FO_IFB_-_AZ_FLAP_64(3) _199(1) _288(3).pdf

PDF 959 KB Posted

Attached to
AZ FLAP 64(3), 199(1), 288(3), Control Road, Houston Mesa Road and Reynolds Creek
Solicitation number
DTFH68-13-B-00011
Issued by

About this file

This file is the Invitation for Bid. TO DOWNLOAD PLANS amendments Q A Geotechnical/Hydraulic reports and other information GO TO http //www.cflhd.gov/contracting/construction/AdvertisedProjects.cfm

View the file

Other files

File Type Posted
A001_Control_Road.pdf PDF
A002ChesterWarnerValley.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INVITATION FOR BID

SOLICITATION NUMBER: DTFH68-13-B-00011

SOLICITATION TYPE: FULL AND OPEN COMPETITION (UNRESTRICTED)

PROJECT NUMBER: AZ FLAP 64(3), 199(1), 288(3)

PROJECT NAME: CONTROL ROAD, HOUSTON MESA ROAD, AND

REYNOLDS CREEK BRIDGES

BID OPENING DATE:

See Page A-1, Block 13A

This solicitation cites

Standard Specifications for Construction of Roads and Bridges On Federal Highway Projects, FP-03 U.S. Customary Units

ISSUING OFFICE:

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

12300 W. DAKOTA AVENUE, SUITE 360

LAKEWOOD, CO 80228

Web site: http://www.cflhd.gov/contracting/construction E-mail: CFLContracts@dot.gov

PROJECT AZ FLAP 64(3), 199(1), 288(3)

STATIONS: (SEPARATE BRIDGE SITES)

LENGTH .62 MILES

LOCATION TONTO NATIONAL FOREST

COUNTY GILA COUNTY

STATE ARIZONA

TYPE OF IMPROVEMENT ROAD RECONSTRUCTION,

BRIDGES, STREAM

IMPROVEMENTS, AND

DRAINAGE

TABLE OF CONTENTS

Notice to Bidders ................................................................................................. A-i to A-iv

Solicitation, Offer, and Award ............................................................................. A-1 to A-3

Basis for Award, Partnering, and Bid Schedule ............................................... A-4 to A-13

Buy American/Hazardous Materials ............................................................... A-14 to A-15

Solicitation Provisions ....................................................................................... B-1 to B-17

Contract Clauses ................................................................................................ C-1 to C-21

Davis Bacon Wage Determination ....................................................................... D-1 to D-5

Division 100 ........................................................................................................ E2- to E-29 Division 150 ...................................................................................................... E29- to E-56 Division 200 ...................................................................................................... E-56 to E-72 Division 300 ...................................................................................................... E-72 to E-74 Division 400 ...................................................................................................... E-74 to E-81 Division 500 ...................................................................................................... E-82 to E-99 Division 600 .................................................................................................... E-99 to E-116 Division 700 .................................................................................................. E-116 to E-128

APPENDICES

Appendix A ............................................................................................................. Fire Plan

Appendix B ........................................................................................... Subcontracting Plan

SPECIAL CONTRACT REQUIREMENTS (SCRs)

The following Special Contract Requirements amend and supplement the Standard Specification for Construction of Roads and Bridges on Federal Highway Projects

NOTICE TO BIDDERS

A-i

NOTE TO LARGE BUSINESSES:

Due to the compressed schedule for award of this project following the bid opening, large businesses are required to submit their completed subcontracting plan with their bid. Failure to submit a subcontracting plan may deem your bid non-responsive.

A sample of a subcontracting plan is included as Appendix B in this solicitation.

Prior to development of this subcontracting plan, please read FAR Clause

52.219-9 – Small Business Subcontracting Plan (April 2008).

It is the Prime Contractors responsibility to ensure that all small business concerns included in this subcontracting plan are eligible. The SAM website is the only source for certification of Small Disadvantaged Business and HUBZone Small Business concerns.

Prime Contractors are encouraged to post sources sought notices for subcontracting opportunities on http://web.sba.gov/subnet/ Small businesses can review this web site to identify opportunities in their areas of expertise.

The use of SUB-Net fulfills the requirements set forth in Federal Acquisition Regulation (FAR) 5.206, Notice of Subcontracting Opportunities, for contractors and subcontractors to post notices and thereby increase competition for subcontracts.

ELECTRONIC BIDS WILL NOT BE ACCEPTED. Submit a printed copy of your bid to the address listed on the SF-1442 (Page A-1, Block 8). Please submit the following with your bid:

Have you rechecked your bid figures?

Have you completed the bid schedule?

Have you completed and signed the SF-1442, Solicitation, Offer & Award?

Have you acknowledged all amendments (See Page A-3, Block 19)?

Have you completed the Representations & Certifications (See B-Section)?

Is your bid guarantee enclosed in proper form and amount, including Power of Attorney affidavit (see FAR Clause 52.228-1)?

Does the lower left corner of the proposal envelope state “Bid Enclosed”?

Does the lower left corner of the proposal envelope include the Solicitation Number and the project number/name?

A-ii

Bids should be submitted in a sealed enveloped and include the Contractor’s Name, Solicitation Number and the Project Number/Name.

I. PRE-BID INFORMATION

It is the responsibility of the bidder to verify that this solicitation document, including the plans, are complete as listed in the table of contents and the index to sheets. Plan sheets can be found at http://www.cflhd.gov/procurement/construction/advertised-projects.cfm and viewed by individual sections, downloaded by individual sections, or the entire plan set downloaded in a zip file.

Physical data relevant to this solicitation may also be viewed or downloaded at the above site.

This solicitation and subsequent contract are governed by the Federal Acquisition Regulations (FAR), agency supplemental regulations, and the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-03 English Units (FP-03).

The FP-03 was utilized for the design of this project. Hard copies of the FP-03 will not be provided to bidders. The FP-03 is available electronically at http://flh.fhwa.dot.gov/resources/pse/standard/ or may be purchased by contacting Bob Rosenblatt at ARC Western, telephone number 303-785- 2520 or email bob.rosenblatt@e-arc.com.

Applicable FAR provisions and clauses in this IFB are incorporated by reference or full text.

FAR provisions and clauses incorporated by reference can be accessed on the Internet at https://www.acquisition.gov/far/ .

Notice of SAM Registration – you must register in the System for Award Management (SAM – replaced CCR) prior to award of a contract resulting from this solicitation. Failure to register prior to contract award may require award to the next successful registered offeror. See FAR Subpart 4.1103©. Register online at www.sam.gov.

Representations and Certifications – This solicitation is issued under NAICS 237310 – Highway, Street & Bridge Construction with a small business size standard of $33.5 million. If your average annual gross receipts for the past 3 years are above $33.5 million, you are a large business for this solicitation. If they are below $33.5 million you are a small business. Please complete the certification listed in paragraph (b) of FAR Provision 52.204-8 Annual Representation and Certifications on Page B-1. Your small business information is pulled into the Online Representations and Certifications Application (ORCA) website from the Central Contractor Registration (CCR). Please include NAICS 237310 in your CCR. Before submitting bids, please ensure you have completed your annual representations and certifications electronically at the ORCA website at http://orca.bpn.gov.

This Solicitation Contains a Price Evaluation Factor - The Government will apply a factor of 10% to an apparent low bid submitted by a large business when we also receive a bid from a certified HUBZone small business concern. The 10% factor does not apply to apparent low bids submitted by small businesses. See FAR Clause 52.219-4 Notice of price evaluation preference for HUBZone small business concerns.

A-iii

In the event this full and open competition results in a contract award to a qualified HUBZone SBC after a price evaluation preference, FAR Clause 52.236-1, Performance of Work by the Contractor does not apply.

§126.700 of the Code of Federal Regulations (Title 13, Part 126, Subpart G), stated below, will replace the performance of work requirements stated in the above mentioned FAR clause. A qualified HUBZone SBC receiving a contract under this solicitation for general construction must spend at least 50% of the cost of the contract incurred for personnel on its own employees or employees of other qualified HUBZone SBCs. This requirement may be met by expending at least 50% of the cost of the contract incurred for personnel on its employees or it may subcontract at least 35% of the cost of the contract performance incurred for personnel to one or more qualified HUBZone SBCs. A qualified HUBZone SBC prime contractor may not, however, subcontract more than 50% of the cost of the contract incurred for personnel to non-qualified HUBZone SBCs.

Bid Guarantee – Follow the requirements of FAR Clause 52.228-1 Bid Guarantee and Subpart

102.03 of the FP-03.

ATTENTION: Minority, Women-owned, and Disadvantaged Business Enterprises (DBEs). The Department of Transportation (DOT), offers working capital financing and bonding assistance for transportation related contracts. DOT's Bonding Assistance Program (BAP) offers bid, performance and payment bonds on contracts up to $1,000,000. DOT's Short-Term Lending Program (STLP) offers lines of credit to finance accounts receivable. Maximum line of credit is $500,000 with interest at the prime rate. For further information, call (800) 532-1169. Internet address:

http://osdbuweb.dot.gov.

The Contractor is fully responsible to verify that all data is correct when an offer is submitted.

Failure to properly update your data may cause the offer to be rejected.

Request for Technical Information – Questions relative to the plans and SCRs for this solicitation will only be accepted in writing (see Block 9 on page A-3).

TECHNICAL QUESTIONS REGARDING THIS SOLICITATION WILL NOT BE

ACCEPTED AFTER 4 P.M. ON AUGUST 29, 2013

Questions can be submitted to CFLContracts@fhwa.dot.gov. Questions and answers will be posted at http://www.cflhd.gov/procurement/construction/advertised-projects.cfm

Modifications to Bids - Bids may be modified or withdrawn by facsimile or telegraphic notice, if such notice is received prior to the time specified for receipt of bids. The Government will not be responsible for ANY failure attributable to the transmission or receipt of telegraphic or facsimile data. See FAR Provision 52.214-5, Submission of Bids. Revisions should be in the form of a fully revised bid schedule. Revisions that require the CFLHD to add or subtract from a contractor’s bid are not acceptable. Please fill out the ENTIRE bid schedule and send the fully amended bid schedule.

FAX Number to submit modifications to bids for this project is (720) 963-3360

A-iv

II. Post Award Information.

Subcontracting - FAR Clause 52.219-8, Utilization of Small Business Concerns states that Prime Contractors afford small business concerns, veteran-owned small business concerns, service-disabled veteran-owned small business concerns, HUBZone small business concerns, small disadvantaged business concerns, and women-owned small business concerns the maximum practicable opportunity to participate in performing contracts let by any Federal agency.

FAR Clause 52.219-9, Small Business Subcontracting Plan, Alternate I, requires that the large business concern who is the successful low bidder on a Federal project with an anticipated award amount exceeding $1 million, is required to submit a subcontracting plan prior to contract award. The subcontracting plan expresses goals in terms of percentages of total planned subcontracting dollars for the use of small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns as subcontractors. To view and download a sample plan for subcontracting requirements, visit http://www.cflhd.gov/contracting/construction/ReferenceLinks.cfm.

Prime Contractors, who are large businesses, are encouraged to post sources sought notices at the Small Business Administration’s Subcontracting Network (SUB-NET) http://web.sba.gov/subnet/ so that small businesses can identify opportunities in their areas of expertise. The use of SUB-Net fulfills the requirements set forth in Federal Acquisition Regulation (FAR) 5.206, Notice of Subcontracting Opportunities, for contractors and subcontractors to post notices and thereby increase competition for subcontracts. If the apparent successful low bidder fails to submit an acceptable subcontracting plan with their bid package, that bidder may be ineligible for award of the contract.

A list of currently known business concerns owned and controlled by socially and economically disadvantaged individuals and/or women-owned small business concerns that have indicated an interest in participating in highway construction is available at http://www.ccr.gov

Insurance requirements - See Subsection 107.05 of the FP-03.

EEBACS - Contractors shall use the Government’s web-based system, Engineer’s Estimating, Bidding, Award, and Construction System (EEBACS), to prepare all “Inspector’s Daily Record of Construction Operations” (Contractors Daily Reports) and measurement notes (pay notes).

The Contractor shall be required to attend a training session on the use of EEBACS. The training session will require up to 4 hours. No more than 3 Contractor staff may attend the training unless approved by the CO. The Contractor shall be responsible for training additional staff.

The Contractor shall be required to submit a user account form to gain access to the EEBACS system. See Subsection 108.01.

A user guide, “EEBACS for Construction Contractors”, is available. An electronic version can be found at http://flh.fhwa.dot.gov/resources/pse/estimate/guide.htm

A-1

SOLICITATION, OFFER

AND AWARD

(Construction, Alteration or Repair)

1. SOLICITATION NO.

DTFH68-13-B-00011

2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED

8/8/13

PAGE OF

PAGES

IMPORTANT - THE "OFFER SECTION ON THE REVERSE MUST BE FULLY COMPLETED BY OFFEROR.

4. CONTRACT NO.

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

AZ FLAP 64(3), 199(1), 288(3)

7. ISSUED BY:

FEDERAL HIGHWAY ADMINISTRATION

CENTRAL FEDERAL LANDS DIVISION

12300 WEST DAKOTA AVENUE, SUITE 167

LAKEWOOD, COLORADO 80228

CODE: 69050001 8. ADDRESS OFFER TO:

FEDERAL HIGHWAY ADMINISTRATION

CENTRAL FEDERAL LANDS DIVISION

ATTN: Jeremiah Rogers

12300 WEST DAKOTA AVENUE, SUITE 167

LAKEWOOD, COLORADO 80228

9. FOR INFORMATION CALL

SEE PAGE A-3

A. NAME:

SEE PAGE A-3

B. TELEPHONE NO. (Include area code)

SEE PAGE A-3

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS:

CONSTRUCTION OF CO FLAP CR 742(5), TAYLOR RIVER ROAD, IN STRICT ACCORDANCE WITH:

1. FEDERAL ACQUISITION AND TRANSPORATION ACQUISITION REGULATIONS (FAR & TAR)

2. DEPARTMENT OF LABOR, DAVIS BACON MINIMUM WAGE RATES

3. SPECIAL CONTRACT REQUIREMENTS

4. PLANS

5. BID SCHEDULE

6. STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY

PROJECTS

7. SUBCONTRACTING PLAN (IF APPLICABLE)

See Subsection 104.04 of the FP-03 for governing order of precedence

11. The Contractor shall begin performance within 10 calendar days and complete it within * calendar days after receiving award notice to proceed. The performance period is mandatory negotiable. *Refer to Subsection 108.01 as amended in the Special Contract Requirements.

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.) YES NO

12B. CALENDAR

DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and 0 copies to perform the work required are due at the place specified in Item 8. by 2:00 p.m.

(hour) local Denver, CO time on 9/6/13 (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is is not required.

C. All offers are subject to the (1) work requirements and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NSN 7540-01-155-3212 1442-102 STANDARD FORM 1442 (REV. 4-85)

X

X

X

X

X

A-2

Prescribed by GSA FAR (48 CFR) 53-236-1(e)

GPO: 1985 0 - 469-796 STANDARD FORM 1442 PAGE 2 (REV. 4-85)

OFFEROR (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14)

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing with calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS

SEE INDIVIDUAL BID SCHEDULE(S)

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED

TO SIGN OFFER (Type or print)

20B. SIGNATURE

20C. OFFER

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 27

(4 copies unless otherwise specified)

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

□ 15 U.S.C. 637( ) □ 41 U.S.C. 253(c)( )

26. ADMINISTERED BY CODE:

27. PAYMENT WILL BE MADE BY

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

12300 W. DAKOTA AVENUE, SUITE 167

LAKEWOOD, COLORADO 80228

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office.)

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by

(a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON

AUTHORIZED TO SIGN (Type or print)

31A. NAME OF CONTRACTING OFFICER (Type or print)

30B. SIGNATURE

30C. DATE 31B. UNITED STATES OF AMERICA

BY

31C. AWARD

A-3

Block 8: LOCATION OF PUBLIC BID OPENING: Offers must be received by designated date and time as stated in Block 13A.

Block 9: FOR GENERAL INFORMATION: Call 720-963-3090 or e-mail us at

CFLContracts@dot.gov.

FOR TECHNICAL INFORMATION (plans and specifications): Questions must be submitted in writing by e-mail at CFLContracts@dot.gov or by fax to 720-963-3360.

FOR PHYSICAL DATA: The following data is available electronically at http://www.cflhd.gov/contracting/construction/AdvertisedProjects.cfm:

Geotech Report

Hydraulics Report

Block 11: COMPLETION DATE: Work shall be completed on or before the date specified in Subsection 108.01 of the SCRs.

Block 12A: PERFORMANCE AND PAYMENT BONDS: See FAR Clause 52.228-15

Performance and Payment Bonds-Construction (Clauses begin on Page C-1) and Subsection 102.06 of the FP-03.

Block 13B: BID BOND AMOUNT: See FAR Provision 52.228-1 Bid Guarantee

(Provisions begin on Page B-1) and Subsection 102.03 Bid Guarantee of the

FP-03.

Block 19: ACKNOWLEDGMENT OF AMENDMENTS: FAILURE TO

ACKNOWLEDGE AMENDMENTS, IN BLOCK 19 OF THE SF-1442, BY

THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION

MAY RESULT IN REJECTION OF YOUR BID. If amendments are issued, they will be posted to www.fbo.gov and/or http://www.cflhd.gov/contracting/construction/AdvertisedProjects.cfm.

Block 24: SUBMITTING INVOICES: See Subsection 109.08 Progress Payments of the

FP-03.

ESTIMATED

PRICE: The price range of the project work is between $5,000,000 and $10,000,000.

A-4

Bid Schedule Instructions

BIDDERS, PLEASE NOTE: Before preparing the bid, carefully read the Solicitation Provisions.

This Bid Proposal is comprised of one schedule as follows:

Schedule A – Road reconstruction, bridges, stream improvements, and drainage.

• Insert a numeric unit bid price for each pay item for which a quantity appears in the bid schedule. Unit bid prices should be quoted no more precisely than the nearest cent (2 decimal places). Unit bid prices quoted more precisely will be rounded up to the nearest cent by the Government

• Multiply the unit price by the quantity for each pay item and show the amount bid.

When the words “Lump Sum” appear as a unit bid price, insert an amount for each lump sum pay item.

• Total all amounts bid for each pay item and show the overall total each for each Schedule and Option separately.

NOTE: If the amount bid for a pay item is inconsistent with the product of the unit price provided by the bidder and the quantity provided by the Government, the unit price will govern and the Government will determine a corrected amount bid for the pay item by multiplying the unit price by the quantity.

Evaluation Factors for Award

To be eligible for award of contract, the offeror shall submit prices for each item in Bid Schedule A.

Accordingly, contract award will be made to the lowest responsible bidder conforming to the solicitation.

A-5

Pay Item 15401-0000, Contractor Testing

Bidders must provide prices on two alternative Contractor Testing pay items in two different places in each schedule’s bid tab.

On Page A-6 in Schedule A bidders must provide a price for Contractor Testing using a Contractor-furnished field laboratory. As part of Schedule A the price for this alternative item will be included in the "Schedule A Total" line and, therefore, included in the evaluation for award.

Bidders must also provide a stand-alone price on the bottom of Page A-13 for the alternative item, Contractor Testing using a Government-furnished field laboratory. This price will not be factored into the evaluation for award. The Government retains the discretion to award a contract which includes either of the alternative Contractor Testing items at the respective bid price.

PARTNERING

A Partnership recognizes the Government and the Contractor are both responsible and can affect the successful completion of this project. Partnering is a vehicle to ensure the partnership has structure and quality. It recognizes the strengths of each party and uses those strengths to identify and achieve shared goals. One of the primary objectives of Partnering is to facilitate the resolution of disputes in a timely, professional, and non-adversarial manner with the outcome focused on achieving those shared goals.

CFLHD supports the concepts and tenets of Partnering and as such is encouraging the Contractors and it’s subcontractors to establish a Partnering relationship on this project.

A formal Partnering meeting can help facilitate this relationship by helping do document the parties’ common purpose and goals, and ensuring alignment. The goals are mutually agreed upon and address effective and efficient performance within the scope of the contract.

Participation in a formal Partnering meeting is voluntary. Costs of implementing and maintaining the partnership would be agreed to by both parties as described in Subsection 103.05 Partnering of the FP-03. Costs of partnering would be in addition to the contract award amount.

Please indicate your desire to participate in a formal partnering meeting on this project.

(___) We would like to participate in a formal partnering meeting.

(___) We do not want to participate in a formal partnering meeting.

A - 6

Contract Quantity Pay Items

20801-0000 STRUCTURE EXCAVATION

55201-0200 STRUCTURAL CONCRETE, CLASS A (AE)

55401-1000 REINFORCING STEEL

55401-2000 REINFORCING STEEL, EPOXY COATED

55601-0900 BRIDGE RAILING, STEEL

61707-0000 STRUCTURE TRANSITION RAILING

Item No. Pay Item No. Description Quantity Unit Unit Price Amount

A0100 15101-0000 MOBILIZATION

ALL LPSM $___LPSM_____ $____________

A0150 15206-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE

36.2 STA $____________ $____________

A0200 15214-1000 SURVEY AND STAKING, BRIDGE

ALL LPSM $___LPSM_____ $____________

A0250 15214-2000 SURVEY AND STAKING, RETAINING WALL

ALL LPSM $___LPSM_____ $____________

A0300 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE

8 EACH $____________ $____________

A0350 15215-5000 SURVEY AND STAKING, BOX CULVERT

1 EACH $____________ $____________

A0400 15216-2000 SURVEY AND STAKING, GRADE FINISHING STAKES

68.6 STA $____________ $____________

A0450 15301-0000 CONTRACTOR QUALITY CONTROL

ALL LPSM $___LPSM_____ $____________

A0500 15401-0000 CONTRACTOR TESTING

ALL LPSM $___LPSM_____ $____________

A0550 15501-0000 CONSTRUCTION SCHEDULE

ALL LPSM $___LPSM_____ $____________

A0600 15702-1000 SOIL EROSION CONTROL, TEMPORARY DIVERSION CHANNEL

ALL LPSM $___LPSM_____ $____________

Bid Schedule Schedule:A Schedule Type:Base

Project No:AZ FLAP 64(3) 199(1) 288(3)

Project Name:Control, Houston Mesa, Reynolds Creek

A - 7

A0650 15705-0100 SOIL EROSION CONTROL, SILT FENCE

2,600 LNFT $____________ $____________

A0700 15705-1500 SOIL EROSION CONTROL, SEDIMENT WATTLE

2,120 LNFT $____________ $____________

A0750 15706-0200 SOIL EROSION CONTROL, CHECK DAM

20 EACH $____________ $____________

A0800 15801-0000 WATERING FOR DUST CONTROL

2,250 MGAL $____________ $____________

A0850 20101-0000 CLEARING AND GRUBBING

5.0 ACRE $____________ $____________

A0900 20301-1900 REMOVAL OF PIPE CULVERT

7 EACH $____________ $____________

A0950 20301-2300 REMOVAL OF SIGN/MARKER

45 EACH $____________ $____________

A1000 20301-2700 REMOVAL OF STRUCTURE

4 EACH $____________ $____________

A1050 20302-1200 REMOVAL OF GUARDRAIL

430 LNFT $____________ $____________

A1100 20303-1600 REMOVAL OF PAVEMENT, ASPHALT

1,000 SQYD $____________ $____________

A1150 20420-0000 EMBANKMENT CONSTRUCTION

19,300 CUYD $____________ $____________

A1200 20801-0000 STRUCTURE EXCAVATION

315 CUYD $____________ $____________

A1250 20820-0000 DEWATERING

ALL LPSM $___LPSM_____ $____________

A1300 21101-1000 ROADWAY OBLITERATION, METHOD 1

1,030 SQYD $____________ $____________

Bid Schedule Schedule:A Schedule Type:Base

A - 8

A1350 25101-1000 PLACED RIPRAP, CLASS 1

62 CUYD $____________ $____________

A1400 25101-2000 PLACED RIPRAP, CLASS 2

380 CUYD $____________ $____________

A1450 25101-3000 PLACED RIPRAP, CLASS 3

150 CUYD $____________ $____________

A1500 25101-4000 PLACED RIPRAP, CLASS 4

376 CUYD $____________ $____________

A1550 25101-5000 PLACED RIPRAP, CLASS 5

860 CUYD $____________ $____________

A1600 25125-0000 BOULDER

145 EACH $____________ $____________

A1650 25126-0000 REMOVE AND RESET BOULDER

36 EACH $____________ $____________

A1700 25210-0000 ROCKERY (IN FILL)

175 SQYD $____________ $____________

A1750 25210-0000 ROCKERY (IN CUT)

200 SQYD $____________ $____________

A1800 25302-1000 GABIONS, GALVANIZED OR ALUMINIZED COATED

85 CUYD $____________ $____________

A1850 30802-2000 ROADWAY AGGREGATE, METHOD 2

3,400 TON $____________ $____________

A1900 40301-0000 HOT ASPHALT CONCRETE PAVEMENT

1,475 TON $____________ $____________

A1950 40920-1000 FOG SEAL, EMULSIFIED ASPHALT GRADE CSS-1 OR CSS-1H, SS-1 OR SS-1H

4.0 TON $____________ $____________

A2000 41201-1000 TACK COAT GRADE CSS-1, CSS-1H, SS-1, OR SS-1H

4.0 TON $____________ $____________

Bid Schedule Schedule:A Schedule Type:Base

A - 9

A2050 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE)

807 CUYD $____________ $____________

A2100 55216-0000 CONCRETE COLOR AGENT

14,800 LB $____________ $____________

A2150 55302-1400 PRECAST, PRESTRESSED CONCRETE BOX BEAM, NON-STANDARD

1,335 LNFT $____________ $____________

A2200 55401-1000 REINFORCING STEEL

52,400 LB $____________ $____________

A2250 55401-2000 REINFORCING STEEL, EPOXY COATED

130,300 LB $____________ $____________

A2300 55601-0900 BRIDGE RAILING, STEEL

826 LNFT $____________ $____________

A2350 56302-1000 PAINTING, CONCRETE STRUCTURE

1,580 SQFT $____________ $____________

A2400 56401-1000 BEARING DEVICE, ELASTOMERIC

32 EACH $____________ $____________

A2450 56501-0300 DRILLED SHAFTS, 30-INCH DIAMETER

305 LNFT $____________ $____________

A2500 56501-0300 DRILLED SHAFTS, 30-INCH DIAMETER (ROCK SOCKET)

95 LNFT $____________ $____________

A2550 56501-0400 DRILLED SHAFTS, 36-INCH DIAMETER (ROCK SOCKET)

60 LNFT $____________ $____________

A2600 56501-0400 DRILLED SHAFTS, 36-INCH DIAMETER

65 LNFT $____________ $____________

A2650 60201-0600 18-INCH PIPE CULVERT

170 LNFT $____________ $____________

A2700 60201-0800 24-INCH PIPE CULVERT

160 LNFT $____________ $____________

Bid Schedule Schedule:A Schedule Type:Base

A - 10

A2750 60201-1000 36-INCH PIPE CULVERT

90 LNFT $____________ $____________

A2800 60202-0800 48-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT

55 LNFT $____________ $____________

A2850 60210-0600 END SECTION FOR 18-INCH PIPE CULVERT

6 EACH $____________ $____________

A2900 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT

5 EACH $____________ $____________

A2950 60210-1000 END SECTION FOR 36-INCH PIPE CULVERT

4 EACH $____________ $____________

A3000 60212-0800 ELBOW, 24-INCH

1 EACH $____________ $____________

A3050 60220-0000 PRECAST REINFORCED CONCRETE BOX CULVERT

80 LNFT $____________ $____________

A3100 60602-0700 PIPE ANCHOR ASSEMBLY, 24-INCH

2 EACH $____________ $____________

A3150 60901-1300 CURB, CONCRETE, 15-INCH DEPTH

260 LNFT $____________ $____________

A3200 60908-1000 PAVED DITCH, ASPHALT

20 SQYD $____________ $____________

A3250 61003-0000 COLLECTOR SYSTEM (BRIDGE DRAIN)

ALL LPSM $___LPSM_____ $____________

A3300 61301-0000 SIMULATED STONE MASONRY SURFACE TREATMENT

270 SQYD $____________ $____________

A3350 61701-2000 GUARDRAIL SYSTEM G4, TYPE 4, CLASS B WOOD POSTS

940 LNFT $____________ $____________

A3400 61701-4350 GUARDRAIL SYSTEM CRG, TYPE 4, CLASS B

80 LNFT $____________ $____________

Bid Schedule Schedule:A Schedule Type:Base

A - 11

A3450 61702-0400 TERMINAL SECTION, TYPE G4-CRT

2 EACH $____________ $____________

A3500 61702-0800 TERMINAL SECTION TYPE TANGENT

8 EACH $____________ $____________

A3550 61707-0000 STRUCTURE TRANSITION RAILING

228 LNFT $____________ $____________

A3600 61711-5000 IMPACT ATTENUATOR, QUADGUARD

1 EACH $____________ $____________

A3650 61902-2100 GATE, METAL, 30 FEET WIDTH

1 EACH $____________ $____________

A3700 62201-0150 DUMP TRUCK, 7 CUBIC YARD MINIMUM CAPACITY

40 HOUR $____________ $____________

A3750 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET,

24-INCH WIDTH

40 HOUR $____________ $____________

A3800 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY

40 HOUR $____________ $____________

A3850 62201-1400 BULLDOZER, 250HP MINIMUM FLYWHEEL POWER

40 HOUR $____________ $____________

A3900 62201-2800 MOTOR GRADER, 8 FOOT MINIMUM BLADE

40 HOUR $____________ $____________

A3950 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY

40 HOUR $____________ $____________

A4000 62301-0000 GENERAL LABOR

40 HOUR $____________ $____________

A4050 62302-0100 SPECIAL LABOR, SLOPE SCALING

8 HOUR $____________ $____________

Bid Schedule Schedule:A Schedule Type:Base

A - 12

A4100 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES

40 HOUR $____________ $____________

A4150 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES

40 HOUR $____________ $____________

A4200 62405-0300 PLACING CONSERVED TOPSOIL, 4-INCH DEPTH

10,950 SQYD $____________ $____________

A4250 62510-2000 SEEDING, HYDRAULIC METHOD

3.0 ACRE $____________ $____________

A4300 62515-3000 MULCHING, HYDRAULIC METHOD, BONDED FIBER MATRIX

3.0 ACRE $____________ $____________

A4350 62901-0800 ROLLED EROSION CONTROL PRODUCT, TYPE 2.D

640 SQYD $____________ $____________

A4400 63301-0000 SIGN SYSTEM

14 EACH $____________ $____________

A4450 63308-0000 OBJECT MARKER

14 EACH $____________ $____________

A4500 63309-0000 DELINEATOR

29 EACH $____________ $____________

A4550 63316-1000 REMOVE AND RESET SIGN

3 EACH $____________ $____________

A4600 63404-0200 PAVEMENT MARKINGS, TYPE B

65 GAL $____________ $____________

A4650 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE

125 EACH $____________ $____________

A4700 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM

125 EACH $____________ $____________

A4750 63502-1500 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE A

30 EACH $____________ $____________

Bid Schedule Schedule:A Schedule Type:Base

A - 13

A4800 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B

35 EACH $____________ $____________

A4850 63502-1700 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE C

65 EACH $____________ $____________

A4900 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN

2 EACH $____________ $____________

A4950 63502-3100 TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNAL SYSTEM

1 EACH $____________ $____________

A5000 63503-0300 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3

180 LNFT $____________ $____________

A5050 63503-0400 TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER

350 LNFT $____________ $____________

A5100 63503-0500 TEMPORARY TRAFFIC CONTROL, MOVING CONCRETE BARRIER

350 LNFT $____________ $____________

A5150 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS

5,760 LNFT $____________ $____________

A5200 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

600 SQFT $____________ $____________

A5250 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER

3,750 HOUR $____________ $____________

A5300 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR

1,250 HOUR $____________ $____________

A5350 65001-1000 CONSTRUCT AND MAINTAIN DIVERSION

ALL LPSM $___LPSM_____ $____________

Submitted by:____________________________________ Schedule Total:____________

Bid Schedule Schedule:A

Project No:AZ FLAP 64(3) 199(1) 288(3)

Project Name:Control, Houston Mesa, Reynolds Creek

Jeremiah.Rogers Typewritten Text Option A Alternate Bid Item 15401-0000, Contractor Testing (Government furnished lab trailer)** **See Page A-5 of this Solicitation for an explanation of how to bid this item.

Jeremiah.Rogers Typewritten Text

Jeremiah.Rogers Typewritten Text

Jeremiah.Rogers Typewritten Text

Jeremiah.Rogers Typewritten Text

Jeremiah.Rogers Typewritten Text

Jeremiah.Rogers Typewritten Text

A-14

BUY AMERICAN ACT- CONSTRUCTION MATERIALS

UNDER TRADE AGREEMENTS

It is understood and agreed that the materials and components listed in Subparts 25.1 and 25.2 of the FAR are a part of this contract and are deemed to be Domestic Construction Material for the purposes of this contract.

NOTE TO CONTRACTOR:

The following information and any applicable supporting data is required for evaluation of requests under FAR Clause 52.225-11 Paragraph (c) & (d) and FAR Provision 52.225-12 Paragraph (b).

Material and/or Component

Construction Material Description Unit of Measure Quantity *Cost Delivered to Job Site

Foreign Construction Material

Comparable Domestic Material

Material and/or Component

Construction Material Description Unit of Measure Quantity *Cost Delivered to Job Site

Foreign Construction Material

Comparable Domestic Material

[* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).] [Please include name, address, telephone number and contact for suppliers surveyed. Attach copy of response; if oral, attach summary. Include all applicable supporting information.]

A-15

HAZARDOUS MATERIALS

As required by FAR Clause 52.223-3, Hazardous Materials Identification and Safety Data - Alternate I, the apparent low bidder must submit prior to award a Material Safety Data Sheet (MSDS) for all hazardous materials that the bidder identifies in paragraph (b) of the FAR clause and defined under the latest version of Federal Standard No. 313.

Hazardous Material Identification Number

USE OF RECOVERED MATERIALS ON FEDERAL LANDS HIGHWAY PROJECTS

Section 6002 of the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act (RCRA) of 1976, as amended (42 U.S.C. 6901 et seq.), requires Federal, State, and local procuring agencies using appropriated Federal funds to purchase items composed of the highest percentage of recovered materials practical. Use of recovered materials is strongly encouraged on Federal Lands Highway Projects. Highway construction items covered by the Environmental Protection Agency’s Comprehensive Guidelines for Procurement of Products Containing Recovered Materials include fly ash, ground granulated blast furnace slag, traffic barricades, traffic cones, hydraulic mulch and compost for mulch.

Use of fly ash and ground granulated blast furnace slag and construction materials containing fly ash and ground granulated blast furnace slag on Federal Lands Highway Projects:

It is the policy of the United States Government that fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag shall have maximum practicable opportunity for incorporation into its construction projects.

The Contractor agrees to investigate the use of fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag to the fullest extent consistent with the efficient performance of this contract. Both the contractor and the subcontractors are urged to seek out suppliers of fly ash and ground granulated blast furnace slag, cement and concrete containing fly ash and ground granulated blast furnace slag and to solicit bids for these materials.

Names of firms that supply fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag are available from the American Coal Ash Association and the National Slag Association.

B-1

BID BOND

(See instructions on reverse)

DATE BOND EXECUTED (Must not be later than bid opening date) OMB NO. 9000-0045

Public reporting burden for this collection of information is estimated to average 25 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the FAR Secretariat (MVR), Federal Acquisition Policy Division, GSA, Washington, D.C. 20405.

PRINCIPAL (Legal name and business address)

TYPE OF ORGANIZATION (AX@ one)

INDIVIDUAL PARTNERSHIP

JOINT VENTURE CORPORATION

STATE OF INCORPORATION

SURETY(IES) (Name and business address)

PENAL SUM OF BOND BID IDENTIFICATION

PERCENT OF

BID PRICE

AMOUNT NOT TO EXCEED BID DATE INVITATION NO.

DTFH68-13-B-00011

20 PERCENT

MILLION(S)

THOUSAND(S)

HUNDRED(S) CENTS FOR (Construction, Supplies or Services) CONSTRUCTION

OBLIGATION:

We, the Principal and Surety(ies) are firmly bound to the United States of America (hereinafter called the Government) in the above penal sum. For payment of the penal sum, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally. However, where the Sureties are corporations acting as co-sureties, we, the Sureties, bind ourselves in such sum “jointly and severally” as well as “severally” only for the purpose of allowing a joint action or actions against any or all of

us. For all other purposes, each Surety binds itself, jointly and severally with the Principal, for the payment of the sum shown opposite the name of the Surety. If no limit of liability is indicated, the limit of liability is the full amount of the penal sum.

CONDITIONS:

The Principal has submitted the bid identified above.

THEREFORE:

The above obligation is void if the Principal - (a) upon acceptance by the Government of the bid identified above, within the period specified therein for acceptance (sixty

(60) days if no period is specified), executes the further contractual documents and gives the bond(s) required by the terms of the bid as accepted within the time specified (ten (10) days if no period is specified) after receipt of the forms by the principal; or (b) in the event of failure to execute such further contractual documents and give such bonds, pays the Government for any cost of procuring the work which exceeds the amount of the bid.

Each Surety executing this instrument agrees that its obligation is not impaired by any extension(s) of time for acceptance of the bid that the Principal may grant to the Government. Notice to the surety(ies) of extension(s) are waived. However, waiver of the notice applies only to extensions aggregating not more than sixty (60) calendar days in addition to the period originally allowed for acceptance of the bid.

WITNESS:

The Principal and Surety(ies) executed this bid bond and affixed their seals on the above date.

PRINCIPAL

SIGNATURE(S)

1.

(Seal)

2.

3.

Corporate

Seal

NAMES(S) &

TITLE(S)

(Typed)

2. 3.

INDIVIDUAL SURETY(IES)

NAME(S)

CORPORATE SURETY(IES)

NAME &

ADDRESS

STATE OF INC. LIABILITY LIMIT

SURETY A

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 24 (Rev. 10-98) Previous edition is usable Prescribed by GSA - FAR (48 CFR) 53.228(a)

B-2

CORPORATE SURETY(IES) (Continued)

SURETY B

SURETY C

SURETY D

SURETY E

SURETY F

SURETY G

INSTRUCTIONS

1. This form is authorized for use when a bid guaranty is required. Any deviation from this form will require the written approval of the Administrator of General Services.

2. Insert the full legal name and business address of the Principal in the space designated “Principal” on the face of the form. An authorized person shall sign the bond. Any person signing in a representative capacity (e.g., an attorney-in-fact) must furnish evidence of authority if that representative is not a member of the firm, partnership, or joint venture, or an officer of the corporation involved.

3. The bond may express penal sum as a percentage of the bid price. In these cases, the bond may state a maximum dollar limitation (e.g., 20% of the bid price but the amount not to exceed 3,000,000.00 dollars).

4. (a) Corporations executing the bond as sureties must appear on the Department of the Treasury=s list of approved sureties and must act within the limitation listed therein. Where more than one corporate surety is involved, their names and addresses shall appear in the spaces (Surety A, Surety B, etc.) headed “CORPORATE SURETY(IES).” In the space designated “SURETY(IES)” on the face of the form, insert only the letter identification of the sureties.

(b) Where individual sureties are involved, a completed Affidavit of Individual Surety (Standard Form 28), for each individual surety, shall accompany the bond. The Government may require the surety to furnish additional substantiating information concerning its financial capacity.

5. Corporations executing the bond shall affix their corporate seals. Individuals shall execute the bond opposite the word “Corporate Seal”;

and shall affix an adhesive seal if executed in Maine, New Hampshire, or any other jurisdiction requiring adhesive seals.

6. Type the name and title of each person signing this bond in the space provided.

7. In its application to negotiated contracts, the terms “bid” and “bidder” shall include “proposal” and “offeror.”

STANDARD FORM 24 (Rev. 10-98) BACK

B-3

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

BIDDER'S INFORMATION

INSTRUCTIONS: Answer all questions on this form inserting "none" or "not applicable" where appropriate. If more space is required attach additional sheets. Return the signed, dated and completed form with the bid to the address shown in the invitation for bids on or before the time set for bid opening. The prospective bidder shall provide any additional information requested by the Government during evaluation of the bids.

If the prospective bidder is a joint venture or general partnership, a separate Bidder's Qualifications form shall be provided individually for each joint venture participant or partner.

1. Name and address of business:

Name DUNS Number (See FAR Provision 52.204-6)*

Street Home Office Congressional District (Insert District #) *

City State Zip Code

* Necessary for Government reporting purposes only To obtain a Dun & Street number, call County 800-333-0505.

Telephone Number (Include Area Code)

Fax Number (Include Area Code)

2. a. Type of organization (check appropriate box):

If a Foreign entity:

Individual

Non-profit organization

Corporation

Partnership

Joint Venture

Registered in:

b. Size and type of Business Concern (check appropriate boxes):

Large Business Concern

Small Disadvantaged Business Concern

Emerging Small Business

Small Business Concern

Women-Owned Small Business

SBA 8(a) Certified

HUB Zone Business Concern

Veteran Owned Business Concern

Service-Disabled Veteran-Owned Business Concern

Individual

Non-profit organization

Corporation

Partnership

Joint Venture Incorporated in:

B-4

3. If a joint venture or general partnership:

a. Provide the name under which the project will be bid, the home office address, and name of the principal who will represent the company with regard to this project if different from "1." above.

Principal

Business Name

Street

City State Zip Code

b. Provide the name and home office addresses of each of the joint venture partners; indicate which partner is the sponsoring partner. Attach a separate sheet for additional partners.

Sponsoring Partner Other Partner

Street Street

City State Zip Code City State Zip Code

4. Date organization established: _______________________

5. Name of succeeded business, if any: _________________________________________________________

6. How many years have you been in business as:

a. General contractor years.

b. Subcontractor years.

7. a. Furnish the following information concerning the owner, partners, officers and directors:

Percent of Business Owned

Years of Business Experience

Name

Title Contracting

Other

b. Attach resumes of these key personnel as well as the on-site project manager(s) and superintendent(s), and specifically identify the following:

- Present position, responsibility, and length of employment.

- Amount and type of construction experience.

- Amount and type of highway construction experience, including position, responsibility, and a brief project description of each period of employment.

- Formal education and training, professional or technical registrations or licenses.

B-5

8. a. Contracts in force. (Attach additional sheets if necessary)

Project Name and Contract Numbers

Owner's Name, Address, and

Contact Name and Telephone #

Scope of Work Performed

Contract Amount

Estimated

Completion Date

Name of Surety

b. Are there any unresolved claims or lawsuits associated with these projects? If so, state the amount in dispute, parties involved, nature and circumstances of the dispute, and status of the matter on a separate sheet.

B-6

9. a. List at least five of the largest jobs you have completed in the last five years which are similar in project work scope to this project. (Attach additional sheets if necessary)

Project Name and Contract Numbers

Owner's Name, Address, Contact Name and Telephone #

Scope of Work

Performed

Original and Final Contract Amounts

Original and Final Completion Dates

Names of On-site Project

Manager and Superintendent

Name of Surety

b. Are there any unresolved claims or lawsuits associated with these projects? If so, state the amount in dispute, parties involved, nature and circumstances of the dispute, and status of the matter on a separate sheet

B-7

Solicitation Provisions – Representations and Certifications

52.204-8 Annual Representations and Certifications. (DEC 2012)

(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 237310

(2) The small business size standard is $33.5 million or fewer.

(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.

(b)(1) If the clause at 52.204-7, Central Contractor Registration, is included in this solicitation, paragraph (d) of this provision applies.

(2) If the clause at 52.204-7 is not included in this solicitation, and the offeror is currently registered in CCR, and has completed the ORCA electronically, the offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The offeror shall indicate which option applies by checking one of the following boxes:

[ ] (i) Paragraph (d) applies.

[ ] (ii) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.

(c)(1) The following representations or certifications in ORCA are applicable to this solicitation as indicated:

(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless--

(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;

(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or