Updated SOW.pdf

PDF 775 KB Posted

Attached to
RESTROOM REMODEL at Barksdale AFB near Shreveport, LA
Solicitation number
DTFAAC-17-R-00088
Issued by

About this file

Updated SOW (pdf)

View the file

Other files

File Type Posted
Screening Information Request.pdf PDF
Past Performance Form.doc DOC document
Wage Determination.pdf PDF
Screening Information Request-0001.pdf PDF
Capability Statemet.docx DOCX document
Contractor's Release Form.doc DOC document
Questions and Answers.docx DOCX document
Experience Information Form.pdf PDF
Authorization Letter.docx DOCX document
Capability Statemet.docx DOCX document
Past Performance Form.doc DOC document
Screening Information Request.pdf PDF
Contractor's Release Form.doc DOC document
Experience Information Form.pdf PDF
Statement of Work (SOW).SOW —
Wage Determination.pdf PDF
Authorization Letter.docx DOCX document
Statement of Work (SOW).SOW —
Contractor's Release Form.doc DOC document
Consent Letter.docx DOCX document
Wage Determination.pdf PDF
Screening Information Request (SIR).SIR —
Past Performance Form.doc DOC document
Authorization Letter.docx DOCX document
Capability Statemet.docx DOCX document
Experience Information Form.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FEDERAL AVIATION ADMINISTRATION FEBRUARY 2017

BAD-RAPCON Restroom Remodel (Shreveport, LA)

SUMMARY OF WORK

01 10 00 - 1

DOCUMENT 00 01 10 – TABLE OF CONTENTS

DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS

00 01 10 TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 10 00 SUMMARY OF WORK

DIVISION 08 - DOORS

08 11 00 HOLLOW METAL DOORS AND FRAMES

DIVISION 09 - FINISHES

09 29 00 GYPSUM BOARD

09 31 00 TILING

09 91 00 PAINTING

DIVISION 10 - SPECIALTIES

10 13 50 TOILET COMPARTMENTS

10 80 10 TOILET ACCESSORIES

DIVISION 22 - PLUMBING

22 05 00 COMMON WORK RESULTS FOR PLUMBING

22 11 16 DOMESTIC WATER PIPING

22 13 00 SANITARY WASTE AND VENT PIPING

22 40 00 PLUMBING FIXTURES

22 82 00 DUCT ACCESSORIES

DIVISION 26 – ELECTRICAL

26 05 00 COMMON WORK RESULTS FOR ELECTRICAL

26 51 00 INTERIOR LIGHTING

APPENDIX

END OF SECTION 00 01 10

01 10 00 - 2

SECTION 01 10 00 – SUMMARY OF WORK

PART 1 - GENERAL

1.1 SCOPE OF WORK

A. Furnish the equipment, labor, material and tools required to renovate and reconfigure the restrooms at the Radar Control Approach Control System (RAPCON) facility in Shreveport, LA in accordance with this specification.

B. Facility Location: Barksdale Air Force Base, LA 71110

C. Under this contract;

1. Relocate the door to the break room from the west wall to the north wall as shown in

Appendix. This work must be done between the hours of 10p.m. and 6a.m and must be done prior to the restroom work. Provide new 36-inch door frame, painted steel, and provide threshold matching the elevation of the adjacent flooring. Patch wall with concrete block and gypsum board matching the thickness of existing, and match texture and paint as closely as possible. Assume existing floor tile does not contain hazardous materials.

2. Demolish the existing plumbing fixtures, partitions, wall and floor tile, lighting fixtures, supply vents, exhaust fans, paper towel/ trash receptacles, soap dispensers, storage cabinets, and doors.

3. Existing Men’s Room (new Women’s) – Furnish and install two (2) new water closets with automatic flush valves, matching the existing location. Furnish and install new sink/faucet/counter and mirror in existing location. Reuse existing supply and drains, but all materials exposed in room must be new.

4. Existing Women’s Room (new Men’s) – Furnish and install two (2) new water closets and one (1) new urinal with automatic flush valves along the west wall as shown in Appendix. Provide supply piping from the mechanical room. Drains must be either routed through the floor slab or through the mechanical room wall (wall mounted toilets) to connect to the existing sanitary drain inside the adjacent wall cavity. Furnish and install new sink/faucet/counter and mirror in southeast corner of room, using the supply and drain from the adjacent break room sink. Provide mechanical design as required to properly size and layout piping in accordance with code and the specification herein.

5. Provide two finish coats of zero-VOC latex paint to the west wall in the break room, the mechanical room, and both restrooms (walls and ceilings). Sand and prep restroom door frames and provide two finish coats of zero-VOC latex paint.

6. Replace both doors to the restrooms with hollow metal doors. Provide heavy-duty rated hinges and hardware, and include a closer. Doors must be vented at the bottom. Paint doors to match adjacent frames.

7. Furnish and install new floor and wall tile to both restrooms.

8. Furnish and install light fixtures to each restroom with occupancy sensor switches, connecting to the existing circuit. Install new vanity lights above mirrors. Install two fixtures per room, surface mount, 4-ft, providing 80-foot candles of light.

9. Furnish and install exhaust fans and ducting to the exterior in each restroom, connecting to the existing power. Fans shall be powered to run continuously. Fans must be rated for an air flow of 110 cubic feet per minute, such as Greenheck SP-A or approved equal.

01 10 00 - 3

10. Furnish and install new supply registers to the restroom ceilings. Vents shall connect to the existing ductwork, and be designed for 4-way adjustable distribution of air, such as Truaire A504, 4-way aluminum with optional damper.

11. Furnish and install new toilet partitions to both restrooms.

12. Furnish and install stainless steel towel dispensers/waste receptacles, soap dispensers, and toilet compartment dispensers to both restrooms.

13. Replace water heater in the mechanical room with a new 2.5 gpm minimum, electric, tankless water heater, such as Stiebel Eltron Tempra 15 Plus, or approved equal. Connect to existing power circuit and water supply.

14. Replace the utility sink, faucet, and adjustable trap in the mechanical room. Service sink must be enameled cast iron construction with stainless steel rim guard, adjustable trap, and chrome faucet, such as Kohler Bannon K-6714-0, K-6672/3, K-8928-CP or approved equal.

1.2 PRE-CONSTRUCTION CONFERENCE

A. Attend a pre-construction conference if arranged by the FAA Contracting Officer. Conference agenda will include coordination of-

1. safety practices;

2. scheduling;

3. operating procedures; and

4. submittals.

B. Submit a construction work schedule to the Contracting Officer prior to the pre-construction meeting for approval.

1.3 WORK RESTRICTIONS

A. All work must be accomplished by experienced workers in accordance with the highest standards of the various work trades involved. Workers must abide by safety requirements, set forth by OSHA, that correspond to the type of work being performed.

B. The Contractor will not be entitled to additional monetary compensation for labor expended outside of the contract time, unless approved in writing by the Contracting Officer in advance.

1.4 CLEANING

A. Working Area. Keep the working area in a clean and proper condition at all times. All rubbish, waste, equipment, and tools must be removed daily or when directed by the FAA COR.

B. Final Cleanup. Upon completion of work and before final acceptance by the FAA, remove tools, equipment, debris, rubbish, and unused materials from the construction site and prep area.

1.5 INGRESS AND EGRESS TO WORK AREA

A. Workers will be escorted at all times when working inside the secure area.

B. Ingress and egress to the work areas and contractor parking will be discussed at the pre-construction meeting. Security precautions against unauthorized site entrance are maintained at

01 10 00 - 4 all times. Keep all vehicles, working equipment and materials within the area designated by the COR. Local security and additional badging requirements will be discussed at the pre-construction meeting. The staging area for equipment will be discussed at the pre-construction meeting.

C. Background check may be required for all contractors. Provide personnel information to the COR at least 45 days prior to the start of construction.

1.6 COORDINATION

A. All correspondence between the contractor, airport authority, and Federal Aviation Administration (FAA) must be through the FAA’s Contracting Officer or the Contracting Officer’s Representative (COR).

B. At no expense to the FAA, procure all construction and working permits required by local and state agencies.

1.7 TEMPORARY FACILITIES AND CONTROLS

A. Furnish and install temporary restroom facilities outside of the building for the duration of the construction. Temporary facilities must be separate for each gender, and include at least two water closets per restroom. Temporary restrooms must have electrical lighting, powered ventilation, and be climate controlled. Provide daily cleaning to these facilities throughout the project. Power will be provided at the site.

B. Temporary Restroom Vendor Option: ROTAG SERVICES, Attn. Chance, Bossier City, LA 71111. Phone: 318-278-5802.

C. Throughout the duration of the project, supply temporary electricity, air, and water as needed for the completion of the project.

1.8 SAFETY

A. The contractor shall be responsible for safety on the work site. It is the responsibility of the contractor to eliminate hazards, which may result in tripping, electrical shock, fire, falling objects, environmental hazards, vehicular accidents, etc. The contractor must comply with all safety precautions required by OSHA.

PART 2 - NOT USED

PART 3 - NOT USED

END OF SECTION 01 10 00

HOLLOW METAL DOORS AND FRAMES

08 11 00 - 1

SECTION 081100 - HOLLOW METAL DOORS AND FRAMES

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Interior standard hollow metal doors and frames.

1.2 DEFINITIONS

A. Minimum Thickness: Minimum thickness of base metal without coatings.

B. Standard Hollow Metal Work: Hollow metal work fabricated according to ANSI/SDI A250.8.

C. Custom Hollow Metal Work: Hollow metal work fabricated according to

ANSI/NAAMMHMMA 861.

1.3 SUBMITTALS

A. Product Data: For each type of product indicated. Include construction details, material descriptions, core descriptions, fire-resistance rating, and finishes.

1.4 QUALITY ASSURANCE

A. Source Limitations: Obtain hollow metal work from single source from single manufacturer.

1.5 DELIVERY, STORAGE, AND HANDLING

A. Deliver hollow metal work palletized, wrapped, or crated to provide protection during transit and Project-site storage. Do not use nonvented plastic.

1. Provide additional protection to prevent damage to finish of factory-finished units.

B. Deliver welded frames with two removable spreader bars across bottom of frames, tack welded to jambs and mullions.

C. Store hollow metal work under cover at Project site. Place in stacks of five units maximum in a vertical position with heads up, spaced by blocking, on minimum 4-inch- high wood blocking.

1.6 PROJECT CONDITIONS

A. Field Measurements: Verify actual dimensions of openings by field measurements before fabrication.

08 11 00 - 2

1.7 COORDINATION

A. Coordinate installation of anchorages for hollow metal frames. Furnish setting drawings, templates, and directions for installing anchorages, including sleeves, concrete inserts, anchor bolts, and items with integral anchors. Deliver such items to Project site in time for installation.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:

1. Amweld Building Products, LLC.

2. Benchmark; a division of Therma-Tru Corporation.

3. Ceco Door Products; an Assa Abloy Group company.

4. Curries Company; an Assa Abloy Group company.

5. Deansteel Manufacturing Company, Inc.

6. Firedoor Corporation.

7. Fleming Door Products Ltd.; an Assa Abloy Group company.

8. Habersham Metal Products Company.

2.2 MATERIALS

A. Cold-Rolled Steel Sheet: ASTM A 1008/A 1008M, Commercial Steel (CS), Type B; suitable for exposed applications.

B. Hot-Rolled Steel Sheet: ASTM A 1011/A 1011M, Commercial Steel (CS), Type B; free of scale, pitting, or surface defects; pickled and oiled.

C. Metallic-Coated Steel Sheet: ASTM A 653/A 653M, Commercial Steel (CS), Type B; with minimum A40 G60 or A60 metallic coating.

D. Frame Anchors: ASTM A 591/A 591M, Commercial Steel (CS), 40Z coating designation; mill phosphatized.

1. For anchors built into exterior walls, steel sheet complying with ASTM A 1008/A 1008M or ASTM A 1011/A 1011M, hot-dip galvanized according to ASTM A 153/A 153M, Class B.

E. Inserts, Bolts, and Fasteners: Hot-dip galvanized according to ASTM A 153/A 153M.

F. Powder-Actuated Fasteners in Concrete: Fastener system of type suitable for application indicated, fabricated from corrosion-resistant materials, with clips or other accessory devices for attaching hollow metal frames of type indicated.

G. Grout: ASTM C 476, except with a maximum slump of 4 inches, as measured according to

ASTM C 143/C 143M.

08 11 00 - 3

H. Mineral-Fiber Insulation: ASTM C 665, Type I (blankets without membrane facing); consisting of fibers manufactured from slag or rock wool with 6- to 12-lb/cu. ft. density; with maximum flame-spread and smoke-development indexes of 25 and 50, respectively; passing ASTM E 136 for combustion characteristics.

I. Bituminous Coating: Cold-applied asphalt mastic, SSPC-Paint 12, compounded for 15-mil dry film thickness per coat. Provide inert-type noncorrosive compound free of asbestos fibers, sulfur components, and other deleterious impurities.

2.3 STANDARD HOLLOW METAL FRAMES

A. General: Comply with ANSI/SDI A250.8 and with details indicated for type and profile.

B. Interior Frames: Fabricated from cold-rolled steel sheet.

1. Fabricate frames with welded mitered corners.

C. Hardware Reinforcement: Fabricate according to ANSI/SDI A250.6 with reinforcement plates from same material as frames.

2.4 FRAME ANCHORS

A. Jamb Anchors:

1. Masonry Type: Adjustable strap-and-stirrup or T-shaped anchors to suit frame size, not less than 0.042 inch thick, with corrugated or perforated straps not less than 2 inches wide by 10 inches long; or wire anchors not less than 0.177 inch thick.

2. Stud-Wall Type: Designed to engage stud, welded to back of frames; not less than 0.042 inch thick.

3. Compression Type for Drywall Slip-on Frames: Adjustable compression anchors.

4. Postinstalled Expansion Type for In-Place Concrete or Masonry: Minimum 3/8-inchdiameter bolts with expansion shields or inserts. Provide pipe spacer from frame to wall, with throat reinforcement plate, welded to frame at each anchor location.

B. Floor Anchors: Formed from same material as frames, not less than 0.042 inch thick, and as follows:

1. Monolithic Concrete Slabs: Clip-type anchors, with two holes to receive fasteners.

2. Separate Topping Concrete Slabs: Adjustable-type anchors with extension clips, allowing not less than 2-inch height adjustment. Terminate bottom of frames at finish floor surface.

2.5 STOPS AND MOLDINGS

A. Moldings for Glazed Lites in Doors: Minimum 0.032 inch thick, fabricated from same material as door face sheet in which they are installed.

B. Fixed Frame Moldings: Formed integral with hollow metal frames, a minimum of 5/8 inch high unless otherwise indicated.

C. Loose Stops for Glazed Lites in Frames: Minimum 0.032 inch thick, fabricated from same material as frames in which they are installed.

08 11 00 - 4

2.6 ACCESSORIES

A. Grout Guards: Formed from same material as frames, not less than 0.016 inch thick.

2.7 FABRICATION

A. Fabricate hollow metal work to be rigid and free of defects, warp, or buckle. Accurately form metal to required sizes and profiles, with minimum radius for thickness of metal. Where practical, fit and assemble units in manufacturer's plant. To ensure proper assembly at Project site, clearly identify work that cannot be permanently factory assembled before shipment.

B. Tolerances: Fabricate hollow metal work to tolerances indicated in SDI 117.

C. Hollow Metal Doors: Face sheets fabricated from cold-rolled steel sheet. Provide doors complying with requirements indicated below by referencing ANSI/SDI A250.8 for level and model and ANSI/SDI A250.4 for physical performance level:

1. Level 1 and Physical Performance Level C (Standard Duty), Model 1 (Full Flush).

2. Thickness: 1-3/4 inches, 18 gauge.

3. Hardware Reinforcement: Fabricate according to ANSI/SDI A250.6 with reinforcing plates from same material as door face sheets.

4. Fabricate concealed stiffeners and hardware reinforcement from either cold- or hotrolled steel sheet.

D. Hollow Metal Frames: Where frames are fabricated in sections due to shipping or handling limitations, provide alignment plates or angles at each joint, fabricated of same thickness metal as frames, 16 gauge.

1. Welded Frames: Weld flush face joints continuously; grind, fill, dress, and make smooth, flush, and invisible.

2. Provide countersunk, flat- or oval-head exposed screws and bolts for exposed fasteners unless otherwise indicated.

3. Grout Guards: Weld guards to frame at back of hardware mortises in frames to be grouted.

4. Floor Anchors: Weld anchors to bottom of jambs and mullions with at least four spot welds per anchor.

5. Jamb Anchors: Provide number and spacing of anchors as follows:

a. Masonry Type: Locate anchors not more than 18 inches from top and bottom of frame. Space anchors not more than 32 inches o.c. and as follows: Three anchors per jamb from 60 to 90 inches high.

b. Stud-Wall Type: Locate anchors not more than 18 inches from top and bottom of frame. Space anchors not more than 32 inches o.c. and as follows: 1) Four anchors per jamb from 60 to 90 inches high., 2) Two anchors per head for frames above 42 inches wide and mounted in metal-stud partitions.

c. Compression Type: Not less than two anchors in each jamb.

d. Postinstalled Expansion Type: Locate anchors not more than 6 inches from top and bottom of frame. Space anchors not more than 26 inches o.c.

08 11 00 - 5

6. Door Silencers: Except on weather-stripped doors, drill stops to receive door silencers as follows. Keep holes clear during construction.

a. Single-Door Frames: Drill stop in strike jamb to receive three door silencers.

b. Double-Door Frames: Drill stop in head jamb to receive two door silencers.

E. Fabricate concealed stiffeners, edge channels, and hardware reinforcement from either cold or hot-rolled steel sheet.

F. Hardware Preparation: Factory prepare hollow metal work to receive templated mortised hardware; include cutouts, reinforcement, mortising, drilling, and tapping.

1. Locate hardware as indicated, or if not indicated, according to ANSI/SDI A250.8.

2. Reinforce doors and frames to receive nontemplated, mortised and surface-mounted door hardware.

3. Comply with applicable requirements in ANSI/SDI A250.6 and ANSI/DHI A115 Series specifications for preparation of hollow metal work for hardware.

4. Coordinate locations of conduit and wiring boxes for electrical connections with Division

26 Sections.

G. Stops and Moldings: Provide stops and moldings around glazed lites where indicated. Form corners of stops and moldings with butted or mitered hairline joints.

1. Single Glazed Lites: Provide fixed stops and moldings welded on secure side of hollow metal work.

2. Multiple Glazed Lites: Provide fixed and removable stops and moldings so that each glazed lite is capable of being removed independently.

3. Provide fixed frame moldings on outside of exterior and on secure side of interior doors and frames.

4. Provide loose stops and moldings on inside of hollow metal work.

5. Coordinate rabbet width between fixed and removable stops with type of glazing and type of installation indicated.

2.8 STANDARD HOLLOW METAL DOORS: General: Provide doors of design indicated, 1 3/4” thickness indicated; fabricated with smooth surfaces, without visible joints or seams on exposed faces unless otherwise indicated. Comply with ANSI/SDI A250.8.

1. Design: Flush panel.

2. Core Construction: Manufacturer's standard kraft-paper honeycomb, polystyrene, polyurethane, polyisocyanurate, mineral-board, or vertical steel-stiffener core.

a. Thermal-Rated (Insulated) Doors: Where indicated, provide doors fabricated with thermal-resistance value (R-value) of not less than 2.1 deg F x h x sq. ft./Btu when tested according to ASTM C 1363. Locations: interior doors where indicated.

3. Vertical Edges for Single-Acting Doors: Manufacturer's standard.

4. Top and Bottom Edges: Closed with flush or inverted 0.042-inch- thick, end closures or channels of same material as face sheets.

5. Tolerances: Comply with SDI 117, "Manufacturing Tolerances for Standard Steel Doors and Frames."

08 11 00 - 6

2.9 STEEL FINISHES

A. Prime Finish: Apply manufacturer's standard primer immediately after cleaning and pretreating.

1. Shop Primer: Manufacturer's standard, fast-curing, lead- and chromate-free primer complying with ANSI/SDI A250.10 acceptance criteria; recommended by primer manufacturer for substrate; compatible with substrate and field-applied coatings despite prolonged exposure.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine substrates, areas, and conditions, with Installer present, for compliance with requirements for installation tolerances and other conditions affecting performance of the Work.

B. Examine roughing-in for embedded and built-in anchors to verify actual locations before frame installation.

C. For the record, prepare written report, endorsed by Installer, listing conditions detrimental to performance of the Work.

D. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 PREPARATION

A. Remove welded-in shipping spreaders installed at factory. Restore exposed finish by grinding, filling, and dressing, as required to make repaired area smooth, flush, and invisible on exposed faces.

B. Prior to installation, adjust and securely brace welded hollow metal frames for squareness, alignment, twist, and plumbness to the following tolerances:

1. Squareness: Plus or minus 1/16 inch, measured at door rabbet on a line 90 degrees from jamb perpendicular to frame head.

2. Alignment: Plus or minus 1/16 inch, measured at jambs on a horizontal line parallel to plane of wall.

3. Twist: Plus or minus 1/16 inch, measured at opposite face corners of jambs on parallel lines, and perpendicular to plane of wall.

4. Plumbness: Plus or minus 1/16 inch, measured at jambs on a perpendicular line from head to floor.

C. Drill and tap doors and frames to receive nontemplated, mortised, and surface-mounted door hardware.

3.3 INSTALLATION

A. General: Install hollow metal work plumb, rigid, properly aligned, and securely fastened in place; comply with manufacturer's written instructions.

08 11 00 - 7

B. Hollow Metal Frames: Install hollow metal frames of size and profile indicated. Comply with

ANSI/SDI A250.11.

1. Set frames accurately in position, plumbed, aligned, and braced securely until permanent anchors are set. After wall construction is complete, remove temporary braces, leaving surfaces smooth and undamaged.

a. At fire-protection-rated openings, install frames according to NFPA 80.

b. Where frames are fabricated in sections because of shipping or handling limitations, field splice at approved locations by welding face joint continuously;

grind, fill, dress, and make splice smooth, flush, and invisible on exposed faces.

c. Install frames with removable glazing stops located on secure side of opening.

d. Install door silencers in frames before grouting.

e. Remove temporary braces necessary for installation only after frames have been properly set and secured.

f. Check plumbness, squareness, and twist of frames as walls are constructed. Shim as necessary to comply with installation tolerances.

g. Field apply bituminous coating to backs of frames that are filled with grout.

2. Floor Anchors: Provide floor anchors for each jamb and mullion that extends to floor, and secure with postinstalled expansion anchors.

a. Floor anchors may be set with powder-actuated fasteners instead of postinstalled expansion anchors if so indicated and approved on Shop Drawings.

3. Metal-Stud Partitions: Solidly pack mineral-fiber insulation behind frames.

4. In-Place Concrete or Masonry Construction: Secure frames in place with postinstalled expansion anchors. Countersink anchors, and fill and make smooth, flush, and invisible on exposed faces.

5. In-Place Gypsum Board Partitions: Secure frames in place with postinstalled expansion anchors through floor anchors at each jamb. Countersink anchors, and fill and make smooth, flush, and invisible on exposed faces.

6. Installation Tolerances: Adjust hollow metal door frames for squareness, alignment, twist, and plumb to the following tolerances:

a. Squareness: Plus or minus 1/16 inch, measured at door rabbet on a line 90 degrees from jamb perpendicular to frame head.

b. Alignment: Plus or minus 1/16 inch, measured at jambs on a horizontal line parallel to plane of wall.

c. Twist: Plus or minus 1/16 inch, measured at opposite face corners of jambs on parallel lines, and perpendicular to plane of wall.

d. Plumbness: Plus or minus 1/16 inch, measured at jambs at floor.

08 11 00 - 8

3.4 ADJUSTING AND CLEANING

A. Final Adjustments: Check and readjust operating hardware items immediately before final inspection. Leave work in complete and proper operating condition. Remove and replace defective work, including hollow metal work that is warped, bowed, or otherwise unacceptable.

B. Remove grout and other bonding material from hollow metal work immediately after installation.

C. Prime-Coat Touchup: Immediately after erection, sand smooth rusted or damaged areas of prime coat and apply touchup of compatible air-drying, rust-inhibitive primer.

END OF SECTION 08110

GYPSUM BOARD

09 29 00 - 1

SECTION 09 29 00 – GYPSUM BOARD

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes the following:

1. Interior gypsum board.

1.2 SUBMITTALS

A. Product Data: For each type of product indicated.

1.3 STORAGE AND HANDLING

A. Store materials inside under cover and keep them dry and protected against damage from weather, condensation, direct sunlight, construction traffic, and other causes. Stack panels flat to prevent sagging.

1.4 PROJECT CONDITIONS

A. Environmental Limitations: Comply with ASTM C 840 requirements or gypsum board manufacturer's written recommendations, whichever are more stringent.

B. Do not install interior products until installation areas are enclosed and conditioned.

C. Do not install panels that are wet, those that are moisture damaged, and those that are mold damaged.

1. Indications that panels are wet or moisture damaged include, but are not limited to, discoloration, sagging, or irregular shape.

2. Indications that panels are mold damaged include, but are not limited to, fuzzy or splotchy surface contamination and discoloration.

PART 2 - PRODUCTS

2.1 PANELS, GENERAL

A. Size: Provide in maximum lengths and widths available that will minimize joints in each area and that correspond with support system indicated.

2.2 INTERIOR GYPSUM BOARD

A. General: Complying with ASTM C 36/C 36M or ASTM C 1396/C 1396M, as applicable to type of gypsum board indicated and whichever is more stringent.

B. Type X:

09 29 00 - 2

1. Thickness: 5/8 inch (15.9 mm).

C. Moisture- and Mold-Resistant Type: With moisture- and mold-resistant core and surfaces.

1. Core: 5/8 inch (15.9 mm), Type X.

2.3 JOINT TREATMENT MATERIALS

A. General: Comply with ASTM C 475/C 475M.

B. Joint Tape:

1. Interior Gypsum Wallboard: Paper.

C. Joint Compound for Interior Gypsum Wallboard: For each coat use formulation that is compatible with other compounds applied on previous or for successive coats.

1. See "Joint Compound" Article in the Evaluations.

2. Prefilling: At open joints[, rounded or beveled panel edges,] and damaged surface areas, use setting-type taping compound.

3. Embedding and First Coat: For embedding tape and first coat on joints, fasteners, and trim flanges, use all-purpose compound.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine areas and substrates, with Installer present, and including welded hollow-metal frames and framing, for compliance with requirements and other conditions affecting performance.

B. Examine panels before installation. Reject panels that are wet, moisture damaged, and mold damaged.

C. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 APPLYING AND FINISHING PANELS, GENERAL

A. Comply with ASTM C 840.

B. Install ceiling panels across framing to minimize the number of abutting end joints and to avoid abutting end joints in central area of each ceiling. Stagger abutting end joints of adjacent panels not less than one framing member.

C. Install panels with face side out. Butt panels together for a light contact at edges and ends with not more than 1/16 inch (1.5 mm) of open space between panels. Do not force into place.

D. Locate edge and end joints over supports, except in ceiling applications where intermediate supports or gypsum board back-blocking is provided behind end joints. Do not place tapered edges against cut edges or ends. Stagger vertical joints on opposite sides of partitions. Do not make joints other than control joints at corners of framed openings.

09 29 00 - 3

E. Form control and expansion joints with space between edges of adjoining gypsum panels.

F. Cover both faces of support framing with gypsum panels in concealed spaces (above ceilings, etc.), except in chases braced internally.

1. Unless concealed application is indicated or required for sound, fire, air, or smoke ratings, coverage may be accomplished with scraps of not less than 8 sq. ft. (0.7 sq. m) in area.

2. Fit gypsum panels around ducts, pipes, and conduits.

3. Where partitions intersect structural members projecting below underside of floor/roof slabs and decks, cut gypsum panels to fit profile formed by structural members; allow 1/4- to 3/8-inch- (6.4- to 9.5-mm-) wide joints to install sealant.

G. Isolate perimeter of gypsum board applied to non-load-bearing partitions at structural abutments, except floors. Provide 1/4- to 1/2-inch- (6.4- to 12.7-mm-) wide spaces at these locations, and trim edges with edge trim where edges of panels are exposed. Seal joints between edges and abutting structural surfaces with acoustical sealant.

H. Attachment to Steel Framing: Attach panels so leading edge or end of each panel is attached to open (unsupported) edges of stud flanges first.

3.3 FINISHING GYPSUM BOARD

A. General: Treat gypsum board joints, interior angles, edge trim, control joints, penetrations, fastener heads, surface defects, and elsewhere as required to prepare gypsum board surfaces for decoration. Promptly remove residual joint compound from adjacent surfaces.

B. Prefill open joints and damaged surface areas.

C. Apply joint tape over gypsum board joints, except those with trim having flanges not intended for tape.

3.4 PROTECTION

A. Protect installed products from damage from weather, condensation, direct sunlight, construction, and other causes during remainder of the construction period.

B. Remove and replace panels that are wet, moisture damaged, and mold damaged.

1. Indications that panels are wet or moisture damaged include, but are not limited to, discoloration, sagging, or irregular shape.

2. Indications that panels are mold damaged include, but are not limited to, fuzzy or splotchy surface contamination and discoloration.

END OF SECTION 09 29 00

TILING

09 31 00 - 1

SECTION 093100 - TILING

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Ceramic tile

2. Tile backing panels

3. Metal edge strips

4. PVC edge strips

1.2 DEFINITIONS

A. General: Definitions in the ANSI A108 series of tile installation standards and in ANSI A137.1 apply to Work of this Section unless otherwise specified.

B. Module Size: Actual tile size plus joint width indicated.

C. Face Size: Actual tile size, excluding spacer lugs.

1.3 PERFORMANCE REQUIREMENTS

A. Static Coefficient of Friction: For tile installed on walkway surfaces, provide products with the following values as determined by testing identical products per ASTM C 1028:

1. Level Surfaces: Minimum 0.7 dry and minimum 0.6 wet.

1.4 SUBMITTALS

A. Product Data: For each type of product indicated.

B. Samples for Initial Selection: For each type of tile and grout indicated. Include Samples of accessories involving color selection.

C. Qualification Data: For qualified Installer.

1.5 QUALITY ASSURANCE

A. Source Limitations for Tile: Obtain tile of each type and color or finish from one source or producer.

B. Source Limitations for Setting and Grouting Materials: Obtain ingredients of a uniform quality for each mortar, adhesive, and grout component from one manufacturer and each aggregate from one source or producer.

09 31 00 - 2

1.6 DELIVERY, STORAGE, AND HANDLING

A. Deliver and store packaged materials in original containers with seals unbroken and labels intact until time of use. Comply with requirements in ANSI A137.1 for labeling tile packages.

B. Store tile and cementitious materials on elevated platforms, under cover, and in a dry location.

C. Store aggregates where grading and other required characteristics can be maintained and contamination can be avoided.

D. Store liquid materials in unopened containers and protected from freezing.

E. Handle tile that has temporary protective coating on exposed surfaces to prevent coated surfaces from contacting backs or edges of other units. If coating does contact bonding surfaces of tile, remove coating from bonding surfaces before setting tile.

1.7 PROJECT CONDITIONS

A. Environmental Limitations: Do not install tile until construction in spaces is complete and ambient temperature and humidity conditions are maintained at the levels indicated in referenced standards and manufacturer's written instructions.

1.8 EXTRA MATERIALS

A. Furnish extra materials that match and are from same production runs as products installed and that are packaged with protective covering for storage and identified with labels describing contents.

1. Tile and Trim Units: Furnish quantity of full-size units equal to 5 percent of amount installed for each type, composition, color, pattern, and size indicated.

PART 2 - PRODUCTS

2.1 PRODUCTS, GENERAL

A. ANSI Ceramic Tile Standard: Provide tile that complies with ANSI A137.1 for types, compositions, and other characteristics indicated.

1. Provide tile complying with Standard grade requirements unless otherwise indicated.

B. ANSI Standards for Tile Installation Materials: Provide materials complying with ANSI A108.02, ANSI standards referenced in other PART 2 articles, ANSI standards referenced by TCA installation methods specified in tile installation schedules, and other requirements specified.

C. Factory Blending: For tile exhibiting color variations within ranges, blend tile in factory and package so tile units taken from one package show same range in colors as those taken from other packages and match approved Samples.

09 31 00 - 3

D. Mounting: For factory-mounted tile, provide back-or edge-mounted tile assemblies as standard with manufacturer unless otherwise indicated.

1. Where tile is indicated for installation in wet areas, do not use back- or edge-mounted tile assemblies unless tile manufacturer specifies in writing that this type of mounting is suitable for installation indicated and has a record of successful in-service performance.

E. Factory-Applied Temporary Protective Coating: Where indicated under tile type, protect exposed surfaces of tile against adherence of mortar and grout by precoating with continuous film of petroleum paraffin wax, applied hot. Do not coat unexposed tile surfaces.

2.2 TILE PRODUCTS

A. Glazed wall tile. Basis-of-Design Product: Daltile; Division of Dal-Tile International Inc.

1. Module Size: 6 by 18 inches

2. Thickness: 5/16 inch.

3. Face: Pattern of design indicated, with manufacturer's standard edges.

4. Finish: Factory.

5. Tile Color and Pattern:

a. Field color Elevare- Lunar

b. Base color Elevare- Carbon

c. Accent band Slate Radience – Glass, Metal, and decorative Accents: Flint 5/8 Staggered Random

6. Grout Color: As selected by Architect and approved by COR from manufacturer's full range.

7. Subject to compliance with requirements, provide comparable product by one of the following:

a. American Marazzi Tile, Inc.

b. American Olean; Division of Dal-Tile International Inc.

c. Deutsche Steinzeug America, Inc.

d. Florida Tile Industries, Inc.

e. Florim USA.

f. Laufen.

g. Grupo Porcelanite.

h. Portobello America, Inc.

i. Seneca Tiles, Inc.

j. United States Ceramic Tile Company.

09 31 00 - 4

B. Porcelain floor tile.

1. Basis-of-Design Product: Daltile; Division of Dal-Tile International Inc. Fabrique

2. Module Size: 12 by 24 inches

3. Thickness: 5/16 inch.

4. Face: Pattern of design indicated, with manufacturer's standard edges.

5. Finish: Factory.

6. Tile Color and Pattern: Gris Linen P690.

7. Grout Color: As selected by Architect and approved by COR from manufacturer's full range

8. Subject to compliance with requirements, provide comparable product by one of the following:

a. American Marazzi Tile, Inc.

b. American Olean; Division of Dal-Tile International Inc.

c. Deutsche Steinzeug America, Inc.

d. Florida Tile Industries, Inc.

e. Florim USA.

f. Laufen.

g. Grupo Porcelanite.

h. Portobello America, Inc.

i. Seneca Tiles, Inc.

j. United States Ceramic Tile Company.

2.3 TILE BACKING PANELS

A. Cementitious Backer Units: ANSI A118.9 or ASTM C 1325, in maximum lengths available to minimize end-to-end butt joints.

1. Products: Subject to compliance with requirements, available products that may be incorporated into the Work include, but are not limited to, the following:

a. C-Cure; C-Cure Board 990.

b. Custom Building Products; Wonderboard.

c. FinPan, Inc.; Util-A-Crete Concrete Backer Board.

d. USG Corporation; DUROCK Cement Board.

2. Thickness: As indicated.

09 31 00 - 5

2.4 SETTING MATERIALS

A. Dry-Set Portland Cement Mortar (Thin Set): ANSI A118.1.

1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:

a. Boiardi Products; a QEP company.

b. Bonsal American; an Oldcastle company.

c. Bostik, Inc.

d. C-Cure.

e. Custom Building Products.

f. Jamo Inc.

g. Laticrete International, Inc.

h. MAPEI Corporation.

i. Southern Grouts & Mortars, Inc.

j. Summitville Tiles, Inc.

k. TEC; a subsidiary of H. B. Fuller Company.

2. For wall applications, provide mortar that complies with requirements for nonsagging mortar in addition to the other requirements in ANSI A118.1.

B. Latex-Portland Cement Mortar (Thin Set): ANSI A118.4.

1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:

a. Boiardi Products; a QEP company.

b. Bonsal American; an Oldcastle company.

c. Bostik, Inc.

d. C-Cure.

e. Custom Building Products.

f. Jamo Inc.

g. Laticrete International, Inc.

09 31 00 - 6

h. MAPEI Corporation.

i. Mer-Kote Products, Inc.

j. Southern Grouts & Mortars, Inc.

k. Summitville Tiles, Inc.

l. TEC; a subsidiary of H. B. Fuller Company.

2. For wall applications, provide mortar that complies with requirements for nonsagging mortar in addition to the other requirements in ANSI A118.4.

2.5 GROUT MATERIALS

A. Sand-Portland Cement Grout: ANSI A108.10, composed of white or gray cement and white or colored aggregate as required to produce color indicated.

B. Standard Cement Grout: ANSI A118.6.

1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:

a. Boiardi Products; a QEP company.

b. Bonsal American; an Oldcastle company.

c. Bostik, Inc.

d. C-Cure.

e. Custom Building Products.

f. Jamo Inc.

g. Laticrete International, Inc.

h. MAPEI Corporation.

i. Southern Grouts & Mortars, Inc.

j. Summitville Tiles, Inc.

k. TEC; a subsidiary of H. B. Fuller Company.

C. Polymer-Modified Tile Grout: ANSI A118.7.

1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:

09 31 00 - 7

a. Boiardi Products; a QEP company.

b. Bonsal American; an Oldcastle company.

c. Bostik, Inc.

d. C-Cure.

e. Custom Building Products.

f. Jamo Inc.

g. Laticrete International, Inc.

h. MAPEI Corporation.

i. Southern Grouts & Mortars, Inc.

j. Summitville Tiles, Inc.

k. TEC; a subsidiary of H. B. Fuller Company.

D. Water-Cleanable Epoxy Grout: ANSI A118.3.

1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:

a. Atlas Minerals & Chemicals, Inc.

b. Boiardi Products; a QEP company.

c. Bonsal American; an Oldcastle company.

d. Bostik, Inc.

e. C-Cure.

f. Custom Building Products.

g. Jamo Inc.

h. Laticrete International, Inc.

i. MAPEI Corporation.

j. Mer-Kote Products, Inc.

k. Southern Grouts & Mortars, Inc.

09 31 00 - 8

l. Summitville Tiles, Inc.

m. TEC; a subsidiary of H. B. Fuller Company.

2. Provide product capable of withstanding continuous and intermittent exposure to temperatures of up to 140 deg F and 212 deg F, respectively, and certified by manufacturer for intended use.

2.6 ELASTOMERIC SEALANTS

A. General: Provide sealants, primers, backer rods, and other sealant accessories that comply with the following requirements.

1. Use primers, backer rods, and sealant accessories recommended by sealant manufacturer.

B. Colors: Provide colors of exposed sealants to match colors of grout in tile adjoining sealed joints unless otherwise indicated.

C. One-Part, Mildew-Resistant Silicone Sealant: ASTM C 920; Type S; Grade NS; Class 25; Uses NT, G, A, and, as applicable to nonporous joint substrates indicated, O; formulated with fungicide, intended for sealing interior ceramic tile joints and other nonporous substrates that are subject to in-service exposures of high humidity and extreme temperatures.

D. Multipart, Pourable Urethane Sealant for Use T: ASTM C 920; Type M; Grade P; Class 25;

Uses T, M, A, and, as applicable to joint substrates indicated, O.

2.7 MISCELLANEOUS MATERIALS

A. Trowelable Underlayments and Patching Compounds: Latex-modified, portland cement-based formulation provided or approved by manufacturer of tile-setting materials for installations indicated.

B. Metal Edge Strips: Angle or L-shape, height to match tile and setting-bed thickness, metallic or combination of metal and PVC or neoprene base, designed specifically for flooring applications; stainless-steel, ASTM A 666, 300 Series exposed-edge material.

C. Tile Cleaner: A neutral cleaner capable of removing soil and residue without harming tile and grout surfaces, specifically approved for materials and installations indicated by tile and grout manufacturers.

D. Grout Sealer: Manufacturer's standard product for sealing grout joints and that does not change color or appearance of grout.

2.8 MIXING MORTARS AND GROUT

A. Mix mortars and grouts to comply with referenced standards and mortar and grout manufacturers' written instructions.

B. Add materials, water, and additives in accurate proportions.

09 31 00 - 9

C. Obtain and use type of mixing equipment, mixer speeds, mixing containers, mixing time, and other procedures to produce mortars and grouts of uniform quality with optimum performance characteristics for installations indicated.

PART 3 - EXECUTION

3.1 EXAMINATION

A. A. Examine substrates, areas, and conditions where tile will be installed, with Installer present, for compliance with requirements for installation tolerances and other conditions affecting performance of installed tile.

1. Verify that substrates for setting tile are firm, dry, clean, free of coatings that are incompatible with tile-setting materials including curing compounds and other substances that contain soap, wax, oil, or silicone; and comply with flatness tolerances required by ANSI A108.01 for installations indicated.

2. Verify that concrete substrates for tile floors installed with adhesives, bonded mortar bed or thin-set mortar comply with surface finish requirements in ANSI A108.01 for installations indicated.

a. Verify that surfaces that received a steel trowel finish have been mechanically scarified.

b. Verify that protrusions, bumps, and ridges have been removed by sanding or grinding.

3. Verify that installation of grounds, anchors, recessed frames, electrical and mechanical units of work, and similar items located in or behind tile has been completed.

4. Verify that joints and cracks in tile substrates are coordinated with tile joint locations; if not coordinated, adjust joint locations in consultation with COR.

B. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 PREPARATION

A. Fill cracks, holes, and depressions in concrete substrates for tile floors installed with adhesives or thin-set mortar with trowelable leveling and patching compound specifically recommended by tile-setting material manufacturer.

B. Where indicated, prepare substrates to receive waterproofing by applying a reinforced mortar bed that complies with ANSI A108.1A and is sloped 1/4 inch per foot toward drains.

C. Blending: For tile exhibiting color variations, verify that tile has been factory blended and packaged so tile units taken from one package show same range of colors as those taken from other packages and match approved Samples. If not factory blended, either return to manufacturer or blend tiles at Project site before installing.

D. Field-Applied Temporary Protective Coating: If indicated under tile type or needed to prevent grout from staining or adhering to exposed tile surfaces, precoat them with continuous film of temporary protective coating, taking care not to coat unexposed tile surfaces.

09 31 00 - 10

3.3 TILE INSTALLATION

A. Comply with TCA's "Handbook for Ceramic Tile Installation" for TCA installation methods specified in tile installation schedules. Comply with parts of the ANSI A108 Series "Specifications for Installation of Ceramic Tile" that are referenced in TCA installation methods, specified in tile installation schedules, and apply to types of setting and grouting materials used.

1. For the following installations, follow procedures in the ANSI A108 Series of tile installation standards for providing 95 percent mortar coverage:

a. Tile floors in wet areas.

B. Extend tile work into recesses and under or behind equipment and fixtures to form complete covering without interruptions unless otherwise indicated. Terminate work neatly at obstructions, edges, and corners without disrupting pattern or joint alignments.

C. Accurately form intersections and returns. Perform cutting and drilling of tile without marring visible surfaces. Carefully grind cut edges of tile abutting trim, finish, or built-in items for straight aligned joints. Fit tile closely to electrical outlets, piping, fixtures, and other penetrations so plates, collars, or covers overlap tile.

D. Jointing Pattern: Lay tile in grid pattern unless otherwise indicated. Lay out tile work and center tile fields in both directions in each space or on each wall area. Lay out tile work to minimize the use of pieces that are less than half of a tile. Provide uniform joint widths unless otherwise indicated.

1. For tile mounted in sheets, make joints between tile sheets same width as joints within tile sheets so joints between sheets are not apparent in finished work.

2. Where adjoining tiles on floor, base, walls, or trim are specified or indicated to be same size, align joints.

3. Where tiles are specified or indicated to be whole integer multiples of adjoining tiles on floor, base, walls, or trim, align joints unless otherwise indicated.

E. Joint Widths: Unless otherwise indicated, install tile with the following joint widths:

1. Ceramic Mosaic Tile: 1/16 inch.

2. Glazed Wall Tile: 1/16 inch.

3. Glazed Floor Tile: 1/16 inch.

F. Expansion Joints: Provide expansion joints and other sealant-filled joints, including control, contraction, and isolation joints, where indicated. Form joints during installation of setting materials, mortar beds, and tile. Do not saw-cut joints after installing tiles.

1. Where joints occur in concrete substrates, locate joints in tile surfaces directly above them.

2. Prepare joints and apply sealants to comply with requirements.

G. Metal Edge Strips: Install where exposed edge of tile flooring meets carpet, wood, or other flooring that finishes flush with or below top of tile and no threshold is indicated.

H. PVC Edge Trim: Install where exposed edge of tile wall is on outside corner.

09 31 00 - 11

I. Grout Sealer: Apply grout sealer to grout joints according to grout-sealer manufacturer's written instructions. As soon as grout sealer has penetrated grout joints, remove excess sealer and sealer from tile faces by wiping with soft cloth.

3.4 TILE BACKING PANEL INSTALLATION

A. Install cementitious backer units and fiber-cement underlayment in all areas to receive tile and treat joints according to ANSI A108.11 and manufacturer's written instructions for type of application indicated.

3.5 CLEANING AND PROTECTING

A. Cleaning: On completion of placement and grouting, clean all ceramic tile surfaces so they are free of foreign matter.

1. Remove epoxy and latex-portland cement grout residue from tile as soon as possible.

2. Clean grout smears and haze from tile according to tile and grout manufacturer's written instructions but no sooner than 10 days after installation. Use only cleaners recommended by tile and grout manufacturers and only after determining that cleaners are safe to use by testing on samples of tile and other surfaces to be cleaned. Protect metal surfaces and plumbing fixtures from effects of cleaning. Flush surfaces with clean water before and after cleaning.

3. Remove temporary protective coating by method recommended by coating manufacturer and that is acceptable to tile and grout manufacturer. Trap and remove coating to prevent drain clogging.

B. Protect installed tile work with kraft paper or other heavy covering during construction period to prevent staining, damage, and wear. If recommended by tile manufacturer, apply coat of neutral protective cleaner to completed tile walls and floors.

C. Prohibit foot and wheel traffic from tiled floors for at least seven days after grouting is completed.

D. Before final inspection, remove protective coverings and rinse neutral protective cleaner from tile surfaces.

3.6 INTERIOR TILE INSTALLATION SCHEDULE

A. Interior Wall Installations, Metal Studs or Furring:

1. Tile Installation: Thin-set mortar on cementitious backer units or fiber cement underlayment over cleavage membrane.

B. Shower Receptor and Wall Installations, Metal Studs or Furring :

1. Tile Installation: Thin-set mortar on waterproof membrane over cementitious backer units or fiber cement underlayment with integrated bonding flange for bonded membranes.

C. Interior Floor Installation, Existing Concrete Floor:

1. Tile Installation: Thin-set mortar.

2. Install all floor tile so as to slope to floor drains. Standing water is unacceptable.

09 31 00 - 12

END OF SECTION 09310

PAINTING

09 91 00 - 1

SECTION 09 91 00 - PAINTING

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes surface preparation and field painting of exposed interior items and surfaces.

B. Paint exposed surfaces, except where these Specifications indicate that the surface or…

This is the start of the file's text. The full file is on GovTribe.