Amendment 0011 SF30.pdf

PDF 87 KB Posted

Attached to
Security System Design and Integration II (SSDI II)
Solicitation number
DTFAWA-17-R-00049
Issued by

About this file

This amendment modifies an existing federal contract solicitation for security system design and integration services. Key details include extending the response due date to August 3, 2017 to allow responses to two vendor questions. The questions clarified that video management systems are required for all sample tasks, including those at security level 2, and confirmed offerors can include details of both phases of work within a single six-page work plan. The period of performance remains December 11, 2018 through December 10, 2028.

Amendment 0011 SF30 (pdf)

View the file

Other files

File Type Posted
J-22 FAA Order 1370.121.pdf PDF
J-08 Task Order Work-Plan Template A0009.xlsx XLSX spreadsheet
J-24 Past Experience and Performance History Form A0008.doc DOC document
J-18 Physical Security Enterprise Management System (PSEMS) FOUO.PSEMS —
J-19 FSL-2 Drawings Amend 0001.pdf PDF
J-19 SSDI II Sample Task for KSN FSL - 2.docx DOCX document
Amendment 0010 SF30.pdf PDF
J-23 FAA Order 1600.16E FOUO.pdf PDF
J-19 SSDI II PSEMS Tasking.docx DOCX document
J-17 Past Performance Questionnaire.docx DOCX document
VENDOR DOCUMENT SECURITY NOTICE.doc DOC document
Amendment 0008 SF30 and change pages.pdf PDF
Amendment 0007 PW Req.pdf PDF
J-10 Non-Standard Equipment Request Template.xls XLS spreadsheet
Amendment 0005 SF30.pdf PDF
Amendment 0001 - SF30.pdf PDF
J-19 Sample Task Drawings 3 A0001.pdf PDF
J-01 SSDI-II List of Facilities_FOUO.pdf PDF
Amendment 0006.pdf PDF
J-04 Labor Category Definitions.doc DOC document
J-11 Contractor Acceptance Inspection (CAI) Template A0008.CAI —
J-16 Equipment ListA0009 PRICE.xls XLS spreadsheet
J-02 Acronym List.pdf PDF
J-03 List of Applicable Documents A0008.pdf PDF
J-19 SSDI II Sample Task for KSN FSL - 1.docx DOCX document
FSL-3 Gate Configuration A0009.pdf PDF
J-12 Sample Site Survey Report.doc DOC document
SSDI II Cost Model Attachment J-20 -1-18-18.xlsx XLSX spreadsheet
J-21 Close Out Task Order Sample Form.xls XLS spreadsheet
J-07 Work-Plan Request.xls XLS spreadsheet
J-16 Equipment ListA0009 TECHNICAL.xls XLS spreadsheet
J-14 drawings.zip ZIP file
SSDI II DID's.zip ZIP file
J-19 Sample Task Drawings 2 180110 A0001.pdf PDF
J-19 Sample Task Drawings 1 A0001.pdf PDF
J-15 Excerpt from 1600.69C FOUO.pdf PDF
J-13 Resume Format.doc DOC document
J-09 Clarification Question Template.xls XLS spreadsheet
Amendment 0009.pdf PDF
SSDI II CDRLs.zip ZIP file
Amendment 0003 SF30.pdf PDF
J-19 FSL-1 Sample Task Drawings A0008.pdf PDF
J-14_Door Matrix FOUO.pdf PDF
Amendment 0002.pdf PDF
Amendment 0004 with change pages.pdf PDF
J-19 FSL-3 SSDI II Sample Task A0008.pdf PDF
FSL-3 Gate Configuration A0009.pdf PDF
VENDOR DOCUMENT SECURITY NOTICE.doc DOC document
Amendment 0001 - SF30.pdf PDF
J-07 Work-Plan Request.xls XLS spreadsheet
Show 40 more

Latest 50 of 490 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

5. PROJECT NO. (If applicable)2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ.NO.

PAGE OF PAGES

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6)

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

Items 8 and 15, and returning is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required.)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO THE AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14.

E. IMPORTANT: Contractor is not, is required to sign this document and return

ORDER NO. IN ITEM 10A.

1 2

0011 01/05/2018

FAA AWA

800 Independence Avenue, S.W.

Washington DC 20591

AWA

x

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

separate letter or telegram which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By ___________ x x

DTFAWA-17-R-00049

copies to the issuing office.

01/05/2018

(x)

The purpose of this amendment is to respond to two vendor questions regarding prior amendments as shown below.

Q. In Amendment 009, the FAA’s response to Question 28 states, “VMS is required for the Sample Task.” In solicitation attachment J-19 for the sample task for FSL-2, the

Assumptions section states, “Security Level 2 does not require metal detectors, and CCTV.”

Please clarify whether VMS/CCTV is required for the FSL-2 sample task.

A. VMS is required for FSL-2 sample task.

Q. Per Amendment 0010, offerors were directed to include both Phases (Phase I and

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. CONTRACT AUTHORITY 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Amy K. Wright

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

DTFAWA-17-R-00049/0011

Phase II) in a single work plan (J-08). Please confirm that within the single work plan, each

Phase is still allocated up to 3 pages for a total of up to 6 allowable pages for the detail of work.

A. Six pages is allowable for the detail of work.

The due date for receipt of proposals is not changed by this amendment.

Period of Performance: 12/11/2018 to 12/10/2028

File details come from the government source that posted it. Updated .