Text version
OMB Control No. 2120-0595 (DD Form 1423-1) FAA Template No. 59 (6/98)
CONTRACT DATA REQUIREMENTS LIST (CDRL) Page 1 of 2
A. Contract line Item No. B. Exhibit C. Category (Check appropriate one)
4.0 Data & Reports N/A TDP TM Other [X]
D. System/Item E. Contract/PR No. F. Contractor
Tower Cab Simulator
AC-17-01730
1. Data Item No. 2. Title of Data Item
3. Subtitle
C001
Final Deliveries
4. Authority 5. Contact Reference 6. Requiring Office
IAW SOW & SIR/RFO Sections L &
M
DTFAAC-17-P-00TBD AAM-006
7. DD 250 Req’d 8. APPROVAL Code 9. Distribution Statement Required 10. Frequency 11. As of Date (AOD)
N/A A NA ASREQ 0
12. Date of First
Submission
IAW AWARD
13. Date of Subsequent
Submission
ASREQ
15. Distribution
14. REMARKS: a. b. Draft c. Final Copies
Addressee Copies Reg. Repro
1. The Contractor must provide in Contractors format its Final updated Blueprint depicting physical layout of the simulator including number and type of displays that will be provided by the contractor.
2. The Contractor must provide final Simulator Instruction Manual.
3. The Contractor must provide government access to air traffic scenarios IAW SOW
4. The Contractor must provide access to Air Traffic Scenarios for one year
5. The Contractor must provide Final Training Syllabus
6. The Contractor must provide Simulator with hardware including computer processors, touch panels, monitors, ear phones, cables and console cabinets.
7. The Contractor must provide simulator software including communication system.
8. The Contractor must provide training IAW SOW Section 5.2.
9. The Contractor must install and Test its delivered Tower Cab
Simulator and Test IAW Section 5.4.
AAQ-811
1 ea
16. Total
G. Prepared By: H. Date I. Approved By J. Date
AAM-006 04/27/2017 Katharine T. McCauley Senior Business Officer
04/27/2017
17. Price Group NSP 18. Estimated Total Price NSP
OMB Control No. 2120-0595 (DD Form 1423-1) FAA Template No. 59 (reverse) (6/98)
INSTRUCTIONS FOR COMPLETING FAA Template No. 59 (6/98) A. Contract Line Item No... Contract Line Item Number (CLIN) associated with this Contract Data Requirements List (CDRL).
B. Exhibit. Exhibit identifier for this CDRL item.
C. Category. TDP(Technical Data package), TM (Technical Manual), or Other (other, such as Provisioning, Configuration Management, Progress Reports, Meeting Minutes, Commercial Catalogs, Commercial Data Sheets, Software License Agreements).
D. System/Item. System, item, project designator or name, or title of services being acquired that the data will support.
E. Contract/PR No. Procurement Instrument Identification Number (PIIN) (i.e., the contract number, the Purchase Request (PR) number, the screening Information Request (SIR) number, or other appropriate designator.
F. Contractor. Contractor’s name.
G. Prepared by. Preparer’s organization responsible for preparing the CDRL.
H. Date. Date the form was prepared.
I. Approved by. Office responsible for approving the CDRL. The approving official’s signature appears on the last page of exhibit.
J. Date. The date the CDRL was approved.
1. Data Item No. The 4-character Exhibit Line Item Number (ELIN). The first position consists of the exhibit identifier and the remaining positions are assigned sequentially.
2. Title of Data Item. The title of the Data Item Description (DID) cited in item 4.
3. Subtitle. Further identification of the data item to supplement the title, if required.
4. Authority (Data Acquisition Document No.) DID identification number where detailed preparation instructions are provided.
5. Contract Reference. The specific paragraph number of the applicable contractual document that contains the tasking that generates a requirement for the data item. Normally, this will be a Statement of Work (SOW) paragraph.
6. Requiring Office. The technical office having responsibility for ensuring the technical adequacy of the data.
7. DD 250 Required.
8. APP Code. Identification, by entry of an “A,” of a requirement for advance written approval prior to final distribution of an item of data. An “A” in this item indicates that one or more draft submittals are required. Item 14 will show length of turn-around time for the contractor to resubmit the data after Government approval/disapproval has been issued.
9. Distribution Statement Required.
10. Frequency. The frequency of data submittal. Entries in this item are explained in Table 1. If the data is of a recurring type, it is to be submitted at the end of the reporting period established in this item unless otherwise indicated in item 14.
Table 1. Data Submittal Frequency Codes
CODE FREQUENCY CODE FREQUENCY
ANNLY Annually ASGEN As generated
ASREQ As required BI-MO Every two months
BI-WE Every two weeks CP/RQ Change pages as required
DAILY Daily DFDEL Deferred delivery
MTHLY Monthly ONE/R One time with revisions
OTIME One time (does not include draft submissions QRTLY Quarterly
R/ASR Revisions as required SEMIA Every six months
WEKLY Weekly “N”TIME Multiple separate submittals (2time, 3time, etc.)
See Item #14 Requirement is described in item #14. Used in lieu of other codes where such are inadequate to define requirement, or used in addition to other codes requiring amplification in item #14.
11. As of Date. Date for cutting off collection of the data. If the data is to be submitted multiple times, a numeral will be entered to indicate the number of calendar days prior to the end of the reporting period, established in item 10, that data collection will be cut off. For example, “15” would place the “as of date” for the data at 15 days before the end of the month, quarter, or year, depending upon the frequency established in item 10; a “0 or blank” would place the “as of” date at the end of each month, quarter, etc.
12. Date of First Submission. Due date for initial data submission. This is normally the postage date or date the data is delivered to the Contracting Officer or keyed to a specific event or milestone, using a code from Table 2.
Table 2. Data Submission Codes
Code Definition Code Definition
ASGEN As generated ASREQ As required
DFDEL Deferred delivery “N”DAC Days after contract award
“N”DACM Days after contract modification “N”DARP Days after reporting period
“N”DARC Days after receipt of comments “N”DTC Days after test completion
NLT No later than EOC End of contract
EOM End of month EOQ End of quarter
See item #14 Use to indicate requirement is described in item 14. Used in lieu of other codes where such are inadequate to define requirement or used in addition to other codes when amplification is included in item 14.
The “N” is assigned a value indicating the number of days, e.g., 30 DAC
13. Date of Subsequent Submission. Due date(s) for subsequent data submission(s), if data is to be submitted more than once. If submittal is constrained by a specific event or milestone, the constraint will be given using a code from Table 2.
14. Remarks. Contains all pertinent information not specified elsewhere and any amplification of other items on this format (e.g., DID tailoring, approva criteria and authority, inspection and acceptance clarification, distributions statements, specific submission instructions, explanation of reproducible copy and delivery requirements, alternative medium for delivery of the data item, etc.)
15. Distribution. Addressees and the number of draft and final copies (regular or reproducible) to be provided to each. FAA facility designator and/or office symbols/codes may be used; however, an explanation of these will be provided in the Addressee Listing. When reproducible copies (e.g., magnetic diskettes/tape, vellum, negative, etc.) are required, an explanation will be provided in item 14. If deferred delivery is required, amplification will be given in item 14.
16. Total. Total number of draft and final (regular/reproducible) copies required.
17. Price Group. Not used. 18. Estimated Total Price. Not used.
File details come from the government source that posted it. Updated .