Establish Precision Approach Path Indicator (PAPI) for runway 10 and 28 at Hartsfield- Jackson International Airport, Atlanta, GA.

• RWY 10 PAPI- Contractor is establish a new PAPI system by, installing the required 4-LHA foundations, Power & Control Foundation, LHAs/Power & Control Rack duct bank, PAPI grounding system, power/control cables from LHAs to PP&CR, power cables from the PP&CR to the GS Shelter, concrete maintenance pads for the LHAs and PP&CR, setup of the new PAPI equipment, concrete walkway for maintenance, megg power/control cables, and ex-ecute a ground resistance test. The contractor will be required to install and test the required frangible breakaway upgrades for each LHA power/control cable. Refer to the site drawings and specifications for plants construction specified details. Contractor is to execute all work within the runway safety area during scheduled closures. The estimated runway closures will be Monday thru Friday, 11:30 p.m. to 6:00 a.m. Refer to the site drawings and specifications for plants construction specified details.

• RWY 28 PAPI- Contractor is establish a new PAPI system by, installing the required 4-LHA foundations, Power & Control Foundation, LHAs/Power & Control Rack duct bank, PAPI grounding system, power/control cables from LHAs to PP&CR, power cables from the PP&CR to the GS Shelter, concrete maintenance pads for the LHAs and PP&CR, setup of the new PAPI equipment, concrete walkway for maintenance, megg power/control cables, and ex-ecute a ground resistance test. The contractor will be required to install and test the required frangible breakaway upgrades for each LHA power/control cable. Refer to the site drawings and specifications for plants construction specified details. Contractor is to execute all work within the runway safety area during scheduled closures. The estimated runway closures will be Monday thru Friday, 11:30 p.m. to 6:00 a.m. Refer to the site drawings and specifications for plants construction specified details.