Construction Cost Breakdown Demolish existing fence and install new chain link fence
Benton, Pennsylvania
NO. ITEM/DESCRIPTION QTY UNIT
UNIT
PRICE
MATERIAL
COST LABORER
HOURLY
RATE HOURS
LABOR
COST
SUBTOTAL LABOR
& MATERIALS
1 5 40505 Plant Construction 160608000400: Ground wire, copper wire, bare stranded, #6
2 160608002730: Exothermic weld, 4/0 wire to 1" ground rod
3 160608002790: Exothermic weld, mold reusable for above 4 260529203000: Nuts, galvanized steel, 1/4" diameter
028201300920: Chain link fence, industrial, galvanized steel, 6 ga. wire, 2-1/2" posts @ 10' OC, 8' high, includes excavation
028204200015: Wire fencing, barbed wire, galvanized, domestic, steel, hi-tensile, 15-1/2 ga.
323113201100: Chain link fence, industrial, galvanized steel, 6 ga. wire, 2-1/2" posts @ 10' OC, 8' high, 3" diameter, includes excavation
024113621100 Sub: RSM: Selective demolition, chain link fences & gates, fence, fabric & accessories, fabric, to 8' high
024113621000 Sub: RSM: Selective demolition, chain link fences & gates, fence, posts, steel in concrete
10 Security Personnell"
TOTAL MATERIAL COSTS $
TOTAL LABOR COSTS $
TOTAL OTHER DIRECT COSTS $
TOTAL DIRECT COSTS $
OVERHEAD $