DS 270000000007 SCHEDULE B - PRICING MATRIX Plugging Wellmaster - Newaygo_Mecosta_.xlsx

XLSX spreadsheet 25 KB Posted

Attached to
Wellmaster Newaygo & Mecosta OW Plug Project 22 wells
Solicitation number
DS 761 270000000007 1
Issued by
Oceana County, Michigan

About this file

This file is a Schedule B Pricing Matrix for the Wellmaster Orphan Well Plugging Project in Newaygo and Mecosta Counties, Michigan, administered by EGLE (Michigan Department of Environment, Great Lakes, and Energy). The pricing matrix establishes unit rates and quantities for a two-well plugging project, requiring bidders to submit line-item pricing for 64 categories of labor, equipment rental, materials, and services. Labor categories include contractor site supervisors, laborers, and specialized operators. Equipment rental items encompass various rig types (pole rig, single derrick rig, double derrick rig), pumps, tanks, and heavy machinery such as dozers, backhoes, excavators, and dump trucks. Material line items include well casing in multiple sizes, cement types, drilling fluids, and specialized plugging equipment such as bridge plugs and cement retainers. The scope requires bidders to provide pricing for all rated items regardless of anticipated use, submit a project timeline assuming 10-hour work days, and include an overhead percentage applicable to subcontracted services, rentals, and materials.

Bidders must submit unit prices for all 64 line items, with a grand total cost calculated by EGLE. The pricing matrix prohibits mobilization or use of any item without prior EGLE Project Manager approval and restricts double-billing by preventing separate invoicing of rated items used to complete lump-sum activities included in the original scope. Overhead percentages cannot be applied to hourly or daily rates already listed on the matrix. The contract includes specific limitations, such as allowing only one contractor site supervisor per day unless authorized by EGLE, and requires that rig crews cannot be invoiced simultaneously at both laborer and rig crew rates. Additional line items may be added to the matrix at the bottom if needed, and any specialized equipment or materials not listed will be invoiced at cost plus the overhead percentage upon EGLE approval.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE B - PRICING MATRIX
Wellmaster - Newaygo & Mecosta Orphan Well Plugging Project (Newaygo and Mecosta Counties) - 2 Wells
Project Resource ItemItem DescriptionUnitPriceTotal for ProjectVendor Item?
Quantityper(Y/N)
Unit
1Contractor Site Supervisorday$0.00
2Contractor Site Supervisor mileagemile$0.00
3Per diem (meals & lodging)day$0.00
4Laborer (this rate is to be utilized but is not limited to Roustabout, Heavy Equipment Operator, Tool Hand, General Laborer type work. See note at bottom of Schedule B for more information.)hour$0.00
5Pick-up Truck mileage (all descriptions)mile$0.00
6Pole Rig-3 man crewhour$0.00
7Single Derrick Rig-3 man crewhour$0.00
8Double Derrick Rig-3 man crewhour$0.00
9Pit Liner Material (20 mil PVC)roll$0.00
10Rig Anchors (install/remove, includes all labor and materials)site$0.00
11Cellar (install./remove, includes all labor and materials)job$0.00
12Mobile Arc Welder (inc. ½” steel plate for capping)hour$0.00
13BOP Rental (hydraulic) - Includes all parts such as but not limited to accumulator, annular (hydril), pipe rams, blind rams, etc
13 A4 1/2”day$0.00
13 B5 1/2"day$0.00
13 C7”day$0.00
13 D7 5/8”day$0.00
13 E8 5/8”day$0.00
13 F9 5/8”day$0.00
13 G10 3/4"day$0.00
13 H11 3/4”day$0.00
14Tubing/Workstring (rental) - rental fees to include any necessary post use pipe inspections
14 A1.9" tubingfoot$0.00
14 B2 3/8" tubingfoot$0.00
14 C2 7/8" tubingfoot$0.00
14 DDrill Collarsfoot$0.00
15Drill Bits (rental)
15 A3.5" - 7"bit$0.00
15 B7 1/8" - 11"bit$0.00
15 C11 1/8" - 16"bit$0.00
16Well Casing
16 A5 1/2" 15.5#/ftfoot$0.00
16 B8 5/8" 24#/ftfoot$0.00
16 C10 3/4" 32#/ftfoot$0.00
16 D11 3/4" 42#/ftfoot$0.00
16 E16" 75#/ftfoot$0.00
17Power Swivel Unithour$0.00
18Power Swivel Unit Operator (can also run mud pump)hour$0.00
19Rental 100 bbl. Half Tankday$0.00
20Rental - Mud Mixing System - includes mixing system and pit(s)day$0.00
21Mud Engineerhour$0.00
22Mixed Mud Drilling Fluidbbl$0.00
23Baritesx$0.00
24Shale Shakerday$0.00
25Rental Frac Tank (water and brine storage)day$0.00
26Casing Cutters (wireline)
26 A(jet cutter) 4 1/2”job$0.00
26 B(jet cutter) 5 1/2"job$0.00
26 C(jet cutter) 7"job$0.00
26 D(jet cutter) 8 5/8"job$0.00
26 ECollar busterjob$0.00
27Casing Cutters (mechanical/hydraulic)
27 A4 ½”job$0.00
27 B5 ½”job$0.00
27 C7"job$0.00
27 D8 5/8"job$0.00
28Casing Spear
28 A3.5" - 8.625"job$0.00
28 B9" - 14"job$0.00
29Mechanical/Electrical Plugs/Fishing Tools
29 A4.5” Cast Iron Bridge Plugea.$0.00
29 B4.5” Cement Retainerea.$0.00
29 C5.5" Cast Iron Bridge Plugea.$0.00
29 D5.5” Cement Retainerea.$0.00
29 E7” Cast Iron Bridge Plugea.$0.00
29 F7” Cement Retainerea.$0.00
29 G8 5/8” Cast Iron Bridge Plugea.$0.00
29 H8 5/8” Cement Retainerea.$0.00
29 I9 5/8” Cast Iron Bridge Plugea.$0.00
29 J9 5/8” Cement Retainerea.$0.00
29 K10” Cast Iron Bridge Plugea.$0.00
29 L10” Cement Retainerea.$0.00
30Wireline Services (inc. operator, and hands/riggers)
30 AElectric logging (Gamma Log, CCL, Freepoint)job$0.00
30 ACement Bond Logjob$0.00
30 CPerforatingjob$0.00
30 DSetting Mechanical Plugsjob$0.00
31Fresh Water Chargebbl.$0.00
32Duplex/Triplex Mud Pumpday$0.00
33Cementing Services
33 ACementerhour$0.00
33 BPump Truck Operatorhour$0.00
33 CBulk Truck Operatorhour$0.00
33 DCement Pump Truck OThour$0.00
33 ECement Pump Truck Mileagemile$0.00
34Cement
34 AStandard Cement (Type 1L)sx$0.00
34 BClass H Cementsx$0.00
34 C50/50 Poz. Cementsx$0.00
34 DGas Block Additivesx$0.00
35Cement Handling Chargesx$0.00
36Cement Transportation Chargeton/mile$0.00
37Calcium Chloridesx$0.00
38Cellophane Flake (LCM)sx$0.00
39Bentonitesx$0.00
40Flarejob$0.00
41H2S Scavenger Fluidbbl$0.00
42H2S Safety Companyday$0.00
43Enclosed (sealed) frac tank for H2Sday$0.00
44Waste Disposal Services
44 APump, Transport, and Disposal of All Generated or Collected Liquids. Per bbl price should include all labor and equipmentbbl$0.00
44 BExcavate, Transport, and Disposal of Contaminated Soil to Landfill. Per ton price should include all labor, equipmentton$0.00
45Dozerhour$0.00
45 ADozer - Standby Ratehour$0.00
46Backhoehour$0.00
46 ABackhoe - Standby Ratehour$0.00
47Excavatorhour$0.00
47 AExcavator - Standby Ratehour$0.00
48Skid Steerhour$0.00
48 ASkid Steer - Standby Ratehour$0.00
49Tele Handlerhour$0.00
49 ATele Handler - Standby Ratehour$0.00
5010,000 Square Feet of Composite Matsday$0.00
51Tractor & Low Boy/Float Transportationhour$0.00
52Site Access/Site Prep/Brush Hogging/Tree Clearing/Woodchipper (for location access) Includes all labor and equipment necessary to complete tasks related to accessing sites, clearing, and making them ready for equipment to plug the well.Lump Sum$0.00
53Site Restoration – Recontour and Seed Location – . Removal of gravel at well pad areas. Includes all labor and equipment necessary to complete tasks.Lump Sum$0.00
54Dump truck w/Operator (10cy dump)hour$0.00
55Dump truck w/Operator (20 cy lead dump)hour$0.00
56Dump truck w/Operator (30 cy dump or train)hour$0.00
5770 bbl. Water Truck w/ Vac. Pumphour$0.00
58120-150 bbl Water Tanker w/ Vac. Pumphour$0.00
59Water Truck Operatorhour$0.00
60Vacuum Truck/Cuscohour$0.00
61Vacuum Truck Operatorhour$0.00
62Hot Oilerhour$0.00
63Infrastructure/Equipment – Dismantle, Remove, Scrap/Salvage (includes any related surface infrastructure, such as but not limited to tanks, flares, heater/treaters, separators, tubulars, well pumps, pumping units, production equipment, compressors, piping, concrete pads, buildings, fencing, gates, electrical infrastructure (power poles and panels, etc.). Concrete Pads, Buildings, Fencing, and Gates. Also, if found to be present, include costs to purge, cut, and cap (steel cap), flow line at the Daniels 1-1B. Includes all labor and equipment necessary to complete tasks.Lump Sum$0.00
64Overhead % for subcontracted services, rentals, & materials%
Grand Total ($)$0.00
NOTES:
1. You must submit a project timeline as outlined in DS document. Please assume 10-hour days.
2. Provide Quantity and Price/Unit for all items listed in the Bid Table, even if the item is not likely to be used for the project. We call this 'Rated Items' and have requested the unit pricing in the event
the Scope of Work changes, a change order is necessary, or we move to a time and materials billing.
3. Bidder cannot mobilize, use, or charge for items in the pricing matrix without prior approval from EGLE Project Manager.
4. If a ‘rated item’ is used to complete a ‘lump sum’ item work activity included in the original scope of work, it cannot be invoiced separately.
For example, if you utilize an ‘excavator’ to complete concrete pad removal (‘Other Infrastructure Removal’ bid item), you cannot charge
for the excavator or operators hours as it should have been included as part of the lump sum price for ‘Other Infrastructure Removal’
5. Only 1 Contractor Site Supervisor can be invoiced per day of onsite work, unless authorized and/or approved by EGLE Project Manager.
6. Rental and/or purchase of any specialized equipment, supplies, services, or materials must have prior approval from EGLE Project Manager.
7. Overhead % cannot be added to the hourly or daily rates of items already included on Schedule B when invoicing.
8. If a material, such as 'casing' is needed to properly plug the well and is not listed on this pricing matrix, it will be invoiced at cost plus the 'Overhead %'
9. Laborer includes but is not limited to: Roustabout, Heavy Equipment Operator, Tool Hand, and other similar positions. The Laborer rate will also be used by the rig crew when they are completing work activities not assoicated
with the rig, including but not limited to: laying mats, moving equipment, loading/offloading equipment and supplies or other similar general labor duties. Rig crew cannot be invoiced at the Laborer and 'Rig Crew'
line items at the same time, as that would be double-billing.
10. You may add additional lines to this pricing matrix at the BOTTOM if needed.