This is Addendum No. 3 issued by the City of Chandler, Arizona on November 22, 2024, modifying the traffic signal construction project at the intersection of Layton Lakes Boulevard and Queen Creek Road (Project No. DS2202.401). The addendum revises the bid schedule, technical specifications, and construction plans for the project, which encompasses the installation of new traffic signal equipment and associated infrastructure at all four corners of the intersection, including pavement markings, signage, Intelligent Transportation Systems equipment, and ADA-compliant sidewalk ramps. The addendum specifically replaces Bid Item 39 regarding the Video Detection System with revised specifications, updates the bid schedule in its entirety, and revises Plans sheet TS02 (Sheet 8) with changes dated November 20, 2024. Sealed bids must be received by the City of Chandler Capital Projects Office located at 215 East Buffalo Street, Chandler, Arizona 85225, on or before 3:00 p.m. local Arizona time on December 5, 2024. The project must be completed within 120 consecutive calendar days from the Notice to Proceed, with an Engineer's Estimate range of $800,000 to $1,100,000.
The revised Bid Item 39 specifies that the Video Detection System shall consist of an Ouster BlueCity OS1 2 Sensor Bundle per intersection, including a Catalyst GPU with AGX Orin Standard Configuration, two 128-channel Lidar sensors, mounting kits, power-over-Ethernet accessories, and perpetual software licenses for Classic Detection and ITS Edge Actuation. The contractor must provide a minimum one-year warranty with free software updates during the warranty period and ensure installation and optimization by an authorized Ouster representative. The video detection system will be measured and paid as a complete lump sum unit, with the contractor required to coordinate with the City's Traffic Management Center and Traffic Operations Supervisor for sensor calibration, alignment, and final approval prior to project acceptance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DS2202.401-Addendum-No1-11-1-24.pdf | ||
| DS2202.401-Addendum-No4-11-27-24.pdf | ||
| DS2202.401-Addendum-No2-11-8-24.pdf | ||
| DS2202.401_BID_-_ITB.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Name: Traffic Signal at Layton Lakes Blvd and Queen Creek Rd Page 1 Project No.: DS2202.401
CITY OF CHANDLER, ARIZONA
TRAFFIC SIGNAL AT LAYTON LAKES BOULEVARD AND QUEEN CREEK ROAD
Project No. DS2202.401
ADDENDUM NO. 3
Date: November 22, 2024
1. Bidder must acknowledge the receipt of this addendum on the Proposal Acknowledgement page of the BID SUBMITTAL. This addendum, containing 7 pages, is hereby incorporated into the Construction Agreement by this reference.
2. Bid schedule. Replace the BID SCHEDULE in its entirety with the accompanying BID SCHEDULE REVISION dated November 2024. The only change is the Bid Item 39 description. See Exhibit A (3 pages).
3. Bid Item 39 in the Technical Specifications/Special Provisions are hereby revised as per Exhibit B as attached. The revised Bid Item 39 – Video Detection System is dated Nov.
2024. See Exhibit B (2 pages).
4. Replace Plans sheet TS02 (Sheet 8) in its entirety with accompanying revised Plans sheet TS02 (Sheet 8) with revisions dated November 20, 2024. See Exhibit C (1 page).
5. Per Addendum 2 (issued on November 8, 2024), the bid due date has been changed.
Sealed bids must be delivered to the City of Chandler Capital Projects Office located at 215 East Buffalo Street, Chandler, Arizona, 85225. Bids must be received on or before 3:00 p.m. local Arizona time on December 5, 2024. Bids will now be opened in the South Atrium Conference Room.
If you have any questions, please email Bid.Questions@chandleraz.gov.
Daniel Haskins, P.E.
CIP City Engineer Public Works & Utilities Dept. – Capital Projects
11/21/24
NAME OF BIDDER: ______________________________________________________
NO. DESCRIPTION UNIT
EST. QTY.
UNIT PRICE EXTENDED PRICE
1 Construction Surveying and Layout LS 1
2 Owners Allowance AL 1 $ 95,000.00 $ 95,000.00
3 Erosion Control (SWPPP Preparation, Installation, Maintenance, and Removal) LS 1
4 Mobilization/Demobilization LS 1
5 Subgrade Preparation SY 99
6 Remove and Replace Asphaltic Concrete Pavement SY 99
7 Vertical Curb & Gutter, Type A, H=6 In, MAG Det 220-1 LF 182
8 Concrete Sidewalk, MAG Det 230 SF 210
9 Dual Directional Concrete Curb Ramp With Detectable Warning, COC Det C-258-1
EA 4
10 Concrete Valley Gutter, MAG Det 240 SF 1,116 11 Adjust Pull Box To Grade EA 1
12 Remove Concrete Curb and Gutter LF 182
13 Remove Sidewalk SF 1,303
14 Remove Concrete Valley Gutter SF 1124
15 Remove and Salvage Streetlight Pole and Equipment EA 1
16 Remove and Relocate Streetlight EA 1
17 Traffic Control LS 1
18 Uniformed Off-Duty Law Enforcement Officer HOUR 80
19 Landscape / Irrigation Restoration LS 1
20 4 In White Traffic Paint Stripe LF 3450
21 4 In White Thermoplastic Traffic Stripe LF 2950
22 Thermoplastic/Preformed Symbol Left Turn Arrow EA 2
23 Thermoplastic/Preformed Symbol Right Turn Arrow EA 2
24 Bike Lane Symbol Set, Type II (High-Build) EA 4
25 Remove and Salvage Sign EA 3
26 Remove Pull Box EA 4
27 No. 7 Pull Box EA 2
28 No. 7 Pull Box w/ Extension EA 1
29 No. 9 Pull Box EA 1
30 Sch. 40 PVC Electrical Conduit, 2 In LF 210
31 Sch. 40 PVC Electrical Conduit, 2½ In (SRP Service Conduit) LF 350
32 Sch. 40 PVC Electrical Conduit, 3 In LF 120
33 Sch. 40 PVC Electrical Conduit, 4 In (Directional Drill) LF 490
CITY OF CHANDLER
Traffic Signal at Layton Lakes Boulevard and Queen Creek Road
BID SCHEDULE
Project No. DS2202.401
REVISED NOVEMBER 2024 - ADDENDUM 3
Bid Page 1 of 3
EXHIBIT A
NO. DESCRIPTION UNIT
EST. QTY.
UNIT PRICE EXTENDED PRICE
BID SCHEDULE
34 Pole Foundation, Type A, ADOT Dwg T-SL 4.01 EA 2
35 Pole Foundation, Type PB (Push Button), ADOT Dwg T-SL 4.27 EA 3
36 Pole Foundation, Type QC EA 2
37 Pole Foundation, Type RC EA 2
38 Audible Pedestrian Push Button w/ Sign EA 8
39 Video Detection System LS 1
40 Sign Assembly (IISNS) EA 4
41 Type A Signal Pole, Type A, ADOT Dwg T-SL 4.01 EA 2
42 Type PB, Push Button Pole. ADOT Dwg T-SL 4.27 EA 3
43 Type QC Signal Pole EA 2
44 Type RC Signal Pole EA 2
45 20 FT Mast Arm (Tapered) EA 4
46 35 FT Mast Arm (Tapered) EA 1
47 40 FT Mast Arm (Tapered) EA 1
48 55 FT Mast Arm (Tapered) EA 2
49 Meter Pedestal Cabinet EA 1
50 Control Cabinet EA 1
51 Emergency Pre-Emption System EA 4
52 Traffic Signal Mounting Assembly (Type II) EA 10
53 Traffic Signal Mounting Assembly (Type IV) EA 2
54 Traffic Signal Mounting Assembly (Type V) EA 8
55 Traffic Signal Mounting Assembly (Type VII) EA 3
56 Traffic Signal Face (Type F) (LED) EA 14
57 Traffic Signal Face (Type Flashing Yellow Arrow) (LED) EA 4
58 Traffic Signal Face (Pedstrian) (Man/Hand) (LED Countdown) EA 8
59 LED Luminaire (Traffic Signal) EA 4
60 Electrical Conductors LS 1
61 Fiber Optic Cable (Single Mode 144) LF 4000
62 Underground Fiber Optic Splice Closure EA 1
63 Fiber Optic Patch Panel (12 Port) EA 1
64 CCTV Camera System EA 1
65 Field Hardened Ethernet Switch EA 1
66 SRP Design & Construction Cost LS 1
TOTAL BASE BID:
Bid Page 2 of 3
BID SCHEDULE
Note 1: Bidders must fill in all blank spaces with an entry. Bids submitted with blank spaces will be considered "Non-Responsive”.
Note 2: Bids will be opened and read aloud at an open public meeting at the time and place designed in the invitation for bids. Bids will not be modified after the bid opening. A bidder withdrawing a bid after the bid opening will be deemed non-responsible and the City may make a claim against the bidder’s bid bond.
Note 3: The City reserves the right to determine the low bidder based on the Base Bid with or without any Bid Alternate(s).
Bid Page 3 of 3
City of Chandler Traffic Signal at Project No. DS2202.401 Layton Lakes Blvd and Queen Creek Rd Technical Specifications Final Submittal / Nov 2024
ITEM NO. 39 VIDEO DETECTION SYSTEM
Description:
The work under this item shall consist of furnishing and installing a complete working video detection system at the locations as specified in the project plans and in accordance with the details shown on the plans and the requirements of these specifications.
A video detection system shall consist of a complete assemblage of the video detection equipment and requirements components for detecting vehicles and bicycles per the direction and approval of the City of Chandler Traffic Management Center (TMC) and Traffic Operations Supervisor, and the approval of the City CIP Inspector.
Materials:
The video detection equipment will be the Ouster BlueCity OS1 2 Sensor Bundle (One Bundle per intersection). The video detection system shall include all necessary equipment and accessories required to install a complete working detection system. The video detection 2 Sensor Bundle (BC-BDL-EDGE-DL-PEROS1R7) shall include, but not be limited by the following items:
• Catalyst, GPU, AGX Orin, Standard Config, Revision 1: OG-CATL-GPU-AGXO- STDC-Rev01: One Per Bundle
• Lidar sensor - OS1 - 128 Channel Rev7: OS1-070-128U-AX-BR: Two Per Bundle.
• Accessory, Mount Kit, Outdoor, Pole Mount: OG-ACC-MNTK-OUT-PM: Two Per Bundle.
• Accessory, POE+, Splitter, OSDome/0/1 24V: OG-ACC-POE-SPLT-OS24V: Two Per Bundle
• Accessory, Mount Part, Splitter Mount: OG-ACC-MNTP-PSM: Two Per Bundle
• Software, Detect, Classic, Perpetual: OG-SW-DTCT-CLSC-PER: One Per Bundle
• Software, ITS Edge, Actuation, Perpetual: OG-SW-ITSE-ACT-PER: One Per Bundle
Sensor calibration and alignment shall be completed per manufacturer’s requirements.
Contractor shall work with City TMC to ensure sensor calibration and alignments are correct.
The video detection system will optimally detect vehicle passage and presence when the Lidar sensor is mounted 4-5 meters above the roadway, tilted 10 degrees down, and when the sensor is calibrated.
EXHIBIT B
Revised - Addendum 3
City of Chandler Traffic Signal at Project No. DS2202.401 Layton Lakes Blvd and Queen Creek Rd Technical Specifications Final Submittal / Nov 2024
Warranty, Support and Service:
The contractor shall provide a minimum of one-year warranty for the video detection system. Ongoing software support by the contractor shall include software updates of the sensor, modular cabinet interface unit and computer applications. These updates will be provided free of charge during the one-year warranty period.
Construction Requirements:
A member of the City’s TMC will supervise the installation and testing of the video detection system.
The video detection system shall be installed and optimized by an authorized Ouster representative per manufacturer’s specifications using the Ouster Gemini Pole Mount Bracket on the signal pole.
The final mounting location shall be per manufacturer’s requirements and approved by the City’s TMC and City Traffic Operations Supervisor, which will inspect and approve the installation and mounting location of the sensor prior to acceptance.
Measurement:
The Video Detection System will be measured as a complete unit of work for each video detection system furnished and installed.
Payment:
The accepted quantity of Video Detection System, measured as provided above, will be paid for at the contract lump sum price, which price shall be full compensation for the work described and specified herein and, on the plans, including sensors, cabling, mounting brackets, interface panels, software, and all other components necessary to provide a complete functional system.
BY
R
EV
IS
IO
N
S N o.
D
AT
E
C
IT
Y O
F C
H
AN
D
LE
R
C .O
.C . L
O G
N O
C
IV
3-
TR
A
FF
IC
S
IG
N
A L
A T
LA
YT
O N
L A
K
ES
B
LV
D
Q U
EE
N
C R
EE
K
R D
SHEET DWG
OF
SC
AL
E (H
SC
AL
E (V
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
D
AT
E:
/2
Q
UE
EN
C
RE
EK
R D
LA
YT
O
N
LA
KE
S
BL
VD
CITY PROJECT NO.
DS2202.401
KI
M
LE
Y-
H O
R N
A N
D A
SS
O
C
IA
TE
S, IN
C
N
. 1 6t h
ST
R
EE
T, S
U
IT
E
0, P
H O
EN
IX
, A Z
PH
O N
E:
-9
-5
F
AX
: 6
-9
-7
W
W W
.K
IM
LE
Y-
H O
R N
.C O
M
TR
AF
FI
C
SI
G
NA
L
IM
PR
O
VE
M
EN
TS
C.O.C. LOG NO. CIV23-0048
GENERAL NOTES:
CONDUCTOR SCHEDULE
6000 S
Rd
4000 E
5999 S 4000 E
Rd
Layton Lakes 6000 S
Blvd
4000 E
5999 S 4000 E
Queen Creek 6000 S
Rd
4000 E
5999 S 4000 E
Rd
6000 S4000 E
5999 S 4000 E
Queen Creek
Queen Creek
Queen Creek
Layton Lakes Blvd
Layton Lakes Blvd
Layton Lakes Blvd
PO
LE
S
CH
ED
UL
E
CO
ND
UC
TO
R
SC
HE
DU
LE
TS02
N /A
1" =2
0'
SJ
M LM KA
C
CABINET AND POLE SCHEDULE
CONTRACTOR SHALL INSTALL TEMPORARY TRAFFIC CONTROL
CHANGE WARNING SIGNS ON SPRING STANDS FOR ALL DIRECTIONS
FOR A PERIOD OF 30 DAYS (FLAGGED AND LIGHTED) COORDINATE
WITH DANNY MARTINEZ FOR TEMPORARY WARNING SIGNS. HE IS
WITH THE STRIPING DEPARTMENT AND CAN BE REACHED AT
DANNY.MARTINEZ@CHANDLERAZ.GOV
VI
D
EO
D
ET
EC
TI
O N
S
YS
TE
M
C H
AN
G
ES
/2 0/
SJ
M
09/09/24
EXHIBIT C
| DS2202.401 - Addendum 3- New Video Detection.pdf |
| Project No. DS2202.401 |
| DS2202.401 - Rev Bid Schedule 11.21.24.pdf |
| Table 1 |
| DS2202.401 - Rev Spec Item 39 - Exhibit B.pdf |
| DS2202.401 - Rev Plan Sht 8 - Exhibit C.pdf |
| Sheets and Views |
| 8 TS02 |
File details come from the government source that posted it. Updated .