Attachment #1a - 65pct CHILR Dwgs.pdf
PDF 9 MB Posted
- Solicitation number
- DTFASA-17-R-00074
About this file
Attachment #1a - 65pct CHILR Dwgs (pdf)
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
:4
:2
P M
J o h n
C T
R
A ll e n
DATE
APPROVED
z lc a g .d g n
E D
M
IS
S
U E
D
F O
R
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
UT
ZLC-1305280A-G001
ARTCC
SALT LAKE CITY
z lc a g .d g n
CHILLER/COOLING TOWER MODERNIZATION
COVER SHEET
Department of Transportation
Federal Aviation Administration
Salt Lake City, UT
ENGINEERING SERVICES
ENROUTE/FSS
CALLEN R. COLLINSJON W. ORR
PROJECT ENGINEER MGR: ENGINEERING - SEATTLE
DRAWING PRODUCED ON WSA MICROSTATION SYSTEM
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
Air Route Traffic Control Center
Chiller/Cooling Tower Modernization (Major Mechanical Sustain)
1305280
March 2016
65% Submittal
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
:2
:5
J o e n
DATE
APPROVED
z lc a g .d g n
E D
M
IS
S
U
R
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
ZLC-1305280A-G002
a g .d g n
CHILLER/COOLING TOWER MODERNIZATION
BUILDING CODE ANALYSISGENERAL NOTESINDEX OF DRAWINGS
LOCATION MAP
ENGINEERING SERVICES
ENROUTE/FSS
CALLEN R. COLLINSJON W. ORR
PROJECT ENGINEER MGR: ENGINEERING - SEATTLE
DRAWING PRODUCED ON WSA MICROSTATION SYSTEM
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
LOCATION MAP AND BUILDING CODE ANALYSIS
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
NOT TO SCALE
W
S
IN
T
E R
S T
A T
E
I
R E
D W
O
700 N ST
AIRPORT
INTERNATIONAL
SALT LAKE CITY
S P
E R
Y
Y
NORTH TEMPLE ST.
SALT LAKE WESTERN R.R.
LOCATION
PROJECT
J O
R D
A N
R
1305280
STRUCTURAL:
PUMP HOUSE PREFAB METAL BUILDING SEISMIC RETROFITS101
DRAWING TITLE DRAWING TITLE A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
N.
O.
P.
Q.
R.
S.
EQUIPMENT TO BE REMOVED.
REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR
MATCH EXISTING FINISHES.
FINISHES AFFECTED BY THE WORK SHALL BE REPAIRED TO
RESOLVED TO SATISFACTION OF COR.
DEMOLITION WORK SHALL PROCEED UNTIL CONFLICTS ARE
WITH NEW WORK AND NOTIFY COR OF CONFLICTS. NO
DEMOLITION OF BUILDING SYSTEMS. COORDINATE DEMOLITION
FIELD VERIFY EXISTING CONDITIONS & DIMENSIONS BEFORE
THAN TWO PANELS ARE REMOVED.
SUPPORTS AFFECTED BY DEMOLITION WORK WHEN MORE
ADDITIONAL LATERAL BRACING’S FOR ACCESS FLOOR
REQUIRED TO PROTECT ACTIVE EQUIPMENT. PROVIDE
AREA. PROVIDE DUST PROOF PARTITIONS AND BARRIERS AS
VIBRATION OR DISRUPTION TO EQUIPMENT IN THE WORK
COORDINATE WITH COR DEMOLITION WORK THAT MAY CAUSE
SHALL REMAIN OPERATIONAL DURING CONSTRUCTION.
EXISTING FAA COMPUTER AND OTHER SENSITIVE EQUIPMENT
FIRE RATED CONSTRUCTION.
INFORMATION. REFER TO SHEET A001 FOR LOCATIONS OF
TO SPECIFICATION SECTION 07 84 13 FOR ADDITIONAL
PROTECTION EQUIPMENT WITH AN APPROVED SYSTEM. REFER
REMOVAL OR PROVISION OF MECHANICAL, ELECTRICAL OR FIRE
SMOKE BARRIERS THAT ARE EXISTING OR CAUSED BY
FIRESTOP OPENINGS IN FIRE RATED WALLS OR CEILINGS AND
PATCHED.
ANCHORING HOLES IN CONCRETE SURFACES SHALL BE
CONCRETE SHALL BE REMOVED UPON COMPLETION OF WORK.
ANCHORING DEVICES FOR DUSTPROOF CONSTRUCTIONS INTO
SPECIAL REQUIREMENTS WITH COTR BEFORE INSTALLATION.
SCHEMATICALLY ON DRAWINGS, VERIFY FINAL LOCATIONS &
PROTECTION EQUIPMENT. TEMPORARY DP ARE SHOWN
NOT RESTRICT ACCESS TO MECH, ELEC, FAA, OR FIRE
PARTITIONS SHALL BE ACCESSIBLE TO FAA PERSONNEL AND
ACCESS DOORS WHERE INDICATED ON DRAWINGS. TEMPORARY
PROVIDE TEMPORARY DUST PROOF PARTITIONS (DP) WITH
AND ELECTRICAL DRAWINGS.
EQUIPMENT. COORDINATE SIZE & LOCATION WITH MECHANICAL
PROVISION OF MECHANICAL, ELECTRICAL & FIRE PROTECTION
PROVIDE OPENINGS THROUGH EXISTING CONC WALL FOR
FOR ADDITIONAL INFORMATION.
NOT TO DISRUPT FAA OPERATIONS. REFER TO SHEET G005
CONSTRUCTION. CONTRACTOR SHALL COORDINATE WITH COR
COMPUTER ROOM AREA WILL BE OCCUPIED BY FAA DURING
EXISTING ELECTRONIC EQUIPMENT ROOM (EAST) & HOST
THE FLYING PUBLIC.
TRAFFIC AND IS DEEMED CRITICAL FOR THE LIFE SAFETY OF
ELECTRONIC EQUIPMENT. THIS EQUIPMENT CONTROLS AIR
SPRINKLER SYSTEM SHALL BE INSTALLED ABOVE CRITICAL
AREAS SHALL BE REMOVED IMMEDIATELY.
COTR. CONSTRUCTION DEBRIS & EQUIPMENT IN OCCUPIED
CLEAN CONSTRUCTION AREAS DAILY TO SATISFACTION OF
AND 1926.21(6)(i).
ACCORDANCE WITH OSHA REQUIREMENTS, 29 CFR 1910.146
WORK IN CONFINED SPACES OR AREAS SHALL BE DONE IN
WITH COR.
THE OPERATION OF THE FACILITY. COORDINATE CUTTING
AVOID CUTTING CONDUITS AS THEY MAY BE CRITICAL TO
INDICATOR TO LOCATE EMBEDDED ELECTRICAL CONDUITS.
PRIOR TO CUTTING CONCRETE, USE MAGNETIC STEEL
WORK IN OTHER AREAS WITH COR.
DEVELOPED TO RESUME WORK IN THAT AREA. COORDINATE
AND CEASE WORK IN THAT AREA UNTIL A PLAN HAS BEEN
DISCOVERD DURING THE WORK, NOTIFY COR, ISOLATE AREA,
DRAWINGS AND REPORTS. IF HAZMAT MATERIALS ARE
MATERIALS. COORDINATE THE WORK WITH HAZMAT ABATEMENT
THIS BUILDING HAS BEEN IDENTIFIED AS CONTAINING HAZMAT
PANELBOARD FOR CIRCUIT BREAKER REPLACEMENT WITH COR.
COORDINATE DE-ENERGIZING, AND ENERGIZING, OF ANY
CLOSE (ENERGIZE) ANY CIRCUIT BREAKER AT ANY TIME.
OPERATION. CONTRACTOR SHALL NOT OPEN (DE-ENERGIZE) OR
ADVANCE AND IN WRITING FOR EACH CASE OF BREAKER
CONTRACTOR SHALL REQUEST PERMISSION OF FAA IN
ONLY FAA PERSONNEL MAY OPERATE CIRCUIT BREAKERS.
PERFORMANCE OF WORK.
BY COR AT LEAST 15 CALENDAR DAYS IN ADVANCE OF
OUTAGES SHALL BE SCHEDULED AND APPROVED IN WRITING
WORK REQUIRING PERMANENT, TEMPORARY OR PARTIAL
UNSCHEDULED INTERRUPTIONS SHALL BE NOT TOLERATED.
FOR LIMITS OF WORK.
NOTED. REFER TO SHEET A001 "GUIDE PLAN - BASEMENT"
INCLUDES WORK FOR ENTIRE AREA, UNLESS OTHERWISE
WORK SPECIFIED IN ROOMS/AREAS WITH BREAK LINES
CONCRETE OR FINISH SURFACE, UNLESS OTHERWISE NOTED.
FROM COLUMN CENTER LINES AND FACE OF MASONRY,
DIMENSION LINES SHOWN ON ARCHITECTURAL SHEETS ARE
DUSTPROOF STRUCTURES ARE PRESENT.
MORE FLOOR PANELS HAVE BEEN REMOVED UNLESS
FLOOR MANUFACTURER IN LOCATIONS WHERE THREE (3) OR
PROVIDE AIR BARRIERS AS RECOMMENDED BY ACCESS
DRAWINGS, REFER TO MECHANICAL & ELECTRICAL DRAWINGS.
REQUIRED OUTSIDE OF AREA SHOWN ON ARCHITECTURAL
MECHANICAL AND ELECTRICAL SYSTEMS. FOR DEMOLITION
VERIFY DEMOLITION REQUIRED TO FACILITATE ROUTING OF
SEISMIC CRITERIA:
WIND LOAD CRITERIA:
WIND CODE: ASCE 7-10
WIND SPEED: 120 MPH (3SEC GUST, STRENGTH)
RISK CATEGORY: IV
6.
5.
NUMBER
DRAWING
NUMBER
DRAWING NOTE:
NFPA 72, NATIONAL FIRE ALARM CODE, 2010 EDITION
NFPA 13, INSTALLATION OF SPRINKLER SYSTEMS, 2010 EDITION
INTERNATIONAL MECHANICAL CODE, 2012 EDITION
INTERNATIONAL FIRE CODE, 2012 EDITION
NFPA 70 (NATIONAL ELECTRICAL CODE (NEC), 2011
(29 CFR 1910 AND 1926 - CURRENT ISSUE)
GENERAL INDUSTRY SAFETY & HEALTH STANDARDS
OCCUPATIONAL SAFETY & HEALTH ADMINISTRATION (OSHA)
BUILDINGS AND FACILITIES (2004)
ABAAS, ADA AND ABA ACCESSIBILITY GUIDELINES FOR
NFPA 101 - LIFE SAFETY CODE, 2012 EDITION
INTERNATIONAL BUILDING CODE (IBC), 2012 EDITION
NFPA 101, EXISTING BUSINESS
IBC, GROUP B
CONTROL AND AUTOMATION WING - TYPE II A IBC
ADMINISTRATION WING - TYPE II B IBCCONSTRUCTION TYPE:
19,500 SF
18,105 SF
12,035 SF
49,640 SF
4.
3.
2.
1.
WILL BE FULLY SPRINKLERED AT COMPLETION OF THIS PROJECT.
THIS BUILDING CODE ANALYSIS IS BASED ON THE ASSUMPTION THAT THE ARTCC
AND REGULATIONS:
APPLICABLE CODES
CLASSIFICATION:
OCCUPANCY
AUTOMATION WING
CONTROL WING
ADMINISTRATION WING
GENERAL:
ARCHITECTURAL:
MECHANICAL:
ELECTRICAL:
A101
A001
M001
A201
A202
A601
M501
M502
M601
M701
A501
A502
M002
M702
M801
M802
E001
E201
E203
E303
E801
E304
E701
E702
G001
G002
G003
G004
G005
MECHANICAL ABBREVIATIONS, SYMBOLS AND GENERAL NOTES
MECHANICAL EQUIPMENT SCHEDULES
HVAC SEISMIC DETAILS
HVAC CONTROL DIAGRAMS
ELECTRICAL ABBREVIATIONS, LEGENDS AND GENERAL NOTES
ABBREVIATIONS
COVER SHEET
GENERAL/ARCHITECTURAL - LEGENDS
CONSTRUCTION STAGING PLAN
BASEMENT CHILLER ROOM B116 VENTILATION PLAN - DEMOLITION
E101
E102
E103
BUILDING CODE ANALYSIS
DRAWING INDEX, GENERAL NOTES, LOCATION MAP &
DRAWING INDEX, GENERAL NOTES
BASEMENT CHILLER ROOM B116 HAZMAT ABATEMENT
BASEMENT CHILLER ROOM B116 REFLECTED CEILING PLAN
NORTH AREA WAY STAIRS AND MISCELLANEOUS DETAILS
M104 COOLING TOWER AND PUMP HOUSE HVAC PIPING PLAN - DEMOLITION
M105
M201
M202
M203
BASEMENT CHILLER ROOM B116 HVAC EQUIPMENT AND PIPING PLAN
BASEMENT CHILLER ROOM B116 HVAC EQUIPMENT AND PIPING PLAN
BASEMENT CHILLER ROOM B116 HVAC EQUIPMENT AND PIPING PLAN
M204
M205 BASEMENT CHILLER ROOM B116 VENTILATION PLAN
COOLING TOWER AND PUMP HOUSE HVAC PIPING PLAN
M301
M302
M303
COOLING TOWER AND PUMP HOUSE PIPING SECTIONS AND DETAILS
COOLING TOWER AND PUMP COOLING TOWER SECTION
HVAC TYPICAL DETAILS
DDCS POINT FUNCTION SCHEDULE
M703
M704
M705
M706
CHILLED WATER SYSTEM SCHEMATIC DIAGRAM - DEMOLITION
CONDENSER WATER SYSTEM SCHEMATIC DIAGRAM - DEMOLITION
COOLING TOWER WATER SYSTEM SCHEMATIC DIAGRAM - DEMOLITION
CHILLED WATER SYSTEM SCHEMATIC DIAGRAM
CONDENSER WATER SYSTEM SCHEMATIC DIAGRAM
COOLING TOWER WATER SYSTEM SCHEMATIC DIAGRAM
- DEMOLITION
BASEMENT CHILLER ROOM B116 HVAC EQUIPMENT AND PIPING PLAN
BASEMENT CHILLER ROOM B116 LIGHTING PLAN - DEMOLITION
BASEMENT CHILLER ROOM B116 POWER PLAN - DEMOLITION
E204
E205
LIGHTNING PROTECTION PLAN - DEMOLITION
COOLING TOWER AND PUMP HOUSE POWER AND
BASEMENT CHILLER ROOM B116 POWER PLAN
AND LIGHTNING PROTECTION PLAN
COOLING TOWER AND PUMP HOUSE POWER
COOLING TOWER AND PUMP HOUSE PANEL SCHEDULE AND DETAILS
CHILLER ROOM PIPING DETAILS
ESSENTIAL POWER SINGLE LINE DIAGRAM - DEMOLITION
E104
ESSENTIAL POWER SINGLE LINE DIAGRAM - DEMOLITION
ESSENTIAL POWER SINGLE LINE DIAGRAM - NEW WORK
- DEMOLITION
MCC-A/MCC-1A AND MCC-B/MCC-1B SINGLE LINE DIAGRAM
- NEW WORK
MCC-A/MCC-1A AND MCC-B/MCC-1B SINGLE LINE DIAGRAM
- DEMOLITION
BASEMENT CHILLER ROOM B116 HVAC EQUIPMENT AND PIPING PLAN
- DEMOLITION
BASEMENT CHILLER ROOM B116 HVAC EQUIPMENT AND PIPING PLAN
M101
M102
M103
M106 BASEMENT CHILLER ROOM B116 VENTILATION DETAILS
BASEMENT FLOOR APPROXIMATE GROSS SQUARE FOOT AREAS:
TOTAL
TEMPORARY COOLING TOWERS:
Z010
Z101
Z121
Z131
E202 COOLING TOWER AND PUMP HOUSE LIGHTING PLAN - DEMOLITION
E302 COOLING TOWER AND PUMP HOUSE LIGHTING PLAN
MECHANICAL ABBREVIATIONS, SYMBOLS AND CONSTRUCTION SEQUENCE
CIVIL:
C001
C002
CIVIL SITE NORTH PIPING PLAN
CIVIL SITE SOUTH PIPING PLAN
CIVIL DETAILSC003
ELEVATIONS
BASEMENT CHILLER ROOM B116 MOTOR CONTROL CENTER
ELEVATIONS
BASEMENT CHILLER ROOM B116 MOTOR CONTROL CENTER
TEMPORARY COOLING TOWER SITE PLAN
TEMPORARY COOLING TOWER PIPING PLAN
SCHEMATIC DIAGRAM
TEMPORARY COOLING TOWER WATER SYSTEM
TEMPORARY COOLING TOWER SCHEDULES
COOLING TOWER AND PUMP HOUSE FLOOR PLAN
COOLING TOWER AND PUMP HOUSE REFLECTED CEILING PLAN
A301
A302 PUMP HOUSE SECTIONS AND DETAILS
PUMP HOUSE EXTERIOR ELEVATIONS
AND VFD ELEVATIONS
COOLING TOWER AND PUMP HOUSE DISCONNECT SWITCH
GUIDE PLAN - BASEMENT
SEISMIC DESIGN CATEGORY: D
SITE CLASS: F
DESIGN SPECTRAL ACCELERATION, Sd1: 0.904
DESIGN SPECTRAL ACCELERATION, Sds: 0.970
MAPPED SPECTRAL RESPONSE ACCELERATION, S1: 0.565
MAPPED SPECTRAL RESPONSE ACCELERATION, Ss: 1.617
SEISMIC IMPORTANCE FACTOR: 1.5
E301 BASEMENT CHILLER ROOM B116 LIGHTING PLAN
S102
S103 PUMP HOUSE ADDITION FOUNDATION SECTIONS AND DETAILS
PUMP HOUSE ADDITION FOUNDATION PLANS
JA
JO
A801 DOOR AND FINISH SCHEDULES
BASEMENT CHILLER ROOM B116 FLOOR PLAN
Z141 TEMPORARY COOLING TOWER POWER SCHEDULES
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
:4
J o e n
DATE
APPROVED
z lc a g .d g n
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
A
AAV AUTOMATIC AIR VENT
AC
A/C AIR CONDITIONING
AD
ADJ ADJACENT OR ADJUSTABLE
ADR ACCESS DOOR
AFF ABOVE FINISH FLOOR
AIC
AL ALUMINUM
ALT ALTERNATE
APPROX APPROXIMATELY
ARCH ARCHITECT(URAL)
ARTS
ATS
AUX AUXILIARY
AWG
B BOILER
BD
BKR BREAKER
BEL BELOW
AF
AT AMPERE TRIP
BF BLIND FLANGE
CONC OR AIR COMPRESSOR
ALTERNATING CURRENT, ASPHALT
ARTCC
CENTER
AIR ROUTE TRAFFIC CONTROL
AMP METERAM
ACC AIR COOLED LIQUID CHILLER
COMPRESSED AIR LINE
AMPERE, AIR,
AA AIR COOLED
ACU
ACT ACCESS CONTROL TERMINAL
AIR CONDITIONING UNIT
ACD ADDRESSABLE CONTROL DEVICE
AFMS AIR FLOW MEASURING STATION
AID
AIF AIR INTAKE FILTER
AO
AMM AMMETER
ANN ANNUNCIATOR
ANALOG OUTPUT
AP ANNUNCIATOR POINT
AS AIR SEPARATOR
ATB AIR TERMINAL BOX
AUTOMATIC TRANSFER SWITCH
ACID VENT
AVG
AV
AVERAGE
AMERICAN WIRE GUAGE
DAMPER, BLOWDOWN
BOARD, BACK-DRAFT
BATTERY CHARGER
BC BARE COPPER
BFP
BFV
BFW
BHP
BACK FLOW PREVENTER
BUTTERFLY VALVE
BOILER FEED WATER
BRAKE HORSE POWER
AREA DRAIN, ACCESS DOOR
& AND
@ AT
ADTN
AWR
APC ACOUSTICAL PANEL CEILING
ASSY ASSEMBLY
AH/AHU AIR HANDLING UNIT
AWP ACOUSTICAL WALL PANEL
BLDG BUILDING
BLKG BLOCKING
BM BENCH MARK OR BEAM
BRG BEARING
BTU BRITISH THERMAL UNIT
C CONDUIT
CAB CABINET
BOTTOM
BOD
BOP
BOTTOM OF DUCT
BOTTOM OF PIPE
BPU BREAKER PROGRAMMING UNIT
BLO BLOWER
BLV
BWP BACK WATER PREVENTER
BWV
BALANCING VALVE
BTU/H
BV BALL VALVE
BACK WATER VALVE
CA
BSMT BASEMENT
COMBUSTION AIR
CB
CC COOLING COIL
CFM
CFT CUBIC FOOT
CH CHILLER
CI
CIP
CKT CIRCUIT
CENTER LINE
CLG CEILING
CLR CLEAR
CMP
CMU
CO
COL COLUMN
COMB
COMP
CONC CONCRETE
COND
CONN CONNECTION
CONST CONSTRUCTION
CONT
CONTR CONTRACTOR
CONCRETE MASONRY UNIT
CORRUGATED METAL PIPE
CL,
CENT CENTRIFUGAL
CP
CT
CTR
CU CONDENSING UNIT
CV
CYD CUBIC YARD
COR
CAST IRON PIPE, CAST IN PLACE
CIRCUIT BREAKER
D
DBL DOUBLE
DB
DDCP DIRECT DIGITAL CONTROL PANEL
CS
CD
CFH CUBIC FEET PER HOUR
CUBIC FEET PER MINUTE
CG CEILING GRILLE
CIR CIRCULATING
CLF CURRENT LIMITING FUSE
CLEANOUT, CONDUIT ONLY
COMBUSTION AIR
COMBINATION, COMBINE,
COMM COMMUNICATIONS
CPT CARPET/RAISED FLOOR
CPC CRITICAL POWER CENTER
CPU CENTRAL PROCESSING UNIT
CR
CTS COOLING TOWER WATER SUPPLY
CONTROL SWITCH
CU
CW
CWR
CWS
CWV
CONDENSING UNIT
DOMESTIC COLD WATER
CHILLER WATER RETURN
CHILLER WATER SUPPLY
COMBINATION WASTE AND VENT
DC DIRECT CURRENT
CURB INLET, CAST IRON
CCMS
CABLE TRAY, COOLING TOWER
COMPRESSIBLE, COMPRESSED
DIRECT BURIAL, DRY BULB
CONDITION, CONDENSATE
RETURN
CENTER, COOLING TOWER WATER
COTR
DET DETAIL
DIA DIAMETER
DIAG DIAGONAL
DISC DISCONNECT
DISP DISPENSER
DIST DISTRIBUTION
DL DEAD LOAD
DN DOWN
DP
DGP DATA GATHERING PANEL
DI
DOM DOMESTIC
DIGITAL INPUT
POSITION INDICATOR,
DROP INLET, DAMPER
DM DEMAND METER
DO DIGITAL OUTPUT
DR DOOR
DPDT
DPNL
DPST
DOUBLE POLE DOUBLE THROW
DISTRIBUTION PANEL
DOUBLE POLE SINGLE THROW
DEG DEGREE(S)
VP
W WATT
W/ WITH
WD WOOD
WG WATER GAGE
W/O WITHOUT
WP WEATHERPROOF
WT WEIGHT
XFMR TRANSFORMER
TRANSFER
VACUUM PRODUCER
VELOCITY PRESSURE,
YD YARD
YH YARD HYDRANT
Y WYE CONNECTION
VIF VERIFY IN FIELD
VIBRATION SWITCHVS
VCT VINYL COMPOSITION TILE
VC VERTICAL CURVE
VD VOLUME DAMPER
VERT VERTICAL
VF
VFD VARIABLE FREQUENCY DRIVE
VENTILATION FAN
VERTICAL FEET OR
VB VINYL BASE
VBT
VGWB
WALL BOARD
VINYL SURFACED GYPSUM
VAV VARIABLE AIR VOLUME TERMINAL
SQ SQUARE
SRF
SSTL STAINLESS STEEL
STA STATION
STD STANDARD
STE STANDARD TAPERED END
STL STEEL
STOR STORAGE
STR
SUSP SUSPENDED
SW SWITCH
SYM SYMMETRICAL
UH UNIT HEATER
UV UNIT VENTILATOR
V VOLT
ST
UPS
SUCT SUCTION
UON UNLESS OTHERWISE NOTED
SP
T
T&B TOP AND BOTTOM
T&G
TK TANK
TOS TOP OF STEEL
TOW TOP OF WALL
TRANS TRANSVERSE
TONGUE AND GROOVE
SAFETY RUBBER FLOOR TILE
VAT VINYL ASBESTOS TILE
TEMP TEMPERATURE
TIC
TC
TI
TEMPERATURE CONTROL SWITCH
TEMPERATURE INDICATOR
TYP TYPICAL
TS
STATIC PRESSURE INDICATOR
SUMP PUMP/SEWAGE PUMP,
STC SOUND TRANSMISSION CLASS
TELCOM
COMPANY LINE
TELECOMMUNICATION, TELEPHONE
TOC TOP OF CONCRETE
TM&O
UL
STGP
STEAM, STREET
TBD TO BE DETERMINED
SRG SIGNAL REFERENCE GRID
SPECIFICATIONSSPEC
UTIL UTILITY
STRUCTURAL, STRUCTURE
THERMOSTAT, TREADPCF
PHC PREHEAT COIL
PI
PIV POST INDICATOR VALVE
PL PROPERTY LINE OR PLATE
PLF
PNL PANEL
PRV
PSF
PSI
PT
PTVC
PVC POLYVINYL CHLORIDE
PVI
PVT
RA RETURN AIR
RADIUS
REF REFERENCE
REINF REINFORCING
POINT OF TANGENCY
PRESSURE REDUCING VALVE
POUNDS PER SQUARE FOOT
POUNDS PER SQUARE INCH
POUNDS PER LINEAR FOOT
RISER
REG REGISTER
RAD, R
POINT OF VERTICAL TANGENCY
PCB POLYCHLORINATED BIPHENYLS
POUNDS PER CUBIC FOOT
PD PRESSURE DIFFERENTIAL
PHASE
PSM POWER SYSTEMS MODIFICATION
RECEPTACLE
MTG MOUNTING OR MOUNTED
NUMBER
NOM NOMINAL
NIC NOT IN CONTRACT
NPT
OA OUTSIDE AIR
OC ON CENTER
OD
OF OUTSIDE FACE
OPNG OPENING
OPP OPPOSITE
MS MOISTURE SENSOR
PC PRESSURE CONTROL SWITCH
PDI
PDS
PRESSURE INDICATOR
POINT OF INTERSECTION,
PS PRESSURE SENSOR
R
PUMP, PHASE OR POLE
NARACS
NFPA
OSHA
OSW OPERATIONS SUPPORT WING
PRIVATE BRANCH EXCHANGEPBX
POC POINT OF CONNECTION
PVDS
OH OPPOSITE HAND
OUTSIDE DIAMETER, OPEN DRAIN
NO, #
PH
RPTS
RECEPT
RCRA
AND RECOVERY ACT
RESOURCE CONSERVATION
NTS NOT TO SCALE
NATIONAL PIPE THREAD
RCP REFLECTED CEILING PLAN
RF
REV
RETURN FAN
RGS
RHC REHEAT COIL
RM ROOM
RO ROUGH OPENING
RV
SA SUPPLY AIR
SCHEDULE
SD SMOKE DAMPER
SEC SECTION
SF
SHT SHEET
SIG SIGNAL
SM SPRINKLER MAIN
RIGID GALVANIZED STEEL
REFRIGERANT VENT
SIM SIMILAR
SAN SANITARY
S SMOKE DETECTOR
REVERSE, REVISION
SUPPLY FAN, SQUARE FEET
SAP SOUND ABSORBING PANEL
REQUIREDREQ’D
HOSE BIBB
HEATING COIL
HDW HARDWARE
HEAT EXCHANGER
HOLLOW METAL
HORIZ HORIZONTAL
HPT HIGH POINT
HOUR
HEIGHT
HTG HEATING
HTR HEATER
HVAC
HERTZ
INSIDE DIAMETER
INCH
INSUL INSULATION
INT INTERIOR
JUNCTION
JUNCTION BOX
KVA KILOVOLT AMPERE
KW KILOWATTS
LINEAR FEET
LIVE LOAD
LLH LONG LEG HORIZONTAL
LCP LOCAL CONTROL PANEL
INV INVERT
HPS
HTP HOT TAP (W/STOPPLE FITTING)
HERM HERMETIC
KCMIL THOUSAND CIRCULAR MILS
INSIDE FACE OR INTERIAL FILTER
HWS
HWR HOT WATER RETURN
HOT WATER SUPPLY
INST INSTRUMENT
POUNDS
HPL HIGH PRESSURE LAMINATE
IN,"
GAS SENSOR
LCV LEVEL CONTROL VALVE
LEVEL GAUGE
HUMIDISTAT
HUMIDIFIER
IEWH
WATER HEATER
INSTANTANEOUS ELECTRIC
GV GATE VALVE
GWB GYPSUM WALLBOARD
GW GLYCOL WASTE
HWL HIGH WATER LEVEL
HW DOMESTIC HOT WATER
HIGH PRESSURE STEAM
HIGH PRESSURE SODIUM,
HIGH PRESSURE
HORSE POWER, HEAT PUMP
HAZMAT HAZARDOUS MATERIALS
GWH GAS WATER HEATER
LAN LOCAL AREA NETWORK
HCS HOST COMPUTER SYSTEMS
HWY HIGHWAY
LBS, #
LLV LONG LEG VERTICAL
LONG LONGITUDINAL
LOW POINT
LIGHT
LTG LIGHTING
MOTOR
MAS MASONRY
MAT MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MET METAL
MG MOTOR GENERATOR
MO MASONRY OPENING
MANUFACTURER
LPS LOW PRESSURE STEAM
LEVEL SWITCH
MOD MODIFICATION
MCC MOTOR CONTROL CENTER
MIL MILLIMETER
MIN MINIMUM
H
HB
HC
HE
HM
HP
HR
HS
HT
HZ
ID
IF
J
JB
LF
LL
GS
LG
HU
LP
LT
M
LS
EF
EG
ELEC ELECTRIC(AL)
EMD ESTIMATED MAXIMUM DEMAND
EHC ELECTRIC HEATING COIL
EMERG EMERGENCY
EMT
EQ EQUAL
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EXH EXHAUST
EXISTING
EXP EXPOSED
EXPN EXPANSION
EXT EXTERIOR
F
FD
FE FIRE EXTINGUISHER
FEC
FIN FINISH
FIXTURE
FLOOR
FM
EL, ELEV
FIRE EXTINGUISHER CABINET
FCV FLOW CONTROL VALVE
FIRE DAMPER OR FLOOR DRAIN
FEPC
EXHAUST FAN
FOR
FOS
FUEL OIL RETURN
FUEL OIL SUPPLY
FFE FINISHED FLOOR ELEVATION
FLEXIBLE DUCTFLEX
FHC FIRE HOSE CABINET
FI
EH
EWH ELECTRIC WATER HEATER
FC FAN COIL UNIT
EAT ENTERING AIR TEMPERATURE
ECP ENGINE CONTROL PANEL
EDAM
AND MONITORING
ELECTRICAL DATA ACQUISITION
EP EXHAUST PIPE
ES EXHAUST SILENCER
ER EXHAUST REGISTER
ERMS
ET ELECTRIC HEAT TRACE
FUEL OIL VENTFOV
FOL FUEL OIL LEVEL
FLG FLANGE
FD/SD
FDR FEEDER
FCO FLOOR CLEANOUT
FOT
FLA
FIBER OPTIC TERMINAL
FO FIBER OPTIC
FLUOR FLUORESCENT
FULL LOAD AMPERES
FA FAN COOLED
EACH, EXHAUST AIR
FIX, FIXT
FL, FLR
FAA
DWG(S) DRAWING(S)
EA
FLOW METER, FIRE MAIN
FILTER, FIRE LINE
EFF EFFICIENCY
ELECTRIC HEATER
ELEVATION, ELEVATOR
ENT
ELECTRICAL METALLIC TUBING
FEET
GA
GALV GALVANIZED
GEN GENERATOR
GFM
GL GLASS
GND
GPM
GR
GALLONS PER MINUTE
GFE
G GAS
FT,’
GRILLE
FS FLOW SWITCH
FZ FREEZESTAT
FTR FINNED TUBE RADIATION
FRP
FEET PER MINUTEFPM
FV FULL VOLTAGE
FPU FIELD PROGRAMMING UNIT
GROUND, GROUND CONNECTOR
GPH GALLONS PER HOUR
GRV GRAVITY VENT
GAGE, GUAGE
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
R
S
T
U
V
W
X
Y
MONITORING SYSTEM
CENTRAL CONTROL AND
DIFFUSER, CONDENSATE DRAIN
CONTROL DAMPER, CEILING
TRANSMISSION NETWORK
ADMINISTRATIVE DATA
PLANE
SIGNAL TRANSPORT GROUND
ASSOCIATION
NATIONAL FIRE PROTECTION
SYSTEM
PORTABLE VISUAL DISPLAY
INTERSECTION
POINT OF VERTICAL
CONDITIONING
HEATING/VENTILATING/AIR
SENSOR
HIGH STRENGTH, HUMIDITY
PLASTIC
FIBER GLASS REINFORCED
INDICATOR
FLANGE INSULATION, FLOW
DAMPER
COMBINATION FIRE AND SMOKE
ADMINISTRATION
FEDERAL AVIATION
EXHAUST GRILLE
ENGINE GENERATOR,
MONITORING SYSTEM
ENVIRONMENTAL REMOTE
PER HOUR
BRITISH THERMAL UNIT
REHABILITATION
AUTOMATION WING
SYSTEM
AUTOMATED RADAR TERMINAL
DEVICE
ADDRESSABLE INTERFACE
CAPACITY
AMPERES INTERRUPTING
AIR FLOW SENSOR
AMPERE FRAME,
REPRESENTATIVE
CONTRACTING OFFICER
CONTINUATION
CONTINUOUS OR
CIRCULATING PUMP
CONTROL PANEL,
TECHNICAL REPRESENTATIVE
CONTRACTING OFFICER
RELAY
CEILING REGISTER, CONTROL
VOLUME TERMINAL
CONTROL VALVE, CONSTANT
DIFFUSER, DAMPER
DRAIN, DELTA CONNECTION,
DIFFERENTIAL PRESSURE SWITCH
DUSTPROOF PARTITION,
COMPUTER
FRONT END PERSONAL
TUBING
ELECTRICAL NON-METALLIC
EQUIPMENT
GOVERNMENT FURNISHED
MATERIAL
GOVERNMENT FURNISHED
HEALTH ADMINISTRATION
OCCUPATIONAL SAFETY &
COMMUNICATIONS SYSTEM
NATIONAL RADIO
CURVATURE
POINT OF VERTICAL
SENSOR
PRESSURE DIFFERENTIAL
INDICATOR
PRESSURE DIFFERENTIAL
LABORATORIES, INC.
UNDERWRITER’S
POWER SYSTEM
UNINTERRUPTIBLE
COMPONENTS
VINYL BASE & TRIM
XFR
XFER,
CHGR
BAT
BOTT
BOT,
EX
EXIST,
MFG
MFGR,
MANAGEMENT AND OPERATIONS
TELECOMMUNICATIONS
TAMPER SWITCH
TEMPERATURE SENSOR,
CONTROLLER
TEMPERATURE INDICATING
SCHED
SCH,
ABBREVIATIONS
E D
M
IS
S
U
R
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
CALLEN R. COLLINS
1305280
ZLC-1305280A-G003
ENGINEERING SERVICES
ENROUTE/FSS
ABBREVIATIONS
CHILLER/COOLING TOWER MODERNIZATION
JON W. ORR
PROJECT ENGINEER MGR: ENGINEERING - SEATTLE
a g .d g n
DRAWING PRODUCED ON WSA MICROSTATION SYSTEM
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
IBC IINTERNATIONAL BUILDING CODE
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
:4
J o e n
DATE
APPROVED
z lc a g .d g n
E D
M
IS
S
U
R
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
ZLC-1305280A-G004
a g .d g n
CHILLER/COOLING TOWER MODERNIZATION
GENERAL/ARCHITECTURAL - LEGENDS
ENGINEERING SERVICES
ENROUTE/FSS
CALLEN R. COLLINSJON W. ORR
PROJECT ENGINEER MGR: ENGINEERING - SEATTLE
1305280
DRAWING PRODUCED ON WSA MICROSTATION SYSTEM
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
ARCHITECTURAL LEGENDGENERAL LEGEND
C-C
A201
C8
A701
A401
A401
A301
E1
E1
E4 A701
E3
E2 C8
REFERENCE:
FE
DP DP
1,2
1,2,3
1A
REFERENCE (CONT):
SYMBOLS
MATERIALS:
SHEET NOTE NUMBER
SPECIFIC INFORMATION
REFER TO HAZMAT DWG FOR
HAZMAT NOTE, ASBESTOS & PCB
SPECIFIC INFORMATION
REFER TO HAZMAT DWG FOR
HAZMAT NOTE, LEAD PAINT
CEILING HEIGHT DESIGNATION
METAL STUD WALL
ACCESS FLOOR PANELS
BREAK LINES
ELEVATION SYMBOL
ABOVE OR BEYOND
OUTLINE OF OBJECT
DETAIL DESIGNATION
DETAIL TITLE REFERENCE
IS DRAWN OR SCHEDULED
SHEET ON WHICH DETAIL
DETAIL DESIGNATION
DETAIL REFERENCE
DETAIL IS DRAWN
SHEET ON WHICH
SECTION DESIGNATION
SECTION CUT
GRAPHIC SCALE
ELEVATION SHOWN
DARKENED ARROW INDICATES
FINISH SCHEDULE
AND/OR INTERIOR WALL
ELEVATION DESIGNATION
ELEVATION NUMBER
DETAIL NUMBER
ELEVATION IS DRAWN
SHEET ON WHICH
ELEVATION REFERENCE
ELEVATION DESIGNATION
SECTION IS CUT
SHEET ON WHICH
PARTIAL SECTION CUT
SECTION DESIGNATION
SECTION IS CUT
SHEET ON WHICH
CONTRACTOR, UON
DEMOLITION BY
CONTRACTOR, UON
DEMOLITION BY
ROOM NAME & NUMBER
NORTH ARROW
EARTH
CONCRETE
METALS
GYPSUM
WOOD
(AWP)
ACOUSTICAL WALL PANEL
PARTITION TYPE
LETTER INDICATES
FIRE RATING
NUMBER INDICATES
PARTITION TYPE
DOOR NUMBER
PARTITION WITH DOOR
TEMPORARY DUSTPROOF
WATER CLOSET
URINAL
LAVATORY
W/ FIRE EXTINGUISHER
FIRE EXTINGUISHER CABINET
FIRE EXTINGUISHER
TRANSFER AIR GRILLE
CEILING REGISTER
RETURN AIR
CEILING DIFFUSER
SUPPLY AIR
LIGHT FIXTURE
(APC)
ACOUSTICAL PANEL CEILING
DESIGNATION
COLUMN LINE GRID
08’ 8’
SCALE: 1/8" = 1’-0"
16’
EQUIPMENT ROOM
ELECTRONIC
B101A
8’-6" AFF
EXISTING NEW
MOUNTED
SURFACE RECESSED
AIR FLOW PANEL
PERFORATED
STEEL
CONC
EARTH
BLKGPLYWOOD
STL
STRUCT
FIN FLR
EL. 89’-6"
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
:4
:3
J o e n
DATE
APPROVED
z lc a g .d g n
E D
M
IS
S
U
R
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
ZLC-1305280A-G005
a g .d g n
CHILLER/COOLING TOWER MODERNIZATION
CONSTRUCTION STAGING PLAN
ENGINEERING SERVICES
ENROUTE/FSS
CALLEN R. COLLINSJON W. ORR
PROJECT ENGINEER MGR: ENGINEERING - SEATTLE
1305280
DRAWING PRODUCED ON WSA MICROSTATION SYSTEM
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
G
F
E
D
C
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
LEFT STEP
NOT TO SCALE
CONSTRUCTION STAGING PLAN
A.1
A.2
A.3
A.4
A.5
B.1
C.1
C.2
C.3
C.4
C.5
REPLACE DIVISION 1 REQUIREMENTS.
PARAPHRASE DIVISION 1 REQUIREMENTS AND ARE NOT INTENDED TO MODIFY OR
"DIVISION 1 GENERAL REQUIREMENTS" OF THE SPECIFICATIONS. THESE NOTES
GRAPHICALLY REPRESENT MANY OF THE MAJOR REQUIREMENTS STATED IN
THE FOLLOWING NOTES AND ACCOMPANYING "CONSTRUCTION STAGING PLAN"
PARTICULARLY IN CONJUNCTION WITH ONGOING PROJECTS.
STAGING AREA SHALL BE COORDINATED WITH SITE PERSONNEL VIA COR;
CONSTRUCTION ACCESS, PARKING, OFFICES AND EXTENT/SIZE OF CONSTRUCTION
THROUGH MAIN ENTRANCE SECURITY GATE.
CONTRACTOR’S VEHICLES, PEDESTRIAN AND DELIVERIES TO SITE SHALL BE
AREAS.
AND FENCING TO PROTECT, WARN AND DIRECT PERSONS NEAR CONSTRUCTION
AND DELIVERIES ON SITE. PROVIDE NECESSARY BARRICADES, LIGHTS, SIGNAGE
PROVIDE SIGNAGE TO INDICATE ACCESS ROUTE FOR CONSTRUCTION EMPLOYEES
CONTROL WING BASEMENT.
LOCATIONS: 1) LOADING DOCK; 2) CHILLER ROOM, CHILLER ROOM AREAWAY, AND
CONTRACTOR’S ACCESS TO BUILDING SHALL BE LIMITED TO THE FOLLOWING
4:00 PM. COORDINATE CONTRACTOR DELIVERIES WITH THE COR.
CONGESTION. FAA SHIFT CHANGES OCCUR AT 6:30 TO 8:00 AM AND 2:00 TO
AT TIMES OTHER THAN FAA EMPLOYEES SHIFT CHANGES TO AVOID
DELIVERIES SHALL BE SCHEDULED AND APPROVED IN ADVANCE WITH COR AND
ACCESSIBLE AT ALL TIMES FOR FAA DELIVERIES.
CONTRACTOR SHALL KEEP LOADING DOCK, FREIGHT ELEVATOR, AND CAFETERIA
PARKING.
EXISTING PARKING SPACES AT ARTCC ARE OFF-LIMITS FOR CONTRACTOR
ADDITIONAL PARKING SHALL BE OFF-SITE AND PROVIDED BY CONTRACTOR.
CONTRACTOR’S PARKING SHALL BE LIMITED TO CONSTRUCTION STAGING AREA.
PERSONNEL WHILE IN THE BUILDING. CONTRACTORS VEHICLES SHALL BE MARKED.
SUPERVISORY PERSONNEL SHALL BE RESPONSIBLE FOR CONDUCT OF THEIR
EMPLOYED BY CONTRACTOR TO WORK AT FACILITY. CONTRACTOR’S
CONSTRUCTION PERSONNEL. FAA RESERVES THE RIGHT TO PROHIBIT WORKERS
PROVIDED TO COR. TEMPORARY SECURITY BADGES SHALL BE ISSUED TO
AN ADVANCE LIST AND WEEKLY LOG OF CONTRACTOR’S PERSONNEL SHALL BE
CONSTRUCTION AREAS.
SITE IS A SECURE AREA AND CONSTRUCTION PERSONNEL SHALL REMAIN IN
WITH COR.
COR. ESCORTS OUTSIDE BUILDING MAY BE REQUIRED. COORDINATE REQUIREMENTS
WITHIN THE BUILDING. COORDINATE WORK WITHIN THE BUILDING IN ADVANCE WITH
FAA ESCORTS SHALL BE REQUIRED FOR CONSTRUCTION PERSONNEL WORKING
THE FLYING PUBLIC.
OF THIS EQUIPMENT FOR ANY AMOUNT OF TIME WILL JEOPARDIZE SAFETY OF
COR IMMEDIATELY OF DAMAGE OR DISRUPTION OF ELECTRICAL SERVICES. LOSS
NOT LIMITED TO, DISRUPTION OF POWER TO UNITS. CONTRACTOR SHALL NOTIFY
DAMAGE AS A RESULT OF INCIDENTAL OR ACCIDENTAL NEGLIGENCE SUCH AS, BUT
CONTINUOUS PROTECTION OF THIS EQUIPMENT FROM PHYSICAL OR ELECTRICAL
DURATION OF THIS CONTRACT. CONTRACTOR SHALL BE RESPONSIBLE FOR
EXISTING FAA AIR TRAFFIC EQUIPMENT SHALL REMAIN OPERATIONAL THROUGHOUT
C.6
D.1
OF THIS FACILITY SHALL NOT BE PERMITTED.
AREAS OF THIS FACILITY. WORK SHALL BE COORDINATED WITH COR. DISRUPTION
CONTRACTOR SHALL USE GREAT CARE AND CAUTION WHILE WORKING IN ALL
CLEARANCES REQUIRED TO PERFORM WORK.
FOLLOWING NOTICE OF CONTRACT AWARD. COORDINATE WITH SITE NUMBER OF
PERSONNEL THAT ARE TO OBTAIN SECURITY CLEARANCE BADGING IMMEDIATELY
CONTRACTOR SHALL SUBMIT SECURITY PAPERWORK FOR CONTRACTOR
CONSTRUCTION STAGING PLAN NOTES:
A. CONSTRUCTION ACCESS
B. CONTRACTOR PARKING
D. CONSTRUCTION MATERIAL STORAGE
C. FAA SECURITY REQUIREMENTS
RUN THROUGH STAGING AREA AND ELSEWHERE.
PRIOR PERMISSION FROM COR. BURIED CABLES (UNDERGROUND UTILITIES) MAY
AT THE DISCRETION OF COR. CONTRACTOR SHALL DO NO DIGGING WITHOUT
STORED AND PROTECTED. LIGHTING SHALL BE INSTALLED BY THE CONTRACTOR
AREA SHALL BE SURROUNDED BY A FENCE. MATERIALS SHALL BE NEATLY
LIMITED TO THE CONSTRUCTION STAGING AREA. THE CONSTRUCTION STAGING
STORAGE OF CONSTRUCTION MATERIALS AND TRAILERS ON SITE SHALL BE
G. CONSTRUCTION OFFICE
G.1
G.2
H. CONSTRUCTION TOILET FACILITIES
H.1
H.2
I. DEMOLITION AND CONSTRUCTION HOURS
I.1
I.2
I.3
I.4
REFER TO DIVISION 1 FOR MORATORIUM OF WORK TIME FRAMES.I.5
CONFERENCE. HOOK-UPS SHALL BE THE RESPONSIBILITY OF CONTRACTOR.
POINT OF CONNECTION SHALL BE DETERMINED AT PRECONSTRUCTION
AT ARTCC, IF REQUIRED FOR CONSTRUCTION PURPOSES OF THE WORK TRAILER.
TELEPHONE AND BOTTLED WATER. TEMPORARY POWER AND WATER IS AVAILABLE
BE LOCATED IN CONSTRUCTION STAGING AREA. CONTRACTOR SHALL PROVIDE
CONTRACTOR’S TRAILERS FOR OFFICE, MATERIALS AND EQUIPMENT STORAGE SHALL
OF BUILDING CELL PHONE USE IS PROHIBITED.
COORDINATE WITH COR USE OF MOBILE CELL PHONES AT FACILITY. SOME AREAS
PERSONNEL LOCATION OF TOILETS PERMITTED FOR USE.
KEPT IN A NEAT AND CLEAN MANNER. CONTRACTOR SHALL COORDINATE WITH FAA
CONTRACTOR MAY USE TOILETS INSIDE ARTCC BUILDING PROVIDED THAT IT IS
WITHIN CONSTRUCTION STAGING AREA.
PORTABLE CHEMICAL TOILETS SHALL BE PROVIDED BY CONTRACTOR AS REQUIRED
BETWEEN 5:30 AM TO 1:00 AM.
THIS FACILITY. DEMOLITION AND CONSTRUCTION NOISE SHALL BE MINIMIZED
CONTRACTOR SHALL NOT INTERFERE WITH AIR TRAFFIC CONTROL FUNCTION OF
COR.
ACCOMPLISHED DURING OFF-HOURS OF 1:00 AM TO 5:30 AM OR AS APPROVED BY
BASEMENT MODIFICATION WORK AREA. WORK ON CRITICAL EQUIPMENT SHALL BE
COORDINATE WORK WITH COR ON CRITICAL EQUIPMENT WITHIN CONTROL WING
WORK.
MINIMUM OF 3 WORKING DAYS NOTICE IN ADVANCE OF PERFORMANCE OF THE
SHALL BE SCHEDULED, COORDINATED AND APPROVED IN WRITING BY COR WITH A
NOISY DEMOLITION (INSIDE OR OUTSIDE) AND OFF-HOURS CONSTRUCTION ACTIVITIES
DAYS BEFORE THE PERFORMANCE OF THE WORK.
COORDINATE AND HAVE APPROVAL BY COR IN WRITING, A MINIMUM OF 3 WORKING
SHALL BE ALLOWED ONLY AT PREARRANGED TIMES APPROVED BY COR. SCHEDULE,
CONCRETE SAWING, CORE DRILLING, CONCRETE DEMOLITION AND ANCHOR DRILLING
K. ASBESTOS REMOVAL AND DISPOSAL
K.2
K.1
L.1
L.2
M. EQUIPMENT PROTECTION
M.1
M.2
M.3
M.4
REMOVAL & DISPOSAL SHALL BE IN ACCORDANCE WITH SPECIFICATIONS.
WORK AREA & BUILDING CONTAINS HAZARDOUS MATERIALS (HAZMAT). ASBESTOS
WORK IN THAT AREA. COORDINATE WORK IN OTHER AREAS WITH COR.
CEASE WORK IN THAT AREA UNITL A PLAN HAS BEEN DEVELOPED TO RESUME
MATERIALS ARE DISCOVERED DURING THE WORK, NOTIFY COR. ISOLATE AREA, AND
THE WORK WITH HAZMAT ABATEMENT DRAWINGS AND REPORTS. IF HAZMAT
THE BUILDING HAS BEEN IDENTIFIED AS CONTAINING HAZMAT MATERIALS. COORDINATE
ORIGINAL CONDITION, INCLUDING STRIPING OF PARKING LOT.
UPON COMPLETION OF WORK, CONTRACTOR SHALL REPAIR PAVED SURFACES TO
BY CONTRACTOR TO THE SATISFACTION OF COR.
DISTURBED LAWNS AND LANDSCAPING SHALL BE RESTORED TO ORIGINAL CONDITION
BY IMPACT, WATER, ASBESTOS, DEBRIS AND DUST, INCLUDING CORE DRILLING.
OUTSIDE BUILDING, FROM DAMAGE, INCLUDING BUT NOT LIMITED TO, DAMAGE CAUSED
CONTRACTOR SHALL PROTECT NEW AND EXISTING FAA EQUIPMENT, BOTH INSIDE AND
L. PARKING LOT AND DRIVEWAY REPAIR
OPEN (DE-ENERGIZE) OR CLOSE (ENERGIZE) ANY CIRCUIT BREAKER AT ANY TIME.
AND IN WRITING FOR EACH CASE OF BREAKER OPERATION. CONTRACTOR SHALL NOT
CIRCUIT BREAKERS. CONTRACTOR SHALL REQUEST PERMISSION OF FAA IN ADVANCE
IN ADVANCE OF PERFORMANCE OF WORK. ONLY FAA PERSONNEL MAY OPERATE
HAVE APPROVAL IN WRITING BY COR WITH A MINIMUM OF 3 WORKING DAYS NOTICE
COMPLETED PRIOR TO SHUTDOWN AND SWITCHOVER. SCHEDULE, COORDINATE AND
UNDER DEMOLITION AND CONSTRUCTION HOURS. PREPARATORY WORK SHALL BE
BE ACCOMPLISHED DURING OFF-HOURS AS INDICATED IN NOTE I.2 THIS SHEET
SHUTDOWNS AND SWITCHOVERS OF MECHANICAL AND ELECTRICAL SYSTEMS SHALL
WITH FUNCTIONS OF THE ARTCC.
NECESSARY TO COORDINATE CONSTRUCTION ACTIVITY SO AS NOT TO INTERFERE
ARTCC IS A 24 HOUR 7 DAY PER WEEK OPERATING FACILITY. IT WILL BE
WRITING BY COR.
WELDING SHALL NOT BE PERMITTED IN FAA OCCUPIED AREAS UNLESS APPROVED IN
NO WELDING EQUIPMENT SHALL BE POWERED BY THE FACILITY ELECTRICAL SYSTEM.
CONSTRUCTION STAGING AREA TO BE DETERMINED AT PRECONSTRUCTION MEETING.
NOTE:
BUILDING
SUPPORT
AAS
INTERIM
SUPPORT
BUILDING
FH
R A
M P
700 NORTH STREET
EXIT MAIN ENTRANCE
S E
C U
R
IT
N C
E
S E
C U
R
IT
N C
E
P R
O P
E R
L
IN
E
PARKING LOT
SCREEN
SECURITY
COOLING TOWERS
PROPERTY LINE
PROPERTY LINE
GATE
GATE
R E
E T
U/G FUEL TANKS
AREAWAY
ROOM
CHILLER
LIFT
DOCK
LOADING
FIRE HYDRANT
FAN EF-
EXHAUST
BUILDING 2
BUILDING
NEMC
FENCE
CARE
CHILD
ELEVATOR
FREIGHT
PARKING
VISITOR
BUILDING
CONTROL
SECURITY
FENCE
SECURITY
WATER TANK
U/G 30,000 GAL.
(TYP. 5 PLACES)
CONCRETE BOLLARD
GARAGE & GENERATOR BUILDING
CENTER
CARE
CHILD
BUILDING 1
(ARTCC)
CENTER
CONTROL
TRAFFIC
AIR ROUTE
COVERED ROOF
PATIO WITH
CONCRETE PAD/
DUST DURING CONSTRUCTION. DEBRIS SHALL BE REMOVED BY CONTRACTOR DAILY.
AROUND DUMPSTERS SHALL BE KEPT CLEAN AND FREE OF EXCESS DEBRIS AND
PROVIDED BY CONTRACTOR WITHIN THE CONSTRUCTION STAGING AREA. AREAS
ENCLOSED DUMPSTERS FOR DISPOSAL OF CONSTRUCTION DEBRIS SHALL BE
E. CONSTRUCTION DEBRIS
E.1
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
:4
J o e n
DATE
APPROVED
z lc a c .d g n
MATCH
TC22.47
FIN FL EL 21.77
PUMP HOUSE
21.89 C
21.39 G
21.23 C
20.73 G
20.62 C
20.62 G
20.92 C
20.84 G
21.73 P
21.65 P
21.73 P
21.08 P
21.00 P
21.65 P
21.00 P
21.08 P
22.52 TW
20.85 INV
22.52 TW
20.60 INV
21.08 P
21.00 P
21.00 P
21.08 P
.1
22.19 P
SWALE (TYP)
(TYP)
APHALT PAVEMENT
GUTTER (TYP)
CONC CURB &
(TYP)
CONC SIDEWALK
JOINT
EXPANSION
TOP OF SLAB
EL 22.00
GRADE BREAK (TYP)
(TYP)
2%
(TYP)
5:1
21.73 P
21.64 P
21.60 C
21.10 G
21.15 C
21.07 G
21.29 C
20.79 G
MH
TELCO
EMH-C
FH
E X
IS
T
G
E
C T
D U
C T S
C .J
R1-1
BANK
ELEC DUCT
X
16.79 top
17.85 TOP
17.09 TOP
16.80 TOP
18.50 TOP
OF DUCT
18.83 TOP
OF DUCT
19.17 TOP
OF DUCT
18.42 top
18.83 top
17.10 top
5’R
12’R
6-1�"C
1"
IA
EXIST DUCT BANK
IR
1"
IR
IR
EXIST SIDEWALK
4"CTR
S
C T
R
4"CTR
4" CTS
R
A
B A
N D
O N
E D
S
A
B A
N D
O N
E D
W 12"CTR
12"CTR
R
S
10" CTR (ABANDONED)
10" CTS (ABANDONED)
R
S
4" CTS
2-3"C(TELCO)
EXIST CURB AND GUTTER
EXIST CURB AND GUTTER
SOD
ABANDONDED DUCT BANK
ABANDONED SD LINE
4" W4" W
POWER SERVICES BUILDING
EXIST PAVEMENT
EXIST SIDEWALK
UNDERGROUND WATER TANK
EXIST CONCRETE SLAB
ELEC CONDUITS
ABANDONED EXIST
S
C T
R
4"CTR
4" CTS
4"CTR
4" CTS
1 2
4" CTS
4"CTR
C003
F6
C003
C6
R
S
12"CTR
12"CTR
R
S
C003
C2
12"CTR
E D
M
IS
S
U
R
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
ZLC-1305280A-C001
a c .d g n
G
F
E
D
C
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
08’ 8’
SCALE: 1/8" = 1’-0"
16’
UTSALT LAKE CITY
CIVIL SITE
CHILLER/COOLING TOWER MODERNIZATION
NORTH PIPING PLAN
ENGINEERING SERVICES
ENROUTE/FSS
CALLEN R. COLLINSJON W. ORR
PROJECT ENGINEER MGR: ENGINEERING - SEATTLE
DRAWING PRODUCED ON WSA MICROSTATION SYSTEM
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
SHEET Z010.
WORK WITH "TEMPORARY COOLING" DRAWINGS BEGINNING AT
FOR CONSTRUCTION SEQUENCE SEE SHEET M002. COORDINATE
DRAWINGS. ADD 4200 FEET FOR TRUE ELEVATIONS.
CONTOUR LINES AND ELEVATIONS ARE COMPILED FROM AS-BUILT
FIELD VERIFIED BY EXCAVATION AND HAND DIGGING.
BANKS ADJACENT TO AND CROSSING THE TRENCH LINE MUST BE
ELEVATIONS OF EXISTING UNDERGROUND UTILITIES AND DUCT
APPROXIMATE AND MUST BE FIELD LOCATED.
LOCATION OF EXISTING IRRIGATION WATER LINES ARE
2 FEET 6 INCHES, UNLESS OTHERWISE NOTED.
MINIMUM COVER FOR UNDERGROUND HYDRONIC PIPING MUST BE
A UNIFORM MANNER.
INSTALL UNDERGROUND HYDRONIC PIPING TO EXISTING GRADES IN
THE MAIN LINES.
REPLACED FAA MAY EXERCISE THE ADDITIVE OPTION TO REPLACE
IF ULTRASONIC TESTING INDICATES MAIN LINES SHOULD BE
TEMPORARY COOLING PLAN TO FAA FOR APPROVAL.
IF THE ADDITIVE OPTION IS EXERCISED SUBMIT REVISED
SHEET NOTES:
GENERAL NOTES:
A.
B.
C.
D.
E.
F.
G.
H.
AND CTR BRANCH LINES TO POWER SERVICES BUILDING (PSB).
AT POINT OF CONNECTION EXCAVATE, DISCONNECT, AND CAP CTS
PSB ENTRANCE.
LINES FROM MAIN LINES TO PSB. TERMINATE BRANCH LINES AT
EXCAVATE AND REPLACE UNDERGROUND CTS AND CTR BRANCH
CONDUCT ONE AUTOMATED ULTRASONIC TEST ON EACH MAIN LINE.
SLAB.
DEMOLISH EXISTING CONCRETE SIDEWALK FOR NEW ADDITION
HOUSE ADDITION. MATCH EXISTING CONCRETE DETAILS AND COLOR.
PROVIDE NEW 48"W CONCRETE SIDEWALK AROUND NEW PUMP
NEW PUMP HOUSE ADDITION.
EXCAVATE, EXTEND AND REPLACE UNDERGROUND 12" CTR AROUND
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
:2
J o e n
DATE
APPROVED
z lc a c .d g n
GUTTER (TYP)
CONC CURB &
FH
VAULT
PREVENTER
BACKFLOW
E X
IS
T
G
E
C T
D U
C T S
18.42 top
18.83 top
17.10 top
13.83’
5’
1.5’
.6
61.00’
25’ RAD
EXIST JIB CRANE
4"S
4"S
4"SD
1"
IA
4"SD
"S
D
.4
IN
V
"C
IP
S
MANHOLE
.1
IN
V
"V
C P
17.53 INV
INV 20.19
2"FOR
2"FOS
2"IW
"C
T R
"C
T S
8"G 6 "W
1"IR
IR
�"IR
1"IR
IR
IR
2"STEAM (LP)
4"HWS
4"HWR
6"CWS
6"CWR
2"FOS ABANDONED
2"FOR ABANDONED
INV 24.35
BANK
DUCT
TELCO
SDSD
S D
S D
"G
GAS METER
(TYP)
CONC SIDEWALK
(TYP)
PAVT
ASPHALT
BANK
ELEC DUCT
22.50 TOP
OF DUCT
20.10 TOP
OF DUCT
20.50 TOP
OF DUCT
EXIST 8"G
CONN TO
25.00+ BOP
23.67 BOP
24.00 BOP
2"FOR
25.36 BOP
(T Y
P
DWG M14
FOR CONT, SEE
(4 PIPES)
SEE NOTE 4
8"G
CAP EXIST
23.86 BOP
23.86 bop
EXIST DUCT BANK
EXIST DUCT BANK
BASEMENT
"G
R
A
B A
N D
O N
E D
S
A
B A
N D
O N
E D
10" CTR (ABANDONED)
10" CTS (ABANDONED)
R
S
R
S
R
S
FUEL OIL LINES
EXIST CURB AND GUTTER
SOD
4" W4" W
ABANDONED 8"G
SEE DWG E01
ELEC CONDUITS,
ABANDONED EXIST
SEE DWG E01
ELEC CONDUITS,
ABANDONED EXIST
EXIST PAVEMENT
C003
F6
C003
C6
C003
F4
C003
C4
R
S
R
S
R
S
E D
M
IS
S
U
R
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
ZLC-1305280A-C002
a c .d g n
G
F
E
D
C
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
08’ 8’
SCALE: 1/8" = 1’-0"
16’
CIVIL SITE
CHILLER/COOLING TOWER MODERNIZATION
SOUTH PIPING PLAN
ENGINEERING SERVICES
ENROUTE/FSS
CALLEN R. COLLINSJON W. ORR
PROJECT ENGINEER MGR: ENGINEERING - SEATTLE
DRAWING PRODUCED ON WSA MICROSTATION SYSTEM
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
SHEET Z010.
WORK WITH "TEMPORARY COOLING" DRAWINGS BEGINNING AT
FOR CONSTRUCTION SEQUENCE SEE SHEET M002. COORDINATE
DRAWINGS. ADD 4200 FEET FOR TRUE ELEVATIONS.
CONTOUR LINES AND ELEVATIONS ARE COMPILED FROM AS-BUILT
FIELD VERIFIED BY EXCAVATION AND HAND DIGGING.
BANKS ADJACENT TO AND CROSSING THE TRENCH LINE MUST BE
ELEVATIONS OF EXISTING UNDERGROUND UTILITIES AND DUCT
APPROXIMATE AND MUST BE FIELD LOCATED.
LOCATION OF EXISTING IRRIGATION WATER LINES ARE
2 FEET 6 INCHES, UNLESS OTHERWISE NOTED.
MINIMUM COVER FOR UNDERGROUND HYDRONIC PIPING MUST BE
A UNIFORM MANNER.
INSTALL UNDERGROUND HYDRONIC PIPING TO EXISTING GRADES IN
THE MAIN LINES.
REPLACED FAA MAY EXERCISE THE ADDITIVE OPTION TO REPLACE
IF ULTRASONIC TESTING INDICATES MAIN LINES SHOULD BE
TEMPORARY COOLING PLAN TO FAA FOR APPROVAL.
IF THE ADDITIVE OPTION IS EXERCISED SUBMIT REVISED
SHEET NOTES:
GENERAL NOTES:
A.
B.
C.
D.
E.
F.
G.
H.
LINES FROM CHILLER ROOM TO COOLING TOWER.
ADDITIVE OPTION: REPLACE UNDERGROUND CTS AND CTR MAIN
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
:3
:0
J o e n
DATE
APPROVED
z lc a c .d g
PAVEMENT
TACK COAT
RADIUS= 1 1/2"
3":12" BATTER
RADIUS= 3/4"
1/4"
6"
OTHERWISE
6" UNLESS NOTED
CONC SIDEWALK
WHERE OCCURS
2’-1 1/2"
SAW CUT
REPLACE PAVEMENT
REMOVE AND
SAW CUT
PIPE BEDDING
PROTECT SAW CUT EDGES OR
MAKE NEW CUT IMMEDIATLEY
PRIOR TO PLACING NEW PAVEMENT
NOTE:
GRASS
SHORING
BRACED
CONST SLOPE
TEMPORARY
SHORING
BRACED
V A
R
IE
S
S S
1’-0" 1’-0"
MINMIN
1:
MATERIAL
TAMPED GRANULAR
HAND PLACED AND
OR ROCK
ORGANIC MATERIAL
COMPACTED FILL FREE OF
THOROUGHLY COMPACTED
GRANULAR MATERIAL
ROCKFIRM EARTH
6" MIN
DIA WW
FOR NUMBER OF PIPES
SEE DWG C03.
2.
1.
WHICHEVER IS GREATER
W=6" OR 0.25 X DIA
JOINT SEALANT
STRUCTURE OR
FOUNDATION
NON-EXTRUDING
JOINT FILLER
1/4" RADIUS
3/4"-1"
NOTE :
CONSTRUCT DUMMY GROOVE
JOINT AT 4’ INTERVAL AND
�" EXPANSION JOINT AT 20’
INTERVAL IN SIDEWALK.
ON DWG C03
BLIND FLANGE AS SHOWN
CONCRETE BASE
MECH DWG
1.00’ MIN OR SEE
STEEL PIPE
FINISH GRADE
GROUND PIPE
WELD TO ABOVE
2’-0" SQ6
90°
M A
X
O V
E R
C003
WARNING TAPE
WARNING TAPE
WATER
COLLAR
CONC
M
IN
@ UNPAVED AREA
GROUND SURFACE
CAST IRON COVER
MARKED "WATER"
OR OTHER SERVICE
AT PAVEMENT
BOX FLUSH
ADJUSTABLE CAST
IRON VALVE BOX
GATE VALVE
MIN
4"
NOTES :
F2
MATCH EXISTING
E D
M
IS
S
U
R
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
ZLC-1305280A-C003
a c .d g n
G
F
E
D
C
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
SCALE: NTS
WELD CONNECTION
C003
F7
SCALE: NTSC003
C6 CONCRETE CURB & GUTTER
SCALE: NTSC003
C4
SCALE: NTSC003
C2CONCRETE SIDEWALK EXPANSION JOINT
F6
F2 PIPE BEDDING DETAILTRENCH @ PAVEMENT
F4 TRENCH @ SOD
SCALE: NTS
VALVE BOX DETAIL
C003
B7
1305280
CHILLER/COOLING TOWER MODERNIZATION
CIVIL DETAILS
ENGINEERING SERVICES
ENROUTE/FSS
CALLEN R. COLLINSJON W. ORR
PROJECT ENGINEER MGR: ENGINEERING - SEATTLE
DRAWING PRODUCED ON WSA MICROSTATION SYSTEM
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
:1
:1
J o e n
DATE
APPROVED
z lc a a .d g n
B119
B119
B120
SYSTEM
EQUIPMENT ROOM
B120
B130
B102
B101
UP
UP
B117
B108
B102
B114
B113
B116
B115
B104
B103
B101 B112
B106
B105
B107
B111
B118
B110
FREIGHT
ELEVATOR
B107
B109
UP
B10
B15 B16
B17 B18 B19 B21
B12
14A
UP
UP
RAMP DN
DN
B135 B137
B136
UP
B13
B23
B24
B20
MECHANICAL ROOM
COMMUNICATIONS EQUIPMENT ROOM
ELEC EQUIP RM
CORRIDORCORRIDOR
FORMER TELCO ROOM OFFICE
SHOP AREA
ESU OFFICE/WORK AREA
CORRIDOR
WOMEN
FORMER TELCO ROOM
BOILER ROOM
CRITICAL VAULT
AREAWAY
WEIGHT ROOM
STAIR-B
VESTIBULE
FSDPS MIFC
PAMRI
NADIN 1A
COMPUTER DISPLAY CHANNEL (CDC)
E-DARC
PAMRI
OFFICESTAIR-ASTAIR #3
TM&O AREA
OFFICE
WORK AREA
STAIR No.1
MEN
CHILLER ROOM
ROOM
UTILITY
TOILET
WOMEN’S
TOILET
MEN’SBREAK ROOM
FSDPS
BREAK ROOM
NDP
REPAIR
MAINTENANCE
AF
OPERATIONS
FSDPS
WORK AREA
FSDPS
OFFICE
NDP
OFFICE
SUPERVISOR
FSDPS
DESK
MAINT
ELECT EQ
ROOM
MECH
ROOM
MONITORING
OFFICE
ESU
OFFICE
AUTO UNIT
CLOSET
JANITOR
MECHANICAL EQUIPMENT ROOM
B112
B134D
B134C
OFFICE
OFFICE
HOST EQUIPMENT ROOM
K-8 G-9 C-2 A-A D-D J-J L-L
M K G C-CA C U T S R P
C-1F K M-1 P-1
L N
P-7
R-6 S-6
A-2 A-1 A-3 A-4 A-5 A-6
M-M K-K G-G
AREA OF WORK
E D
M
IS
S
U
R
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
ZLC-1305280A-A001
a a .d
GENERAL NOTES:
LEGEND:
KEY PLAN:
08’ 40’10’ 20’ 30’
SCALE: 1/16" = 1’-0"
A001
A7
SCALE: 1/16" = 1’-0"
GUIDE PLAN - BASEMENT
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
RATED CONSTRUCTION.
FIRST FLOOR SLAB ABOVE BOILER ROOM SHALL BE A 1-HOUR FIRE
UTILITY CHASE WALLS ARE 2-HOUR FIRE RATED CONSTRUCTION.
FIRE RATED CONSTRUCTION.
ELECTRICAL EQUIPMENT ROOM 13A, CONCRETE CEILING, IS 2-HOUR
A.
B.
C.
D.
TYPE II A CONSTRUCTION.
WAFFLE SLAB HAS ONE-HOUR FIRE RATING RATING PER IBC 2009
CONTROL AND AUTOMATION WINGS FIRST FLOOR CONCRETE
E.
F.
THE PARTITIONS AS SHOWN SHOULD BE RATED AS INDICATED.
CURRENTLY PROVIDE THE REQUIRED FIRE RATING, BUT ONLY THAT
DOES NOT REPRESENT THAT THESE EXISTING PARTITIONS, IN FACT,
FIRE-RATED PARTITIONS AS REQUIRED BY CODE. THIS DRAWING
THIS DRAWING ILLUSTRATES THE EXTENT AND LAYOUT OF
G.
H.
ITEMS LEAVING OPENINGS/HOLES).
MADE BY THE WORK OF THIS PROJECT (REMOVALS OF EXISTING
COMPLY WITH THE INDICATED RATINGS AT NEW OPENINGS/HOLES
THE WORK OF THIS PROJECT; FIRE AND SMOKE-STOPPING TO
RATINGS AT NEW PENETRATIONS IN THESE PARTITIONS MADE BY
FIRE AND SMOKE-STOPPING TO COMPLY WITH THE INDICATED
SCOPE INCLUDES:
CURRENTLY PROVIDE THE REQUIRED FIRE RATING. THIS PROJECT
UPGRADING ANY OF THESE EXISTING PARTITIONS THAT DO NOT
PACKAGE, THIS PROJECT SCOPE DOES NOT INCLUDE REPLACING OR
UNLESS SPECIFICALLY INDICATED OTHERWISE IN THIS DRAWING
PER IBC 2009 TYPE II B CONSTRUCTION.
ADMINISTRATION WING CONCRETE FLOOR DECKS HAVE NO RATING
2-HOUR RATED WALL
1-HOUR RATED WALL
AREA OF WORK
WING
AUTOMATION
CONTROL WING
WING
ADMINISTRATION
DRAWING PRODUCED ON WSA MICROSTATION SYSTEM
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
CALLEN R. COLLINSJON W. ORR
PROJECT ENGINEER MGR: ENGINEERING - SEATTLE
GUIDE PLAN - BASEMENT
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
:0
:0
P
M J o e n
DATE
APPROVED
z lc a a .d g n
UP
UP
ELEVATOR
UP
B115
B119
B116
B113
B107
B117
B112
B118
B111
R A
N
A-1 A-3 A-4 A-5 A-6F C-1 A-2
VESTIBULE
ROOM
BOILER ROOM
ROOM
MONITORING
SHOP
ROOM
MACHINE
ELEVATOR
ROOM
CHILLER
WAY
AREA
ROOM
ELECTRICAL
ROOM
MECHANICAL
ROOM
ELECTRICAL EQUIPMENT
WING
AUTOMATION
WING
ADMINISTRATION
CONTROL WING
08’ 8’
SCALE: 1/8" = 1’-0"
16’
HAZMAT GENERAL NOTES:
KEY PLAN:
E D
M
IS
S
U
R
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
ZLC-1305280A-A101
BASEMENT CHILLER ROOM B116
a a .d g n
HAZMAT ABATEMENT
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
A101
A8
SCALE: 1/8" = 1’-0"
BASEMENT CHILLER ROOM B116 - HAZMAT ABATEMENT
CALLEN R. COLLINSJON W. ORR
A.
B.
IN ACCORDANCE WITH DIVISION 2 SPECIFICATIONS.
COMPONENTS (LCC) ARE PRESENT IN THE PROJECT AREA. ABATE
ASBESTOS CONTAINING MATERIAL (ACM) AND LEAD COATED
COORDINATE WITH DEMOLITION.
QUANTITIES ONLY. VERIFY QUANTITIES BEFORE BEGINNING WORK.
HAZMAT DRAWINGS SHOW LOCATIONS AND APPROXIMATE
HAZMAT KEY NOTES:
1KEY
ACM AND LCC
- LLC: CHILLERS (4 EA) - GREEN FOAM RUBBER GUARDS
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
:0
J o e n
DATE
APPROVED
z lc a a .d g n
UP
UP
ELEVATOR
UP
B115
B119
B116
B113
B107
B117
B112
B118
B111
A-1 A-3 A-4 A-5 A-6F C-1 A-2
ROOM
MECHANICAL
ROOM
ELECTRICAL
ROOM
MACHINE
ELEVATOR
SHOP
VESTIBULE
ROOM
BOILER ROOM
WAY
AREA
ROOM
CHILLER
ROOM
MONITORING
ROOM
ELECTRICAL EQUIPMENT
4 5
1 2 7 6 3 8
UP
UP
F8
A601
1B116
2B116
E D
M
IS
S
U
R
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
ZLC-1305280A-A201
a a
.d
08’ 8’
SCALE: 1/8" = 1’-0"
16’
WING
AUTOMATION
WING
ADMINISTRATION
CONTROL WING
KEY PLAN:
SHEET NOTES:
GENERAL SHEET NOTES:
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
WITH COR.
MECHANICAL. COORDINATE RECONNECTION OF SECURITY SYSTEM
REINSTALL DOOR AND LOUVER ASSEMBLY. COORDINATE WITH
PATCH, REPAIR AND PREPARE WALLS AND CEILING TO BE PAINTED.
SURFACE.
MANUFACTURER FOR/IF WORK IS REQUIRED TO PREPARE
MAY HINDER APPLICATION OF NEW FINISH. COORDINATE WITH
PREPARE FLOOR FOR NEW FINISH. EXISTING FLOOR FINISH
WHERE EQUIPMENT WAS REMOVED.
PAINT EXPOSED PARTITION TO MATCH ADJACENT SURFACE
DOORS. DOOR FRAMES TO REMAIN. SEE DOOR SCHEDULE.
EXISTING DOORS TO BE REMOVED AND REPLACED WITH NEW
REMOVE EXISTING STAIRS.
A.
CRITICAL TO THE OPERATION AND FUNCTION OF THIS FACILITY.
EQUIPMENT FROM DUST, DEBRIS AND WATER. EQUIPMENT IS
PROTECT EXISTING OPERATIONAL AND NON-OPERATIONAL
RATED WALLS.
SMOKE AND FIRESTOP EXISTING AND NEW PENETRATIONS IN FIRE
PRECAUTIONS WITH COR.
AND COR. COORDINATE SECURITY SYSTEMS DISCONNECTION AND
TO ALLOW FOR THE WORK, COORDINATE REMOVAL WITH MECH
REMOVE AND SAVE FOR REUSE DOOR AND LOUVER ASSEMBLY
MAINTENANCE PADS.
COORDINATE WITH MECHANICAL AND EXISTING CONCRETE
CONCRETE MAINTENANCE PADS REQUIRED FOR EQUIPMENT.
EXPAND EXISTING.
REQUIRED. USE EXISTING PADS. IF LARGER PADS ARE REQUIRED,
EQUIPMENT REQUIRED. REFER TO MECHANICAL FOR SIZE OF PADS
6" HIGH CONCRETE MAINTENANCE PAD FOR MECHANICAL
PROVIDE NEW METAL STAIRS. SEE SHEET A601.
BASEMENT CHILLER ROOM B116
A201 SCALE: 1/8" = 1’-0"
BASEMENT CHILLER ROOM B116 FLOOR PLANC7
ENGINEERING SERVICES
ENROUTE/FSS
DRAWING PRODUCED ON WSA MICROSTATION SYSTEM
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
CALLEN R. COLLINSJON W. ORR
REQUIRED TO REMOVE CHILLERS.
REMOVE DOORS AND CONCRETE THRESHOLD/CURB IF
RC
JA
FLOOR PLAN
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
:5
J o e n
DATE
APPROVED
z lc a a .d g n
20’-0"
8’-7 1/8"
SLOPE IN SLAB SLOPE IN SLAB
FLOOR DRAIN
T
1CS
1ER
EX
A302
B8
E D
M
IS
S
U
R
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
ZLC-1305280A-A202
a a
.d
SHEET NOTES:
04’ 4’ 8’
SCALE: 1/4" = 1’-0"
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
NOT MATCH ADJACENT SURFACES. COORDINATE WITH COR.
EQUIPMENT HAS BEEN REMOVED THAT EXPOSES FINISHES THAT DO
REFINISH FLOORS WHERE DAMAGED BY THE WORK, OR WHERE
THAT DO NOT MATCH ADJACENT SURFACES. COORDINATE WITH COR.
WHERE EQUIPMENT HAS BEEN REMOVED THAT EXPOSES FINISHES
PAINT WALLS AND CEILING WHERE DAMAGED BY THE WORK, OR
2 1
PH-1
SHEETS FOR WORK IN THIS AREA
SEE MECHANICAL AND ELECTRICAL
ENGINEERING SERVICES
ENROUTE/FSS
DRAWING PRODUCED ON WSA MICROSTATION SYSTEM
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
A202
C7
SCALE: 1/4" = 1’-0"
COOLING TOWER PUMP HOUSE PLAN
CALLEN R. COLLINSJON W. ORR
(ADDITION)
CHEMICAL STORAGE
(ADDITION)
ELECTRICAL ROOM
FLOOR PLAN
COOLING TOWER AND PUMP HOUSE
PUMP HOUSE
EXISTING
(SEE SHEET C001)
CONCRETE SIDEWALK
EDGE OF NEW
(SEE SHEET C001)
CONCRETE SIDEWALK
EXTEND EXISTING
C O
N C
R E
T E
N E
W
C O
N C
R E
T E
E X
IS
T
IN
G
C O
N C
R E
T E
N E
W
C O
N C
R E
T E
E X
IS
T
IN
G
JA
RC
CS-1
ER-1
COAT.
FOR CLEANING OPTIONS. CLEAN IS TO PREPARE FLOOR FOR A SEAL
CLEAN CONCRETE SLAB FLOOR. SEE SPECIFICATION SECTION 030130
REPLACE FLOOR DRAIN GRATES.
PROVIDE CONCRETE SEALER FOR FLOOR.
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
:4
J o e n
DATE
APPROVED
z lc a a .d g n
METAL SIDING
PREFINISHED
PREFORMED &
INSULATED
FINISH FLOOR
FINISH GRADE
FINISH FLOOR
CONC RAMP
FINISH GRADE
& LOUVER
EXISTING FAN
RELOCATE
DOWNSPOUT
SPECS
SEE MECH
LOUVER.
FAN &
NEW VENT
"METAL SIDING
PREFINISHED
PREFORMED &
INSULATED
LOUVER IN DOOR
AIR INTAKE
METAL BUILDING
PREFABRICATED
EXISTING
METAL BUILDING
PREFABRICATED
EXISTING
NEW ADDITIONEXISTING STRUCTURENEW ADDITION
METAL SIDING
PREFINISHED
PREFORMED &
INSULATED FINISH FLOOR
FINISH GRADE
DOWNSPOUT
SPECS
SEE MECH
LOUVER.
FAN &
NEW VENT
METAL SIDING
PREFINISHED
PREFORMED &
INSULATED
FLOOR
FINISH
RAMP
CONC
MECH SPECS
& LOUVER. SEE
NEW VENT FAN METAL BUILDING
PREFABRICATED
EXISTING
METAL BUILDING
PREFABRICATED
EXISTING
GRADE
FINISH
SEE ELECT SPECS
AND DISCONNECT.
EXTERIOR HOOKUPS
R
SEE MECH SPECS
& LOUVER.
NEW VENT FAN
M
IN
E D
M
IS
S
U
R
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
ZLC-1305280A-A301
a a
.d
A301
F8
SCALE: 1/4" = 1’-0" A301
F6
SCALE: 1/4" = 1’-0"
WEST ELEVATION
04’ 4’ 8’
SCALE: 1/4" = 1’-0"
CHILLER/COOLING TOWER MODERNIZATION
ENGINEERING SERVICES
ENROUTE/FSS
DRAWING PRODUCED ON WSA MICROSTATION SYSTEM
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
CALLEN R. COLLINSJON W. ORR
PROJECT ENGINEER MGR: ENGINEERING - SEATTLE
1305280
NORTH ELEVATION
A301
B8
SCALE: 1/4" = 1’-0" A301
B6
SCALE: 1/4" = 1’-0"
EAST ELEVATIONSOUTH ELEVATION
EXTERIOR ELEVATIONS
PUMP HOUSE
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
:3
J o e n
DATE
APPROVED
z lc a a .d g n
Z GIRT (TYP)
INSULATED METAL PANEL
RAIN GUTTER
ROOF PURLIN (TYP)
INSULATED PREFINISHED METAL DECKING
DOWNSPOUT
BUILDING SYSTEM
PREFAB METAL
- SEE STRUCTURAL
FOUNDATION
ADDITION
ROOM
ELECTRICAL
PH-1
HOUSE
PUMP
EXISTING
5" MIN BUILDING SEPARATION. PROVIDE
FLASHING TO ALLOW MOVEMENT IN
ORTHOGONAL DIRECTIONS
E D
M
IS
S
U
R
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
ZLC-1305280A-A302
a a
.d
01’ 2’ 5’
SCALE: 1/2" = 1’-0"
1’
ENROUTE/FSS
DRAWING PRODUCED ON WSA MICROSTATION SYSTEM
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
CALLEN R. COLLINSJON W. ORR
PROJECT ENGINEER MGR: ENGINEERING - SEATTLE
1305280
A302
B8
SCALE: 1/2" = 1’-0"
SECTIONS AND DETAILS
SECTION THROUGH ADDITION
PUMP HOUSE
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
:2
J o e n
DATE
APPROVED
z lc a a .d g n
UP
UP
ELEVATOR
UP
B115
B119
B116
B113
B107
B117
B112
B118
B111
A-…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .