This file is a Schedule B Pricing Matrix for the Wellmaster Orphan Well Plugging Project in Newaygo and Mecosta Counties, Michigan, administered by EGLE (Michigan Department of Environment, Great Lakes, and Energy). The pricing matrix establishes unit rates and quantities for a two-well plugging project, requiring bidders to submit line-item pricing for 64 categories of labor, equipment rental, materials, and services. Labor categories include contractor site supervisors, laborers, and specialized operators. Equipment rental items encompass various rig types (pole rig, single derrick rig, double derrick rig), pumps, tanks, and heavy machinery such as dozers, backhoes, excavators, and dump trucks. Material line items include well casing in multiple sizes, cement types, drilling fluids, and specialized plugging equipment such as bridge plugs and cement retainers. The scope requires bidders to provide pricing for all rated items regardless of anticipated use, submit a project timeline assuming 10-hour work days, and include an overhead percentage applicable to subcontracted services, rentals, and materials.
Bidders must submit unit prices for all 64 line items, with a grand total cost calculated by EGLE. The pricing matrix prohibits mobilization or use of any item without prior EGLE Project Manager approval and restricts double-billing by preventing separate invoicing of rated items used to complete lump-sum activities included in the original scope. Overhead percentages cannot be applied to hourly or daily rates already listed on the matrix. The contract includes specific limitations, such as allowing only one contractor site supervisor per day unless authorized by EGLE, and requires that rig crews cannot be invoiced simultaneously at both laborer and rig crew rates. Additional line items may be added to the matrix at the bottom if needed, and any specialized equipment or materials not listed will be invoiced at cost plus the overhead percentage upon EGLE approval.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SCHEDULE B - PRICING MATRIX | |
| Wellmaster - Newaygo & Mecosta Orphan Well Plugging Project (Newaygo and Mecosta Counties) - 2 Wells |
| Project Resource Item | Item Description | Unit | Price | Total for Project | Vendor Item? | |
| Quantity | per | (Y/N) | ||||
| Unit | ||||||
| 1 | Contractor Site Supervisor | day | $0.00 | |||
| 2 | Contractor Site Supervisor mileage | mile | $0.00 | |||
| 3 | Per diem (meals & lodging) | day | $0.00 | |||
| 4 | Laborer (this rate is to be utilized but is not limited to Roustabout, Heavy Equipment Operator, Tool Hand, General Laborer type work. See note at bottom of Schedule B for more information.) | hour | $0.00 | |||
| 5 | Pick-up Truck mileage (all descriptions) | mile | $0.00 | |||
| 6 | Pole Rig-3 man crew | hour | $0.00 | |||
| 7 | Single Derrick Rig-3 man crew | hour | $0.00 | |||
| 8 | Double Derrick Rig-3 man crew | hour | $0.00 | |||
| 9 | Pit Liner Material (20 mil PVC) | roll | $0.00 | |||
| 10 | Rig Anchors (install/remove, includes all labor and materials) | site | $0.00 | |||
| 11 | Cellar (install./remove, includes all labor and materials) | job | $0.00 | |||
| 12 | Mobile Arc Welder (inc. ½” steel plate for capping) | hour | $0.00 | |||
| 13 | BOP Rental (hydraulic) - Includes all parts such as but not limited to accumulator, annular (hydril), pipe rams, blind rams, etc | |||||
| 13 A | 4 1/2” | day | $0.00 | |||
| 13 B | 5 1/2" | day | $0.00 | |||
| 13 C | 7” | day | $0.00 | |||
| 13 D | 7 5/8” | day | $0.00 | |||
| 13 E | 8 5/8” | day | $0.00 | |||
| 13 F | 9 5/8” | day | $0.00 | |||
| 13 G | 10 3/4" | day | $0.00 | |||
| 13 H | 11 3/4” | day | $0.00 | |||
| 14 | Tubing/Workstring (rental) - rental fees to include any necessary post use pipe inspections | |||||
| 14 A | 1.9" tubing | foot | $0.00 | |||
| 14 B | 2 3/8" tubing | foot | $0.00 | |||
| 14 C | 2 7/8" tubing | foot | $0.00 | |||
| 14 D | Drill Collars | foot | $0.00 | |||
| 15 | Drill Bits (rental) | |||||
| 15 A | 3.5" - 7" | bit | $0.00 | |||
| 15 B | 7 1/8" - 11" | bit | $0.00 | |||
| 15 C | 11 1/8" - 16" | bit | $0.00 | |||
| 16 | Well Casing | |||||
| 16 A | 5 1/2" 15.5#/ft | foot | $0.00 | |||
| 16 B | 8 5/8" 24#/ft | foot | $0.00 | |||
| 16 C | 10 3/4" 32#/ft | foot | $0.00 | |||
| 16 D | 11 3/4" 42#/ft | foot | $0.00 | |||
| 16 E | 16" 75#/ft | foot | $0.00 | |||
| 17 | Power Swivel Unit | hour | $0.00 | |||
| 18 | Power Swivel Unit Operator (can also run mud pump) | hour | $0.00 | |||
| 19 | Rental 100 bbl. Half Tank | day | $0.00 | |||
| 20 | Rental - Mud Mixing System - includes mixing system and pit(s) | day | $0.00 | |||
| 21 | Mud Engineer | hour | $0.00 | |||
| 22 | Mixed Mud Drilling Fluid | bbl | $0.00 | |||
| 23 | Barite | sx | $0.00 | |||
| 24 | Shale Shaker | day | $0.00 | |||
| 25 | Rental Frac Tank (water and brine storage) | day | $0.00 | |||
| 26 | Casing Cutters (wireline) | |||||
| 26 A | (jet cutter) 4 1/2” | job | $0.00 | |||
| 26 B | (jet cutter) 5 1/2" | job | $0.00 | |||
| 26 C | (jet cutter) 7" | job | $0.00 | |||
| 26 D | (jet cutter) 8 5/8" | job | $0.00 | |||
| 26 E | Collar buster | job | $0.00 | |||
| 27 | Casing Cutters (mechanical/hydraulic) | |||||
| 27 A | 4 ½” | job | $0.00 | |||
| 27 B | 5 ½” | job | $0.00 | |||
| 27 C | 7" | job | $0.00 | |||
| 27 D | 8 5/8" | job | $0.00 | |||
| 28 | Casing Spear | |||||
| 28 A | 3.5" - 8.625" | job | $0.00 | |||
| 28 B | 9" - 14" | job | $0.00 | |||
| 29 | Mechanical/Electrical Plugs/Fishing Tools | |||||
| 29 A | 4.5” Cast Iron Bridge Plug | ea. | $0.00 | |||
| 29 B | 4.5” Cement Retainer | ea. | $0.00 | |||
| 29 C | 5.5" Cast Iron Bridge Plug | ea. | $0.00 | |||
| 29 D | 5.5” Cement Retainer | ea. | $0.00 | |||
| 29 E | 7” Cast Iron Bridge Plug | ea. | $0.00 | |||
| 29 F | 7” Cement Retainer | ea. | $0.00 | |||
| 29 G | 8 5/8” Cast Iron Bridge Plug | ea. | $0.00 | |||
| 29 H | 8 5/8” Cement Retainer | ea. | $0.00 | |||
| 29 I | 9 5/8” Cast Iron Bridge Plug | ea. | $0.00 | |||
| 29 J | 9 5/8” Cement Retainer | ea. | $0.00 | |||
| 29 K | 10” Cast Iron Bridge Plug | ea. | $0.00 | |||
| 29 L | 10” Cement Retainer | ea. | $0.00 | |||
| 30 | Wireline Services (inc. operator, and hands/riggers) | |||||
| 30 A | Electric logging (Gamma Log, CCL, Freepoint) | job | $0.00 | |||
| 30 A | Cement Bond Log | job | $0.00 | |||
| 30 C | Perforating | job | $0.00 | |||
| 30 D | Setting Mechanical Plugs | job | $0.00 | |||
| 31 | Fresh Water Charge | bbl. | $0.00 | |||
| 32 | Duplex/Triplex Mud Pump | day | $0.00 | |||
| 33 | Cementing Services | |||||
| 33 A | Cementer | hour | $0.00 | |||
| 33 B | Pump Truck Operator | hour | $0.00 | |||
| 33 C | Bulk Truck Operator | hour | $0.00 | |||
| 33 D | Cement Pump Truck OT | hour | $0.00 | |||
| 33 E | Cement Pump Truck Mileage | mile | $0.00 | |||
| 34 | Cement | |||||
| 34 A | Standard Cement (Type 1L) | sx | $0.00 | |||
| 34 B | Class H Cement | sx | $0.00 | |||
| 34 C | 50/50 Poz. Cement | sx | $0.00 | |||
| 34 D | Gas Block Additive | sx | $0.00 | |||
| 35 | Cement Handling Charge | sx | $0.00 | |||
| 36 | Cement Transportation Charge | ton/mile | $0.00 | |||
| 37 | Calcium Chloride | sx | $0.00 | |||
| 38 | Cellophane Flake (LCM) | sx | $0.00 | |||
| 39 | Bentonite | sx | $0.00 | |||
| 40 | Flare | job | $0.00 | |||
| 41 | H2S Scavenger Fluid | bbl | $0.00 | |||
| 42 | H2S Safety Company | day | $0.00 | |||
| 43 | Enclosed (sealed) frac tank for H2S | day | $0.00 | |||
| 44 | Waste Disposal Services | |||||
| 44 A | Pump, Transport, and Disposal of All Generated or Collected Liquids. Per bbl price should include all labor and equipment | bbl | $0.00 | |||
| 44 B | Excavate, Transport, and Disposal of Contaminated Soil to Landfill. Per ton price should include all labor, equipment | ton | $0.00 | |||
| 45 | Dozer | hour | $0.00 | |||
| 45 A | Dozer - Standby Rate | hour | $0.00 | |||
| 46 | Backhoe | hour | $0.00 | |||
| 46 A | Backhoe - Standby Rate | hour | $0.00 | |||
| 47 | Excavator | hour | $0.00 | |||
| 47 A | Excavator - Standby Rate | hour | $0.00 | |||
| 48 | Skid Steer | hour | $0.00 | |||
| 48 A | Skid Steer - Standby Rate | hour | $0.00 | |||
| 49 | Tele Handler | hour | $0.00 | |||
| 49 A | Tele Handler - Standby Rate | hour | $0.00 | |||
| 50 | 10,000 Square Feet of Composite Mats | day | $0.00 | |||
| 51 | Tractor & Low Boy/Float Transportation | hour | $0.00 | |||
| 52 | Site Access/Site Prep/Brush Hogging/Tree Clearing/Woodchipper (for location access) Includes all labor and equipment necessary to complete tasks related to accessing sites, clearing, and making them ready for equipment to plug the well. | Lump Sum | $0.00 | |||
| 53 | Site Restoration – Recontour and Seed Location – . Removal of gravel at well pad areas. Includes all labor and equipment necessary to complete tasks. | Lump Sum | $0.00 | |||
| 54 | Dump truck w/Operator (10cy dump) | hour | $0.00 | |||
| 55 | Dump truck w/Operator (20 cy lead dump) | hour | $0.00 | |||
| 56 | Dump truck w/Operator (30 cy dump or train) | hour | $0.00 | |||
| 57 | 70 bbl. Water Truck w/ Vac. Pump | hour | $0.00 | |||
| 58 | 120-150 bbl Water Tanker w/ Vac. Pump | hour | $0.00 | |||
| 59 | Water Truck Operator | hour | $0.00 | |||
| 60 | Vacuum Truck/Cusco | hour | $0.00 | |||
| 61 | Vacuum Truck Operator | hour | $0.00 | |||
| 62 | Hot Oiler | hour | $0.00 | |||
| 63 | Infrastructure/Equipment – Dismantle, Remove, Scrap/Salvage (includes any related surface infrastructure, such as but not limited to tanks, flares, heater/treaters, separators, tubulars, well pumps, pumping units, production equipment, compressors, piping, concrete pads, buildings, fencing, gates, electrical infrastructure (power poles and panels, etc.). Concrete Pads, Buildings, Fencing, and Gates. Also, if found to be present, include costs to purge, cut, and cap (steel cap), flow line at the Daniels 1-1B. Includes all labor and equipment necessary to complete tasks. | Lump Sum | $0.00 | |||
| 64 | Overhead % for subcontracted services, rentals, & materials | % |
| Grand Total ($) | $0.00 | |
| NOTES: | ||
| 1. You must submit a project timeline as outlined in DS document. Please assume 10-hour days. | ||
| 2. Provide Quantity and Price/Unit for all items listed in the Bid Table, even if the item is not likely to be used for the project. We call this 'Rated Items' and have requested the unit pricing in the event | ||
| the Scope of Work changes, a change order is necessary, or we move to a time and materials billing. | ||
| 3. Bidder cannot mobilize, use, or charge for items in the pricing matrix without prior approval from EGLE Project Manager. | ||
| 4. If a ‘rated item’ is used to complete a ‘lump sum’ item work activity included in the original scope of work, it cannot be invoiced separately. | ||
| For example, if you utilize an ‘excavator’ to complete concrete pad removal (‘Other Infrastructure Removal’ bid item), you cannot charge | ||
| for the excavator or operators hours as it should have been included as part of the lump sum price for ‘Other Infrastructure Removal’ | ||
| 5. Only 1 Contractor Site Supervisor can be invoiced per day of onsite work, unless authorized and/or approved by EGLE Project Manager. | ||
| 6. Rental and/or purchase of any specialized equipment, supplies, services, or materials must have prior approval from EGLE Project Manager. | ||
| 7. Overhead % cannot be added to the hourly or daily rates of items already included on Schedule B when invoicing. | ||
| 8. If a material, such as 'casing' is needed to properly plug the well and is not listed on this pricing matrix, it will be invoiced at cost plus the 'Overhead %' | ||
| 9. Laborer includes but is not limited to: Roustabout, Heavy Equipment Operator, Tool Hand, and other similar positions. The Laborer rate will also be used by the rig crew when they are completing work activities not assoicated | ||
| with the rig, including but not limited to: laying mats, moving equipment, loading/offloading equipment and supplies or other similar general labor duties. Rig crew cannot be invoiced at the Laborer and 'Rig Crew' | ||
| line items at the same time, as that would be double-billing. | ||
| 10. You may add additional lines to this pricing matrix at the BOTTOM if needed. |