Attachment 7 - CDRL-B001.pdf

PDF 305 KB Posted

Attached to
Air Traffic Control Advanced Research Simulator (ATCARS) Tower Simulation Replacement for AMEN II
Solicitation number
DTFAAC-17-R-00041
Issued by

About this file

Attachment 7 - CDRL-B001 (pdf)

View the file

Other files

File Type Posted
Attachment 6 - CDRL-A004.pdf PDF
Attachment 3 - CDRL-A001.pdf PDF
Attachment 11 - Client Authorization Letter.docx DOCX document
Attachment 8 - CDRL-C001.pdf PDF
Attachment 1 - Section B - Supplies or Services-Prices.xlsx XLSX spreadsheet
Attachment 4 - CDRL-A002.pdf PDF
Attachment 2 - Statement of Work.pdf PDF
SIR/RFO DTFAAC-17-R-00041.pdf PDF
Attachment 10 - Past Performance Survey.pdf PDF
Attachment 5 - CDRL-A003.pdf PDF
Attachment 9 - Past Performance Experience Form.pdf PDF
Attachment 6 - CDRL-A004.pdf PDF
Attachment 8 - CDRL-C001.pdf PDF
Attachment 4 - CDRL-A002.pdf PDF
Attachment 7 - CDRL-B001.pdf PDF
Attachment 3 - CDRL-A001.pdf PDF
Attachment 5 - CDRL-A003.pdf PDF
Attachment 10 - Past Performance Survey.pdf PDF
Attachment 2 - Statement of Work.pdf PDF
Attachment 1 - Section B - Supplies or Services-Prices.xlsx XLSX spreadsheet
SIR/RFO DTFAAC-17-R-00041.pdf PDF
Attachment 9 - Past Performance Experience Form.pdf PDF
Attachment 11 - Client Authorization Letter.docx DOCX document
Attachment 7 - CDRL-B001.pdf PDF
Attachment 8 - CDRL-C001.pdf PDF
Attachment 4 - CDRL-A002.pdf PDF
Attachment 6 - CDRL-A004.pdf PDF
Attachment 5 - CDRL-A003.pdf PDF
Attachment 2 - Statement of Work.pdf PDF
Attachment 1 - Section B - Supplies or Services-Prices.xlsx XLSX spreadsheet
SIR/RFO DTFAAC-17-R-00041.pdf PDF
Attachment 9 - Past Performance Experience Form.pdf PDF
Attachment 10 - Past Performance Survey.pdf PDF
Attachment 11 - Client Authorization Letter.docx DOCX document
Attachment 3 - CDRL-A001.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OMB Control No. 2120-0595 (DD Form 1423-1) FAA Template No. 59 (6/98)

CONTRACT DATA REQUIREMENTS LIST (CDRL) Page 1 of 2

A. Contract line Item No. B. Exhibit C. Category (Check appropriate one)

4.0 Data & Reports N/A TDP TM Other [X]

D. System/Item E. Contract/PR No. F. Contractor

Tower Cab Simulator

AC-17-01730

1. Data Item No. 2. Title of Data Item

3. Subtitle

B001

Post Award Documentation

4. Authority 5. Contact Reference 6. Requiring Office

IAW SOW & SIR/RFO Sections L &

M

DTFAAC-17-R-00041 AAM-006

7. DD 250 Req’d 8. APPROVAL Code 9. Distribution Statement Required 10. Frequency 11. As of Date (AOD)

N/A A NA ASREQ 0

12. Date of First

Submission

IAW AWARD

13. Date of Subsequent

Submission

ASREQ

15. Distribution

14. REMARKS: a. b. Draft c. Final Copies

Addressee Copies Reg. Repro

1. The Contractor must provide in Contractors format its Final Blueprint depicting physical layout of the simulator including number and type of displays that will be provided by the contractor as described in their proposal 15 days from Contract Award

2. The Contractor must provide Simulator Instruction Manual.

3. The Contractor must provide government access to air traffic scenarios IAW SOW

4. The Contractor must provide access to Air Traffic Scenarios

5. The Contractor must provide Final Training Syllabus

6. The Contractor must provide Final Installation and Test Plan for

Government Approval 20 days from Contract Award. The Government has up to 10 for review and recommendation. The Contractor will have10 days for Final Installation and Test Plan for submission coordination.

AAQ-811

AAQ-811

AAQ-811

1 ea

1 ea

1 ea

16. Total

G. Prepared By: H. Date I. Approved By J. Date

AAM-006 04/27/2017 Katharine T. McCauley Senior Business Officer

04/27/2017

17. Price Group NSP 18. Estimated Total Price NSP

OMB Control No. 2120-0595 (DD Form 1423-1) FAA Template No. 59 (reverse) (6/98)

INSTRUCTIONS FOR COMPLETING FAA Template No. 59 (6/98) A. Contract Line Item No... Contract Line Item Number (CLIN) associated with this Contract Data Requirements List (CDRL).

B. Exhibit. Exhibit identifier for this CDRL item.

C. Category. TDP(Technical Data package), TM (Technical Manual), or Other (other, such as Provisioning, Configuration Management, Progress Reports, Meeting Minutes, Commercial Catalogs, Commercial Data Sheets, Software License Agreements).

D. System/Item. System, item, project designator or name, or title of services being acquired that the data will support.

E. Contract/PR No. Procurement Instrument Identification Number (PIIN) (i.e., the contract number, the Purchase Request (PR) number, the screening Information Request (SIR) number, or other appropriate designator.

F. Contractor. Contractor’s name.

G. Prepared by. Preparer’s organization responsible for preparing the CDRL.

H. Date. Date the form was prepared.

I. Approved by. Office responsible for approving the CDRL. The approving official’s signature appears on the last page of exhibit.

J. Date. The date the CDRL was approved.

1. Data Item No. The 4-character Exhibit Line Item Number (ELIN). The first position consists of the exhibit identifier and the remaining positions are assigned sequentially.

2. Title of Data Item. The title of the Data Item Description (DID) cited in item 4.

3. Subtitle. Further identification of the data item to supplement the title, if required.

4. Authority (Data Acquisition Document No.) DID identification number where detailed preparation instructions are provided.

5. Contract Reference. The specific paragraph number of the applicable contractual document that contains the tasking that generates a requirement for the data item. Normally, this will be a Statement of Work (SOW) paragraph.

6. Requiring Office. The technical office having responsibility for ensuring the technical adequacy of the data.

7. DD 250 Required.

8. APP Code. Identification, by entry of an “A,” of a requirement for advance written approval prior to final distribution of an item of data. An “A” in this item indicates that one or more draft submittals are required. Item 14 will show length of turn-around time for the contractor to resubmit the data after Government approval/disapproval has been issued.

9. Distribution Statement Required.

10. Frequency. The frequency of data submittal. Entries in this item are explained in Table 1. If the data is of a recurring type, it is to be submitted at the end of the reporting period established in this item unless otherwise indicated in item 14.

Table 1. Data Submittal Frequency Codes

CODE FREQUENCY CODE FREQUENCY

ANNLY Annually ASGEN As generated

ASREQ As required BI-MO Every two months

BI-WE Every two weeks CP/RQ Change pages as required

DAILY Daily DFDEL Deferred delivery

MTHLY Monthly ONE/R One time with revisions

OTIME One time (does not include draft submissions QRTLY Quarterly

R/ASR Revisions as required SEMIA Every six months

WEKLY Weekly “N”TIME Multiple separate submittals (2time, 3time, etc.)

See Item #14 Requirement is described in item #14. Used in lieu of other codes where such are inadequate to define requirement, or used in addition to other codes requiring amplification in item #14.

11. As of Date. Date for cutting off collection of the data. If the data is to be submitted multiple times, a numeral will be entered to indicate the number of calendar days prior to the end of the reporting period, established in item 10, that data collection will be cut off. For example, “15” would place the “as of date” for the data at 15 days before the end of the month, quarter, or year, depending upon the frequency established in item 10; a “0 or blank” would place the “as of” date at the end of each month, quarter, etc.

12. Date of First Submission. Due date for initial data submission. This is normally the postage date or date the data is delivered to the Contracting Officer or keyed to a specific event or milestone, using a code from Table 2.

Table 2. Data Submission Codes

Code Definition Code Definition

ASGEN As generated ASREQ As required

DFDEL Deferred delivery “N”DAC Days after contract award

“N”DACM Days after contract modification “N”DARP Days after reporting period

“N”DARC Days after receipt of comments “N”DTC Days after test completion

NLT No later than EOC End of contract

EOM End of month EOQ End of quarter

See item #14 Use to indicate requirement is described in item 14. Used in lieu of other codes where such are inadequate to define requirement or used in addition to other codes when amplification is included in item 14.

The “N” is assigned a value indicating the number of days, e.g., 30 DAC

13. Date of Subsequent Submission. Due date(s) for subsequent data submission(s), if data is to be submitted more than once. If submittal is constrained by a specific event or milestone, the constraint will be given using a code from Table 2.

14. Remarks. Contains all pertinent information not specified elsewhere and any amplification of other items on this format (e.g., DID tailoring, approva criteria and authority, inspection and acceptance clarification, distributions statements, specific submission instructions, explanation of reproducible copy and delivery requirements, alternative medium for delivery of the data item, etc.)

15. Distribution. Addressees and the number of draft and final copies (regular or reproducible) to be provided to each. FAA facility designator and/or office symbols/codes may be used; however, an explanation of these will be provided in the Addressee Listing. When reproducible copies (e.g., magnetic diskettes/tape, vellum, negative, etc.) are required, an explanation will be provided in item 14. If deferred delivery is required, amplification will be given in item 14.

16. Total. Total number of draft and final (regular/reproducible) copies required.

17. Price Group. Not used. 18. Estimated Total Price. Not used.

File details come from the government source that posted it. Updated .