QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

The following schedule outlines the Government’s plan for ensuring contract performance; including maximum deductions which may be taken should deficiencies be found for the noted services. The Government shall, at its option, require corrective action or take a deduction from the monthly invoice. The contractor will be notified of any discrepancies found, and shall have an opportunity to respond to the deficiencies. The Government has the right to inspect services at any time. Any random inspection shall take into consideration the normally scheduled times and frequencies required for service performance. The Contractor is entitled to a joint monthly inspection each month. The Contractor shall coordinate with the Contracting Officer’s Representative (COR) when a joint inspection is needed. The COR also may initiate a joint inspection, which will be coordinated with the Contractor Quality Control Representative or his/her designee.

Upon request the COR is entitled to review the results of the contractor’s quality control program and internal inspections.

REQUIRED SERVICE
PERFORMANCE STANDARD
ALLOWABLE DEVIATION
METHOD OF SURVEILLANCE
MAXIMUM DEDUCTION FOR DEVIATION
Remove Waste
Accomplish per specifications and frequency schedule
5 defects per month
Random Sampling
6%
Wash Wastebaskets
Accomplish per specifications and frequency schedule
None
Random Sampling
2%
Low Cleaning
Accomplish per specifications and frequency schedule
5 defects per month
Random Sampling
5%
High Cleaning
Accomplish per specifications and frequency schedule
5 defects per month
Random Sampling
5%
Spot Clean Woodwork, Walls and Partitions
Accomplish per specifications and frequency schedule
5 defects per month
Random Sampling
5%
Clean Light Fixtures
Accomplish per specifications and frequency schedule
None
Random Sampling
3%
Sweep Floors, Hallways and Stairs
Accomplish per specifications and frequency schedule
3% of area swept
Random Sampling
5%
Floor Maintenance
Accomplish per specifications and frequency schedule
3% of area maintained
Random Sampling
8%
Mop Floors
Accomplish per specifications and frequency schedule
3% of area mopped
Random Sampling
6%
Vacuum Carpet
Accomplish per specifications and frequency schedule
3% of carpeted area
Random Sampling
6%
Shampoo Carpet
Accomplish per specifications and frequency schedule
1% of carpeted area
100% Inspection
5%
Clean/Refill Restroom Dispensers
Accomplish per specifications and frequency schedule
3 defects per month
Random Sampling
7%
Clean Restroom Fixtures and Floors
Accomplish per specifications and frequency schedule
3 defects per month
Random Sampling
8%
Wash Restroom Walls and Doors
Accomplish per specifications and frequency schedule
3 defects per month
Random Sampling
5%
Glass Cleaning
Accomplish per specifications and frequency schedule
3 defects per month
Random Sampling
2%
Wash Windows
Accomplish per specifications and frequency schedule
None
100% Inspection
8%
Clean Refrigerators
Accomplish per specifications and frequency schedule
None
100% Inspection
3%
Clean Microwaves
Accomplish per specifications and frequency schedule
None
100% Inspection
3%
Clean Oven/Range
Accomplish per specifications and frequency schedule
None
100% Inspection
2%
Clean Counters, Sinks and Fixtures
Accomplish per specifications and frequency schedule
2 defects per month
Random Sampling
4%
Entrance/Entrance mats maintenance
Accomplish per specifications and frequency schedule
1 defect per month
Random Sampling
2%