16 SIR16R00173_Atch3_SOW_Benton.pdf

PDF 198 KB Posted

Attached to
Demolish existing fence and install new chain link fence, Benton, Pennsylvania.
Solicitation number
DTFAEN-16-R-00173
Issued by

About this file

16 SIR16R00173_Atch3_SOW_Benton (pdf)

View the file

Other files

File Type Posted
16 SIR16R00173_Atch1_Specs_Benton - 30Aug16.pdf PDF
16 SIR16R00173_Atch2_Dwgs_Benton - 30Aug16.pdf PDF
16 SIR16R00173_Atch4_WD_PA20150108_Benton - 30Aug16.pdf PDF
21 SF30 Amend 0002 signed Fence Benton - 20Sep16.pdf PDF
16 SIR16R00173_Atch7_PPQ_Benton - 31Aug16.pdf PDF
21 SF30 Amend 0001 signed Fence Benton - 7Sep16.pdf PDF
16 SIR16R00173_Atch3_SOW_Benton.pdf PDF
16 SIR16R00173_Fence_Benton - 31Aug16.pdf PDF
16 SIR16R00173_Atch6_Construction Breakdown_Benton - 31Aug16.pdf PDF
16 SIR16R00173_Atch5_Bus Dec_Benton - 31Aug16.pdf PDF
16 SIR16R00173_Atch1_Specs_Benton - 30Aug16.pdf PDF
16 SIR16R00173_Atch7_PPQ_Benton - 31Aug16.pdf PDF
16 SIR16R00173_Atch4_WD_PA20150108_Benton - 30Aug16.pdf PDF
16 SIR16R00173_Atch2_Dwgs_Benton - 30Aug16.pdf PDF
16 SIR16R00173_Fence_Benton - 31Aug16.pdf PDF
21 SF30 Amend 0001 signed Fence Benton - 7Sep16.pdf PDF
16 SIR16R00173_Atch5_Bus Dec_Benton - 31Aug16.pdf PDF
16 SIR16R00173_Atch3_SOW_Benton.pdf PDF
16 SIR16R00173_Atch6_Construction Breakdown_Benton - 31Aug16.pdf PDF
16 SIR16R00173_Atch2_Dwgs_Benton - 30Aug16.pdf PDF
16 SIR16R00173_Atch1_Specs_Benton - 30Aug16.pdf PDF
16 SIR16R00173_Fence_Benton - 31Aug16.pdf PDF
16 SIR16R00173_Atch6_Construction Breakdown_Benton - 31Aug16.pdf PDF
16 SIR16R00173_Atch7_PPQ_Benton - 31Aug16.pdf PDF
16 SIR16R00173_Atch5_Bus Dec_Benton - 31Aug16.pdf PDF
16 SIR16R00173_Atch4_WD_PA20150108_Benton - 30Aug16.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scope of Work for Demolition of existing fence

& installation of a new fence.

Benton ARSR, Benton, Pennsylvania

Contractor responsible to furnish all material, labor, and equipment necessary to complete the following:

DEMOLISH EXISTING FENCE

FURNISH AND INSTALL EIGHT (8) FOOT HEIGHT CHAIN LINK FENCE WITH THREE (3) STRANDS OF

BARBED WIRE.

FURNISH AND INSTALL CEMETITIOUS STONE AROUND FENCE LINE.

INSTALL NEW ASPHALT AT MAIN ENTRANCE.

B. FAA Holiday Moratorium - No work shall be scheduled or take place during the week of and the weekend preceding and following: The Thanksgiving, Christmas, and New Year’s Holidays. Only emergency work to restore critical services to the Facility will be considered and a moratorium waiver must be submitted and approved. The moratorium period will not be counted against the contract construction duration of the project.

C. FAA Holidays Observed - The FAA also observed the following Holidays:

1. Birthday of Martin Luther King, Jr.

2. Washington’s Birthday

3. Memorial Day

4. Independence Day

5. Labor Day

6. Columbus Day

7. Veterans Day

If the Contractor thinks that work will be required on any of these Holidays he will need to coordinate with the Contracting Officer Technical Representative (COTR) two weeks in advanced. The Holidays observance will not be counted against the contract construction duration of the project.

See the attached Specifications and Drawings and other related attachments for complete details.