DS2202.401-Addendum-No1-11-1-24.pdf
PDF 6 MB Posted
- Solicitation number
- BPM006595
- Issued by
- Maricopa County, Chandler City, Arizona
About this file
This Addendum No. 1, issued by the City of Chandler, Arizona Public Works & Utilities Department on November 1, 2024, modifies the bidding documents for the Traffic Signal at Layton Lakes Boulevard and Queen Creek Road project (DS2202.401). The addendum addresses contractor inquiries regarding project timeline feasibility, specifically the 120 consecutive calendar day completion requirement stipulated in the original solicitation. The City clarified that it is open to issuing a limited Notice to Proceed (NTP) to allow contractors to procure long-lead items such as traffic signal poles and meter pedestals, which currently require 18 to 22 weeks of manufacturing time plus additional weeks for submittal approval and material delivery. The addendum confirms that contract duration will not commence until the official NTP is issued, effectively decoupling material procurement time from the 120-day construction timeline. Additionally, the addendum references Exhibit A, which contains three pages of SRP (Salt River Project) electrical design and construction plans that clarify the scope and specifications for Item 66 (SRP Design & Construction Cost), providing technical details on electrical infrastructure, transformer specifications, conduit requirements, and equipment pad installations necessary for the project.
The addendum specifies that all bidders must acknowledge receipt of this five-page addendum on the Proposal Acknowledgement page of their bid submittal. The SRP plans attached as Exhibit A detail electrical service specifications, including requirements for 3-phase transformer pads, trenching and conduit installation, meter pedestal specifications, and coordination with SRP for inspection and wire installation. The plans indicate the customer (contractor) is responsible for conduit installation, trench preparation and compaction, equipment pad installation, surface restoration, and landscape repairs, while SRP maintains responsibility for wire installation and equipment ownership after wire installation. The project location is at the intersection of Layton Lakes Boulevard and Queen Creek Road in Chandler, Arizona, with designated utility easements and public utility access requirements clearly mapped in the technical drawings.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DS2202.401-Addendum-No4-11-27-24.pdf | ||
| DS2202.401-Addendum-No3-11-22-24.pdf | ||
| DS2202.401-Addendum-No2-11-8-24.pdf | ||
| DS2202.401_BID_-_ITB.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Name: Traffic Signal at Layton Lakes Blvd and Queen Creek Rd Page 1 Project No.: DS2202.401
CITY OF CHANDLER, ARIZONA
TRAFFIC SIGNAL AT LAYTON LAKES BOULEVARD AND QUEEN CREEK ROAD
Project No. DS2202.401
ADDENDUM NO. 1
Date: November 1, 2024
1. Bidder must acknowledge the receipt of this addendum on the Proposal
Acknowledgement page of the BID SUBMITTAL. This addendum, containing 5 pages, is hereby incorporated into the Construction Agreement by this reference.
2. Question: Currently the solicitation and bidding documents state the project must be completed within (120) consecutive calendar days from the Notice to Proceed. Can the City increase the Contract time to account for long lead materials. Currently traffic signal poles are being quoted 18 to 22 weeks after release of materials. This does not included time released to the material submittal process.
Response: The city is open to issuing a limited notice to proceed (NTP) to procure long-lead items. The contract duration will not commence until the official NTP is issued.
3. Question: The advertisement states that this project must be completed within 120 calendar days, however, the lead time on meter pedestals and signal poles will be well over that. Right now meter pedestals are taking up to 40 weeks after approved submittals and signal poles are 4 weeks to get shop drawings + 2 weeks for submittal approvals + 22-26 weeks for pole fabrication and delivery. The duration to receive materials is up to 280 calendar days and then the contractor needs 6-8 weeks to build the job. That 6-8 week duration does not include the time frame for SRP’s crews to heat up the meter pedestal. With all of that considered, will the City issue a delayed NTP after award to account for the material lead times?
Response: The city is open to issuing a limited notice to proceed (NTP) to procure long-lead items. The contract duration will not commence until the official NTP is issued.
4. Question: The current bid schedule shows Item 66 - SRP Design & Construction Cost (1) LS. There does not appear to be an item scope in the Technical Specifications or SRP plan sheets included in the project plans. Please clarify what is required for this item.
Response: The SRP plans have been attached to this addendum – See Exhibit A. (3 Pages)
Project Name: Traffic Signal at Layton Lakes Blvd and Queen Creek Rd Page 2 Project No.: DS2202.401
If you have any questions, please email Bid.Questions@chandleraz.gov.
Daniel Haskins, P.E.
CIP City Engineer Public Works & Utilities Dept. – Capital Projects
B B C C
A A
P1 P2
A
B
C
A
B
C
E-P-0208 500-279523 277/480V
E-PD-0211
600A GOS
1E-PD-0207
600A GOS
E-MH-0206
OCT
E-3-3"K
E-3-3"K
E-3-3"K
E-3-3"K
E-3-3"K
E-3-3"K
E-1-2.5"K
E-3-3"K
E-3-3"K
C-1-2.5"K 293'
2 C-P-0226
25-________-AØ
TRAFFIC SIG
TO
P
D -1
TO PD-0204
TO PD-0204
TO PD-0101
TO PD-0101
TO
P
-0
TO
P
D -0
TO P-0209
TO P-0209
C-1-2.5"K 5'
2A
EM (C
U
ST
AØ
AØ
AØ
AØ
L
E-P-0208 500-279523 277/480V
MFG: E-PD-0211
600A GOS
1E-PD-0207
600A GOS
E-N.O.
E-12A
C-12A
E-MH-0206
OCT
E-3-UA750K
E-3-UA750K
E-3-UA750K
E-3-UA750K
E-3-UA40K
E-3-UA40K
E-1-UA2K
E-3-UA750K
E-3-UA40K
C-1-UA2K
298'
2C-P-0226
25-________-AØ
TRAFFIC SIG
TO P-0209
TO P-0209
TO
P
D -1
TO PD-0204
TO PD-0204
TO
P
D -0
TO
P
-0
TO PD-0101
TO PD-0101
E-F.I.
E-F.I.
AØ
AØ
AØ
FIELD INSTALLATION STAMPVICINITY MAP
TYPICAL SRP ABBREVIATIONS
C = CONSTRUCT
R = REMOVE
T = TRANSFER
A = ABANDON
F/SW = FRONT OF SIDEWALK
B/SW = BACK OF SIDEWALK
F/C = FRONT OF CURB
B/C = BACK OF CURB
E/P = EDGE OF PAVEMENT
L/G = LIP OF GUTTER
R/W = RIGHT OF WAY
PROPOSED FUSING ENCLOSURE
(SHADED SYMBOL INDICATES EXISTING FACILITY)
GRAPHIC SYMBOLS
PROPOSED SINGLE-PHASE TRANSFORMER
3 PROPOSED THREE-PHASE TRANSFORMER
F
PROPOSED SWITCHING ENCLOSURES
PROPOSED 1 PHASE PULLING ENCLOSUREP
P3
PROPOSED 4/0 PRIMARY TAP ENCLOSURET3
PROPOSED CAPACITOR BANKC
F FOR MOST PRIMARY DEVICES OTHER THAN TRANSFORMERS,
NO BAR ABOVE THE LETTER INDICATES AN EXIST.FACILITY
NO BAR IN PAD INDICATES FACILITY IS EXISTING
BAR INDICATES FRONT OF DEVICE
A SHADED BAR INDICATES FACILITY IS EXISTING PROPOSED POLE AND RISER
PROPOSED STREET LIGHT
PROPOSED MANHOLE
PROPOSED PULL BOX
PROPOSED SPLICE POINT
E
C C-COMMUNICATION
E-ELECTRIC
W W-WATER
G G-GAS
SD SD-STORM DRAIN
S S-SEWER
E
E
"E" WITHOUT CIRCLE
INDICATES EXISTING TRENCH
"E" WITH CIRCLE INDICATES
PROPOSED TRENCH
PB
UNDERGROUND STREETLIGHT CONDUCTOR
UNDERGROUND SERVICE CONDUCTOR
UNDERGROUND SECONDARY CONDUCTOR
PROPOSED UNDERGROUND TRENCH/BORE
EXISTING UNDERGROUND TRENCH/BORE
INDICATES ABANDONMENT
CONDUITK
AA
ELECTRONIC MARKEREM
MATCH POINTS FOR MULTIPLE SHEETS OF DRAWING
PROPOSED 3 PHASE / FEEDER
PULLING ENCLOSURE
PROPOSED PRIVATE LIGHT
(STAKED BY CUSTOMER)
DOUBLE SLASH LINES
INDICATE REMOVAL
SERVICE ENTRANCE SECTION
(S.E.S.)
PROPOSED FLUSH-MOUNTED J-BOX
PROPOSED ABOVE-GROUND J-BOX
REV REVISED BY DATE REVISION DESCRIPTION
TAYAZZIE 07/05/2023 JOB CREATED
CONSTRUCTION CONSULTANT:
MOBILE:
STEVEN C. KELLY
(602) 501-6582
MOBILE:
PROJECT LEADER:
STEVEN D. RICE
(480) 221-3414
OFFICE:
DESIGN CONSULTANT:
MOBILE:
CONTACTS
(602) 236-
MICHAEL S. LARANCE
(602) 856-5506
INSPECTIONS:
OFFICE: 602-236-6300
COST CENTER
ROUTING CODE SHEET NUMBER OF
WAM WO
FIS JO
BILLING ACCT NO.
CONTACT
ADDRESS/LOCATION
JOBNAME
PHONE
NATURAL GAS
MAP 1/4 S T R
40/ACRE COORDS
WAM VERSION
Contact Arizona 811 at least two full working days before you begin excavation
Call 811 or click Arizona811.com
R
DDY+8
30 11/16E - 7 15/16S
NE 18 2S 6E
(602) 906-1161
LAYTON LAKES BLVD W AND QUEEN CREEK RD TS
LAYTON LAKES BLVD W AND QUEEN CREEK RD
BECKY BRATCHER
YF-18-01
T3503492
22640 0301
FOR CUSTOMER REVIEW
NOT FOR CONSTRUCTION
THIS JOB ORDER WORKS
WITH OTHER JOBS.
NOTICE
O.H.#
SER.#
U.G..# U.G..# U.G..# U.G..# U.G..#
KEB-6479
N
NTS
SCHEMATICCONDUIT ONE LINE
COMMERCIAL PROJECT NOTES
SRP ELECTRIC SERVICE SPECIFICATIONS ARE AVAILABLE ON-LINE AT: HTTP://WWW.SRPNET.COM/ELECTRIC/BUSINESS/SPECS
1. CUSTOMER IS RESPONSIBLE FOR:
a. PROVIDING SRP VEHICLES WITH A MINIMUM 12' WIDE AND 20' HIGH PERMANENT TRUCK ACCESS TO ALL SRP EQUIPMENT, ANY SES OR EXTERIOR METER ROOM ENTRANCE. EACH SERVICE ENTRANCE PULL SECTION SHALL OPEN DIRECTLY TOWARDS THE EXTERIOR METER ROOM ENTRANCE. THIS PROVIDES EQUIPMENT ACCESS FOR CABLE INSTALLATION. WITH A MINIMUM WIDTH OF 12', MOVABLE SCREEN WALLS, PANELS, OR DOORS MAY BE USED AS AN ARCHITECTURAL FEATURE, PROVIDED THE ACCESS ROUTE COMPLIES TO SRP
b. ALL CONDUIT (PVC, DB120, RATED FOR 90 DEGREES C CABLE, ASTM F512 WITH ALL ELBOWS VEHICLE ACCESS REQUIREMENTS. BEING SCHEDULE 40 36" RADIUS), TRENCH, BACKFILL, COMPACTION, (UNLESS OTHERWISE SPECIFIED. ALL FILL BELOW AND AROUND ELECTRIC UTILITY FIXTURE FOUNDATION PADS SHALL BE COMPACTED TO AT LEAST 95% OF MAXIMUM DRY DENSITY (AT OR NEAR OPTIMUM MOISTURE CONTENT) IN ACCORDANCE WITH ASTM D698. 1/2 CONTROLLED LOW STRENGTH MATERIAL BACKFILL MAY BE PLACED IN LEIU OF COMPACTED BACKFILL) AND MAINTENANCE OF TRENCH AND CONDUIT UNTIL WIRE IS PULLED. CONTACT SRP TO SCHEDULE A HOT ID
AFTER.
c. CUSTOMER IS SOLELY RESPONSIBLE FOR ALL CONDUIT INSTALLED ON THE JOB UNTIL SRP'S WIRE IS INSTALLED. SRP TAKES OWNERSHIP OF ALL CONDUITS AFTER WIRE IS INSTALLED. FOR JOBS THAT REQUIRE CONDUIT SPLICING INTO SRP EXISTING CONDUIT SYSTEMS; THE CUSTOMER WILL BE RESPONSIBLE FOR ANY REPAIRS AND/OR RE-DESIGN IN THE EVENT OF A CONDUIT FAILURE.
d. INSTALLATION OF 3 PHASE TRANSFORMER PAD(S), TEMPLATE(S) AND GROUND ROD(S). LOCATING AND EXPOSING EXISTING STUBBED
CONDUIT.
e. STAMPED AND REGISTERED PROPERTY PINS AND FINAL GRADE STAKES FOR PAD AND TRENCH LOCATIONS.
f. REVIEWING AND SIGNING OFF ON MATERIALS DELIVERED TO THE JOB SITE.
g. ALL SURFACE RESTORATIONS AND LANDSCAPE REPAIRS.
2. SRP'S POINT OF DELIVERY TO BE: SES JUNCTION BOX TRANSFORMER
3. SRP TO INSPECT THE FOLLOWING: TRENCHING, CONDUIT INSTALLATION, MANDREL (IF REQUIRED), EQUIPMENT PAD(S), COMPACTION AND SERVICE
ENTRANCE SECTION.
4. METERING PER EUSERC, SRP SPECIFICATIONS AND MUNICIPAL CODES. SUBMIT ONE ELECTRONIC COPY OF SHOP DRAWINGS FOR ALL PROPOSED 400AMP OR LARGER SERVICE ENTRANCE SECTION. DOUBLE RESIDENTIAL METER PEDESTALS, AND COMMERCIAL SAFETY SOCKET PEDESTALS TO COMMERCIAL NEW BUSINESS FOR APPROVAL PRIOR TO PURCHASE AND/OR MANUFACTURING. SUCH DRAWINGS SHALL INDICATE THE PROJECT AND CUSTOMER NAME, SRP JOB NUMBER, JOB ADDRESS, CONTRACTORS NAME AND PHONE NUMBERS. SUBMIT TO SHOPDRAW@SRPNET.COM
5. FOR THAT PORTION OF THE FACILITY LOCATED WITHIN PUBLIC UTILITY EASEMENTS, THIS SUBMITTAL IS MADE FOR NOTIFICATION PURPOSES ONLY.
X
30E
7S GERMANN RD.
31E
JOB SITE
E. QUEEN CREEK RD.
8S
S.
G
IL
BE
R T
R D
LI
N
D
SA
Y R
D
SURVEY AND PERMIT INFORMATION
SRP SURVEY TO STAKE FOR LOCATION, NO EASEMENT REQUIRED.
NO SURVEY REQUIRED.
SRP SURVEY TO STAKE FOR LOCATION AND TIE FOR EASEMENTS.
CUSTOMER CONTROL POINTS REQUIRED: YES NO
CUSTOMER'S SURVEY TO STAKE FOR LOCATION/CONSTRUCTION AND TIE FOR EASEMENTS.
CUSTOMER'S SURVEYOR MUST ATTEND PRE-CON MEETING.
3RD PARTY EASEMENT REQUIRED.
NO PERMIT REQ.
OTHER PERMIT NO.
PERMIT REQUIRED: CITY OF COUNTY
X X
X CHANDLER
SRP PROPRIETARY
ELECTRICAL
SPECIFICATIONS
LA
YT
O N
L
AK
ES
B
LV
D
EA
ST
ER
N
/R W
C D
C N
AL
N
NTS
EXHIBIT A
x x x x xx
G
G G G
W W
W W
T T
CATV
CATV
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
C L C L
CLCL
C L
PL
PL
PL
PL
P L
P L x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
FV
GV
HV1
1263.52 HV4
1267.50
HV5
1265.95
HV812
.40
HV9
1265.73
XS
1264.62 xxxxxx x x x x x x x
S S S S S S S S
S S
S
TS TS
TS
TSTS
TS
x x x x x x x xxxxx
G G
G G G G G G
IRR IRR IRR IRR IRR IRRIRR IRR
IRR IRR
IRR IRR IRR IRR IRR IRRIRR IRR IRR IRR IRR IRR
W W W W W W W W
W W W W W W W W W W W W W W W W
IRRIRRIRR
W W W W W W W W W W W W W W W W
W W W W W W W W
EAST QUEEN CREEK ROAD
SO
U
TH
L
AY
TO
N L
AK
ES
SO
U
TH
L
AY
TO
N
LA
KE
S
BO
U
LE
VA
R D
EDGE OF WATER LINE
W W
W
W W
W W
W W
S
T T T T
T T T
CATV CATV
CATV
CATV CATV CATV
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
EAST LANTANA DRIVE
SO
U
TH
C
O
BB
LE
ST
O N
E D
R
IV
E
S
S
41.00' R/W
41.00' R/W
8.00'
PUE
8.00'
PUE
5.00'
65.00' R /W
71.00' R /W
8.00'
PU
E
E-P-0208 500-279523 277/480V
E-PD-0211
600A GOS
1E-PD-0207
600A GOS
E-CH265346
R-CH265345
T-CH273649
E-CH270812
E-CH270811
E-CH270813
E-CH273644
E-GI254924
E-MH-0206
OCT
2 C-P-0226
25-________-AØ
TRAFFIC SIG
K
P.O.D.
TO PD-0204
TO
P
D -0
TO
P
-0
TO P-0209
TO PD-0101
TO
P
D -1
TRACT F
R
/W
R /W
R
/W
R /W
YF-07-15
YF-18-02
YF-07-16
YF-18-01
TRACT H
4'x4'x4' WORK PIT
BY CUST.
3 100A 120/240V 1Ø-3W
7,917 AFC
2A
EM (C
U
ST
C-1-US10X-80' (SRP)
C-1-2.5"K-75' (CUST)
R-CH273649
R-1-UTX10LK80' (SRP)
A-1-2.5"K-75' (CUST)
A-1-2.5"K-12' (CUST)
C-1-UTX10LK-245 (SRP)
R-1-UTX10LK-250' (SRP)
E-1-2.5"K-240' (CUST)
Customer to stake new location of streetlight from city approved plans.
Customer to install jbox within 2' of light location.
Customer to remove and install streetlights
CONSTRUCTION CONSULTANT:
MOBILE:
STEVEN C. KELLY
(602) 501-6582
MOBILE:
PROJECT LEADER:
STEVEN D. RICE
(480) 221-3414
OFFICE:
DESIGN CONSULTANT:
MOBILE:
CONTACTS
(602) 236-
MICHAEL S. LARANCE
(602) 856-5506
INSPECTIONS:
OFFICE: 602-236-6300
COST CENTER
ROUTING CODE SHEET NUMBER OF
WAM WO
FIS JO
BILLING ACCT NO.
CONTACT
ADDRESS/LOCATION
JOBNAME
PHONE
NATURAL GAS
MAP 1/4 S T R
40/ACRE COORDS
WAM VERSION
Contact Arizona 811 at least two full working days before you begin excavation
Call 811 or click Arizona811.com
R
DDY+8
30 11/16E - 7 15/16S
NE 18 2S 6E
(602) 906-1161
LAYTON LAKES BLVD W AND QUEEN CREEK RD TS
LAYTON LAKES BLVD W AND QUEEN CREEK RD
BECKY BRATCHER
YF-18-01
T3503492
22640 0302
SRP PROPRIETARY
N
SCALE:1" = 30'
MAINLINE
ELECTRICAL
SPECIFICATIONS
PAD LOCATION DETAIL @ PT. 2
N
NTS
P L
PL
PL
8.00'
PUE
2 C-P-0226
25-________-AØ
TRAFFIC SIG
3.5' X 3.5'
0.5'
17.5' S/W
SIDEWALK
FR
O
N T
S . L
A Y
T O
N L
A K
E S
B
LV
D
E. QUEEN CREEK RD.
B/C
SIDEWALK
CONDUIT AND MULE TAPE SPECS
1. CONDUIT WILL BE PVC DB120 RATED 90 C CABLE
MEETING THE REQUIREMENTS OF ASTM F512
2. CUSTOMER SHALL PROVIDE & INSTALL 2500 LB
TENSILE STRENGTH 5/8" PRE-LUBRICATED MULE
TAPE FOR ALL SERVICE CONDUITS
FOR CUSTOMER REVIEW
NOT FOR CONSTRUCTION
EASEMENTS
NOTE:
THIS JOB MAY INVOLVE ACQUIRING EASEMENTS FROM
MORE THAN ONE PROPERTY OWNER. SRP ADVISES NO
TRENCHING BE DONE UNTIL ALL SRP EASEMENTS HAVE
BEEN SECURED. SHOULD THE CUSTOMER TRENCH
PRIOR TO SRP EASEMENTS BEING SECURED, IT IS AT
THE CUSTOMER’S OWN RISK AND SRP DOES NOT
ASSUME ANY COST OR LIABILITY INVOLVED.
· CUSTOMER TO EXCAVATE AND EXPOSE EXISTING
CONDUIT UNLESS OTHERWISE NOTED.
· SRP TO PHASE ID CONDUIT.
· CUSTOMER TO SPLICE ALL CONDUIT UNLESS
OTHERWISE NOTED.
· CUSTOMER TO BACKFILL.
*SPLICE POINT NOTES:
CONSTRUCTION CONSULTANT:
MOBILE:
STEVEN C. KELLY
(602) 501-6582
MOBILE:
PROJECT LEADER:
STEVEN D. RICE
(480) 221-3414
OFFICE:
DESIGN CONSULTANT:
MOBILE:
CONTACTS
(602) 236-
MICHAEL S. LARANCE
(602) 856-5506
INSPECTIONS:
OFFICE: 602-236-6300
COST CENTER
ROUTING CODE SHEET NUMBER OF
WAM WO
FIS JO
BILLING ACCT NO.
CONTACT
ADDRESS/LOCATION
JOBNAME
PHONE
NATURAL GAS
MAP 1/4 S T R
40/ACRE COORDS
WAM VERSION
Contact Arizona 811 at least two full working days before you begin excavation
Call 811 or click Arizona811.com
R
DDY+8
30 11/16E - 7 15/16S
NE 18 2S 6E
(602) 906-1161
LAYTON LAKES BLVD W AND QUEEN CREEK RD TS
LAYTON LAKES BLVD W AND QUEEN CREEK RD
BECKY BRATCHER
YF-18-01
T3503492
22640 0303
SRP PROPRIETARY
ELECTRICAL
SPECIFICATIONS
| DS2202.401 - Addendum 1.pdf |
| Project No. DS2202.401 |
| FINAL SRP Distribution Design - Layton Lakes and QC.pdf |
| Sheets and Views |
| T3503492_Layton Lkes Queend Creek TS-SHEET-01 |
| T3503492_Layton Lkes Queend Creek TS-SHEET-02 |
| T3503492_Layton Lkes Queend Creek TS-SHEET-03 |
File details come from the government source that posted it. Updated .