Mather Point A002.pdf
PDF 428 KB Posted
- Attached to
- AZ PRA GRCA 12(6), CVIP and Mather Point Improvements Federal contract opportunity
- Solicitation number
- DTFH68-09-B-00012
About this file
This is Amendment A002 to the Invitation for Bid
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A001.pdf | ||
| Invitation for Bid.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REVISED 03/06/09
AMENDMENT A002
C-1
Contract Clauses
52.202-1 Definitions. (JUL 2004)
52.203-3 Gratuities. (APR 1984)
52.203-5 Covenant Against Contingent Fees. (APR 1984)
52.203-7 Anti-Kickback Procedures. (JUL 1995)
52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity.
(JAN 1997)
52.203-10 Price or Fee Adjustment for Illegal or Improper Activity. (JAN 1997)
52.203-12 Limitation on Payments to Influence Certain Federal Transactions. (SEP 2007)
52.204-4 Printed or Copied Double-Sided on Recycled Paper. (AUG 2000)
52.204-7 Central Contractor Registration. (APR 2008)
52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (SEP 2006)
52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984) - Alternate I
(APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than October 30, 2009. The time stated for completion shall include final cleanup of the premises.
The completion date is based on the assumption that the successful offeror will receive the notice to proceed by April 10, 2009 April 24, 2009.. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.
(End of clause)
52.211-12 Liquidated Damages - Construction. (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of (See Page 41 of FP-
03) for each calendar day of delay until the work is completed or accepted.
D-1
General Decision Number: AZ080002 02/13/2009 AZ2
Superseded General Decision Number: AZ20070002
State: Arizona
Construction Type: Highway
Counties: Coconino, Maricopa, Mohave, Pima, Pinal and Yuma Counties in Arizona.
HIGHWAY CONSTRUCTION PROJECTS
Modification Number Publication Date 0 02/08/2008 1 04/18/2008 2 06/20/2008 3 07/11/2008 4 08/08/2008 5 08/15/2008 6 08/22/2008 7 02/13/2009
* CARP0408-003 09/01/2007
Rates Fringes
CARPENTER (Including Cement Form Work)....................... $ 22.50 5.97
PILEDRIVERMAN.................... $ 23.00 5.97
ELEC0518-005 07/01/2008
PINAL COUNTY (North of the line, "First Standard Parallel South", and East of the line, "Second Guide Meridian East".
Rates Fringes
Electrician/Wireman.............. $ 24.05 12%+6.50
D-2
ELEC0570-001 06/01/2007
PIMA, PINAL [Remaining Southern Area], and YUMA COUNTIES
Rates Fringes
Electrician/Wireman Zone 1 (Base Rate).......... $ 20.75 18%+4.50
ZONE DEFINITIONS:
Zone 1: 0 to 29 miles radius from City Hall in the following cities: Tucson, Benson, Bisbee, Clifton, Douglas, Morenci, Nogales, Parker, Safford, Sierra Vista, Wilcox & Yuma
Zone 2: More than 29 miles to 46 miles - add $1.25 to Zone 1 rate
Zone 3: More than 46 miles - add $3.75 to Zone 1 rate
FRINGES:
The fringe of 14.4% is figured on the base amount excluding any additional zone pay.
ELEC0640-001 06/21/2008
COCONINO; MARICOPA; MOHAVE COUNTIES; and the following portion of PINAL COUNTY (Area lying North andWest of the boundary line beginning at a point where Papago Indian Reservation Road No.15 crosses the Pima-Pinal County line, then extending in a Northeasterly direction on Papago Indian Reservation Road No.15 to the intersection with Highway FAS-267, extending North on Highway FAS-267 to the intersection with the Florence Canal, North and East on the Florence Canal to the intersection of the line "Second Guide Meridian East" then North to the Pinal-Maricopa County lines )
Rates Fringes
Electrician/Wireman.............. $ 24.80 3%+7.09
ELEC0769-001 05/01/2008
Rates Fringes
Line Construction:
Cable Splicer............... $ 35.98 19%+5.08 Groundman................... $ 20.93 19%+5.08 Lineman..................... $ 36.09 19%+5.08 Powderman................... $ 25.45 19%+5.08 Technician, Crane 80 Ton & over, Pilot................. $ 35.07 19%+5.08
D-3
Equipment Operator: 75% of Lineman rate.
HD Equipment Operator: 85% of Lineman rate.
Mechanic: 75% of Lineman rate.
ENGI0428-011 06/15/2008
Rates Fringes
Power Equipment Operator Group 1..................... $ 19.89 8.84 Group 2..................... $ 23.16 8.84 Group 3..................... $ 24.24 8.84 Group 4..................... $ 25.27 8.84
GROUP 1: Forklift; Oiler; Roller (Dirt); Small self-propelled Compactor; Tractor (wheel type and D-5 & under).
GROUP 2: Backhoe under 1 cu yd; Crane under 15 tons; Drilling Machine (including water wells); Pneumatic-Tired Scraper; Roller (asphalt); Self-propelled compactor; Skip Loader over 3cu yd to 6 cu yd.
GROUP 3: backhoe over 1 cu yd to 10 cu yd; Boring Machine; Crane over 15 tons to 100 tons;
Motor Grader; Overhead Crane; Skip Loader 6 to 10 cu yd; Paving Machine; Tower Crane.
GROUP 4: Crane 100 tons and over; Skip Loader 10 cu yd or more
Multiple-Unit Earth Equipment (Holland Loader etc), Tractor (track or tired type) Two Units - $0.50 per hour over base rate, and $1.00 per hour for each additional unit.
All Operators, Oilers, and Motor Crane Drivers on equipment with Booms, except concrete pumping truck booms, including Jibs, shall receive $0.01 per foot per hour over 80 ft in addition to regular rate of pay.
Premium pay for performing hazardous wast removal $0.50 per hour over base rate.
IRON0075-006 08/01/2008
Rates Fringes
Ironworker, Rebar Zone 1...................... $ 25.52 16.39
Zone 1: 0 to 50 miles from City Hall in Phoenix or Tucson
D-4
Zone 2: 050 to 100 miles - Add $4.00 Zone 3: 100 to 150 miles - Add $5.00 Zone 4: 150 miles & over - Add $6.50
LABO0383-006 06/01/2007
Rates Fringes
Laborers
(1) General Laborer;
Cleanup Laborer............. $ 14.74 4.55
(4) Asphalt Raker/Ironer;
Jackhammer.................. $ 17.28 4.55
(5) Form Setter............. $ 18.14 4.55
$0.50 per hour premiuim for performing hazardous waste removal
SUAZ2004-009 03/11/2004
Rates Fringes
Cement Mason/Finisher............ $ 17.88 2.24
Laborers Concrete Worker............. $ 12.22 2.86 Concrete/Asphalt Saw........ $ 14.27 0.74 Fence Erector, Chain Link... $ 10.27 2.85 Flagger..................... $ 12.48 0.00 Grade Checker............... $ 12.45 0.00 Guard Rail Installer........ $ 13.97 0.00 Pipelayer................... $ 13.72 2.88
Power Equipment Operator Bulldozer................... $ 17.35 4.18 Gradall..................... $ 23.02 1.97 Grade Checker/Setter........ $ 15.00 4.17 Guard Rail Punch............ $ 18.61 3.68 Heavy Duty Repairman / Welder...................... $ 21.79 4.31 Screedman................... $ 14.50 4.15
TRUCK DRIVER
Belly Dump.................. $ 13.00 0.00
D-5
TEAM0104-005 06/01/2007
Rates Fringes
TRUCK DRIVER
(2) 2-3 Axle dump; Water Truck under 2500 gallons.... $ 17.18 3.40+a
(3) 4 axle dump............. $ 17.58 3.40+a
(4) 5 axle dump; Water Trucks 2500 gal to 3900 gal. $ 18.20 3.40+a
(5) 6-axle dump; Water Trucks 3900 gal and over.... $ 18.44 3.40+a
(6) 7 axle dump............. $ 19.02 3.40+a
FOOTNOTE:
a. Health & Welfare $586.36 per month.
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response
D-6 from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
Untitled
| Text1: |
| Text2: |
| 0: 1 |
| 1: 8 |
| Text3: |
| 0: A002 |
| 1: March 6, 2009 |
| 2: |
| 0: |
| 1: AZ PRA GRCA 12(6) |
| Text4: |
| 0: |
| 0: FEDERAL HIGHWAY ADMINISTRATION |
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 WEST DAKOTA AVENUE, SUITE 360
LAKEWOOD, COLORADO 80228
ATTENTION: BRENDA MCGEHEE
1:
| 1: |
| 0: |
| Text6: |
| 0: DTFH68-09-B-00012 |
| 1: 02/13/09 |
| 2: |
| 3: |
| Check Box7: |
| 0: Yes |
| 2: Yes |
| 1: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Off |
| Check Box9: |
| 1: Off |
| 2: Off |
| 0: |
| 0: Off |
| 1: Off |
| Text10: 1* |
| Text11: |
| 0: |
| 1: |
| Text12: * See Item 11 Above |
| Text13: INVITATION FOR BID |
Remove Page C-1 and replace with new Page C-1 bearing revision date 03/06/09. Changes FAR Clause 52.211-10 Commencement, Prosecution, and Completion of Work, Notice to Proceed date.
Remove Pages D-1 through D-6 and replace with new Pages D-1 through D-6 bearing revision date 03/06/09. Update to Davis Bacon Wage Determination
*FAILURE TO ACKNOWLEDGE THIS AMENDMENT BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT IN REJECTION OF YOUR BID (REFER TO ITEM 11.)
| Text14: |
| 0: |
| 1: |
| Text15: |
| 1: |
| 0: |
| 1: |
| 0: |
| 0: |
| 1: |
| Text16: |
| 0: |
| 1: |
| Text17: |
| Text5: |
| 0: 6905001 |
| 1: |
| Check Box1: |
| 0: Yes |
| 1: Off |
File details come from the government source that posted it. Updated .