Questions and Answers.docx
DOCX document 16 KB Posted
- Solicitation number
- DTFAAC-17-R-00088
About this file
Questions and Answers (docx)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Screening Information Request.pdf | ||
| Past Performance Form.doc | DOC document | |
| Wage Determination.pdf | ||
| Screening Information Request-0001.pdf | ||
| Updated SOW.pdf | ||
| Capability Statemet.docx | DOCX document | |
| Contractor's Release Form.doc | DOC document | |
| Experience Information Form.pdf | ||
| Authorization Letter.docx | DOCX document | |
| Capability Statemet.docx | DOCX document | |
| Past Performance Form.doc | DOC document | |
| Screening Information Request.pdf | ||
| Contractor's Release Form.doc | DOC document | |
| Experience Information Form.pdf | ||
| Statement of Work (SOW).SOW | — | |
| Wage Determination.pdf | ||
| Authorization Letter.docx | DOCX document | |
| Statement of Work (SOW).SOW | — | |
| Contractor's Release Form.doc | DOC document | |
| Consent Letter.docx | DOCX document | |
| Wage Determination.pdf | ||
| Screening Information Request (SIR).SIR | — | |
| Past Performance Form.doc | DOC document | |
| Authorization Letter.docx | DOCX document | |
| Capability Statemet.docx | DOCX document | |
| Experience Information Form.pdf |
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTIONS AND ANSWERS
1. Are there specifications on the tile such as, type, color, size etc? Included in correct specification.
2. Will specifications be provided for all fixtures, electrical, plumbing etc.? Included in correct specification.
3. Is there any information on the existing panel to ensure space for new hot water heater and distance to panel? Reuse existing circuit.
4. Is the room where the water supply is coming from fire rated walls? No, not fire rated.
5. Does this project need to comply with ADA requirements.? No, ADA compliance is not technically feasible based on the limited area.
6. Would grab bars be required? Shown in Appendix of specification.
7. In women’s restroom would there need to be sanitary dispenser and receptacle? No
8. To add additional water closet to new men’s restroom would there be the ability to expand through the West wall? No, west wall is mechanical room with electrical equipment.
9. According to the IBC a drinking fountain is required. Is this part of the renovation? Or already on site? Already on site, it will not be impacted.