Schedule of Values

Title Establish RYW 10/28 PAPI systems Location Hartsfield-Jackson Atlanta International Airport

Atlanta, Georgia

DESCRIPTION QTYUNIT UNIT COST TOTAL

RWY 10 PAPI Cost Estimate 1 LS RWY 28 PAPI Cost Estimate 1 LS

Total Cost Estimate $0.00

�1

Title ATL Establish RWY 10 PAPI System Location Hartsfield Jackson International Airport

Atlanta, GA Project Engineer Nacho Brantley

DESCRIPTION QTYUNIT UNIT COST TOTAL

General Requirements & Mobilization Quality Control 1 MO

Site Prep Site Prep-PAPI foundations 1 LS Site Prep for PAPI P&C Rack 1 LS Site Prep for PAPI Maintenance Pad 1 LS Prefabricated LHA Foundation 4 EA Sod 1 LS Site Cleanup and Restoration 1 LS

Structural PAPI Power & Control Concrete Foundation 1 LS PAPI Power & Control Concrete Maintenance Area 1 LS

Site Electrical Counterpoise - Underground 1 LS Counterpoise - Aboveground 1 LS Power Cabling for LHA 1 thru LHA 4 to the PP&C Unit 1 LS Control Cabling from LHA 1 thru LHA 4 to the PP&C Unit 1 LS

Electrical PAPI Power Cable from PP&CR to Meter Rack 1 LS Install oversize LB for each LHA 1 LS

Ductbank Installation PAPI Ductbank from PAPI LHAs to PP&C 1 LS Install GFM Install LHA Breakaway Connectors 1 LS Install LHAs 4 EA Install PP&C Rack 1 LS

Total Direct Costs

General Requirements Field Overhead 1 LS Bonding and Insurance 1 LS Profit (Contingency) 1 LS Total Indirect Costs Total

�2

Title ATL Establish RWY 28 PAPI System Location Hartsfield Jackson International Airport

Atlanta, GA

DESCRIPTION QTYUNIT UNIT COST TOTAL

General Requirements & Mobilization Quality Control 1 MO

Site Prep Site Prep-PAPI foundations 1 LS Site Prep for PAPI P&C Rack 1 LS Site Prep for PAPI Maintenance Pad 1 LS Prefabricated LHA Foundation 4 EA Sod 1 LS Site Cleanup and Restoration 1 LS

Structural PAPI Power & Control Concrete Foundation 1 LS PAPI Power & Control Concrete Maintenance Area 1 LS Bollard 2 EA

Site Electrical Counterpoise - Underground 1 LS Counterpoise - Aboveground 1 LS Power Cabling for LHA 1 thru LHA 4 to the PP&C Unit 1 LS Control Cabling from LHA 1 thru LHA 4 to the PP&C Unit 1 LS

Electrical PAPI Power Cable from PP&CR to Meter Rack 1 LS Install oversize LB for each LHA 1 LS

Ductbank Installation PAPI Ductbank from PAPI LHAs to PP&C 1 LS Install GFM Install LHA Breakaway Connectors 1 LS Install LHAs 4 EA

Install PP&C Rack 1 LS

Total Direct Costs

General Requirements Field Overhead 1 LS Bonding and Insurance 1 LS Profit (Contingency) 1 LS Total Indirect Costs Total

�2