DTCC Owens Campus Betze Learning Commons Renovation
Solicitation number
DTCC-C9004020002
Issued by
Sussex County, Delaware

About this file

DTCC Betze Learning Commons Addendum No. 1

This document is an addendum to the bid package for the Delaware Technical Community College (DTCC) Betze Learning Commons renovation project, issued by the college in coordination with construction manager Richard Y. Johnson & Son, Inc. and architect BSA+A. The project encompasses comprehensive interior and exterior renovation of the existing Betze Learning Commons facility with associated site improvements across 17 separate trade contracts, including demolition, site work, concrete, masonry, steel, carpentry, roofing, hollow metal doors and hardware, aluminum storefronts and glazing, drywall, acoustical work, floor coverings, caulking and painting, casework, mechanical systems, fire suppression, and electrical work. The facility is located at 21179 College Drive, Georgetown, Delaware 19947. A mandatory pre-bid meeting was held on June 30, 2026 at 10:00 a.m., with building walkthroughs offered on July 8, 2026 from 10:00 a.m. to 11:00 a.m. at Betze Library, Building 1000. Sealed bids are due July 28, 2026 at 2:00 p.m. at DTCC Owens Campus in the Theatre, Arts and Sciences Building, with public bid opening to follow. The construction schedule extends from August 2026 through February 2028.

Bidders must submit a 10% bid bond, completed subcontractor lists naming specific firms for each trade category, Delaware business licenses, Federal E.I. numbers, signed non-collusion statements, and affidavits certifying employee drug-testing programs and contractor qualifications; failure to provide a completed subcontractor list results in bid rejection. The project includes six project alternates and 15 allowances ranging from $10,000 to $50,000 for unforeseen conditions, temporary closures, exterior temporary fencing, temporary heating fuel, selective demolition, and short circuit analysis gear revisions. All work is subject to state prevailing wage requirements under Delaware Code Title 29, Section 6960, with rates established by the Department of Labor. Requests for Information must be submitted in written form to jdixon@ryjson.com by 12:00 noon on Tuesday, July 21, 2026, and all substitutions must be submitted by 12:00 noon on Thursday, July 16, 2026. Addendums are scheduled for July 6, 13, 20, and July 23 (if necessary), with notice emailed to contractors who signed in at the pre-bid meeting. Bid documents are available through the Richard Y. Johnson & Son website plan room, and bids shall remain valid for 30 days following opening (60 days for school districts and Department of Education).

View the file

Other files

File Type Posted
DTCC-C9004020002_pw.pdf PDF
DTCC-C9004020002_ad2.pdf PDF
DTCC-C9004020002_itb.pdf PDF
DTCC-C9004020002_specs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DTCC Betze Learning Commons Addendum No. 1

DTCC No. DC900402002 Delaware Technical Community College

Betze Learning Commons Bid Pac A – Contracts 1 thru 17

July 02, 2026

Attention all Prospective Bidders:

The following clarifications, changes and /or additions shall by this reference be incorporated into the contract documents as though dully set forth therein.

Addendum No. 1 consists of:

RYJ Written directive (2 pages) Betze Learning Commons Pre-Bid Agenda (2 pages) Betze Learning Commons Sign-In Sheets (8 pages) Betze Learning Commons Attendees from Sign-in Sheets (2 pages) Section 004126 Bid Form (187 pages) – (Each Contract has a separate Bid Form)

Site Visits:

Building Walk-throughs will be available the following date and times for contractors. It is strongly encouraged to attend to review existing conditions.

*Location: Betze Library; Building 1000, 21179 College Drive Georgetown, DE 19947 July 8, 2026 from 10:00am – 11:00am

Non – Technical Specifications

NOTE: All Prime Contractors are responsible for bidding from a full set of bidding documents.

This project is a State wage rated project.

No administrative items shall be delivered to the job site.

All correspondence with Architect, Engineer, Owner, Etc. must go through this office.

Application for Payment

All bills are due the 25th of the month. Bills must be on for AIA G702/CMa. Billing will not be processed early, late bills will be rejected.

A total of five copies of each bill and corresponding waiver (one notarized original and 4 copies) are required.

Richard Y. Johnson & Son, Inc.

General Contractors & Construction Managers

Serving Delaware Since 1946 www.ryjson.com

18404 Johnson Rd PO Box 105

Lincoln, DE 19960 Phone 302-422-3732

Fax 302-422-4696

DTCC Betze Learning Commons

General Conditions

Please refer to Section 9.3.2; any stored material (including on-site storage) being billed during a pay period must be insured and a certificate of stored material be included with your application for payment. Your payment will not be processed and your bill will be rejected for that period.

Stored materials must stay in the stored materials column, and must be insured, until the material has been incorporated into the building.

Shop Drawings, Product Data and Samples

Submittals are to be submitted via email for review and approval, if certain items are deemed not emailable then ten (10) copies of all submittals are required. Inadequate amounts will be rejected.

Section 001116 – Advertisement for Bid

Bids are Due July 28, 2026 at 2:00pm and are to be read aloud at DTCC Owens Campus located at 21179 College Drive Georgetown, DE 19947 in the Theatre, in the Arts and Sciences Building.

Section 004126 – Bid Form

See attached Bid Forms for each Contract *Note: Each Contractor is required to list themselves on the attached sublist along with any listed subs

End of Addendum No. 1

DTCC Betze Learning Commons Pre-Bid Meeting Agenda

PRE-BID MEETING

June 30, 2026

10:00 am

Delaware Technical Community College

Betze Learning Commons

DTCC No. C900402002

Bid Pac A

Contracts 1 thru 17 Agenda

1. Attendees at Pre-Bid Meeting DTCC – Statewide Director of Facilities – Mark Devore

Construction Manager – Richard Y. Johnson & Son, Inc.

Architect – BSA+A

2. Review projects' description and time frame

- You will be bidding Bid Pac A –

A-1: Demolition A-10: Drywall/Metal Stud

A-2: Site Work A-11: Acoustical Work

A-3: Concrete Work A-12: Floor Covering Work

A-4: Masonry Work A-13: Caulking/Painting

A-5: Steel Work A-14: Casework

A-6: Carpentry & General Work A-15: Mechanical

A-7: Roofing Work A-16: Sprinkler System

A-8: Furnish Hollow Metal/Doors/Hardware A-17: Electrical

A-9: Aluminum Storefront/Windows/

Glass & Glazing

- Project involves Project involves the interior and exterior renovation of the Existing Betze Learning

Commons with associated site improvements. This is a construction management project.

- Construction schedule is from August 2026 – February 2028.

3. Review Bid date and location

- July 28, 2026 @ 2:00 pm

- DTCC Owens Campus located at 21179 College Drive Georgetown, DE 19947 in the Theatre, in the Arts and Sciences Building

Bidder bears the risk of late delivery. Any bids received after the stated time will be returned unopened.

4. Review the bidding procedures and bonding requirements

- You are bidding a full set of documents.

- You must use bid form provided in bid documents and/or as revised in Addendums

- Review scope of work, section 011100 Summary of Work

- No exclusions from your scope of work or bid will be rejected!!

- 10% Bid Bond is required.

Richard Y. Johnson & Son, Inc.

General Contractors & Construction Managers

Serving Delaware Since 1946 www.ryjson.com

18404 Johnson Rd PO Box 105

Lincoln, DE 19960 Phone 302-422-3732

Fax 302-422-4696

DTCC Betze Learning Commons Pre-Bid Meeting Agenda

- Public bid opening.

- This is a Mandatory pre-bid meeting.

5. Review the Project

- Owner to provide building permits; contractor provides all other permits, licenses and inspection fees

- Architect (BSA+A) to summarize scope of project.

- Six (6) Alternates

- Fifteen (15) Allowances

- Zero (0) Unit Prices

6. Receive Bidding questions – R. F. I. to be forwarded to Construction Manager. Email address is jdixon@ryjson.com.

- RFI's to be in written form only, with plan number or specification number noted with question.

- No RFI's shall be accepted after 12 noon on Tuesday, July 21, 2026.

- All substitutions shall be submitted no later than 12 noon on Thursday, July 16, 2026.

- Addendum notice will be emailed to contractors who have signed in at pre-bid meeting.

The notice will direct you the Richard Y. Johnson & Son, Inc. website under Plan Room for review of the

Addendums.

- State prevailing wage rates apply.

7. Bidding documents

- www.ryjson.com under plan room

-Documents Shown on My Market Place State of Delaware website are labeled Not for Bidding.

For Bidding, you must use the documents from the RYJ website.

8. Addendum Schedule

- Addendum 1 – July 6, 2026

- Addendum 2 – July 13, 2026

- Addendum 3 – July 20, 2026

- Addendum 4 – July 23, 2026 (If necessary)

9. Drug Testing/Craft Training Requirements

-All Prime Contractors are to include a signed affidavit that is included in the project documents.

10. Subcontractor List: Prime Contractors are to list all Subcontractors that will be working on the project as noted on the subcontractor form, please review verbiage on the bid form.

11. Site Visit: View after Pre-Bid Meeting; an additional site visit will be noted in Addendum for date and time.

12. Receive questions

13. Summation and Conclusion mailto:jdixon@ryjson.com http://www.ryjson.com/

BID FORM 004126-1

Delaware Technical and Community College

DTCC No. C9004020002

21179 College Drive Georgetown Delaware 19947

Project No. 25.006

BID FORM

For Bids Due: July 28, 2026 To: Delaware Technical Community College

Attn: Mark Devore P.E.

Collegewide Director of Facilities

Contracts

Clearly Mark Contract you are bidding (Only 1 contract per bid form)

For Bid Package A:

___ Contract #1 Demolition

Name of Bidder:

Delaware Business License No.: Taxpayer ID No.:

(Other License Nos.):

Phone No.: ( ) - Fax No.: ( ) -

The undersigned, representing that he has read and understands the Bidding Documents and that this bid is made in accordance therewith, that he has visited the site and has familiarized himself with the local conditions under which the Work is to be performed, and that his bid is based upon the materials, systems and equipment described in the Bidding Documents without exception, hereby proposes and agrees to provide all labor, materials, plant, equipment, supplies, transport and other facilities required to execute the work described by the aforesaid documents for the lump sum itemized below:

BID FORM 004126-2

Delaware Technical and Community College

DTCC No. C9004020002

21179 College Drive Georgetown Delaware 19947

Project No. 25.006

ALTERNATES

Alternate prices conform to applicable project specification section. Refer to specifications for a complete description of the following Alternates. An “ADD” or “DEDUCT” amount is indicated by the crossed out part that does not apply. Contract numbers are a recommendation; it is the contractor’s responsibility to determine if an alternate cost affects their pricing

Alternate No. One – Outdoor Gathering Space (Patio) (Contracts A-2, A-3, A-4 & A-5)

1. Base Bid: Sod turf replacement at disturbed area with 1’-0” mow strip at building edge.

2. Alternate: New Specialty stamped concrete with brick knee wall & mounted ornamental site fencing. New sidewalk connector to existing sidewalk.

Add/Delete:

Alternate No. Two – Interior Library/Learning Commons, Lounge and Circulation Corridor Floor

Finishes – 50% Carpet / 50% Terrazzo at first floor & Second Floor. (Contract A-12)

1. Base Bid: As noted on floor plans (Terrazo)

2. Alternate: As noted on floor plans. (LVT)

Alternate No. Three – Terrazzo Flooring in Main Connector Corridor. (Contract A-12)

1. Base Bid: As noted on plans – Provide Terrazzo in C100 where noted on plans.

2. Alternate: Provide LVT in C100 where noted on plans.

Alternate No. Four – ATC System by Siemens. (Contract A-15)

1. Base Bid: Provide ATC Controls by any listed ATC vendor.

2. Alternate: Provide additional costs, if any, for ATC system by Siemens as specified in specifica tion section

230900 “Instrumentation and Controls of HVAC and Plumbing Systems.” If Siemens is the low cost ATC subcontractor, then the alternate value on the big form shall be listed as $0.

Alternate No. Five – Glass Backed Markerboards (Contract A-6)

1. Base Bid: No markerboards to be provided.

2. Alternate: Provide Glass Backed Markerboards (4’-0” W x 2’-0”) at locations noted on floor plans

BID FORM 004126-3

Delaware Technical and Community College

DTCC No. C9004020002

21179 College Drive Georgetown Delaware 19947

ALTERNATES (CON’T)

Alternate No. Six – Hybrid Thermoplastic Membrane Roofing (Contract A-7)

1. Base Bid: Provide EPDM membrane roofing as noted on plans.

2. Alternate: Provide Hybrid Thermoplastic membrane Roofing per 075200, in lieu of EPDM membrane roofing.

ALLOWANCES

Contract No. 1 Demolition

1 - Include the lump sum of the following amount $20,000 in the contract for unforeseen conditions that may arise during construction to be used at the discretion of the Construction Manager. See Section 012100 Allowances.

Contract No. 2 Sitework

2 - Include the lump sum of the following amount $10,000 in the contract for exterior temporary fence. See Section 012100

Allowances.

Contract No. 5 Steel Work

3 - Include the lump sum of the following amount $20,000 in the contract for unforeseen conditions that may arise during construction

Contract No. 6 Carpentry & General Works

4 - Include the lump sum of the following amount $20,000 in the contract for unforeseen conditions that may arise during construction

5 - Include the lump sum of the following amount $20,000 in the contract for temporary closures during construction for the exterior wall construction. See Section 012100 Allowances.

Contract No. 7 Roofing Work

6 - Include the lump sum of the following amount $20,000 in the contract for unforeseen conditions that may arise during construction

Contract No. 9 Aluminum Storefront/Windows/Glass & Glazing

7 – Include the lump sum of the following amount $20,000 in the contract for unforeseen conditions that may arise during construction

Contract No. 10 Drywall/Metal Studs

8 – Include the lump sum of the following amount $20,000 in the contract for unforeseen conditions that may arise during construction

Contract No. 12 Floor Covering Work

9 – Include the lump sum of the following amount $20,000 in the contract for unforeseen conditions that may arise during construction

Contract No. 15 Mechanical

10 – Include the lump sum of the following amount $20,000 in the contract for unforeseen conditions that may arise during construction to be used at the discretion of the Construction Manager. See Section 012100 Allowances.

BID FORM 004126-4

Delaware Technical and Community College

DTCC No. C9004020002

21179 College Drive Georgetown Delaware 19947

11 – Include the lump sum of the following amount $50,000 in the contract for the temp heat fuel cost. Cost of work to be determined by fuel company receipts with the amount of fuel and cost per gallon. All equipment and labor for temp heat is part of the contract.

This allowance is for fuel cost only. See Section 012100 Allowances.

Contract No. 16 Sprinkler System

12 – Include the lump sum of the following amount $20,000 in the contract for unforeseen conditions that may arise during construction to be used at the discretion of the Construction Manager. See Section 012100 Allowances.

Contract No. 17 Electrical

13 – Include the lump sum of the following amount $20,000 in the contract for unforeseen conditions that may arise during construction to be used at the discretion of the Construction Manager. See Section 012100 Allowances.

14 – Include the lump sum of the following amount $25,000 in the contract for short circuit analysis gear revisions. See Section

012100 Allowances.

15 – Include the lump sum of the following amount $25,000 in the contract for selective demolition of the existing building See

Section 012100 Allowances.

UNIT PRICES

NOT USED

BID FORM 004126-5

Delaware Technical and Community College

DTCC No. C9004020002

21179 College Drive Georgetown Delaware 19947

I/We acknowledge Addendums numbered and the price(s) submitted include any cost/schedule impact they may have.

This bid shall remain valid and cannot be withdrawn for thirty (30) days from the date of opening of bids (60 days for School Districts and Department of Education), and the undersigned shall abide by the Bid Security forfeiture provisions. Bid Security is attached to this Bid.

The Owner shall have the right to reject any or all bids, and to waive any informality or irregularity in any bid received.

This bid is based upon work being accomplished by the Sub-Contractors named on the list attached to this bid.

Should I/We be awarded this contract, I/We pledge to achieve substantial completion of all the work within calendar days of the Notice to Proceed.

The undersigned represents and warrants that he has complied and shall comply with all requirements of local, state, and national laws; that no legal requirement has been or shall be violated in making or accepting this bid, in awarding the contract to him or in the prosecution of the work required; that the bid is legal and firm; that he has not, directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken action in restraint of free competitive bidding.

Upon receipt of written notice of the acceptance of this Bid, the Bidder shall, within twenty (20) calendar days, execute the agreement in the required form and deliver the Contract Bonds, and Insurance Certificates, required by the Contract Documents.

I am / We are an Individual / a Partnership / a Corporation

By Trading as

(Individual’s / General Partner’s / Corporate Name)

(State of Corporation)

Business Address:

Witness: By:

( Authorized Signature )

(SEAL)

( Title )

Date:

ATTACHMENTS

Sub-Contractor List

Non-Collusion Statement

Affidavit of Employee Drug Testing Program

Affidavit of Contractor Qualifications

Bid Security

(Others as Required by Project Manuals)

BID FORM 004126-6

Delaware Technical and Community College

DTCC No. C9004020002

21179 College Drive Georgetown Delaware 19947

Project No. 25.006

SUBCONTRACTOR LIST

In accordance with Title 29, Chapter 69, Section 6962(d)(10)b of the Delaware Code, the following subcontractor listing must accompany any bid submittal. The bidder must list in each category the full name and address (City & State) of the sub-contractor that the bidder will be using to perform the work and provide material for that subcontractor category. Should the bidder’s listed subcontractor intend to provide any of their subcontractor category of work through a third-tier contractor, the bidder shall list that third-tier contractor’s full name and address (City & State). If the bidder intends to perform any category of work itself, it must list its full name and address. For clarification, if the bidder intends to perform the work themselves, the bidder may not insert “not applicable”, “N/A”, “self” or anything other than its own full name and address (City & State). To do so shall cause the bid to be rejected. In addition, the failure to produce a completed subcontractor list with the bid submittal shall cause the bid to be rejected. If you have more than three (3) third-tier contractors to report in any subcontractor category, print out additional page(s) containing the appropriate category, complete the rest of your list of third-tier contractors for that category, notate the addition in parentheses as (CONTINUATION) next to the subcontractor category and an asterisk (*) next to any additional third-tier contractors, and submit it with your bid.

Subcontractor Category Subcontractor Address (City & State) Subcontractors tax-payer ID # or Delaware Business license #

1.

A.

B.

C.

2.

BID FORM 004126-7

Delaware Technical and Community College

DTCC No. C9004020002

21179 College Drive Georgetown Delaware 19947

3.

4.

5.

BID FORM 004126-8

Delaware Technical and Community College

DTCC No. C9004020002

21179 College Drive Georgetown Delaware 19947

Project No. 25.006

NON-COLLUSION STATEMENT

This is to certify that the undersigned bidder has neither directly nor indirectly, entered into any agreement, participated in any collusion or otherwise taken any action in restraint of free competitive bidding in connection with this proposal submitted this date to

Delaware Technical and Community College.

All the terms and conditions of Project No. 19.021, Contract #: DTCC22C900406SSC-A have been thoroughly examined and are understood.

NAME OF BIDDER:

AUTHORIZED REPRESENTATIVE

(TYPED):

(SIGNATURE):

TITLE:

ADDRESS OF BIDDER:

E-MAIL: ______________________________________________________________

PHONE NUMBER:

Sworn to and Subscribed before me this day of 20 .

My Commission expires . NOTARY PUBLIC .

THIS PAGE MUST BE SIGNED AND NOTARIZED FOR YOUR BID TO BE CONSIDERED.

BID FORM 004126-9

Delaware Technical and Community College

DTCC No. C9004020002

21179 College Drive Georgetown Delaware 19947

AFFIDAVIT

OF

EMPLOYEE DRUG TESTING PROGRAM

4104 Regulations for the Drug Testing of Contractor and Subcontractor Employees Working on Large Public Works Projects requires that Contractors and Subcontractors implement a program of mandatory drug testing for Employees who work on Large Public Works

Contracts funded all or in part with public funds.

We hereby certify that we have in place or will implement during the entire term of the contract a Mandatory Drug Testing Program for our employees on the jobsite, including subcontractors, that complies with this regulation:

Contractor/Subcontractor Name:

Contractor/Subcontractor Address:

Authorized Representative (typed or printed):

Authorized Representative (signature):

Title:

BID FORM 004126-10

Delaware Technical and Community College

DTCC No. C9004020002

21179 College Drive Georgetown Delaware 19947

CONTRACTOR QUALIFICATIONS

We hereby certify that we will abide by the contractor’s qualifications outlined in the construction bid specifications for the duration of the contract term.

In accordance with Title 29, Chapter 69, Section 6962(d)(10)b.3 of the Delaware Code, after a contract has been awarded the successful bidder shall not substitute another subcontractor whose name was submitted on the Subcontractor Form except for the reasons in the statute and not without written consent from the awarding agency. Failure to utilize the subcontractors on the list will subject the successful bidder to penalties as outlined in the General Requirements Section 5.2 of the contract.

Contractor Name:

Contractor Address:

BID FORM 004126-11

Delaware Technical and Community College

DTCC No. C9004020002

21179 College Drive Georgetown Delaware 19947

AFFIDAVIT OF

CRAFT TRAINING COMPLIANCE

We, the contractor, hereby certify that we and all applicable subcontractors will abide by the contractor and subcontractor craft training requirements outlined below for the duration of the contract. Craft training must be provided by a contractor and/or subcontractor for each craft on a project for which there are Delaware Department of Labor approved and registered training programs. A list of crafts for which there are approved and registered training programs is maintained by the Delaware Department of

Labor and can be found at https://laborfiles.delaware.gov/main/det/apprenticeship/DE%20Craft%20Training%20Occupation%20List%20Effective%20March%2

01%202022.pdf. If you have questions regarding craft training programs, please submit them in writing to the Delaware Department of Labor at: apprenticeship@delaware.gov. The Craft Training Compliance Affidavit must be submitted prior to contract execution.

In accordance with Title 29, Chapter 69, Section 6962(c)(13) of the Delaware Code, contractors and subcontractors must provide craft training for journeyman and apprentice levels if all of the following apply:

A. A project meets the prevailing wage requirement under Title 29, Chapter 69, Section 6960 of the Delaware Code.

B. The contractor employs 10 or more total employees.

C. The project is not a federal highway project

Failure to provide required craft training on the project may subject the successful contractor and/or subcontractor(s) to penalties as outlined in Title 29, Chapter 69, Section 6962(c)(13) of the Delaware Code.

Craft(s) ___________________________________________________

Contractor Program

Registration Number(s) __________________________________________________

On this line also indicate whether DE, Other State (identify) or US Registration Number

Or

Craft Training requirements are not applicable because: __________________________________

THIS PAGE MUST BE SIGNED AND NOTARIZED TO BE CONSIDERED.

https://laborfiles.delaware.gov/main/det/apprenticeship/DE%20Craft%20Training%20Occupation%20List%20Effective%20March%201%202022.pdf https://laborfiles.delaware.gov/main/det/apprenticeship/DE%20Craft%20Training%20Occupation%20List%20Effective%20March%201%202022.pdf mailto:apprenticeship@delaware.gov

Delaware Technical and Community College

DTCC No. C9004020002

21179 College Drive Georgetown Delaware 19947

___ Contract #10 Drywall/Metal Studs

Phone No.: ( ) - Fax No.: ( ) -

The undersigned, representing that he has read and understands the Bidding Documents and that this bid is made in accordance therewith, that he has visited the site and has familiarized himself with the local conditions under which the Work is to be performed, and that his bid is based upon the materials, systems and equipment described in the Bidding Documents without exception, hereby proposes and agrees to provide all labor, materials, plant, equipment, supplies, transport and other facilities required to execute the

Delaware Technical and Community College

DTCC No. C9004020002

21179 College Drive Georgetown Delaware 19947

Project No. 25.006

Alternate prices conform to applicable project specification section. Refer to specifications for a complete description of the following Alternates. An “ADD” or “DEDUCT” amount is indicated by the crossed out part that does not apply. Contract numbers are a recommendation; it is the contractor’s responsibility to determine if an alternate cost affects their pricing

2. Alternate: Provide additional costs, if any, for ATC system by Siemens as specified in specifica tion section

Delaware Technical and Community College

DTCC No. C9004020002

21179 College Drive Georgetown Delaware 19947

2. Alternate: Provide Hybrid Thermoplastic membrane Roofing per 075200, in lieu of EPDM membrane roofing.

1 - Include the lump sum of the following amount $20,000 in the contract for unforeseen conditions that may arise during construction

2 - Include the lump sum of the following amount $10,000 in the contract for exterior temporary fence. See Section 012100

3 - Include the lump sum of the following amount $20,000 in the contract for unforeseen conditions that may arise during construction

4 - Include the lump sum of the following amount $20,000 in the contract for unforeseen conditions that may arise during construction

5 - Include the lump sum of the following amount $20,000 in the contract for temporary closures during construction for the exterior

6 - Include the lump sum of the following amount $20,000 in the contract for unforeseen conditions that may arise during construction

7 – Include the lump sum of the following amount $20,000 in the contract for unforeseen conditions that may arise during construction

8 – Include the lump sum of the following amount $20,000 in the contract for unforeseen conditions that may arise during construction

9 – Include the lump sum of the following amount $20,000 in the contract for unforeseen conditions that may arise during construction

10 – Include the lump sum of the following amount $20,000 in the contract for unforeseen conditions that may arise during construction to be used at the discretion of the Construction Manager. See Section 012100 Allowances.

Delaware Technical and Community College

DTCC No. C9004020002

21179 College Drive Georgetown Delaware 19947

11 – Include the lump sum of the following amount $50,000 in the contract for the temp heat fuel cost. Cost of work to be determined by fuel company receipts with the amount of fuel and cost per gallon. All equipment and labor for temp heat is part of the contract.

12 – Include the lump sum of the following amount $20,000 in the contract for unforeseen conditions that may arise during construction to be used at the discretion of the Construction Manager. See Section 012100 Allowances.

13 – Include the lump sum of the following amount $20,000 in the contract for unforeseen conditions that may arise during construction to be used at the discretion of the Construction Manager. See Section 012100 Allowances.

14 – Include the lump sum of the following amount $25,000 in the contract for short circuit analysis gear revisions. See Section

15 – Include the lump sum of the following amount $25,000 in the contract for selective demolition of the existing building See

Delaware Technical and Community College

DTCC No. C9004020002

21179 College Drive Georgetown Delaware 19947

I/We acknowledge Addendums numbered and the price(s) submitted include any cost/schedule impact they may have.

This bid shall remain valid and cannot be withdrawn for thirty (30) days from the date of opening of bids (60 days for School Districts and Department of Education), and the undersigned shall abide by the Bid Security forfeiture provisions. Bid Security is attached to

The Owner shall have the right to reject any or all bids, and to waive any informality or irregularity in any bid received.

This bid is based upon work being accomplished by the Sub-Contractors named on the list attached to this bid.

Should I/We be awarded this contract, I/We pledge to achieve substantial completion of all the work within calendar days of

The undersigned represents and warrants that he has complied and shall comply with all requirements of local, state, and national laws; that no legal requirement has been or shall be violated in making or accepting this bid, in awarding the contract to him or in the prosecution of the work required; that the bid is legal and firm; that he has not, directly or indirectly, entered into any agreement, Upon receipt of written notice of the acceptance of this Bid, the Bidder shall, within twenty (20) calendar days, execute the agreement in the required form and deliver the Contract Bonds, and Insurance Certificates, required by the Contract Documents.

(SEAL)

Non-Collusion Statement

Affidavit of Employee Drug Testing Program

Affidavit of Contractor Qualifications

Delaware Technical and Community College

DTCC No. C9004020002

21179 College Drive Georgetown Delaware 19947

Project No. 25.006

In accordance with Title 29, Chapter 69, Section 6962(d)(10)b of the Delaware Code, the following subcontractor listing must accompany any bid submittal. The bidder must list in each category the full name and address (City & State) of the sub-contractor that the bidder will be using to perform the work and provide material for that subcontractor category. Should the bidder’s listed subcontractor intend to provide any of their subcontractor category of work through a third-tier contractor, the bidder shall list that third-tier contractor’s full name and address (City & State). If the bidder intends to perform any category of work itself, it must list its full name and address. For clarification, if the bidder intends to perform the work themselves, the bidder may not insert “not applicable”, “N/A”, “self” or anything other than its own full name and address (City & State). To do so shall cause the bid to be rejected. In addition, the failure to produce a completed subcontractor list with the bid submittal shall cause the bid to be rejected. If you have more than three (3) third-tier contractors to report in any subcontractor category, print out additional page(s) containing the appropriate category, complete the rest of your list of third-tier contractors for that category, notate the addition in parentheses as (CONTINUATION) next to the subcontractor category and an asterisk (*) next to any additional third-tier

Subcontractor Category Subcontractor Address (City & State) Subcontractors tax-payer ID #

Delaware Technical and Community College

DTCC No. C9004020002

21179 College Drive Georgetown Delaware 19947

Delaware Technical and Community College

DTCC No. C9004020002

21179 College Drive Georgetown Delaware 19947

Project No. 25.006

This is to certify that the undersigned bidder has neither directly nor indirectly, entered into any agreement, participated in any collusion or otherwise taken any action in restraint of free competitive bidding in connection with this proposal submitted this date to

All the terms and conditions of Project No. 19.021, Contract #: DTCC22C900406SSC-A have been thoroughly examined and are

DTCC No. C9004020002

21179 College Drive Georgetown Delaware 19947

4104 Regulations for the Drug Testing of Contractor and Subcontractor Employees Working on Large Public Works Projects requires that Contractors and Subcontractors implement a program of mandatory drug testing for Employees who work on Large Public Works

We hereby certify that we have in place or will implement during the entire term of the contract a Mandatory Drug Testing Program

Delaware Technical and Community College

DTCC No. C9004020002

21179 College Drive Georgetown Delaware 19947

We hereby certify that we will abide by the contractor’s qualifications outlined in the construction bid specifications for the duration

In accordance with Title 29, Chapter 69, Section 6962(d)(10)b.3 of the Delaware Code, after a contract has been awarded the successful bidder shall not substitute another subcontractor whose name was submitted on the Subcontractor Form except for the reasons in the statute and not without written consent from the awarding agency. Failure to utilize the subcontractors on the list will subject the successful bidder to penalties as outlined in the General Requirements Section 5.2 of the contract.

Delaware Technical and Community College

DTCC No. C9004020002

We, the contractor, hereby certify that we and all applicable subcontractors will abide by the contractor and subcontractor craft training requirements outlined below for the duration of the contract. Craft training must be provided by a contractor and/or subcontractor for each craft on a project for which there are Delaware Department of Labor approved and registered training programs. A list of crafts for which there are approved and registered training programs is maintained by the Delaware Department of

Labor and can be found at https://laborfiles.delaware.gov/main/det/apprenticeship/DE%20Craft%20Training%20Occupation%20List%20Effective%20March%2

01%202022.pdf. If you have questions regarding craft training programs, please submit them in writing to the Delaware Department of Labor at: apprenticeship@delaware.gov. The Craft Training Compliance Affidavit must be submitted prior to contract execution.

In accordance with Title 29, Chapter 69, Section 6962(c)(13) of the Delaware Code, contractors and subcontractors must provide craft

A. A project meets the prevailing wage requirement under Title 29, Chapter 69, Section 6960 of the Delaware Code.

Failure to provide required craft training on the project may subject the successful contractor and/or subcontractor(s) to penalties as https://laborfiles.delaware.gov/main/det/apprenticeship/DE%20Craft%20Training%20Occupation%20List%20Effective%20March%201%202022.pdf https://laborfiles.delaware.gov/main/det/apprenticeship/DE%20Craft%20Training%20Occupation%20List%20Effective%20March%201%202022.pdf

Delaware Technical and Community College

DTCC No. C9004020002

21179 College Drive Georgetown Delaware 19947

___ Contract #11 Acoustical Work

Phone No.: ( ) - Fax No.: ( ) -

The undersigned, representing that he has read and understands the Bidding Documents and that this bid is made in accordance therewith, that he has visited the site and has familiarized himself with the local conditions under which the Work is to be performed, and that his bid is based upon the materials, systems and equipment described in the Bidding Documents without exception, hereby proposes and agrees to provide all labor, materials, plant, equipment, supplies, transport and other facilities required to execute the

Delaware Technical and Community College

DTCC No. C9004020002

21179 College Drive Georgetown Delaware 19947

Project No. 25.006

Alternate prices conform to applicable project specification section. Refer to specifications for a complete description of the following Alternates. An “ADD” or “DEDUCT” amount is indicated by the crossed out part that does not apply. Contract numbers are a recommendation; it is the contractor’s responsibility to determine if an alternate cost affects their pricing

2. Alternate: Provide additional costs, if any, for ATC system by Siemens as specified in specifica tion section

Delaware Technical and Community College

DTCC No. C9004020002

21179 College Drive Georgetown Delaware 19947

2. Alternate: Provide Hybrid Thermoplastic membrane Roofing per 075200, in lieu of EPDM membrane roofing.

1 - Include the lump sum of the following amount $20,000 in the contract for unforeseen conditions that may arise during construction

2 - Include the lump sum of the following amount $10,000 in the contract for exterior temporary fence. See Section 012100

3 - Include the lump sum of the following amount $20,000 in the contract for unforeseen conditions that may arise during construction

4 - Include the lump sum of the following amount $20,000 in the contract for unforeseen conditions that may arise during construction

5 - Include the lump sum of the following amount $20,000 in the contract for temporary closures during construction for the exterior

6 - Include the lump sum of the following amount $20,000 in the contract for unforeseen conditions that may arise during construction

7 – Include the lump sum of the following amount $20,000 in the contract for unforeseen conditions that may arise during construction

8 – Include the lump sum of the following amount $20,000 in the contract for unforeseen conditions that may arise during construction

9 – Include the lump sum of the following amount $20,000 in the contract for unforeseen conditions that may arise during construction

10 – Include the lump sum of the following amount $20,000 in the contract for unforeseen conditions that may arise during construction to be used at the discretion of the Construction Manager. See Section 012100 Allowances.

Delaware Technical and Community College

DTCC No. C9004020002

21179 College Drive Georgetown Delaware 19947

11 – Include the lump sum of the following amount $50,000 in the contract for the temp heat fuel cost. Cost of work to be determined by fuel company receipts with the amount of fuel and cost per gallon. All equipment and labor for temp heat is part of the contract.

12 – Include the lump sum of the following amount $20,000 in the contract for unforeseen conditions that may arise during construction to be used at the discretion of the Construction Manager. See Section 012100 Allowances.

13 – Include the lump sum of the following amount $20,000 in the contract for unforeseen conditions that may arise during construction to be used at the discretion of the Construction Manager. See Section 012100 Allowances.

14 – Include the lump sum of the following amount $25,000 in the contract for short circuit analysis gear revisions. See Section

15 – Include the lump sum of the following amount $25,000 in the contract for selective demolition of the existing building See

Delaware Technical and Community College

DTCC No. C9004020002

21179 College Drive Georgetown Delaware 19947

I/We acknowledge Addendums numbered and the price(s) submitted include any cost/schedule impact they may have.

This bid shall remain valid and cannot be withdrawn for thirty (30) days from the date of opening of bids (60 days for School Districts and Department of Education), and the undersigned shall abide by the Bid Security forfeiture provisions. Bid Security is attached to

The Owner shall have the right to reject any or all bids, and to waive any informality or irregularity in any bid received.

This bid is based upon work being accomplished by the Sub-Contractors named on the list attached to this bid.

Should I/We be awarded this contract, I/We pledge to achieve substantial completion of all the work within calendar days of

The undersigned represents and warrants that he has complied and shall comply with all requirements of local, state, and national laws; that no legal requirement has been or shall be violated in making or accepting this bid, in awarding the contract to him or in the prosecution of the work required; that the bid is legal and firm; that he has not, directly or indirectly, entered into any agreement, Upon receipt of written notice of the acceptance of this Bid, the Bidder shall, within twenty (20) calendar days, execute the agreement in the required form and deliver the Contract Bonds, and Insurance Certificates, required by the Contract Documents.

(SEAL)

Non-Collusion Statement

Affidavit of Employee Drug Testing Program

Affidavit of Contractor Qualifications

Delaware Technical and Community College

DTCC No. C9004020002

21179 College Drive Georgetown Delaware 19947

Project No. 25.006

In accordance with Title 29, Chapter 69, Section 6962(d)(10)b of the Delaware Code, the following subcontractor listing must accompany any bid submittal. The bidder must list in each category the full name and address (City & State) of the sub-contractor that the bidder will be using to perform the work and provide material for that subcontractor category. Should the bidder’s listed subcontractor intend to provide any of their subcontractor category of work through a third-tier contractor, the bidder shall list that third-tier contractor’s full name and address (City & State). If the bidder intends to perform any category of work itself, it must list its full name and address. For clarification, if the bidder intends to perform the work themselves, the bidder may not insert “not applicable”, “N/A”, “self” or anything other than its own full name and address (City & State). To do so shall cause the bid to be rejected. In addition, the failure to produce a completed subcontractor list with the bid submittal shall cause the bid to be rejected. If you have more than three (3) third-tier contractors to report in any subcontractor category, print out additional page(s) containing the appropriate category, complete the rest of your list of third-tier contractors for that category, notate the addition in parentheses as (CONTINUATION) next to the subcontractor category and an asterisk (*) next to any additional third-tier

Subcontractor Category Subcontractor Address (City & State) Subcontractors tax-payer ID #

Delaware Technical and Community College

DTCC No. C9004020002

21179 College Drive Georgetown Delaware 19947

Delaware Technical and Community College

DTCC No. C9004020002

21179 College Drive Georgetown Delaware 19947

Project No. 25.006

This is to certify that the undersigned bidder has neither directly nor indirectly, entered into any agreement, participated in any collusion or otherwise taken any action in restraint of free competitive bidding in connection with this proposal submitted this date to

All the terms and conditions of Project No. 19.021, Contract #: DTCC22C900406SSC-A have been thoroughly examined and are

DTCC No. C9004020002

21179 College Drive Georgetown Delaware 19947

4104 Regulations for the Drug Testing of Contractor and Subcontractor Employees Working on Large Public Works Projects requires that Contractors and Subcontractors implement a program of mandatory drug testing for Employees who work on Large Public Works

We hereby certify that we have in place or will implement during the entire term of the contract a Mandatory Drug Testing Program

Delaware Technical and Community College

DTCC No. C9004020002

21179 College Drive Georgetown Delaware 19947

We hereby certify that we will abide by the contractor’s qualifications outlined in the construction bid specifications for the duration

In accordance with Title 29, Chapter 69, Section 6962(d)(10)b.3 of the Delaware Code, after a contract has been awarded the successful bidder shall not substitute another subcontractor whose name was submitted on the Subcontractor Form except for the reasons in the statute and not without written consent from the awarding agency. Failure to utilize the subcontractors on the list will subject the successful bidder to penalties as outlined in the General Requirements Section 5.2 of the contract.

Delaware Technical and Community College

DTCC No. C9004020002

We, the contractor, hereby certify that we and all applicable subcontractors will abide by the contractor and subcontractor craft training requirements outlined below for the duration of the contract. Craft training must be provided by a contractor and/or subcontractor for each craft on a project for which there are Delaware Department of Labor approved and registered training programs. A list of crafts for which there are approved and registered training programs is maintained by the Delaware Department of

Labor and can be found at https://laborfiles.delaware.gov/main/det/apprenticeship/DE%20Craft%20Training%20Occupation%20List%20Effective%20March%2

01%202022.pdf. If you have questions regarding craft training programs, please submit them in writing to the Delaware Department of Labor at: apprenticeship@delaware.gov. The Craft Training Compliance Affidavit must be submitted prior to contract execution.

In accordance with Title 29, Chapter 69, Section 6962(c)(13) of the Delaware Code, contractors and subcontractors must provide craft

A. A project meets the prevailing wage requirement under Title 29, Chapter 69, Section 6960 of the Delaware Code.

Failure to provide required craft training on the project may subject the successful contractor and/or subcontractor(s) to penalties as https://laborfiles.delaware.gov/main/det/apprenticeship/DE%20Craft%20Training%20Occupation%20List%20Effective%20March%201%202022.pdf https://laborfiles.delaware.gov/main/det/apprenticeship/DE%20Craft%20Training%20Occupation%20List%20Effective%20March%201%202022.pdf

Delaware Technical and Community College

DTCC No. C9004020002

21179 College Drive Georgetown Delaware 19947

___ Contract #12 Floor Covering Work

Phone No.: ( ) - Fax No.: ( ) -

The undersigned, representing that he has read and understands the Bidding Documents and that this bid is made in accordance therewith, that he has visited the site and has familiarized himself with the local conditions under which the Work is to be performed, and that his bid is based upon the materials, systems and equipment described in the Bidding Documents without exception, hereby proposes and agrees to provide all labor, materials, plant, equipment, supplies, transport and other facilities required to execute the

Delaware Technical and Community College

DTCC No. C9004020002

21179 College Drive Georgetown Delaware 19947

Project No. 25.006

Alternate prices conform to applicable project specification section. Refer to specifications for a complete description of the following Alternates. An “ADD” or “DEDUCT” amount is indicated by the crossed out part that does not apply. Contract numbers are a recommendation; it is the contractor’s responsibility to determine if an alternate cost affects their pricing

2. Alternate: Provide additional costs, if any, for ATC system by Siemens as specified in specifica tion section

Delaware Technical and Community College

DTCC No. C9004020002

21179 College Drive Georgetown Delaware 19947

2. Alternate: Provide Hybrid Thermoplastic membrane Roofing per 075200, in lieu of EPDM membrane roofing.

1 - Include the lump sum of the following amount $20,000 in the contract for unforeseen conditions that may arise during construction

2 - Include the lump sum of the following amount $10,000 in the contract for exterior temporary fence. See Section 012100

3 - Include the lump sum of the following amount $20,000 in the contract for unforeseen conditions that may arise during construction

4 - Include the lump sum of the following amount $20,000 in the contract for unforeseen conditions that may arise during construction

5 - Include the lump sum of the following amount $20,000 in the contract for temporary closures during construction for the exterior

6 - Include the lump sum of the following amount $20,000 in the contract for unforeseen conditions that may arise during construction

7 – Include the lump sum of the following amount $20,000 in the contract for unforeseen conditions that may arise during construction

8 – Include the lump sum of the following amount $20,000 in the contract for unforeseen conditions that may arise during construction

9 – Include the lump sum of the following amount $20,000 in the contract for unforeseen conditions that may arise during construction

10 – Include the lump sum of the following amount $20,000 in the contract for unforeseen conditions that may arise during construction to be used at the discretion of the Construction Manager. See Section 012100 Allowances.

Delaware Technical and Community College

DTCC No. C9004020002

21179 College Drive Georgetown Delaware 19947

11 – Include the lump sum of the following amount $50,000 in the contract for the temp heat fuel cost. Cost of work to be determined by fuel company receipts with the amount of fuel and cost per gallon. All equipment and labor for temp heat is part of the contract.

12 – Include the lump sum of the following amount $20,000 in the contract for unforeseen conditions that may arise during construction to be used at the discretion of the Construction Manager. See Section 012100 Allowances.

13 – Include the lump sum of the following amount $20,000 in the contract for unforeseen conditions that may arise during construction to be used at the discretion of the Construction Manager. See Section 012100 Allowances.

14 – Include the lump sum of the following amount $25,000 in the contract for short circuit analysis gear revisions. See Section

15 – Include the lump sum of the following amount $25,000 in the contract for selective demolition of the existing building See

Delaware Technical and Community College

DTCC No. C9004020002

21179 College Drive Georgetown Delaware 19947

I/We acknowledge Addendums numbered and the price(s) submitted include any cost/schedule impact they may have.

This bid shall remain valid and cannot be withdrawn for thirty (30) days from the date of opening of bids (60 days for School Districts and Department of Education), and the undersigned shall abide by the Bid Security forfeiture provisions. Bid Security is attached to

The Owner shall have the right to reject any or all bids, and to waive any informality or irregularity in any bid received.

This bid is based upon work being accomplished by the Sub-Contractors named on the list attached to this bid.

Should I/We be awarded this contract, I/We pledge to achieve substantial completion of all the work within calendar days of

The undersigned represents and warrants that he has complied and shall comply with all requirements of local, state, and national laws; that no legal requirement has been or shall be violated in making or accepting this bid, in awarding the contract to him or in the prosecution of the work required; that the bid is legal and firm; that he has not, directly or indirectly, entered into any agreement, Upon receipt of written notice of the acceptance of this Bid, the Bidder shall, within twenty (20) calendar days, execute the agreement in the required form and deliver the Contract Bonds, and Insurance Certificates, required by the Contract Documents.

(SEAL)

Non-Collusion Statement

Affidavit of Employee Drug Testing Program

Affidavit of Contractor Qualifications

Delaware Technical and Community College

DTCC No. C9004020002

21179 College Drive Georgetown Delaware 19947

Project No. 25.006

In accordance with Title 29, Chapter 69, Section 6962(d)(10)b of the Delaware Code, the following subcontractor listing must accompany any bid submittal. The bidder must list in each category the full name and address (City & State) of the sub-contractor that the bidder will be using to perform the work and provide material for that subcontractor category. Should the bidder’s listed subcontractor intend to provide any of their subcontractor category of work through a third-tier contractor, the bidder shall list that third-tier contractor’s full name and address (City & State). If the bidder intends to perform any category of work itself, it must list its full name and address. For clarification, if the bidder intends to perform the work themselves, the bidder may not insert “not applicable”, “N/A”, “self” or anything other than its own full name and address (City & State).