T A B U L A T I O N O F B I D S
Option X Total of Bid Items: 3,396,420.00$ 11.3% 3,779,361.70$ 23.1% 4,181,596.00$ Project No: CO FLAP CR77(5)
Project Name: Tarryall Creek Road
CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount
15101-0000
Line X0020 ALL LPSM 330,346.00$ 330,346.00$ 360,000.00$ 400,000.00$
15206-0000
Line X0040 150.580 STA 175.00$ 26,351.50$ 12,799.30$ 30,116.00$
15215-1000
Line X0060 20 EACH 725.00$ 14,500.00$ 12,000.00$ 16,000.00$
15215-3000
Line X0080 28 EACH 600.00$ 16,800.00$ 19,600.00$ 11,200.00$
15216-2000
Line X0100 301.160 STA 125.00$ 37,645.00$ 27,104.40$ 60,232.00$
15301-0000
Line X0120 ALL LPSM 40,000.00$ 40,000.00$ 60,000.00$ 15,000.00$
15401-0000
Line X0140 ALL LPSM 45,000.00$ 45,000.00$ 160,000.00$ 70,000.00$
15501-0000
Line X0160 ALL LPSM 5,000.00$ 5,000.00$ 17,000.00$ 5,000.00$
15705-0100
Line X0180 1,480 LNFT 2.00$ 2,960.00$ 2,960.00$ 5,920.00$
15705-1400
Line X0200 5,250 LNFT 5.50$ 28,875.00$ 15,750.00$ 21,000.00$
15706-0200
Line X0220 72 EACH 275.00$ 19,800.00$ 3,168.00$ 36,000.00$
15706-1000
Line X0240 1 EACH 240.00$ 240.00$ 500.00$ 140.00$
15802-0000
Line X0260 ALL LPSM 25,000.00$ 25,000.00$ 44,000.00$ 55,000.00$
20101-0000
Line X0280 22.0 ACRE 2,500.00$ 55,000.00$ 44,000.00$ 37,400.00$
20301-1900
Line X0300 22 EACH 1,000.00$ 22,000.00$ 33,000.00$ 8,800.00$
20304-1000
Line X0320 ALL LPSM 25,000.00$ 25,000.00$ 19,000.00$ 6,000.00$
20401-0000
Line X0340 32,000 CUYD 18.00$ 576,000.00$ 608,000.00$ 768,000.00$
20402-0000
Line X0360 500 CUYD 20.00$ 10,000.00$ 16,500.00$ 13,500.00$
20425-1000
Line X0380 105 LNFT 15.00$ 1,575.00$ 3,150.00$ 1,365.00$
21101-2000
Line X0400 700 SQYD 4.50$ 3,150.00$ 6,300.00$ 2,100.00$
25101-2000
Line X0420 145 CUYD 57.00$ 8,265.00$ 21,750.00$ 7,250.00$
25101-3000
Line X0440 17 CUYD 90.00$ 1,530.00$ 2,720.00$ 850.00$
Engineer's Estimate
160.00$ 50.00$
150.00$ 50.00$
9.00$ 3.00$
30.00$ 13.00$
33.00$ 27.00$
19.00$ 24.00$
19,000.00$ 6,000.00$
1,500.00$ 400.00$
2,000.00$ 1,700.00$
44,000.00$ 55,000.00$
500.00$ 140.00$
44.00$ 500.00$
3.00$ 4.00$
2.00$ 4.00$
17,000.00$ 5,000.00$
160,000.00$ 70,000.00$
60,000.00$ 15,000.00$
90.00$ 200.00$
200.00$
600.00$ 800.00$
A & S Construction Co. American Civil Constructors, Inc.
85.00$
360,000.00$ 400,000.00$
MOBILIZATION
SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE
SURVEY AND STAKING, APPROACH ROAD
REMOVAL OF STRUCTURES AND OBSTRUCTIONS
ROADWAY EXCAVATION
SUBEXCAVATION
CONTRACTOR TESTING
CONSTRUCTION SCHEDULE
SOIL EROSION CONTROL, SILT FENCE
SOIL EROSION CONTROL, SEDIMENT LOG
SOIL EROSION CONTROL, CHECK DAM
SOIL EROSION CONTROL, INLET PROTECTION
DITCH, EXCAVATION
ROADWAY OBLITERATION, METHOD 2
PLACED RIPRAP, CLASS 2
PLACED RIPRAP, CLASS 3
SURVEY AND STAKING, GRADE FINISHING STAKES
CONTRACTOR QUALITY CONTROL
WATERING FOR DUST CONTROL
CLEARING AND GRUBBING
REMOVAL OF PIPE CULVERT
SURVEY AND STAKING, DRAINAGE STRUCTURE
700.00$ 400.00$
12/11/2015 Page 1 of 4
Project No: CO FLAP CR77(5)
Project Name: Tarryall Creek Road
CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount
Engineer's Estimate A & S Construction Co. American Civil Constructors, Inc.
25101-4000
Line X0460 52 CUYD 100.00$ 5,200.00$ 8,840.00$ 2,600.00$
25125-0000
Line X0480 7 EACH 230.00$ 1,610.00$ 1,540.00$ 1,925.00$
30103-0000
Line X0500 11,750 CUYD 50.00$ 587,500.00$ 611,000.00$ 775,500.00$
40101-5600
Line X0520 7,400 TON 95.00$ 703,000.00$ 562,400.00$ 969,400.00$
40105-3000
Line X0540 74 TON 175.00$ 12,950.00$ 15,540.00$ 14,800.00$
40920-1000
Line X0560 19 TON 780.00$ 14,820.00$ 17,100.00$ 13,300.00$
41103-0000
Line X0580 45,100 SQYD 0.90$ 40,590.00$ 54,120.00$ 42,845.00$
41105-0000
Line X0600 63 TON 60.00$ 3,780.00$ 5,670.00$ 6,174.00$
41201-1000
Line X0620 19 TON 850.00$ 16,150.00$ 19,000.00$ 14,250.00$
60103-0220
Line X0640 2 EACH 15,000.00$ 30,000.00$ 18,000.00$ 30,000.00$
60201-0600
Line X0660 424 LNFT 100.00$ 42,400.00$ 59,360.00$ 39,008.00$
60201-0800
Line X0680 764 LNFT 110.00$ 84,040.00$ 122,240.00$ 118,420.00$
60201-1000
Line X0700 58 LNFT 150.00$ 8,700.00$ 13,340.00$ 9,570.00$
60201-1200
Line X0720 54 LNFT 190.00$ 10,260.00$ 24,840.00$ 10,800.00$
60210-0600
Line X0740 19 EACH 300.00$ 5,700.00$ 8,550.00$ 5,700.00$
60210-0800
Line X0760 24 EACH 350.00$ 8,400.00$ 13,200.00$ 7,800.00$
60210-1000
Line X0780 2 EACH 680.00$ 1,360.00$ 1,800.00$ 1,400.00$
60403-0000
Line X0800 1 EACH 4,500.00$ 4,500.00$ 5,500.00$ 6,500.00$
60902-1000
Line X0820 1,600 LNFT 28.00$ 44,800.00$ 80,000.00$ 56,000.00$
60905-1000
Line X0840 58 LNFT 100.00$ 5,800.00$ 5,800.00$ 3,770.00$
61106-1000
Line X0860 1 EACH 6,000.00$ 6,000.00$ 13,000.00$ 10,000.00$
61901-0900
Line X0880 2,300 LNFT 3.25$ 7,475.00$ 11,500.00$ 10,350.00$ 5.00$ 4.50$
13,000.00$ 10,000.00$
100.00$ 65.00$
50.00$ 35.00$
5,500.00$ 6,500.00$
900.00$ 700.00$
550.00$ 325.00$
450.00$ 300.00$
460.00$ 200.00$
230.00$ 165.00$
160.00$ 155.00$
140.00$ 92.00$
9,000.00$ 15,000.00$
1,000.00$ 750.00$
90.00$ 98.00$
1.20$ 0.95$
900.00$ 700.00$
210.00$ 200.00$
76.00$ 131.00$
52.00$ 66.00$
220.00$ 275.00$
170.00$ 50.00$
FIRE HYDRANT, DRY
FENCE, BARBED WIRE, 4 STRAND
AGGREGATE BASE
SUPERPAVE PAVEMENT, 1/2-INCH OR 3/4-INCH NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL
ANTISTRIP ADDITIVE, TYPE 3
FOG SEAL, EMULSIFIED ASPHALT GRADE CSS-1 OR CSS-1H, SS-1 OR SS-1H
PRIME COAT
PLACED RIPRAP, CLASS 4
BOULDER
BLOTTER
END SECTION FOR 18-INCH PIPE CULVERT
END SECTION FOR 24-INCH PIPE CULVERT
END SECTION FOR 36-INCH PIPE CULVERT
INLET
CURB AND GUTTER, CONCRETE, 12-INCH DEPTH
GUTTER, CONCRETE
TACK COAT GRADE CSS-1, CSS-1H, SS-1, OR SS-1H
CONCRETE, HEADWALL FOR 48-INCH PIPE CULVERT
18-INCH PIPE CULVERT
24-INCH PIPE CULVERT (ARCH EQUIVALENT)
36-INCH PIPE CULVERT
48-INCH PIPE CULVERT
12/11/2015 Page 2 of 4
Project No: CO FLAP CR77(5)
Project Name: Tarryall Creek Road
CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount
Engineer's Estimate A & S Construction Co. American Civil Constructors, Inc.
61901-2250
Line X0900 1,075 LNFT 18.00$ 19,350.00$ 18,275.00$ 19,350.00$
61902-1400
Line X0920 1 EACH 850.00$ 850.00$ 1,400.00$ 1,400.00$
61902-2500
Line X0940 1 EACH 500.00$ 500.00$ 1,100.00$ 1,100.00$
61920-2000
Line X0960 3 EACH 450.00$ 1,350.00$ 3,000.00$ 3,300.00$
62201-0100
Line X0980 60 HOUR 115.00$ 6,900.00$ 6,600.00$ 5,400.00$
62201-0350
Line X1000 60 HOUR 120.00$ 7,200.00$ 8,400.00$ 5,400.00$
62201-0750
Line X1020 60 HOUR 160.00$ 9,600.00$ 11,400.00$ 4,800.00$
62201-1450
Line X1040 20 HOUR 150.00$ 3,000.00$ 4,800.00$ 5,000.00$
62201-2050
Line X1060 40 HOUR 110.00$ 4,400.00$ 4,400.00$ 3,600.00$
62201-2850
Line X1080 40 HOUR 130.00$ 5,200.00$ 6,000.00$ 5,600.00$
62201-3100
Line X1100 20 HOUR 160.00$ 3,200.00$ 4,200.00$ 4,000.00$
62301-0000
Line X1120 40 HOUR 50.00$ 2,000.00$ 2,200.00$ 1,600.00$
62302-1000
Line X1140 50 HOUR 130.00$ 6,500.00$ 11,500.00$ 6,000.00$
62302-1100
Line X1160 50 HOUR 170.00$ 8,500.00$ 9,000.00$ 10,000.00$
62405-0200
Line X1180 70,750 SQYD 0.85$ 60,137.50$ 169,800.00$ 60,845.00$
62510-2000
Line X1200 7.0 ACRE 1,400.00$ 9,800.00$ 15,400.00$ 4,900.00$
62515-2000
Line X1220 7.0 ACRE 1,200.00$ 8,400.00$ 8,400.00$ 7,000.00$
62901-0600
Line X1240 7,500 SQYD 2.00$ 15,000.00$ 30,000.00$ 16,875.00$
63301-0000
Line X1260 37 EACH 750.00$ 27,750.00$ 20,350.00$ 19,906.00$
63308-2000
Line X1280 35 EACH 65.00$ 2,275.00$ 2,100.00$ 1,925.00$
63309-0100
Line X1300 280 EACH 25.00$ 7,000.00$ 5,600.00$ 5,600.00$
63316-1000
Line X1320 6 EACH 450.00$ 2,700.00$ 3,600.00$ 2,700.00$
1,200.00$ 1,000.00$
2,200.00$ 700.00$
2.40$ 0.86$
180.00$ 200.00$
230.00$ 120.00$
55.00$ 40.00$
210.00$ 200.00$
150.00$ 140.00$
110.00$ 90.00$
240.00$ 250.00$
190.00$ 80.00$
140.00$ 90.00$
110.00$ 90.00$
1,000.00$ 1,100.00$
1,100.00$ 1,100.00$
1,400.00$ 1,400.00$
17.00$ 18.00$
REMOVE AND RESET SIGN
HYDRAULIC EXCAVATOR, 3.0 CUBIC YARD MINIMUM CAPACITY, 165HP MINIMUM FLYWHEEL POWER
GENERAL LABOR
SPECIAL LABOR, HIRED TECHNICAL SERVICES
SPECIAL LABOR, HIRED SURVEY SERVICES
PLACING CONSERVED TOPSOIL, 3-INCH DEPTH
SEEDING, HYDRAULIC METHOD
DUMP TRUCK, 6 CUBIC YARD MINIMUM CAPACITY
BACKHOE
WHEEL LOADER, 0.4 CUBIC YARD MINIMUM RATED CAPACITY
BULLDOZER, 350HP MINIMUM FLYWHEEL POWER
ROLLER
MOTOR GRADER, 12 FOOT MINIMUM BLADE
FENCE, RAIL
GATE, METAL, 16 FEET WIDTH
GATE, BARBED WIRE, 4-STRAND
REMOVE AND RESET GATE
MULCHING, HYDRAULIC METHOD
ROLLED EROSION CONTROL PRODUCT, TYPE 2.B
SIGN SYSTEM
OBJECT MARKER, TYPE 2
DELINEATOR, TYPE 1
4.00$ 2.25$
60.00$ 55.00$
550.00$ 538.00$
600.00$ 450.00$
20.00$ 20.00$
12/11/2015 Page 3 of 4
Project No: CO FLAP CR77(5)
Project Name: Tarryall Creek Road
CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount
Engineer's Estimate A & S Construction Co. American Civil Constructors, Inc.
63404-0200
Line X1340 290 GAL 70.00$ 20,300.00$ 17,400.00$ 10,730.00$
63501-1000
Line X1360 ALL LPSM 40,000.00$ 40,000.00$ 55,000.00$ 29,000.00$
63502-0600
Line X1380 4 EACH 400.00$ 1,600.00$ 120.00$ 1,200.00$
63502-0900
Line X1400 750 EACH 12.00$ 9,000.00$ 8,250.00$ 21,750.00$
63502-1300
Line X1420 100 EACH 25.00$ 2,500.00$ 3,500.00$ 8,900.00$
63503-0400
Line X1440 70 LNFT 65.00$ 4,550.00$ 4,900.00$ 1,540.00$
63504-1000
Line X1460 215 SQFT 15.00$ 3,225.00$ 3,225.00$ 14,190.00$
63505-1000
Line X1480 6.0 MILE 1,850.00$ 11,100.00$ 22,800.00$ 15,000.00$
63506-0500
Line X1500 3,600 HOUR 26.00$ 93,600.00$ 93,600.00$ 100,800.00$
63506-0600
Line X1520 1,200 HOUR 48.00$ 57,600.00$ 60,000.00$ 60,000.00$
64620-0400
Line X1540 2 EACH 630.00$ 1,260.00$ 1,400.00$ 1,200.00$
TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
TEMPORARY TRAFFIC CONTROL, FLAGGER
TEMPORARY TRAFFIC CONTROL, PILOT CAR
REMOVE AND RESET MAILBOX
PAVEMENT MARKINGS, TYPE B
TEMPORARY TRAFFIC CONTROL, TRAFFIC AND SAFETY SUPERVISOR
TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
TEMPORARY TRAFFIC CONTROL, CONE, TYPE 28-INCH
TEMPORARY TRAFFIC CONTROL, DRUM
TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER
55,000.00$ 29,000.00$
60.00$ 37.00$
11.00$ 29.00$
30.00$ 300.00$
70.00$ 22.00$
35.00$ 89.00$
3,800.00$ 2,500.00$
15.00$ 66.00$
50.00$ 50.00$
26.00$ 28.00$
700.00$ 600.00$
12/11/2015 Page 4 of 4