM RATED CAPACITY HOUR 80 80 80
X0920 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM
BLADE HOUR 80 80 80
X0940 62201-3000 HYDRAULIC EXCAVATOR HOUR 80 80 80
X0960 62301-0000 GENERAL LABOR HOUR 160 160 160
X0980 62302-1000 SPECIAL LABOR, HIRED
TECHNICAL SERVICES HOUR 160 160 160
X1000 62302-1100 SPECIAL LABOR, HIRED SURVEY
SERVICES HOUR 80 80 80
Estimated Quantities
Remarks and/or Determination of
Estimated Quantity
-J un -2
:5
A M c:
\p w _w or kd ir \d en
1\ hm or to n\ d0
0%
_R R C 1_
Es tim at e_
O pt io nX
_C
FL
_F or m at
_M od ifi ed
.x ls x] S he et
2) SUMMARY OF QUANTITIES - Option X
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B2NV BLM 10(1)NV
SHEET
NUMBER
Grading Surfacing Misc. Striping Drainage Traffic Control Structures Total Plan
Quantity ALLOWANCE Bid Schedule
X1020 62405-0200 PLACING CONSERVED TOPSOIL,
3-INCH DEPTH SQYD 50,336 50,336 2,520 52,856
X1040 62510-1000 SEEDING, DRY METHOD ACRE 10.4 10.4 0.6 11.0
X1060 62515-1000 MULCHING, DRY METHOD ACRE 10.4 10.4 0.6 11.0
X1080 63302-0000 SIGN SYSTEM SQFT 49 49 6 55
X1100 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM ALL
Estimated Quantities
Remarks and/or Determination of
Estimated Quantity
-J un -2
:5
A M c:
\p w _w or kd ir \d en
1\ hm or to n\ d0
0%
_R R C 1_
Es tim at e_
O pt io nX
_C
FL
_F or m at
_M od ifi ed
.x ls x] S he et
3) SUMMARY OF QUANTITIES - Option X
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B3NV BLM 10(1)NV
SHEET
NUMBER
E1
P
M d e n p w p p w ic s jo b s E
C
R R
C
X .d g n
U s e r D
E N
P W
P
STATE PROJECT
NO.
SHEET
NV NV BLM 10 (1)
DROP INLET PROTECTION (TYPE C)
PREFABRICATED FILTER INSERT
Back of curb
Face of curb
1-bag high
Spillway
PLAN VIEW - INLET AT SAG
high
1-bag
Spillway
B
B
SECTION A-A
Drop inlet grate
PLAN VIEW - INLET ON GRADE
Flow
Face of curb
Back of curb
Flow
1-bag high
Spillway basin
Catch
SECTION B-B
onto curb bags overlap
Gravel filled
A
A Drop inlet grate
PLAN
Drop inlet
DROP INLET PROTECTION (TYPE B)
GRAVEL BAG BERM
Flow
(stacked tightly)
Gravel filled bags
Spillway (beyond)
Drop inlet
Flow Flow
Drop inlet grate
See Note 5
2-bags high
Gravel filled bags
See Note 5
2-bags high
Gravel filled bags
Accumulated sediment
Accumulated sediment
Drop inlet grate
Expansion restraint
Prefabricated filter insert
Dump straps (2 each)
Lifting loops (2 each)
Drop inlet
Fiber roll
Fiber roll in full contact with the ground
DROP INLET PROTECTION (TYPE A)
FIBER ROLL
PROTECTION
TEMPORARY INLET
NO SCALE
Sheet 1 of 2
C157-51
NOTE:
1" x 1" or 1" ø wood stake. See Note 2.
5.
4.
3.
2.
1.
DETAIL APPROVED FOR USE
REVISED: 08/2014
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY DETAIL
DETAIL
9" ø min. fiber roll
3" in diameter.
with clean, silt-free coarse aggregate between 2" and bags. Cover geotextile fabric to the top of the fabric geotextile fabric a minimum of 18" upstream of the the next layer of bags on top of it. Extend the to the spillway elevation. Anchor the fabric by placing face of the bags. Place fabric over the top of the bags geotextile filter, class 2, type C along the upstream bags. Where tight fit is unachievable, install ensure no sediment flows between or underneath the
Pack gravel filled bags tightly together end to end to of curb minus 1".
Maximum top of gravel bag spillway elevation = Top
12" x 18".
Approximate finished dimension of gravel bags is soil.
on center. Drive stakes 12" (min.) into undisturbed
Install fiber roll with stakes spaced no more than 24" as approved by the CO.
Select the inlet protection device to fit field conditions
E2
P
M d e n p w p p w ic s jo b s E
C
R R
C
X .d g n
U s e r D
E N
P W
P
STATE PROJECT
NO.
SHEET
NV NV BLM 10 (1)
SECTION C-C
Overflow water
Filtered
DROP INLET PROTECTION (TYPE D1)
BLOCK AND GRAVEL
E
E
SECTION E-E
Curb and gutter
Filtered water
Accumulated sediment
Curb inlet See Note 2 Inlet protection device
PLAN
See Note 1
Wire mesh
Drop inlet with grate
Filtered water
Sediment laden runoff
Accumulated sediment
Curb inlet
Curb inlet
Sediment laden runoff
Accumulated sediment
Overflow
Curb inlet
SECTION D-D
D
D
CURB INLET PROTECTION (TYPE D2)
BLOCK AND GRAVEL
See Note 1
Gravel filter
See Note 1
Wire mesh
CURB INLET PROTECTION (TYPE E)
INLET PROTECTION DEVICE
CC
Wire mesh
See Note 2 Inlet protection device
See Note 1
Gravel filter
Wire mesh
PROTECTION
TEMPORARY INLET
NO SCALE
Sheet 2 of 2
C157-51
NOTE:
3.
2.
1.
Dimensions may vary to fit field conditions.
to manufacturer's recommendations.
prefabricated filter material. Install device according continuous filter tubing filled with gravel or other
Inlet protection device (Type E) may consist of
Use wire mesh with 1/2" x 1/2" openings.
coarse aggregate between 2" and 3" in diameter.
For Type D1 and D2 gravel filter, use clean, silt-free
8" x 8" x 16" (nominal)
Concrete masonry unit
9"
8" x 8" x 16" (nominal) Concrete masonry unit
16"
2"
18"
12" min.
12" min.
2" x 2" (nominal) wood frame used to retain concrete blocks
2" x 4" (nominal) wood stud
DETAIL APPROVED FOR USE
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY DETAIL
DETAIL
E3
P
M d e n p w p p w ic s jo b s E
C
R R
C
X .d g n
U s e r D
E N
P W
P
STATE PROJECT
NO.
SHEET
NV NV BLM 10 (1)
CHECK DAM
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
6"
6''
(ft) (ft)
12" (min.)
DETAILDETAIL APPROVED FOR USE 01/2011
C157-53
NOTE:
(ft)
12'' (typ.)
6'' min
6" min.
16" min
Trench 2" min.
steeper than 5%.
log check dams on ditch grades sediment log. Do not use sediment
* Spacing calculated based on 9" Ø min
12" (min.)
7.
6.
5.
4.
3.
2.
1.
Adjust check dam spacing based on site-specific conditions.
around the ends of the fiber roll.
Provide sufficient length to prevent water from flowing
Expose stakes 2" (min.) above top of fiber roll.
Drive stakes into undisturbed soil of trench bottom 16" (min).
2' (max) spacing.
Drive stakes at each end of the fiber roll and at
Stake fiber rolls in place with 1?" x 1?" wood stakes.
Install check dams in ditches perpendicular to the flowline.
Repair all rills or gullies and properly compact prior to installation.
requirements of the check dam device.
may be used as approved by the CO, to meet the functional
Check dams of fiber rolls, riprap, or gravel bags
9" Ø min.
Fiber roll
Trench 2" min.
6%
5%
4%
3%
2%
RIPRAP CHECK DAM
CROSS SECTION
PLAN
NO SCALE
Flow
Flow
Se e
Not e
GRADE
DITCH
6%
5%
4%
3%
2%
CROSS SECTION CROSS SECTION
V-DITCH
Class 1 riprap on ditch grades steeper than 6%
* Do not use gravel bag check dams
GRAVEL BAG CHECK DAM
See Note 6 the ends to prevent flow around
Curve ends upstream similar for flat-bottom ditches.
Check dam installation details are
V-ditch design shown.
5%
4%
3%
2%
See Note 5
Flow Line Class 1 riprap
Gravel bag
STAKING DETAIL
FIBER ROLL
uphill side of fiber roll
Place excavated material on
(See Note 7)
CHECK DAM SPACING*
FIBER ROLL
(See Note 7)
CHECK DAM SPACING*
GRAVEL BAG
(See Note 7)
CHECK DAM SPACING
RIPRAP
FIBER ROLL CHECK DAM
CROSS SECTION
FLAT-BOTTOM DITCH
SPACING (max.)
CHECK DAM
SPACING (max.)
CHECK DAM
SPACING (max.)
CHECK DAM
GRADE
DITCH
GRADE
DITCH
E4
P
M d e n p w p p w ic s jo b s E
C
R R
C
X .d g n
U s e r D
E N
P W
P
STATE PROJECT
NO.
REVISED:
12" min.
12" max.
Trench 2" min.
12" min.
See Note 3
Stake Spacing
DETAIL APPROVED FOR USE 01/2011
C157-55
6.
5.
4.
3.
2.
1.
FIBER ROLL
Maximum spacing (ft)
9" Ø Fiber Roll
Spacing Table
See Fiber Roll manufacturer's recommendations.
Fiber rolls may be overlapped according to the fiber roll rather than under it.
roll to ensure storm water is forced to flow through
Tamp soil backfill against upstream side of fiber continuous contact with trench bottom and sides.
parallel to the contour. Place fiber rolls in
For fiber rolls on bare soil, construct trenches of fiber roll.
12" deep. Expose stakes 2" above top
Drive stakes into undisturbed soil at least
Stake fiber rolls at each end.
1" Ø wood stakes. Space stakes 4' o.c. max.
Stake fiber rolls in place with 1" x 1" or roll to vary more than 5% from level.
20' section of fiber roll, do not allow the fiber
Install fiber rolls along slope contours. For any prior to installation.
Repair all rills or gullies and properly compact flared end section
Culvert inlet with
2" min.
Trench
AT CULVERT INLET
FIBER ROLL
inlets fiber rolls around culvert
Install 3 - 9" Ø min. x 10'
See Note 3
See Note 3
Flow
12" min.
Fill slope
C le a r in g
L im it
S lo p e
S ta k e
INSTALLATION DETAIL
FIBER ROLL AS PERIMETER CONTROL
Trench 2" min.
uphill side of fiber roll
Place excavated material on
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY DETAIL
DETAIL
Flow
NO SCALE
1V:4H or flatter
1V:4H to 1V:3H
1V:3H to 1V:2H
Slope Gradient
1V:2H or steeper
Stagger joints (typ.)
STAKE DETAIL
uphill side of fiber roll
Place excavated material on
Fiber roll
Install fiber rolls along contour
SLOPE LAYOUT
FIBER ROLL
uphill side of fiber roll
Place excavated material on gaps. See Note 6.
Tie ends if necessary to eliminate
Abut fiber roll ends tightly together.
FIBER ROLL JOINT DETAIL
Tightly abut joints (typ.)
Fill or cut slope
FIBER ROLL SPACING TABLE*
project-specific conditions.
*Approximate spacing shown. Adjust spacing as needed due to
E5
157-A
CONSTRUCTION EXIT
STABILIZED
50' m in.
ingress / egress area
Provide full width of
Existing paved road
STABILIZED CONSTRUCTION EXIT
non- woven, Type C
Geotextile Class 2, 12" min.
30' (typ.)
3" to 6" Coarse aggregate
See Note 2
20' radius (typ.)
reduce tracking onto paved roadway.
Remove build-up of sediment as necessary to typical truck using exit.
Construct radius to allow turning movement of where entrance crosses existing drainage ditches.
directed by the CO. Provide temporary drainage
Construct drainage ditches along entrance as
3.
2.
1.
NOTES:
P
M d e n p w p p w ic s jo b s E s p
A R
R C
X .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
SPECIAL
U.S. CUSTOMARY SPECIAL
U s e r D
E N
P W
P
STATE PROJECT
NO.
G1
P
M d e n p w p p w ic s jo b s G
C
R R
C
X .d g n
U s e r D
E N
P W
P
STATE PROJECT
NO.
SHEET
NV NV BLM 10 (1)
C251-50
CLASS
RIPRAP
SECTION
END
WITH
SECTION
END
WITHOUT
(CY)
QUANTITY
RIPRAP
ESTIMATED
(SY)
QUANTITY
GEOTEXTILE
ESTIMATED
(inches) D
SIZE
CULVERT
(feet) L
APRON
OF
LENGTH
(feet) H
APRON
OF
DEPTH
CLASS
RIPRAP
SECTION
END
WITH
SECTION
END
WITHOUT
PROTECTIVE APRON DIMENSIONS AND ESTIMATED QUANTITIES
OUTLET WITHOUT DITCH
(CY)
QUANTITY
RIPRAP
ESTIMATED
(SY)
QUANTITY
GEOTEXTILE
ESTIMATED
(inches) D
SIZE
CULVERT
(feet) L
APRON
OF
LENGTH
(feet) H
APRON
OF
DEPTH
PROTECTIVE APRON DIMENSIONS AND ESTIMATED QUANTITIES
OUTLET WITH DITCH
AT CULVERT OUTLETS
PLACED RIPRAP
14.5
12.5
2.5
2.5
1.5
1.5
1.5
2.5
2.5
1.5
1.5
1.5
14.5
12.5
2.5
2.5
1.5
1.5
1.5
2.5
2.5
1.5
1.5
1.5
2'
49.8
38.7
18.5
13.3
5.2
3.2
1.7
44.5
34.1
15.6
10.9
3.9
2.2
2'
38.6
29.9
15.2
10.8
4.5
2.7
1.4
35.6
27.3
13.4
9.3
3.6
0.9
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAILDETAIL APPROVED FOR USE
C
PLAN VIEW PLAN VIEW
Geotextile
END SECTION
CULVERT WITHOUT STANDARD
SECTION C-C
END SECTION
CULVERT WITH STANDARD
S p a n
D ia o r m in
S p a n
D ia o r
L
A A
B B
PLAN VIEW
Variable slope ground Original
Geotextile
END SECTION
CULVERT WITHOUT STANDARD
SECTION B-BSECTION A-A
END SECTION
CULVERT WITH STANDARD
S p a n
D ia o r
S p a n
D ia o r m in
Geotextile
Variable slope ground Original m in
L
D D
D
H
H
D D
D
WITHOUT DITCH
PROTECTIVE APRON AT CULVERT OUTLET
WITH DITCH
PROTECTIVE APRON AT CULVERT OUTLET
L
C C
C
NOTE:
L
H
D
Geotextile
SECTION E-ESECTION D-D
Geotextile ground Original m in ditch slope
Match existing
D
H m in ground Original m in
D m in
H ditch slope
Match existing
D D EE
ground
Original
D
D it c h B o tt o m
W id th
D it c h B o tt o m
W id t h
D
4D
PLAN VIEW
or flatter
Sloped 1V:2H will not be measured for payment.
3. Excavation for placement of riprap
Subsection 714.01(a).
2. Furnish geotextile conforming to slopes of less than 10%.
1. Use for aprons serving culverts with
D
D D
Flowline
D
D D
(min.)
G2
P
M d e n p w p p w ic s jo b s G
C
R R
C
X .d g n
U s e r D
E N
P W
P
STATE PROJECT
NO.
SHEET
NV NV BLM 10 (1)
18" (min.)
(min.)
10'
(m in
(m in
(m in.
BETWEEN CUT AND FILL
PLACED RIPRAP
C251-51
(min.)
12"
(min.)
18"
(min.)
18"
(min.)
18"
12"
24"±24"±5'±24"±
10' (min.)
40"±24"±24"24"±40"±
08/2014
(Qmax = 5 cfs)
(Qmax = 5 cfs) DETAIL APPROVED FOR USE
08/2006
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY DETAIL
DETAIL
(min.)
CUT
FILL
CUT
shoulder
Subgrade
FILL
End of roadway ditch
A
A roadway ditch
F at end ofL
Existing ground
Slope variable
L at toe of fill
Original ground at toe of fill
Variable ground slope
Cut limits
Cut limits condition to fit field
F Waterway
End of roadway ditch shoulder
Subgrade
PLAN VIEW
ELEVATION
PLAN VIEW
ELEVATION
fill
Toe of
B original ground
Variable slope slope
Fill
Geotextile
SECTION B-B
of fill in line with toe
Flowline Approx.
Flowline of Waterway ditch end of roadway
Flowline at
Roadway ditch
Flowline
Fl ow lin e
Flowline
B
Original ground original ground
Variable slope
Geotextile
SECTION A-A
NOTE:
m in
2.
1.
Roadway ditch Flowline
1:
1:2
Variable length
V a ri a b le l e n g th
Va ria ble le ng th
Variable length
Class 2 (min.)
Placed riprap, TYPE 1 - NOT CONTIGUOUS TO FILL SLOPE
TYPE 2 - CONTIGUOUS TO FILL SLOPE
a s s h o w n i n t h e p la n s as shown in the plans as shown in the plans as sh own in th e p lan s to Subsection 714.01 (a).
Furnish geotextile materials conforming not be measured for payment.
Excavation for placement of riprap will
Class 2 (min.)
Placed riprap, d e n p w p p w ic s jo b s S
R G
P
E .d g n
P
M
NO.
STATE PROJECT
SHEET
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
BRIDGE DRAWING DATE DRAWING NO.
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
DESIGNED BY DRAWN BY CHECKED BY SCALE PROJECT TEAM LEADERNO. DATE BY REVISIONS NO. DATE BY REVISIONS
NV BLM 10 (1)NV
R. GIRARD J. ROHNER AUGUST 2015
S1
K. SCHNEIDER
RETURN ROAD CULVERT
RED ROCK NATIONAL CONSERVATION AREA
CLARK COUNTY, NEVADA
RG3070-A1" = 20'-0"
PLAN
SECTION
C
Flow
C
L Culvert =
Sta. 2105+35.00
Return Road
C
(Taken along L of culvert)C
(typ.)
(ty p.)
49.60' RT
DRAWING INDEX:
L
K
J
I
H
G
F
E
D
C
B
A
Drawing No.
A. PLANKIS
PLAN AND SECTION
REBAR LIST 3 OF 3
REBAR LIST 2 OF 3
REBAR LIST 1 OF 3
CABLE RAILING DETAILS
WINGWALL DETAILS 3 OF 3
WINGWALL DETAILS 2 OF 3
WINGWALL DETAILS 1 OF 3
CULVERT DETAILS 2 OF 2
CULVERT DETAILS 1 OF 2
CULVERT ELEVATIONS
GENERAL NOTES
PLAN AND SECTION
Drawing Title
E l.
.0
V P
T S ta
.7
E l.
.3
V P
C S ta
.0
PROFILE GRADE DIAGRAM
No Scale
135°
5°
29'-9" 29'-9"
W in g w a ll A
'-6
W in g w a ll
B
W in g w a ll D
'-6
W in g w a ll
C
Clearing Limits
Clearing Limits
Slope stake limits
Slope stake limits
HCL Return road
L 14'x8' Box culvert
& wingwall (typ.)
Concrete headwall
65.11' RT
Sta 2105+60.90, 46.47' RT
Sta 2105+46.14, 46.47' RT
21.04' LT
41.04' LT
41.04' LT
Sta 2105+79.55, Sta 2105+95.06, Sta 2105+23.86, Sta 2104+68.86, Sta 2104+68.86, -2.141%
Existing ground
Elev. 3800.40
Top of Headwall
Elev. 3789.57
Inlet Invert
Cable railing (typ.) L & PGL Return road
Elev. 3789.29
Outlet Invert Proposed grade
Elev. 3799.94
Top of Headwall
59'-6" ty p d e n p w p p w ic s jo b s S
R G
G e n N o te s .d g n
P
M
NO.
STATE PROJECT
SHEET
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
BRIDGE DRAWING DATE DRAWING NO.
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
DESIGNED BY DRAWN BY CHECKED BY SCALE PROJECT TEAM LEADERNO. DATE BY REVISIONS NO. DATE BY REVISIONS
NV BLM 10 (1)NV
R. GIRARD J. ROHNER AUGUST 2015
GENERAL NOTES:
S2
CLARK COUNTY, NEVADA
GENERAL NOTES
RG3070-BNO SCALE
a DS
D1
1 V
S
SPGA
ESTIMATE NOTES:
* Quantities do not include over-excavation and replacement backfill
Pay limits of roadway embankment *
Pay limits of structural backfill
Pay limits of structure excavation
LEGEND
EXCAVATION NOTES:
ground line
Existing ground line
Existing ground line
Existing ground line
Existing ground line
Existing ground line
Existing
(typ.)
1'-6"
(typ.)
1'-6"
(typ.)
1'-6" (typ.)
1'-6"
3'-0"
3'-0"
CULVERT WINGWALL
CULVERT END SECTION
CULVERT WINGWALL
CULVERT END SECTION
STRUCTURAL BACKFILL
Not to Scale
Not to Scale minimum friction angle of 36°.
a distance 1H of wall shall have a
* Roadway embankment placed within excavation (typ.)
Neat line
(typ.)
1'-6"
3'-0" ground line Proposed
(typ.)
1'-6"
Over-excavation and replacement backfill limits not shown.3.
separately, but included in the cost of structure excavation and structural backfill pay items.
laterally a distance equal to the depth of over-excavation. Payment for over-excavation and replacement backfill not paid for a depth of 6" below bottom of slab, and replacement with structural backfill. The removal and recompaction should extend
Cemented soil layers may be located beneath part of the proposed bottom slab. The subgrade soils require over-excavation to 2.
Payment for roadway embankment not included with bridge. See Roadway sheets for payment specifics.1.
ae oe v
STRUCTURE EXCAVATION
ground line Proposed
See drainage sheets for rip rap quantity and payment specifics.(6)
Includes cost of cable railing materials and installation.(5)
Includes cost of staining and applying anti-graffiti coating to culvert ends and wingwall limits as defined in the plans.(4)
Includes cost of over-excavation and replacement backfill.(3)
Includes cost of furnishing and installing wall drainage system, weepholes, and all joint fillers.(2)
Contract Quantity(1)
A. PLANKIS
Anti-graffiti coating shall be Sherwin Williams Pro Industrial (code #B97C00150) or approved equal.
Anti-Graffiti Treatment:
SCR's for additional information.
Stain color shall be Vistapaint 8430 "Rock of Ages". Stain exposed surfaces of culvert ends and wingwalls as shown in plans. See Section 563 of the
Stain:
capacity = 22,000 psf and the factored service bearing capacity = 4,000 psf.
bearing capacity = 19,500 psf and the factored service bearing capacity = 4,000 psf. For wingwalls B and C, the factored strength bearing
Earth:
Backfill underneath bottom slab shall meet the requirements for Structural Backfill as specified in Section 208.09(d).
Backfill behind culvert walls and wingwalls shall meet the requirements for Structural Backfill as specified in Section 208.10 and 704.04.
Structure Backfill:
unless shown otherwise on the plans. Bar splices other than those shown on the plans shall not be paid for.
All reinforcing steel shall conform to AASHTO M31 or M322, Grade 60 deformed. The minimum concrete cover to the face of any bar shall be 2", Reinforcing Steel:
requirements of AASHTO M213.
", unless noted otherwise on the plans. Preformed expansion joint filler shall meet the 4 3 be used. Chamfer exposed edges of all concrete
All cast-in-place concrete shall be structural Class A(AE) with a minimum 28 day compressive strength f'c = 4,000 psi. Type II low alkali cement shall
Concrete:
MATERIALS:
with earthquake effect, k = 0.43. Seismic vertical acceleration coefficient, k = 0.
S = 0.190g. Site Class = C. Seismic Zone = 2. Active earth pressure coefficient with earthquake effect, k = 0.27. At-rest earth pressure coefficient
Long period acceleration at 1.0 seconds (S = 0.113g) modified by the Site Coefficient (F = 1.69) to give the long period spectrum acceleration, acceleration at 0.2 seconds (S = 0.292g) modified by the Site Coefficient (F = 1.20) to give the short period spectrum acceleration, S = 0.35g.
Peak Ground Acceleration (PGA = 0.123g), modified by the Site Coefficient (F = 1.20) to give a spectrum acceleration, A = 0.147g. Short period
Seismic:
HL-93.
Live Load:
Vertical earth: unit weight of soil = 125 pcf.
Lateral Earth Pressure: equivalent fluid unit weight of soil, 0.033 kcf (active), 0.055 kcf (at-rest), and 0.800 kcf (passive)
HMA: 144 lbs per cubic foot
Concrete: 150 lbs. per cubic foot
Dead Loads:
DESIGN LOADS:
Federal Highway Administration Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14, U.S. customary units.
Construction:
AASHTO LRFD Bridge Design Specifications, 7th Edition, 2014.
Design:
SPECIFICATIONS:
c.p.p. = corrugated plastic pipe e.f. = each face i.f. = inside face b.f. = back face o.f. = outside face f.f. = front face
Abbreviations:
d e n p w p p w ic s jo b s S
R G
E le v .d g n
P
M
NO.
STATE PROJECT
SHEET
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
BRIDGE DRAWING DATE DRAWING NO.
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
DESIGNED BY DRAWN BY CHECKED BY SCALE PROJECT TEAM LEADERNO. DATE BY REVISIONS NO. DATE BY REVISIONS
S3
CLARK COUNTY, NEVADA
RG3070-C
INLET ELEVATION
OUTLET ELEVATION
CULVERT ELEVATIONS
joint filler (typ.)
1/2" Pre-molded
Invert El. 3789.57
El. 3795.02 Top of wingwall
El. 3801.26 Top of wingwall
El. 3787.57 (typ.)
Top of footing joint filler (typ.)
1/2" Pre-molded
Invert El. 3789.29
El. 3795.04 Top of wingwall
El. 3798.84 Top of wingwall
El. 3787.29 (typ.)
Top of footing
L Box culvertC
L Box culvertC
Existing ground
Existing ground
Proposed grade
Proposed grade
Proposed grade
Proposed grade
3 OF 12" = 1'-0"8
Wingwall D Wingwall C
Wingwall A Wingwall B
Box culvert
Box culvert
A. PLANKIS
El. 3800.40 Top of head wall
El. 3799.94 Top of head wall d e n p w p p w ic s jo b s S
R G
R e in f .d g n
P
M
NO.
STATE PROJECT
SHEET
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
BRIDGE DRAWING DATE DRAWING NO.
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
DESIGNED BY DRAWN BY CHECKED BY SCALE PROJECT TEAM LEADERNO. DATE BY REVISIONS NO. DATE BY REVISIONS
S4
CLARK COUNTY, NEVADA
RG3070-D
TOP SLAB PLAN BOTTOM SLAB PLAN
B
B
A A
C
L Box culvertC
C
L Box culvertC
CULVERT DETAILS 1 OF 2
Notes:
4 OF 12" = 1'-0"4
Each side 3 - #8C14
Each side 3 - #4C13
Each side 3 - #4C6
F a n n e d
C o .f
C i.
f.
C
B o tt o m c u t)
C
T o p c u t)
#8C19
C o
C i.
f.
C B o tt o m
C T o p
F a n n e d
C o
C i.
f.
C o
C i.
f.
C B o tt o m
C T o p
17 - #4C1 Bottom
17 - #4C1 Top
C
32 - #4C2 Bottom
17 - #4C1 Top
S tirru p s
C
C
C
Headwall Toewall
Top & bottom
#8C19
C
T o p c u t)
C
B o tt o m c u t)
A. PLANKIS
(See note 3)
(See note 3)
See sheet S5 for Section A-A and Section B-B details.3.
Raise C10 bars when needed to avoid contact with C12 bars.2.
Lower C10 bars when needed to avoid contact with C11 bars.1.
Each side 3 - #8C23 d e n p w p p w ic s jo b s S
R G
R e in f .d g n
P
M
NO.
STATE PROJECT
SHEET
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
BRIDGE DRAWING DATE DRAWING NO.
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
DESIGNED BY DRAWN BY CHECKED BY SCALE PROJECT TEAM LEADERNO. DATE BY REVISIONS NO. DATE BY REVISIONS
S5
CLARK COUNTY, NEVADA
RG3070-EAS NOTED
SECTION C-C
SECTION A-A
C
C
CULVERT DETAILS 2 OF 2
L im it s
O v e r e x c a v a ti o n
3 - #8C19
3 - #8C19
3 - #4C13
3 - #4C6
3 - #8C19
3 - #8C14
2 - #4C15
#4C20
SECTION B-B
" = 1'-0"8 3Scale:
O u tl e t
C lr
C lr
C lr
C lr
1'-0"
3 - #8C19
#5C16 @ 1'-6" (b.f.)
#5C18 @ 1'-6"
#5C17 @ 1'-6" (f.f.)
Optional const. joint
3 - #8C19
2 - #4C15
3 - #8C19
2 - #4C20
#4C21 @ 1'-0"
8"
#4C4 @ 6"*
#6C3 @ 6"*
#4C5 @ 6"
#4C6 @ 6"
#6C3 @ 6"*
#4C4 @ 6"*
#5C7 @ 6"*
#5C8 @ 6"*
C e .f
17 - #4C1 @ 1'-0" Bottom
17 - #4C1 @ 1'-0" Top
32 - #4C2 @ 6" Bottom
17 - #4C1 @ 1'-0" Top
23 - #4C21 @ 1'-0"
10"
10"14'-0"
16 - #4C16, #5C17 & #5C18 @ 1'-6" n le t
I n le t
O u tl e t
I n le t
15'-8"
1 Limits of staining headwall reinforcing Top slab
Cable railing reinforcing Bottom slab
A. PLANKIS
"8 11'-2
"8 11'-2"8
519'-9
"8 722'-1
(See sheet S4 for section location)
" = 1'-0"4 1Scale:
See sheet S4.
in skewed end areas.
*Bar marks are different
(See sheet S4 for section location)
3 - #8C23 d e n p w p p w ic s jo b s S
R G
W in g w a ll .d g n
P
M
NO.
STATE PROJECT
SHEET
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
BRIDGE DRAWING DATE DRAWING NO.
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
DESIGNED BY DRAWN BY CHECKED BY SCALE PROJECT TEAM LEADERNO. DATE BY REVISIONS NO. DATE BY REVISIONS
S6
CLARK COUNTY, NEVADA
RG3070-F
#4W1 (e.f.)
2.00% not shown for clarity Footing reinforcement
Finished grade
A
A grade Existing
Keyway
2'-0"
#4W2
#4W1 (2 tot.)
#4W6 f.f.
1'-0" finished grade Proposed
#6W9
#4W3
4'-6"
#6W8 b.f.
#6W7
#4W4
#4W5
7'-6"
SECTION A-A
Box culvert
WINGWALL DETAILS 1 OF 3
Stem as constructed
PARTIAL PLAN
PARTIAL ELEVATION
WALL OFFSETS
" = 1'-0"4
Wingwalls A & D
Wingwalls A & D
6 OF 10" = 1'-0"4
#6W7 Alternate with #6W8 @ 9" (b.f.)
T o p B o tt o m
W
Clr.
3"
Box culvert
(Wingwall)
14'-6"
(Alternate with #6W7)
10 - #6W8 @ 1'-6" (b.f.)
V a r ie s e .f
W
W e .f
V a r ie s
C lr
6"
#4W1, #4W2, or #4W3 (e.f.)
10 - #4W6 @ 1'-6" (f.f.)
& #7W9 (Top) #4W5 (Bottom)
#6W10
#4W11
(Alternate with #6W8)
9 - #6W7 @ 1'-6" (b.f.)
10 - #4W6 @ 1'-6" (f.f.)
6"
& #4W11 (f.f.)
#6W10 (b.f.)
(slope 2%)
(varies) Finished grade
Perforated C.P.P.
geotextile filter fabric Drainable fill with
N.T.S.
(Applies to all wingwalls)
2'-0"
LIMITS OF STAINING
(Applies to all wingwalls)
A. PLANKIS
10 - #4W5 @ 1'-6" (Bottom)
19 - #6W9 @ 9" (Top) joint filler 1/2" Pre-molded
Shall be 1% of wall height
Offset before backfilling
Line Layout Wall
Cable Railing joint filler 1/2" Pre-molded d e n p w p p w ic s jo b s S
R G
W in g w a ll .d g n
P
M
NO.
STATE PROJECT
SHEET
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
BRIDGE DRAWING DATE DRAWING NO.
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
DESIGNED BY DRAWN BY CHECKED BY SCALE PROJECT TEAM LEADERNO. DATE BY REVISIONS NO. DATE BY REVISIONS
S7
RG3070-G
Keyway
2'-0"
#4W1 (1 tot.)
#4W6 f.f.
1'-0" finished grade Proposed
#7W9
#4W3
6'-0"
#7W8 b.f.
#7W7
#4W4
#4W5
9'-0"
SECTION A-A
culvert Box
A
A not shown for clarity Footing reinforcement grade Existing
2.00%
Finished grade
WINGWALL DETAILS 2 OF 3
PARTIAL PLAN
" = 1'-0"4
Wingwall C
PARTIAL ELEVATION
1Scale:
Wingwall C
7 OF 10" = 1'-0"4
6"
1'-0"
V a r ie s
C lr
19 - #4W6 @ 1'-6" (f.f.)
Clr.
3"
Box culvert
19 - #4W6 @ 1'-6" (f.f.)
(Wingwall)
28'-0"
V a r ie s
#4W11
19 - #4W5 @ 1'-6" (Bottom)
37 - #7W9 @ 9" (Top)
#7W7 Alternate with #7W8 @ 9" (b.f.)
#4W1 or #4W3
#4W14 or #4W15
T o p B o tt o m
W
W
B o tt o m
T o p
T o p
#4W14 (1 tot.)
#4W15
#4W16
#4W11 (f.f.)
#7W10 (b.f.)
#4W1 or #4W14
W b .f
W f.
f.
(Alternate with #7W7)
19 - #7W8 @ 1'-6" (b.f.)
(Alternate with #7W8)
18 - #7W7 @ 1'-6" (b.f.)
6"
#4W17 @ 1'-6" geotextile filter fabric Drainable fill with
Perforated C.P.P.
(slope 2%)
(varies) Finished grade
2'-0"
A. PLANKIS
joint filler
" Pre-molded 2
#4W5 (Bottom) #7W9 (Top)
#4W13 (Bottom) #7W12 (Top)
2-#7W10 joint filler
" Pre-molded 2
@ 1'-6" #4W17
Cable railing d e n p w p p w ic s jo b s S
R G
W in g w a ll .d g n
P
M
NO.
STATE PROJECT
SHEET
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
BRIDGE DRAWING DATE DRAWING NO.
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
DESIGNED BY DRAWN BY CHECKED BY SCALE PROJECT TEAM LEADERNO. DATE BY REVISIONS NO. DATE BY REVISIONS
S8
CLARK COUNTY, NEVADA
RG3070-H
SECTION A-A
WINGWALL DETAILS 3 OF 3
A
Finished grade
A not shown for clarity Footing reinforcement
2.00% grade Existing
PARTIAL PLAN
" = 1'-0"4
Wingwall B
PARTIAL ELEVATION
1Scale:
Wingwall B
" = 1'-0"4
1 8 OF 10
Box culvert
19 - #4W6 @ 1'-6" (f.f.)
(Wingwall)
28'-0"
Clr.
3" culvert Box
6"
1'-0"
19 - #4W6 @ 1'-6" (f.f.)
#4W11
19 - #4W5 @ 1'-6" (Bottom)
37 - #7W9 @ 9" (Top)
#7W7 Alternate with #7W8 @ 9" (b.f.)
#4W1 or #4W3
#4W14 or #4W15
W
B o tt o m
T o p
T o p
#4W17 @ 1'-6"
#4W1 or #4W14
#4W11 (f.f.)
#7W10 (b.f.)
6"
(Alternate with #7W7)
19 - #7W8 @ 1'-6" (b.f.)
(Alternate with #7W8)
18 - #7W7 @ 1'-6" (b.f.)
V a r ie s
W b .f
W f.
f.
T o p B o tt o m
W
Keyway
2'-0"
#4W1 (1 tot.)
#4W6 f.f.
1'-0" finished grade Proposed
#7W9
#4W3
6'-0"
#7W8 b.f.
#7W7
#4W4
#4W5
9'-0"
V a r ie s
C lr
#4W14 (1 tot.)
#4W15
#4W16 geotextile filter fabric Drainable fill with
Perforated C.P.P.
(slope 2%)
(varies) Finished grade
2'-0" joint filler
" Pre-molded 2 joint filler
" Pre-molded 2
A. PLANKIS
#4W13 (Bottom) #7W12 (Top)
#4W5 (Bottom) #7W9 (Top)
2-#7W10
@ 1'-6" #4W17
Cable railing d e n p w p p w ic s jo b s S
R G
R a il in g .d g n
P
M
NO.
STATE PROJECT
SHEET
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
BRIDGE DRAWING DATE DRAWING NO.
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
DESIGNED BY DRAWN BY CHECKED BY SCALE PROJECT TEAM LEADERNO. DATE BY REVISIONS NO. DATE BY REVISIONS
S9
CLARK COUNTY, NEVADA
RG3070-INO SCALE
NOTES:
8"
A
A
1000' Max.200'-0"±
SECTION A-A POST POCKET
ALTERNATIVE DEAD END ANCHORAGE
ELEVATION
ALTERNATIVE CABLE CONNECTION
Crimped sleeve clamp end of turnbuckle Eye bolt or eye
2 - #4
#4 11"
Mortar
5" 4"x5"x9" or sleeve clamp
Crimped stop
Washer
Pipe NPS 2" std. post
Typ. Intermediate Span
10'-0" Max.
Typ. Intermediate Span
10'-0" Max.
Typ. End Span
4'-0"
Peen ends of bolts (typ.)
" adjustment (typ.)2 clamps per end
12 - turnbuckles
Intermediate
Drilled holes
" std.4
Pipe NPS
Top of wall
Metal clamp
2" std.
Pipe NPS driven fit (typ.)
Post cap to be a
Typ. End Span
4'-0" slope
Toe of
" std. (typ.)4
Place NPS
A. PLANKIS
CABLE RAILING DETAILS
Provide thimbles at all cable loops.11.
at changes in line where the angle of deflection is 15° or more.
Typical end spans, braced in both directions, shall be constructed 10.
Post pockets to be centered in top of walls.9.
both directions at intervals not to exceed 1000'.
Line posts shall be braced horizontally and trussed diagonally in 8.
before ordering or fabricating any material.
The Contractor shall verify all dependent dimensions in the field 7.
of walls.
Alignment of holes in posts may vary to conform to slope of top 6.
Posts to be vertical.5.
end posts.
Cable shall not be spliced between intermediate turnbuckles and 4.
Intermediate turnbuckles to be placed in adjacent spans.3.
Maximum distance between turnbuckles shall be 200'-0"±.2.
Department of Transportation Standard Detail B11-47.
This cable railing originated from the State of California1.
d e n p w p p w ic s jo b s S
R G
R e b a r .d g n
P
M
NO.
STATE PROJECT
SHEET
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
BRIDGE DRAWING DATE DRAWING NO.
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
DESIGNED BY DRAWN BY CHECKED BY SCALE PROJECT TEAM LEADERNO. DATE BY REVISIONS NO. DATE BY REVISIONS
B
STR
NOTES:
ABBREVIATIONS:
B
C
D
OPTIONAL LEG
TYPE 17
REINFORCING STEEL SCHEDULE DIMENSION TABLE
BAR MK SIZE TYPE PIN SZ LOCATION QTY LENGTH WEIGHT A B C D E F G H J K O R
BOX CULVERT
V or N
WINGWALL A
911 LBSSUBTOTAL
WINGWALL B
NONE 10 OF 12 RG3070-J
S10
9"
19775 LBSSUBTOTAL
#4W11
#6W10
#6W9
#6W8
#6W7
#4W6
#4W5
#4W4
#4W3
#4W2
#4W1
STR
STR
STR
STR
STR
STR
STR
STR
4•"
4•"
4•" of 9
1 set of 10
1 set of 3 sets
1'-3"
2'-8"
1'-3"
8'-8"
27'-6"
27'-6"
27'-6"
Dimensions in bending diagrams are out-to-out of bars.
REBAR LIST 1 OF 3
Vert. f.f.
Vert. b.f. tall
Trans. foot. top
Vert. b.f. short
Vert. b.f. tall
Vert. f.f.
Trans. foot. bot.
Longit. foot.
Horiz. stem
Horiz. stem
Horiz. top
13'-6ƒ"
14'-9ƒ"
7'-2"
7'-8" incr.
@ 6ƒ" to 14'-5"
9'-11" incr.
@ 6ƒ" to 13'-5"
8'-4‚"
7'-2"
14'-0"
14'-0" incr.
@ 4'-•"
12'-3•" to
4'-2•"
14'-11‚"
13'-6ƒ"
13'-6ƒ"
7'-2"
5'-0" incr.
@ 6ƒ"
13'-2"
8'-8" to incr.
@ 6ƒ" to 13'-5"
8'-4‚"
7'-2"
14'-0"
14'-0" incr.
" 2 -1@ 4'
12'-3•" to
4'-2•"
14'-11‚"
A. PLANKIS
2"
2†"
2†"
2†"
6"
3"
3‡"
3‡"
3‡"
3‡"
3"
3" i.f. = inside face o.f. = outside face b.f. = back face f.f. = front face
#4C23
#4C22
#4C21
#4C20
#8C19
#5C18
#5C17
#5C16
#4C15
#8C14
#4C13
#5C12
#5C11
#4C10
#6C9
#5C8
#5C7
#4C6
#4C5
#4C4
#6C3
#4C2
#4C1
STR
STR
STR
STR
STR
STR
STR
STR
STR
STR
Vert. wall o.f. bot.
Longit. wall
Vert. toe
Longit. toe
Longit. toe & HW
HW top
HW f.f.
HW b.f.
Longit. HW
Vert. wall o.f. end
Vert. wall i.f. end
Vert. wall o.f. bot.
Vert. wall o.f. top bot. skew
Trans. top & bot. skew
Trans. top &
Vert. wall o.f. bot.
Vert. wall o.f. top
Vert. wall i.f. bot.
Vert. wall i.f. top
Trans. top & bot.
Trans. top & bot.
Longit. top
Longit. top & bot.
of 29
4 sets of 29
4 sets
9'-10"
59'-0"
3'-3"
21'-8"
21'-8"
2'-2"
5'-4"
4'-4"
21'-8"
16'-3"
11'-0"
7'-5"
13'-5"
6" incr.
1'-1" @
15'-1" to
6" incr.
1'-1" @
15'-1" to
7'-5"
13'-7"
4'-0"
9'-8"
15'-2"
15'-2"
59'-0"
59'-0"
5'-7"
59'-0"
2'-7"
21'-8"
21'-8"
9"
2'-4"
2'-4"
21'-8"
10'-4"
10'-4"
3'-4"
9'-0"
6" incr.
1'-1" @
15'-1" to
6" incr.
1'-1" @
15'-1" to
3'-4"
9'-0"
3'-4"
9'-0"
15'-2"
15'-2"
59'-0"
59'-0"
4'-3"
8"
8"
3'-0"
2'-0"
5'-11"
8"
4'-1"
4'-5"
4'-1"
4'-7"
8"
8"
#4W4
#4W3
#4W1
STR
STR
STR
Longit. foot. toe
Horiz. stem f.f.
Horiz. top f.f.
27'-6"
27'-6"
27'-6" d e n p w p p w ic s jo b s S
R G
R e b a r .d g n
P
M
NO.
STATE PROJECT
SHEET
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
BRIDGE DRAWING DATE DRAWING NO.
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
DESIGNED BY DRAWN BY CHECKED BY SCALE PROJECT TEAM LEADERNO. DATE BY REVISIONS NO. DATE BY REVISIONS
STR
NOTES:
ABBREVIATIONS:
B
C
D
OPTIONAL LEG
TYPE 17TYPE 54
E
F
D C
WINGWALL C
2516 LBSSUBTOTAL
WINGWALL D
NONE 11 OF 12 RG3070-K
S11
Dimensions in bending diagrams are out-to-out of bars.
(CONTINUED)WINGWALL B
8"
1'-5"
2'-8"
1'-5"
8" 8"
REBAR LIST 2 OF 3
2611 LBSSUBTOTAL
#4W17
#4W16
#4W15
#4W14
#4W13
#7W12
#4W11
#7W10
#7W9
#7W8
#7W7
#4W6
#4W5
#4W4
#4W3
#4W1
STR
STR
STR
STR
STR
STR
STR
STR
STR
STR
STR
STR
2"
5‚"
5‚"
5‚"
2"
5‚"
5‚"
5‚" of 18
1 set of 19
1 set
Stem stirrup
Long. foot. heel
Horiz. stem b.f.
Horiz. top b.f.
Trans. foot. bot.
Trans. foot. top
Vert. f.f.
Vert. b.f. tall
Trans. foot. top
Vert. b.f. short
Vert. b.f. tall
Vert. f.f.
Trans. foot. bot.
Longit. foot. toe
Horiz. stem f.f.
Horiz. top f.f.
2'-3‚"
28'-6"
28'-4"
28'-4"
5'-11"
5'…
This is the start of the file's text. The full file is on GovTribe.