T A B U L A T I O N O F B I D S
Schedule A Total of Bid Items: 7,076,027.95$ -9.1% 6,434,000.00$ 18.7% 8,400,000.00$ 14.8% 8,123,604.00$ Project No: NV NV BLM 10(1)
Project Name: Scenic Loop Drive and Calico 1
CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
15101-0000
Line A0020 ALL LPSM 531,951.40$ 531,951.40$ 308,611.10$ 524,976.00$ 760,000.00$
15210-3000
Line A0040 12.460 MILE 2,500.00$ 31,150.00$ 37,380.00$ 12,460.00$ 40,993.40$
15214-2000
Line A0060 ALL LPSM 3,000.00$ 3,000.00$ 2,650.00$ 4,000.00$ 2,940.00$
15215-3000
Line A0080 7 EACH 525.00$ 3,675.00$ 3,500.00$ 14,000.00$ 3,703.00$
15215-7000
Line A0100 1 EACH 5,000.00$ 5,000.00$ 12,600.00$ 6,000.00$ 14,100.00$
15216-2000
Line A0120 0.560 MILE 4,000.00$ 2,240.00$ 5,320.00$ 2,800.00$ 5,936.00$
15301-0000
Line A0140 ALL LPSM 180,000.00$ 180,000.00$ 188,000.00$ 250,000.00$ 243,900.00$
15401-0000
Line A0160 ALL LPSM 90,000.00$ 90,000.00$ 442,000.00$ 200,000.00$ 156,500.00$
15501-0000
Line A0180 ALL LPSM 60,000.00$ 60,000.00$ 1.00$ 50,000.00$ 104,600.00$
15705-1400
Line A0200 2,450 LNFT 6.00$ 14,700.00$ 12,250.00$ 61,250.00$ 10,535.00$
15706-0200
Line A0220 5 EACH 700.00$ 3,500.00$ 325.00$ 5,000.00$ 1,965.00$
15706-1000
Line A0240 20 EACH 135.00$ 2,700.00$ 2,200.00$ 4,000.00$ 6,740.00$
15706-1600
Line A0260 5 EACH 2,250.00$ 11,250.00$ 26,500.00$ 10,000.00$ 21,750.00$
20101-0000
Line A0280 3.2 ACRE 4,000.00$ 12,800.00$ 41,600.00$ 22,400.00$ 25,280.00$
20301-0700
Line A0300 352 EACH 15.00$ 5,280.00$ 5,632.00$ 3,520.00$ 5,808.00$
20301-1900
Line A0320 4 EACH 1,000.00$ 4,000.00$ 6,400.00$ 20,000.00$ 5,720.00$
20301-2400
Line A0340 163 EACH 60.00$ 9,780.00$ 6,031.00$ 16,300.00$ 5,379.00$
20301-3400
Line A0360 20 EACH 40.00$ 800.00$ 580.00$ 400.00$ 680.00$
20302-0500
Line A0380 1,700 LNFT 11.00$ 18,700.00$ 5,100.00$ 11,900.00$ 10,880.00$
20302-0700
Line A0400 160 LNFT 5.00$ 800.00$ 4,800.00$ 800.00$ 1,920.00$
Engineer's Estimate
30.00$ 5.00$ 12.00$
3.00$ 7.00$ 6.40$
29.00$ 20.00$ 34.00$
37.00$ 100.00$ 33.00$
1,600.00$ 5,000.00$ 1,430.00$
16.00$ 10.00$ 16.50$
13,000.00$ 7,000.00$ 7,900.00$
5,300.00$ 2,000.00$ 4,350.00$
110.00$ 200.00$ 337.00$
65.00$ 1,000.00$ 393.00$
5.00$ 25.00$ 4.30$
1.00$ 50,000.00$ 104,600.00$
442,000.00$ 200,000.00$ 156,500.00$
188,000.00$ 250,000.00$ 243,900.00$
9,500.00$ 5,000.00$ 10,600.00$
12,600.00$ 6,000.00$ 14,100.00$
1,000.00$ 3,290.00$
2,650.00$ 4,000.00$ 2,940.00$
Las Vegas Paving Corporation Road and Highway Builders, LLC. ACC Southwest
3,000.00$
308,611.10$ 524,976.00$ 760,000.00$
MOBILIZATION
CENTERLINE, VERIFICATION AND STAKING
SURVEY AND STAKING, RETAINING WALL
REMOVAL OF PIPE CULVERT
REMOVAL OF SIGN
REMOVAL OF WHEELSTOP
CONTRACTOR QUALITY CONTROL
CONTRACTOR TESTING
CONSTRUCTION SCHEDULE
SOIL EROSION CONTROL, FIBER ROLL
SOIL EROSION CONTROL, CHECK DAM
SOIL EROSION CONTROL, INLET PROTECTION
REMOVAL OF CURB, CONCRETE
REMOVAL OF FENCE
SURVEY AND STAKING, PARKING AREA
SURVEY AND STAKING, GRADE FINISHING STAKES
SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT
CLEARING AND GRUBBING
REMOVAL OF DELINEATOR
SURVEY AND STAKING, DRAINAGE STRUCTURE
500.00$ 2,000.00$ 529.00$
9/9/2016 Page 1 of 4
Schedule A Total of Bid Items: 7,076,027.95$ -9.1% 6,434,000.00$ 18.7% 8,400,000.00$ 14.8% 8,123,604.00$ Project No: NV NV BLM 10(1)
Project Name: Scenic Loop Drive and Calico 1
CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
Engineer's Estimate Las Vegas Paving Corporation Road and Highway Builders, LLC. ACC Southwest
20303-1400
Line A0420 15 SQYD 10.00$ 150.00$ 450.00$ 750.00$ 1,320.00$
20303-3200
Line A0440 270 SQYD 20.00$ 5,400.00$ 1,620.00$ 5,400.00$ 9,990.00$
20420-0000
Line A0460 8,500 CUYD 15.00$ 127,500.00$ 221,000.00$ 212,500.00$ 191,250.00$
25101-2200
Line A0480 200 CUYD 170.00$ 34,000.00$ 15,400.00$ 24,000.00$ 21,800.00$
25101-2300
Line A0500 1,050 CUYD 180.00$ 189,000.00$ 94,500.00$ 94,500.00$ 128,100.00$
25120-2200
Line A0520 50 LNFT 60.00$ 3,000.00$ 8,000.00$ 40,000.00$ 3,600.00$
25125-0000
Line A0540 600 EACH 200.00$ 120,000.00$ 69,000.00$ 18,000.00$ 77,400.00$
25801-0300
Line A0560 647 SQFT (CQ) 125.00$ 80,875.00$ 66,964.50$ 64,700.00$ 83,463.00$
25801-0400
Line A0580 415 SQFT (CQ) 140.00$ 58,100.00$ 40,670.00$ 41,500.00$ 56,025.00$
25801-0500
Line A0600 1,870 SQFT (CQ) 155.00$ 289,850.00$ 175,780.00$ 187,000.00$ 209,440.00$
25801-0600
Line A0620 968 SQFT (CQ) 170.00$ 164,560.00$ 97,768.00$ 96,800.00$ 119,064.00$
30202-2000
Line A0640 1,500 TON 30.00$ 45,000.00$ 55,500.00$ 60,000.00$ 58,500.00$
30402-1000
Line A0660 190,700 SQYD 4.00$ 762,800.00$ 724,660.00$ 190,700.00$ 1,296,760.00$
40201-2600
Line A0680 33,198 TON 90.00$ 2,987,820.00$ 2,373,657.00$ 4,813,710.00$ 3,037,617.00$
40205-3000
Line A0700 500 TON 250.00$ 125,000.00$ 5.00$ 50,000.00$ 59,500.00$
40601-0000
Line A0720 90 TON 425.00$ 38,250.00$ 54,000.00$ 13,500.00$ 64,170.00$
40702-0100
Line A0740 70 SQYD 3.00$ 210.00$ 3,150.00$ 4,200.00$ 3,780.00$
41102-1000
Line A0760 198,000 SQYD 0.75$ 148,500.00$ 53,460.00$ 99,000.00$ 63,360.00$
41105-0000
Line A0780 1,500 TON 55.00$ 82,500.00$ 15.00$ 10,500.00$ 27,000.00$
41201-0000
Line A0800 90 TON 425.00$ 38,250.00$ 54,000.00$ 13,500.00$ 64,170.00$ 600.00$ 150.00$ 713.00$
0.01$ 7.00$ 18.00$
0.27$ 0.50$ 0.32$
45.00$ 60.00$ 54.00$
600.00$ 150.00$ 713.00$
0.01$ 100.00$ 119.00$
71.50$ 145.00$ 91.50$
3.80$ 1.00$ 6.80$
37.00$ 40.00$ 39.00$
101.00$ 100.00$ 123.00$
94.00$ 100.00$ 112.00$
98.00$ 100.00$ 135.00$
103.50$ 100.00$ 129.00$
115.00$ 30.00$ 129.00$
160.00$ 800.00$ 72.00$
90.00$ 90.00$ 122.00$
77.00$ 120.00$ 109.00$
26.00$ 25.00$ 22.50$
6.00$ 20.00$ 37.00$
30.00$ 50.00$ 88.00$
PLACED RIPRAP, METHOD B, CLASS 3
RIPRAP DITCH, METHOD B, CLASS 2
BOULDER
REINFORCED CONCRETE RETAINING WALL, 8 FEET
REINFORCED CONCRETE RETAINING WALL, 10 FEET
REMOVAL OF PAVED WATERWAY, CONCRETE
REMOVAL OF SIDEWALK, CONCRETE
EMBANKMENT CONSTRUCTION
PLACED RIPRAP, METHOD B, CLASS 2
REINFORCED CONCRETE RETAINING WALL, 12 FEET
CHIP SEAL, TYPE 1A
PRIME COAT, METHOD 1
BLOTTER
TACK COAT
REINFORCED CONCRETE RETAINING WALL, 14 FEET
ROADWAY AGGREGATE, METHOD 2
FULL DEPTH RECLAMATION, METHOD 1
ASPHALT CONCRETE PAVEMENT, HVEEM MIX, CLASS B
ANTISTRIP ADDITIVE, TYPE 3
FOG SEAL
9/9/2016 Page 2 of 4
Schedule A Total of Bid Items: 7,076,027.95$ -9.1% 6,434,000.00$ 18.7% 8,400,000.00$ 14.8% 8,123,604.00$ Project No: NV NV BLM 10(1)
Project Name: Scenic Loop Drive and Calico 1
CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
Engineer's Estimate Las Vegas Paving Corporation Road and Highway Builders, LLC. ACC Southwest
56302-1000
Line A0820 19,800 SQFT 2.00$ 39,600.00$ 69,300.00$ 79,200.00$ 65,340.00$
60201-0600
Line A0840 200 LNFT 115.00$ 23,000.00$ 35,000.00$ 50,000.00$ 21,000.00$
60201-0900
Line A0860 50 LNFT 120.00$ 6,000.00$ 16,250.00$ 17,500.00$ 6,450.00$
60210-0600
Line A0880 1 EACH 450.00$ 450.00$ 315.00$ 3,000.00$ 1,000.00$
60210-0900
Line A0900 2 EACH 600.00$ 1,200.00$ 1,500.00$ 4,000.00$ 2,580.00$
60403-1200
Line A0920 1 EACH 5,000.00$ 5,000.00$ 7,125.00$ 5,000.00$ 7,470.00$
60403-1900
Line A0940 3 EACH 5,000.00$ 15,000.00$ 21,900.00$ 15,000.00$ 22,410.00$
60601-0000
Line A0960 5 EACH 2,500.00$ 12,500.00$ 40,000.00$ 35,000.00$ 29,400.00$
60901-0000
Line A0980 3,550 LNFT 30.00$ 106,500.00$ 68,337.50$ 28,400.00$ 145,550.00$
60901-2100
Line A1000 19,500 LNFT 10.00$ 195,000.00$ 73,125.00$ 78,000.00$ 87,750.00$
60915-1000
Line A1020 78 EACH 200.00$ 15,600.00$ 8,970.00$ 11,700.00$ 9,516.00$
61501-0100
Line A1040 800 SQYD 55.00$ 44,000.00$ 47,200.00$ 32,000.00$ 58,000.00$
61901-2400
Line A1060 200 LNFT 50.00$ 10,000.00$ 3,600.00$ 10,000.00$ 4,000.00$
61901-3300
Line A1080 3,200 LNFT 6.00$ 19,200.00$ 32,000.00$ 16,000.00$ 35,200.00$
62201-0200
Line A1100 80 HOUR 115.00$ 9,200.00$ 8,400.00$ 9,600.00$ 8,000.00$
62201-0900
Line A1120 80 HOUR 175.00$ 14,000.00$ 10,400.00$ 11,200.00$ 11,840.00$
62201-2850
Line A1140 80 HOUR 185.00$ 14,800.00$ 13,600.00$ 11,200.00$ 11,600.00$
62201-3000
Line A1160 80 HOUR 180.00$ 14,400.00$ 18,800.00$ 11,200.00$ 15,120.00$
62301-0000
Line A1180 160 HOUR 75.00$ 12,000.00$ 11,360.00$ 8,000.00$ 10,400.00$
62302-1000
Line A1200 160 HOUR 90.00$ 14,400.00$ 9,600.00$ 12,800.00$ 21,760.00$ 60.00$ 80.00$ 136.00$
71.00$ 50.00$ 65.00$
235.00$ 140.00$ 189.00$
170.00$ 140.00$ 145.00$
130.00$ 140.00$ 148.00$
105.00$ 120.00$ 100.00$
10.00$ 5.00$ 11.00$
18.00$ 50.00$ 20.00$
59.00$ 40.00$ 72.50$
115.00$ 150.00$ 122.00$
3.75$ 4.00$ 4.50$
19.25$ 8.00$ 41.00$
8,000.00$ 7,000.00$ 5,880.00$
7,300.00$ 5,000.00$ 7,470.00$
7,125.00$ 5,000.00$ 7,470.00$
750.00$ 2,000.00$ 1,290.00$
315.00$ 3,000.00$ 1,000.00$
325.00$ 350.00$ 129.00$
175.00$ 250.00$ 105.00$
3.50$ 4.00$ 3.30$
DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY
WHEEL LOADER, 2 CUBIC YARD MINIMUM RATED CAPACITY
MOTOR GRADER, 12 FOOT MINIMUM BLADE
HYDRAULIC EXCAVATOR
GENERAL LABOR
SPECIAL LABOR, HIRED TECHNICAL SERVICES
CURB, CONCRETE
CURB, ASPHALT, 4-INCH DEPTH
WHEELSTOP, CONCRETE
SIDEWALK, CONCRETE
FENCE, SPLIT RAIL, 2 RAIL
FENCE, TORTOISE BARRIER
30-INCH PIPE CULVERT
END SECTION FOR 18-INCH PIPE CULVERT
END SECTION FOR 30-INCH PIPE CULVERT
INLET, FLH TYPE 5A
INLET, FLH TYPE 6B
SPILLWAY ASSEMBLY
PAINTING, CONCRETE STRUCTURE
18-INCH PIPE CULVERT
9/9/2016 Page 3 of 4
Schedule A Total of Bid Items: 7,076,027.95$ -9.1% 6,434,000.00$ 18.7% 8,400,000.00$ 14.8% 8,123,604.00$ Project No: NV NV BLM 10(1)
Project Name: Scenic Loop Drive and Calico 1
CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
Engineer's Estimate Las Vegas Paving Corporation Road and Highway Builders, LLC. ACC Southwest
62302-1100
Line A1220 80 HOUR 175.00$ 14,000.00$ 18,000.00$ 8,000.00$ 11,760.00$
62405-0200
Line A1240 4,900 SQYD 3.50$ 17,150.00$ 11,515.00$ 39,200.00$ 4,900.00$
62510-1000
Line A1260 1.0 ACRE 1,000.00$ 1,000.00$ 1,632.00$ 8,000.00$ 1,830.00$
62515-1000
Line A1280 1.0 ACRE 1,000.00$ 1,000.00$ 3,181.00$ 8,000.00$ 3,570.00$
63301-1000
Line A1300 13 EACH 300.00$ 3,900.00$ 4,810.00$ 11,700.00$ 4,992.00$
63302-0000
Line A1320 776 SQFT 30.00$ 23,280.00$ 36,472.00$ 62,080.00$ 34,532.00$
63308-0000
Line A1340 113 EACH 110.00$ 12,430.00$ 5,311.00$ 13,560.00$ 5,593.50$
63309-0100
Line A1360 861 EACH 25.00$ 21,525.00$ 40,467.00$ 25,830.00$ 42,619.50$
63401-0700
Line A1380 17,633 LNFT 0.35$ 6,171.55$ 22,922.90$ 141,064.00$ 21,159.60$
63405-1300
Line A1400 4 EACH 250.00$ 1,000.00$ 212.00$ 2,000.00$ 420.00$
63405-1350
Line A1420 10 EACH 250.00$ 2,500.00$ 530.00$ 5,000.00$ 420.00$
63405-1400
Line A1440 1 EACH 250.00$ 250.00$ 105.00$ 500.00$ 42.00$
63405-1450
Line A1460 2 EACH 250.00$ 500.00$ 210.00$ 1,000.00$ 176.00$
63405-1650
Line A1480 6 EACH 250.00$ 1,500.00$ 630.00$ 3,000.00$ 339.00$
63501-0000
Line A1500 ALL LPSM 50,000.00$ 50,000.00$ 460,000.00$ 300,000.00$ 311,900.00$
64601-1000
Line A1520 1 EACH 30,000.00$ 30,000.00$ 30,000.00$ 20,000.00$ 45,800.00$
64604-3000
Line A1540 372 LNFT (CQ) 40.00$ 14,880.00$ 72,540.00$ 37,200.00$ 43,896.00$
64605-0000
Line A1560 ALL LPSM 11,000.00$ 11,000.00$ 7,600.00$ 5,000.00$ 9,630.00$
225.00$ 100.00$ 147.00$
SIGN SYSTEM
PAVEMENT MARKINGS, TYPE D, "ONLY" WORD MESSAGE
PAVEMENT MARKINGS, TYPE D, ACCESSIBILITY SYMBOL
TEMPORARY TRAFFIC CONTROL
BUILDING, RESTROOM FACILITY
FIXTURE, PEDESTRIAN RAILING
FIXTURE
OBJECT MARKER
DELINEATOR, TYPE 1
PAVEMENT MARKINGS, TYPE D, SOLID
PAVEMENT MARKINGS, TYPE D, TURN ARROW
PAVEMENT MARKINGS, TYPE D, STRAIGHT ARROW
PAVEMENT MARKINGS, TYPE D, STRAIGHT/TURN ARROW COMBINATION
SPECIAL LABOR, HIRED SURVEY SERVICES
PLACING CONSERVED TOPSOIL, 3-INCH DEPTH
SEEDING, DRY METHOD
MULCHING, DRY METHOD
SIGN SYSTEM, GOVERNMENT FURNISHED SIGN
2.35$ 8.00$ 1.00$
3,181.00$ 8,000.00$ 3,570.00$
1,632.00$ 8,000.00$ 1,830.00$
47.00$ 80.00$ 44.50$
370.00$ 900.00$ 384.00$
47.00$ 30.00$ 49.50$
47.00$ 120.00$ 49.50$
53.00$ 500.00$ 105.00$
1.30$ 8.00$ 1.20$
105.00$ 500.00$ 42.00$
53.00$ 500.00$ 42.00$
105.00$ 500.00$ 56.50$
105.00$ 500.00$ 88.00$
30,000.00$ 20,000.00$ 45,800.00$
460,000.00$ 300,000.00$ 311,900.00$
7,600.00$ 5,000.00$ 9,630.00$
195.00$ 100.00$ 118.00$
9/9/2016 Page 4 of 4
Schedule B Total of Bid Items: 9,615,079.00$ 0.0% 9,614,000.00$ 29.0% 12,400,000.00$ 18.3% 11,376,287.80$
Project No: NV NV BLM 10(1)
Project Name: Parking Areas + Schedule A
CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
15101-0000
Line B0020 ALL LPSM 749,008.85$ 749,008.85$ 570,276.81$ 1,143,556.00$ 1,000,000.00$
15201-0000
Line B0040 ALL LPSM 10,000.00$ 10,000.00$ 15,000.00$ 20,000.00$ 16,500.00$
15210-3000
Line B0060 12.460 MILE 2,500.00$ 31,150.00$ 37,380.00$ 12,460.00$ 40,993.40$
15214-2000
Line B0080 ALL LPSM 6,000.00$ 6,000.00$ 6,000.00$ 3,000.00$ 6,470.00$
15215-3000
Line B0100 12 EACH 525.00$ 6,300.00$ 6,000.00$ 24,000.00$ 6,348.00$
15215-7000
Line B0120 12 EACH 5,000.00$ 60,000.00$ 81,900.00$ 12,000.00$ 91,800.00$
15216-2000
Line B0140 0.560 MILE 4,000.00$ 2,240.00$ 4,704.00$ 4,480.00$ 5,269.60$
15301-0000
Line B0160 ALL LPSM 249,000.00$ 249,000.00$ 285,000.00$ 350,000.00$ 295,700.00$
15401-0000
Line B0180 ALL LPSM 124,500.00$ 124,500.00$ 620,000.00$ 300,000.00$ 156,500.00$
15501-0000
Line B0200 ALL LPSM 83,000.00$ 83,000.00$ 1.00$ 60,000.00$ 139,500.00$
15705-1400
Line B0220 3,760 LNFT 6.00$ 22,560.00$ 16,920.00$ 75,200.00$ 16,168.00$
15706-0200
Line B0240 10 EACH 700.00$ 7,000.00$ 655.00$ 8,000.00$ 3,930.00$
15706-1000
Line B0260 25 EACH 135.00$ 3,375.00$ 2,750.00$ 7,500.00$ 8,425.00$
15706-1600
Line B0280 5 EACH 2,250.00$ 11,250.00$ 27,000.00$ 10,000.00$ 21,750.00$
20101-0000
Line B0300 10.8 ACRE 4,000.00$ 43,200.00$ 172,800.00$ 43,200.00$ 197,640.00$
20301-0700
Line B0320 352 EACH 15.00$ 5,280.00$ 5,632.00$ 3,520.00$ 5,808.00$
20301-1900
Line B0340 4 EACH 1,000.00$ 4,000.00$ 6,400.00$ 20,000.00$ 5,720.00$
20301-2100
Line B0360 5 EACH 5,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 26,750.00$
20301-2400
Line B0380 245 EACH 60.00$ 14,700.00$ 9,065.00$ 7,350.00$ 8,085.00$
20301-3400
Line B0400 114 EACH 40.00$ 4,560.00$ 3,306.00$ 1,140.00$ 3,876.00$
Engineer's Estimate
29.00$ 10.00$ 34.00$
37.00$ 30.00$ 33.00$
5,000.00$ 5,000.00$ 5,350.00$
1,600.00$ 5,000.00$ 1,430.00$
16.00$ 10.00$ 16.50$
16,000.00$ 4,000.00$ 18,300.00$
5,400.00$ 2,000.00$ 4,350.00$
110.00$ 300.00$ 337.00$
65.50$ 800.00$ 393.00$
4.50$ 20.00$ 4.30$
1.00$ 60,000.00$ 139,500.00$
620,000.00$ 300,000.00$ 156,500.00$
285,000.00$ 350,000.00$ 295,700.00$
8,400.00$ 8,000.00$ 9,410.00$
6,825.00$ 1,000.00$ 7,650.00$
500.00$ 2,000.00$ 529.00$
20,000.00$ 16,500.00$
3,000.00$ 1,000.00$ 3,290.00$
Las Vegas Paving Corporation Road and Highway Builders, LLC. ACC Southwest
15,000.00$
570,276.81$ 1,143,556.00$ 1,000,000.00$
MOBILIZATION
CONSTRUCTION SURVEY AND STAKING
CENTERLINE, VERIFICATION AND STAKING
REMOVAL OF DELINEATOR
REMOVAL OF PIPE CULVERT
REMOVAL OF RESTROOM FACILITY
SURVEY AND STAKING, GRADE FINISHING STAKES
CONTRACTOR QUALITY CONTROL
CONTRACTOR TESTING
CONSTRUCTION SCHEDULE
SOIL EROSION CONTROL, FIBER ROLL
SOIL EROSION CONTROL, CHECK DAM
REMOVAL OF SIGN
REMOVAL OF WHEELSTOP
SURVEY AND STAKING, DRAINAGE STRUCTURE
SURVEY AND STAKING, PARKING AREA
SOIL EROSION CONTROL, INLET PROTECTION
SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT
CLEARING AND GRUBBING
SURVEY AND STAKING, RETAINING WALL
6,000.00$ 3,000.00$ 6,470.00$
9/9/2016 Page 1 of 5
Schedule B Total of Bid Items: 9,615,079.00$ 0.0% 9,614,000.00$ 29.0% 12,400,000.00$ 18.3% 11,376,287.80$
Project No: NV NV BLM 10(1)
Project Name: Parking Areas + Schedule A
CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
Engineer's Estimate Las Vegas Paving Corporation Road and Highway Builders, LLC. ACC Southwest
20302-0500
Line B0420 2,380 LNFT 11.00$ 26,180.00$ 7,140.00$ 16,660.00$ 24,990.00$
20302-0700
Line B0440 1,080 LNFT 5.00$ 5,400.00$ 9,180.00$ 4,320.00$ 12,960.00$
20303-1400
Line B0460 15 SQYD 10.00$ 150.00$ 450.00$ 750.00$ 1,320.00$
20303-3200
Line B0480 315 SQYD 20.00$ 6,300.00$ 2,205.00$ 6,300.00$ 14,805.00$
20420-0000
Line B0500 15,500 CUYD 15.00$ 232,500.00$ 488,250.00$ 620,000.00$ 441,750.00$
21101-2000
Line B0520 900 SQYD 5.00$ 4,500.00$ 7,650.00$ 4,500.00$ 4,680.00$
25101-2200
Line B0540 200 CUYD 170.00$ 34,000.00$ 19,000.00$ 24,000.00$ 21,800.00$
25101-2300
Line B0560 1,050 CUYD 180.00$ 189,000.00$ 94,500.00$ 94,500.00$ 128,100.00$
25120-2200
Line B0580 150 LNFT 60.00$ 9,000.00$ 15,450.00$ 120,000.00$ 14,550.00$
25125-0000
Line B0600 600 EACH 200.00$ 120,000.00$ 69,000.00$ 30,000.00$ 77,400.00$
25801-0300
Line B0620 1,883 SQFT (CQ) 125.00$ 235,375.00$ 191,124.50$ 188,300.00$ 248,556.00$
25801-0400
Line B0640 1,467 SQFT (CQ) 140.00$ 205,380.00$ 144,499.50$ 146,700.00$ 177,507.00$
25801-0500
Line B0660 1,870 SQFT (CQ) 155.00$ 289,850.00$ 175,780.00$ 187,000.00$ 209,440.00$
25801-0600
Line B0680 968 SQFT (CQ) 170.00$ 164,560.00$ 97,768.00$ 96,800.00$ 113,256.00$
30202-2000
Line B0700 5,500 TON 30.00$ 165,000.00$ 253,000.00$ 220,000.00$ 253,000.00$
30402-1000
Line B0720 211,000 SQYD 4.00$ 844,000.00$ 822,900.00$ 211,000.00$ 1,434,800.00$
40201-2600
Line B0740 39,000 TON 90.00$ 3,510,000.00$ 2,856,750.00$ 6,045,000.00$ 3,568,500.00$
40205-3000
Line B0760 500 TON 250.00$ 125,000.00$ 5.00$ 50,000.00$ 59,500.00$
40601-0000
Line B0780 100 TON 425.00$ 42,500.00$ 65,000.00$ 15,000.00$ 77,200.00$
40702-0100
Line B0800 60 SQYD 3.00$ 180.00$ 3,120.00$ 3,000.00$ 3,720.00$ 52.00$ 50.00$ 62.00$
650.00$ 150.00$ 772.00$
0.01$ 100.00$ 119.00$
73.25$ 155.00$ 91.50$
3.90$ 1.00$ 6.80$
46.00$ 40.00$ 46.00$
101.00$ 100.00$ 117.00$
94.00$ 100.00$ 112.00$
98.50$ 100.00$ 121.00$
101.50$ 100.00$ 132.00$
115.00$ 50.00$ 129.00$
103.00$ 800.00$ 97.00$
90.00$ 90.00$ 122.00$
95.00$ 120.00$ 109.00$
8.50$ 5.00$ 5.20$
31.50$ 40.00$ 28.50$
7.00$ 20.00$ 47.00$
30.00$ 50.00$ 88.00$
8.50$ 4.00$ 12.00$
3.00$ 7.00$ 10.50$
EMBANKMENT CONSTRUCTION
ROADWAY OBLITERATION, METHOD 2
PLACED RIPRAP, METHOD B, CLASS 2
PLACED RIPRAP, METHOD B, CLASS 3
RIPRAP DITCH, METHOD B, CLASS 2
REMOVAL OF CURB, CONCRETE
REMOVAL OF FENCE
REMOVAL OF PAVED WATERWAY, CONCRETE
REMOVAL OF SIDEWALK, CONCRETE
BOULDER
ASPHALT CONCRETE PAVEMENT, HVEEM MIX, CLASS B
ANTISTRIP ADDITIVE, TYPE 3
FOG SEAL
CHIP SEAL, TYPE 1A
REINFORCED CONCRETE RETAINING WALL, 8 FEET
REINFORCED CONCRETE RETAINING WALL, 10 FEET
REINFORCED CONCRETE RETAINING WALL, 12 FEET
REINFORCED CONCRETE RETAINING WALL, 14 FEET
ROADWAY AGGREGATE, METHOD 2
FULL DEPTH RECLAMATION, METHOD 1
9/9/2016 Page 2 of 5
Schedule B Total of Bid Items: 9,615,079.00$ 0.0% 9,614,000.00$ 29.0% 12,400,000.00$ 18.3% 11,376,287.80$
Project No: NV NV BLM 10(1)
Project Name: Parking Areas + Schedule A
CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
Engineer's Estimate Las Vegas Paving Corporation Road and Highway Builders, LLC. ACC Southwest
41102-1000
Line B0820 235,000 SQYD 0.75$ 176,250.00$ 65,800.00$ 117,500.00$ 82,250.00$
41105-0000
Line B0840 1,720 TON 55.00$ 94,600.00$ 17.20$ 12,040.00$ 30,960.00$
41201-0000
Line B0860 100 TON 425.00$ 42,500.00$ 70,000.00$ 15,000.00$ 83,200.00$
56302-1000
Line B0880 22,700 SQFT 2.00$ 45,400.00$ 79,450.00$ 90,800.00$ 74,910.00$
60201-0600
Line B0900 520 LNFT 115.00$ 59,800.00$ 83,200.00$ 104,000.00$ 54,600.00$
60201-0900
Line B0920 50 LNFT 120.00$ 6,000.00$ 16,250.00$ 15,000.00$ 6,450.00$
60210-0600
Line B0940 5 EACH 450.00$ 2,250.00$ 1,575.00$ 7,500.00$ 5,000.00$
60210-0900
Line B0960 2 EACH 600.00$ 1,200.00$ 1,500.00$ 3,600.00$ 2,580.00$
60403-1200
Line B0980 9 EACH 5,000.00$ 45,000.00$ 64,125.00$ 27,000.00$ 67,230.00$
60403-1900
Line B1000 3 EACH 5,000.00$ 15,000.00$ 21,900.00$ 12,000.00$ 22,410.00$
60601-0000
Line B1020 6 EACH 2,500.00$ 15,000.00$ 42,000.00$ 36,000.00$ 31,500.00$
60801-0400
Line B1040 87 SQYD 100.00$ 8,700.00$ 34,104.00$ 69,600.00$ 34,191.00$
60901-0000
Line B1060 12,700 LNFT 30.00$ 381,000.00$ 254,000.00$ 114,300.00$ 520,700.00$
60901-2100
Line B1080 19,500 LNFT 10.00$ 195,000.00$ 73,125.00$ 78,000.00$ 87,750.00$
60915-1000
Line B1100 371 EACH 200.00$ 74,200.00$ 42,665.00$ 37,100.00$ 45,262.00$
61501-0100
Line B1120 2,700 SQYD 55.00$ 148,500.00$ 164,700.00$ 108,000.00$ 195,750.00$
61901-2400
Line B1140 950 LNFT 50.00$ 47,500.00$ 13,300.00$ 57,000.00$ 14,725.00$
61901-3300
Line B1160 6,500 LNFT 6.00$ 39,000.00$ 60,775.00$ 32,500.00$ 68,250.00$
62201-0200
Line B1180 80 HOUR 115.00$ 9,200.00$ 8,400.00$ 9,600.00$ 8,000.00$
62201-0900
Line B1200 80 HOUR 175.00$ 14,000.00$ 10,400.00$ 11,200.00$ 11,840.00$ 130.00$ 140.00$ 148.00$
105.00$ 120.00$ 100.00$
9.35$ 5.00$ 10.50$
14.00$ 60.00$ 15.50$
61.00$ 40.00$ 72.50$
115.00$ 100.00$ 122.00$
3.75$ 4.00$ 4.50$
20.00$ 9.00$ 41.00$
392.00$ 800.00$ 393.00$
7,000.00$ 6,000.00$ 5,250.00$
7,300.00$ 4,000.00$ 7,470.00$
7,125.00$ 3,000.00$ 7,470.00$
750.00$ 1,800.00$ 1,290.00$
315.00$ 1,500.00$ 1,000.00$
325.00$ 300.00$ 129.00$
160.00$ 200.00$ 105.00$
3.50$ 4.00$ 3.30$
700.00$ 150.00$ 832.00$
0.01$ 7.00$ 18.00$
0.28$ 0.50$ 0.35$
WHEELSTOP, CONCRETE
SIDEWALK, CONCRETE
FENCE, SPLIT RAIL, 2 RAIL
FENCE, TORTOISE BARRIER
DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY
WHEEL LOADER, 2 CUBIC YARD MINIMUM RATED CAPACITY
INLET, FLH TYPE 5A
INLET, FLH TYPE 6B
SPILLWAY ASSEMBLY
PAVED WATERWAY, TYPE 4
CURB, CONCRETE
CURB, ASPHALT, 4-INCH DEPTH
TACK COAT
PAINTING, CONCRETE STRUCTURE
18-INCH PIPE CULVERT
30-INCH PIPE CULVERT
END SECTION FOR 18-INCH PIPE CULVERT
END SECTION FOR 30-INCH PIPE CULVERT
PRIME COAT, METHOD 1
BLOTTER
9/9/2016 Page 3 of 5
Schedule B Total of Bid Items: 9,615,079.00$ 0.0% 9,614,000.00$ 29.0% 12,400,000.00$ 18.3% 11,376,287.80$
Project No: NV NV BLM 10(1)
Project Name: Parking Areas + Schedule A
CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
Engineer's Estimate Las Vegas Paving Corporation Road and Highway Builders, LLC. ACC Southwest
62201-2850
Line B1220 80 HOUR 185.00$ 14,800.00$ 13,600.00$ 11,200.00$ 11,600.00$
62201-3000
Line B1240 80 HOUR 180.00$ 14,400.00$ 18,800.00$ 11,200.00$ 15,120.00$
62301-0000
Line B1260 160 HOUR 75.00$ 12,000.00$ 11,360.00$ 8,000.00$ 10,400.00$
62302-1000
Line B1280 160 HOUR 90.00$ 14,400.00$ 9,600.00$ 12,800.00$ 21,760.00$
62302-1100
Line B1300 80 HOUR 175.00$ 14,000.00$ 20,000.00$ 8,000.00$ 11,760.00$
62405-0200
Line B1320 15,500 SQYD 3.50$ 54,250.00$ 49,600.00$ 124,000.00$ 15,500.00$
62510-1000
Line B1340 3.2 ACRE 1,000.00$ 3,200.00$ 7,200.00$ 19,200.00$ 8,064.00$
62515-1000
Line B1360 3.2 ACRE 1,000.00$ 3,200.00$ 9,072.00$ 19,200.00$ 10,176.00$
63301-1000
Line B1380 15 EACH 300.00$ 4,500.00$ 5,505.00$ 13,500.00$ 5,760.00$
63302-0000
Line B1400 1,392 SQFT 30.00$ 41,760.00$ 65,424.00$ 111,360.00$ 61,944.00$
63308-0000
Line B1420 113 EACH 110.00$ 12,430.00$ 5,311.00$ 13,560.00$ 5,593.50$
63309-0100
Line B1440 861 EACH 25.00$ 21,525.00$ 40,467.00$ 25,830.00$ 42,619.50$
63401-0700
Line B1460 36,929 LNFT 0.35$ 12,925.15$ 48,376.99$ 221,574.00$ 44,314.80$
63405-1300
Line B1480 18 EACH 250.00$ 4,500.00$ 936.00$ 9,000.00$ 756.00$
63405-1350
Line B1500 40 EACH 250.00$ 10,000.00$ 2,080.00$ 20,000.00$ 1,680.00$
63405-1400
Line B1520 5 EACH 250.00$ 1,250.00$ 525.00$ 2,500.00$ 210.00$
63405-1450
Line B1540 18 EACH 250.00$ 4,500.00$ 1,890.00$ 9,000.00$ 1,584.00$
63405-1650
Line B1560 22 EACH 250.00$ 5,500.00$ 2,310.00$ 11,000.00$ 1,243.00$
63501-0000
Line B1580 ALL LPSM 50,000.00$ 50,000.00$ 675,000.00$ 400,000.00$ 373,600.00$
64601-1000
Line B1600 5 EACH 30,000.00$ 150,000.00$ 150,000.00$ 100,000.00$ 229,000.00$
170.00$ 140.00$ 145.00$
TEMPORARY TRAFFIC CONTROL
BUILDING, RESTROOM FACILITY
PLACING CONSERVED TOPSOIL, 3-INCH DEPTH
PAVEMENT MARKINGS, TYPE D, SOLID
PAVEMENT MARKINGS, TYPE D, TURN ARROW
PAVEMENT MARKINGS, TYPE D, STRAIGHT ARROW
PAVEMENT MARKINGS, TYPE D, STRAIGHT/TURN ARROW COMBINATION
PAVEMENT MARKINGS, TYPE D, "ONLY" WORD MESSAGE
PAVEMENT MARKINGS, TYPE D, ACCESSIBILITY SYMBOL
SEEDING, DRY METHOD
MULCHING, DRY METHOD
SIGN SYSTEM, GOVERNMENT FURNISHED SIGN
SIGN SYSTEM
OBJECT MARKER
DELINEATOR, TYPE 1
MOTOR GRADER, 12 FOOT MINIMUM BLADE
HYDRAULIC EXCAVATOR
GENERAL LABOR
SPECIAL LABOR, HIRED TECHNICAL SERVICES
SPECIAL LABOR, HIRED SURVEY SERVICES
235.00$ 140.00$ 189.00$
60.00$ 80.00$ 136.00$
71.00$ 50.00$ 65.00$
3.20$ 8.00$ 1.00$
250.00$ 100.00$ 147.00$
2,835.00$ 6,000.00$ 3,180.00$
2,250.00$ 6,000.00$ 2,520.00$
47.00$ 80.00$ 44.50$
367.00$ 900.00$ 384.00$
47.00$ 30.00$ 49.50$
47.00$ 120.00$ 49.50$
52.00$ 500.00$ 42.00$
1.31$ 6.00$ 1.20$
105.00$ 500.00$ 42.00$
52.00$ 500.00$ 42.00$
105.00$ 500.00$ 56.50$
105.00$ 500.00$ 88.00$
30,000.00$ 20,000.00$ 45,800.00$
675,000.00$ 400,000.00$ 373,600.00$
9/9/2016 Page 4 of 5
Schedule B Total of Bid Items: 9,615,079.00$ 0.0% 9,614,000.00$ 29.0% 12,400,000.00$ 18.3% 11,376,287.80$
Project No: NV NV BLM 10(1)
Project Name: Parking Areas + Schedule A
CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
Engineer's Estimate Las Vegas Paving Corporation Road and Highway Builders, LLC. ACC Southwest
64604-3000
Line B1620 621 LNFT (CQ) 40.00$ 24,840.00$ 121,095.00$ 62,100.00$ 73,278.00$
64605-0000
Line B1640 ALL LPSM 50,000.00$ 50,000.00$ 30,000.00$ 15,000.00$ 37,700.00$
FIXTURE, PEDESTRIAN RAILING
FIXTURE
30,000.00$ 15,000.00$ 37,700.00$
195.00$ 100.00$ 118.00$
9/9/2016 Page 5 of 5
Option X Total of Bid Items: 3,559,454.00$ -8.2% 3,266,000.00$ 5.4% 3,750,000.00$ 13.0% 4,021,333.50$ Project No: NV NV BLM 10(1)
Project Name: Return Route
CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
15101-0000
Line X0020 ALL LPSM 276,503.00$ 276,503.00$ 47,293.25$ 367,274.00$ 210,000.00$
15201-0000
Line X0040 ALL LPSM 10,000.00$ 10,000.00$ 6,000.00$ 20,000.00$ 6,590.00$
15206-0000
Line X0060 2.420 MILE 5,000.00$ 12,100.00$ 7,744.00$ 12,100.00$ 8,542.60$
15215-3000
Line X0080 12 EACH 525.00$ 6,300.00$ 6,000.00$ 24,000.00$ 6,348.00$
15216-2000
Line X0100 4.840 MILE 4,000.00$ 19,360.00$ 40,656.00$ 24,200.00$ 45,544.40$
15301-0000
Line X0120 ALL LPSM 84,900.00$ 84,900.00$ 40,000.00$ 250,000.00$ 18,100.00$
15401-0000
Line X0140 ALL LPSM 42,450.00$ 42,450.00$ 52,400.00$ 200,000.00$ 24,200.00$
15501-0000
Line X0160 ALL LPSM 28,300.00$ 28,300.00$ 1.00$ 20,000.00$ 39,600.00$
15705-1400
Line X0180 280 LNFT 6.00$ 1,680.00$ 924.00$ 8,400.00$ 1,288.00$
15706-0200
Line X0200 14 EACH 700.00$ 9,800.00$ 679.00$ 14,000.00$ 5,404.00$
15706-1000
Line X0220 4 EACH 135.00$ 540.00$ 322.00$ 2,000.00$ 1,352.00$
15706-1600
Line X0240 3 EACH 2,250.00$ 6,750.00$ 16,080.00$ 12,000.00$ 13,050.00$
15802-0000
Line X0260 ALL LPSM 25,000.00$ 25,000.00$ 16,300.00$ 100,000.00$ 53,700.00$
20101-0000
Line X0280 24.8 ACRE 4,000.00$ 99,200.00$ 109,120.00$ 74,400.00$ 119,536.00$
20420-0000
Line X0300 34,000 CUYD 15.00$ 510,000.00$ 1,020,000.00$ 850,000.00$ 1,224,000.00$
20801-0000
Line X0320 374 CUYD (CQ) 30.00$ 11,220.00$ 8,602.00$ 37,400.00$ 23,375.00$
20803-0000
Line X0340 411 CUYD (CQ) 40.00$ 16,440.00$ 23,838.00$ 49,320.00$ 31,236.00$
25101-2200
Line X0360 2,550 CUYD 170.00$ 433,500.00$ 196,350.00$ 178,500.00$ 277,950.00$
25101-2300
Line X0380 350 CUYD 180.00$ 63,000.00$ 29,750.00$ 42,000.00$ 42,700.00$
25101-2400
Line X0400 150 CUYD 110.00$ 16,500.00$ 16,050.00$ 21,000.00$ 24,450.00$
SURVEY AND STAKING, DRAINAGE STRUCTURE
500.00$ 2,000.00$ 529.00$
MOBILIZATION
CONSTRUCTION SURVEY AND STAKING
SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE
STRUCTURE EXCAVATION
STRUCTURAL BACKFILL
PLACED RIPRAP, METHOD B, CLASS 2
CONTRACTOR TESTING
CONSTRUCTION SCHEDULE
SOIL EROSION CONTROL, FIBER ROLL
SOIL EROSION CONTROL, CHECK DAM
SOIL EROSION CONTROL, INLET PROTECTION
SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT
PLACED RIPRAP, METHOD B, CLASS 3
PLACED RIPRAP, METHOD B, CLASS 4
SURVEY AND STAKING, GRADE FINISHING STAKES
CONTRACTOR QUALITY CONTROL
WATERING FOR DUST CONTROL
CLEARING AND GRUBBING
EMBANKMENT CONSTRUCTION
367,274.00$ 210,000.00$
Las Vegas Paving Corporation Road Highway Builders, LLC. ACC Southwest
6,000.00$
47,293.25$
8,400.00$ 5,000.00$ 9,410.00$
20,000.00$ 6,590.00$
3,200.00$ 5,000.00$ 3,530.00$
1.00$ 20,000.00$ 39,600.00$
52,400.00$ 200,000.00$ 24,200.00$
40,000.00$ 250,000.00$ 18,100.00$
48.50$ 1,000.00$ 386.00$
3.30$ 30.00$ 4.60$
5,360.00$ 4,000.00$ 4,350.00$
80.50$ 500.00$ 338.00$
4,400.00$ 3,000.00$ 4,820.00$
16,300.00$ 100,000.00$ 53,700.00$
23.00$ 100.00$ 62.50$
30.00$ 25.00$ 36.00$
77.00$ 70.00$ 109.00$
58.00$ 120.00$ 76.00$
107.00$ 140.00$ 163.00$
85.00$ 120.00$ 122.00$
Engineer's Estimate
9/10/2016 Page 1 of 3
Option X Total of Bid Items: 3,559,454.00$ -8.2% 3,266,000.00$ 5.4% 3,750,000.00$ 13.0% 4,021,333.50$ Project No: NV NV BLM 10(1)
Project Name: Return Route
CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
Las Vegas Paving Corporation Road Highway Builders, LLC. ACC SouthwestEngineer's Estimate
25125-0000
Line X0420 114 EACH 200.00$ 22,800.00$ 13,110.00$ 5,700.00$ 14,706.00$
30202-2000
Line X0440 8,900 TON 30.00$ 267,000.00$ 189,125.00$ 106,800.00$ 213,600.00$
40201-2600
Line X0460 7,500 TON 90.00$ 675,000.00$ 511,875.00$ 525,000.00$ 686,250.00$
40205-3000
Line X0480 75 TON 250.00$ 18,750.00$ 0.75$ 11,250.00$ 8,925.00$
40601-0000
Line X0500 20 TON 425.00$ 8,500.00$ 11,200.00$ 4,000.00$ 13,300.00$
41102-1000
Line X0520 37,000 SQYD 0.75$ 27,750.00$ 9,250.00$ 37,000.00$ 11,100.00$
41105-0000
Line X0540 300 TON 55.00$ 16,500.00$ 3.00$ 2,100.00$ 5,400.00$
41201-0000
Line X0560 20 TON 425.00$ 8,500.00$ 11,700.00$ 4,000.00$ 13,900.00$
55201-0200
Line X0580 191 CUYD (CQ) 690.00$ 131,790.00$ 173,810.00$ 191,000.00$ 179,158.00$
55401-1000
Line X0600 26,500 LB (CQ) 1.25$ 33,125.00$ 39,750.00$ 53,000.00$ 37,100.00$
56302-1000
Line X0620 1,500 SQFT 2.00$ 3,000.00$ 5,250.00$ 15,000.00$ 4,950.00$
60103-0240
Line X0640 4 EACH 15,000.00$ 60,000.00$ 56,000.00$ 16,000.00$ 68,400.00$
60201-0900
Line X0660 110 LNFT 120.00$ 13,200.00$ 19,250.00$ 22,000.00$ 13,530.00$
60201-1000
Line X0680 60 LNFT 125.00$ 7,500.00$ 10,800.00$ 13,200.00$ 7,980.00$
60201-1100
Line X0700 70 LNFT 125.00$ 8,750.00$ 12,950.00$ 16,800.00$ 10,010.00$
60201-1300
Line X0720 165 LNFT 200.00$ 33,000.00$ 31,350.00$ 42,900.00$ 39,435.00$
60202-0700
Line X0740 40 LNFT 150.00$ 6,000.00$ 10,000.00$ 10,000.00$ 6,160.00$
60210-0900
Line X0760 4 EACH 600.00$ 2,400.00$ 3,000.00$ 4,000.00$ 5,160.00$
60210-1000
Line X0780 2 EACH 700.00$ 1,400.00$ 1,680.00$ 2,400.00$ 3,060.00$
60210-1100
Line X0800 2 EACH 1,000.00$ 2,000.00$ 2,440.00$ 2,800.00$ 3,900.00$
REINFORCING STEEL
42-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT
END SECTION FOR 30-INCH PIPE CULVERT
END SECTION FOR 36-INCH PIPE CULVERT
END SECTION FOR 42-INCH PIPE CULVERT
PAINTING, CONCRETE STRUCTURE
CONCRETE, HEADWALL FOR 54-INCH PIPE CULVERT
30-INCH PIPE CULVERT
36-INCH PIPE CULVERT
42-INCH PIPE CULVERT
54-INCH PIPE CULVERT
FOG SEAL
PRIME COAT, METHOD 1
BLOTTER
TACK COAT
STRUCTURAL CONCRETE, CLASS A (AE)
BOULDER
ROADWAY AGGREGATE, METHOD 2
ASPHALT CONCRETE PAVEMENT, HVEEM MIX, CLASS B
ANTISTRIP ADDITIVE, TYPE 3
21.25$ 12.00$ 24.00$
115.00$ 50.00$ 129.00$
0.01$ 150.00$ 119.00$
68.25$ 70.00$ 91.50$
0.25$ 1.00$ 0.30$
560.00$ 200.00$ 665.00$
585.00$ 200.00$ 695.00$
0.01$ 7.00$ 18.00$
1.50$ 2.00$ 1.40$
910.00$ 1,000.00$ 938.00$
14,000.00$ 4,000.00$ 17,100.00$
3.50$ 10.00$ 3.30$
180.00$ 220.00$ 133.00$
175.00$ 200.00$ 123.00$
190.00$ 260.00$ 239.00$
185.00$ 240.00$ 143.00$
750.00$ 1,000.00$ 1,290.00$
250.00$ 250.00$ 154.00$
1,220.00$ 1,400.00$ 1,950.00$
840.00$ 1,200.00$ 1,530.00$
9/10/2016 Page 2 of 3
Option X Total of Bid Items: 3,559,454.00$ -8.2% 3,266,000.00$ 5.4% 3,750,000.00$ 13.0% 4,021,333.50$ Project No: NV NV BLM 10(1)
Project Name: Return Route
CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
Las Vegas Paving Corporation Road Highway Builders, LLC. ACC SouthwestEngineer's Estimate
60211-1100
Line X0820 2 EACH 1,200.00$ 2,400.00$ 2,440.00$ 3,200.00$ 3,700.00$
60601-0000
Line X0840 3 EACH 2,500.00$ 7,500.00$ 21,150.00$ 15,000.00$ 15,750.00$
60901-2100
Line X0860 600 LNFT 10.00$ 6,000.00$ 2,700.00$ 6,000.00$ 3,300.00$
61901-3300
Line X0880 28,600 LNFT 6.00$ 171,600.00$ 257,400.00$ 57,200.00$ 286,000.00$
62201-0200
Line X0900 80 HOUR 115.00$ 9,200.00$ 8,400.00$ 9,600.00$ 8,000.00$
62201-0900
Line X0920 80 HOUR 175.00$ 14,000.00$ 10,400.00$ 11,200.00$ 11,840.00$
62201-2850
Line X0940 80 HOUR 185.00$ 14,800.00$ 13,600.00$ 12,800.00$ 11,600.00$
62201-3000
Line X0960 80 HOUR 180.00$ 14,400.00$ 18,800.00$ 12,800.00$ 15,120.00$
62301-0000
Line X0980 160 HOUR 75.00$ 12,000.00$ 11,360.00$ 8,000.00$ 10,400.00$
62302-1000
Line X1000 160 HOUR 90.00$ 14,400.00$ 9,600.00$ 12,800.00$ 21,760.00$
62302-1100
Line X1020 80 HOUR 175.00$ 14,000.00$ 20,000.00$ 8,000.00$ 11,760.00$
62405-0200
Line X1040 52,856 SQYD 3.50$ 184,996.00$ 105,712.00$ 52,856.00$ 52,856.00$
62510-1000
Line X1060 11.0 ACRE 1,000.00$ 11,000.00$ 10,065.00$ 44,000.00$ 11,220.00$
62515-1000
Line X1080 11.0 ACRE 1,000.00$ 11,000.00$ 18,535.00$ 44,000.00$ 20,790.00$
63302-0000
Line X1100 55 SQFT 30.00$ 1,650.00$ 2,585.00$ 11,000.00$ 2,447.50$
63501-0000
Line X1120 ALL LPSM 50,000.00$ 50,000.00$ 2,600.00$ 50,000.00$ 11,800.00$
END SECTION FOR 42-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT
SPILLWAY ASSEMBLY
GENERAL LABOR
SPECIAL LABOR, HIRED TECHNICAL SERVICES
SPECIAL LABOR, HIRED SURVEY SERVICES
PLACING CONSERVED TOPSOIL, 3-INCH DEPTH
SEEDING, DRY METHOD
MULCHING, DRY METHOD
CURB, ASPHALT, 4-INCH DEPTH
FENCE, TORTOISE BARRIER
DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY
WHEEL LOADER, 2 CUBIC YARD MINIMUM RATED CAPACITY
MOTOR GRADER, 12 FOOT MINIMUM BLADE
HYDRAULIC EXCAVATOR
SIGN SYSTEM
TEMPORARY TRAFFIC CONTROL
7,050.00$ 5,000.00$ 5,250.00$
1,220.00$ 1,600.00$ 1,850.00$
9.00$ 2.00$ 10.00$
4.50$ 10.00$ 5.50$
130.00$ 140.00$ 148.00$
105.00$ 120.00$ 100.00$
235.00$ 160.00$ 189.00$
170.00$ 160.00$ 145.00$
60.00$ 80.00$ 136.00$
71.00$ 50.00$ 65.00$
2.00$ 1.00$ 1.00$
250.00$ 100.00$ 147.00$
1,685.00$ 4,000.00$ 1,890.00$
915.00$ 4,000.00$ 1,020.00$
2,600.00$ 50,000.00$ 11,800.00$
47.00$ 200.00$ 44.50$
9/10/2016 Page 3 of 3
File details come from the government source that posted it. Updated .