DS 270000000005 SCHEDULE B - PRICING MATRIX Fisher-McCall 12th Ave.xlsx

XLSX spreadsheet 26 KB Posted

Attached to
Fisher McCall 12th Ave. OW Plug&Decom 2-Facility 8-wells
Solicitation number
DS 761 270000000005 1
Issued by
Saginaw County, Michigan

About this file

This is a Schedule B Pricing Matrix for the Fisher-McCall 12th Avenue Orphan Well Plugging and Facility Decommissioning Project in Ottawa County, Michigan, administered by the state environmental agency (EGLE). The project encompasses plugging of eight wells and decommissioning of two facilities. The pricing matrix establishes unit rates for all materials, labor, equipment, and services required to complete the well plugging and facility decommissioning work. Line items include contractor supervision, laborers, specialized drilling equipment (pole rigs, derrick rigs, BOPs in multiple sizes), tubing and casing materials in various dimensions, drilling bits, wireline services, cementing services and materials, mud engineering and drilling fluids, waste disposal services, heavy equipment (dozers, backhoes, excavators, cranes), transportation services, site preparation and restoration, infrastructure removal, and flowline services. The bidder must submit pricing for all rated items regardless of anticipated use, provide a project timeline assuming 10-hour workdays, and obtain EGLE Project Manager approval before mobilizing or charging for any items.

All pricing in the matrix currently reflects $0.00 values, indicating this is a blank template awaiting bidder submission. Bidders must provide unit prices and quantities for each line item, with the grand total calculated from these submissions. The contract prohibits double-billing (such as charging both rig crew and laborer rates simultaneously), prohibits invoicing overhead percentages on items already included on the Schedule B, and limits contractor site supervisor charges to one person per day unless approved by the EGLE Project Manager. Any specialized equipment, supplies, services, or materials not listed on the pricing matrix require prior EGLE approval and will be invoiced at cost plus the overhead percentage. Materials necessary for proper well plugging that are not listed on the matrix will also be billed at cost plus overhead.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE B - PRICING MATRIX
Fisher-McCall 12th Avenue Orphan Well Plugging and Facility Decommissioning Project (Ottawa County) - 8 Wells, and 2 Facilities
Project Resource ItemItem DescriptionUnitPriceTotal for ProjectVendor Item?
Quantityper(Y/N)
Unit
1Contractor Site Supervisorday$0.00
2Contractor Site Supervisor mileagemile$0.00
3Per diem (meals & lodging)day$0.00
4Laborer (this rate is to be utilized but is not limited to Roustabout, Heavy Equipment Operator, Tool Hand, General Laborer type work. See note at bottom of Schedule B for more information.)hour$0.00
5Pick-up Truck mileage (all descriptions)mile$0.00
6Pole Rig-3 man crewhour$0.00
7Single Derrick Rig-3 man crewhour$0.00
8Double Derrick Rig-3 man crewhour$0.00
9Pit Liner Material (20 mil PVC)roll$0.00
10Rig Anchors (install/remove, includes all labor and materials)site$0.00
11Cellar (install./remove, includes all labor and materials)job$0.00
12Mobile Arc Welder (inc. ½” steel plate for capping)hour$0.00
13BOP Rental (hydraulic) - Includes all parts such as but not limited to accumulator, annular (hydril), pipe rams, blind rams, etc
13 A4 1/2”day$0.00
13 B5 1/2"day$0.00
13 C7”day$0.00
13 D7 5/8”day$0.00
13 E8 5/8”day$0.00
13 F9 5/8”day$0.00
13 G10 3/4"day$0.00
13 H11 3/4”day$0.00
14Tubing/Workstring (rental) - rental fees to include any necessary post use pipe inspections
14 A1.9" tubingfoot$0.00
14 B2 3/8" tubingfoot$0.00
14 C2 7/8" tubingfoot$0.00
14 DDrill Collarsfoot$0.00
15Drill Bits (rental)
15 A3.5" - 7"bit$0.00
15 B7 1/8" - 11"bit$0.00
15 C11 1/8" - 16"bit$0.00
16Well Casing
16 A5 1/2" 15.5#/ftfoot$0.00
16 B8 5/8" 24#/ftfoot$0.00
16 C10 3/4" 32#/ftfoot$0.00
16 D11 3/4" 42#/ftfoot$0.00
16 E16" 75#/ftfoot$0.00
17Power Swivel Unithour$0.00
18Power Swivel Unit Operator (also can run mud pump)hour$0.00
19Rental 100 bbl. Half Tankday$0.00
20Rental - Mud Mixing System - includes mixing system and pit(s)day$0.00
21Mud Engineerhour$0.00
22Mixed Mud Drilling Fluidbbl$0.00
23Baritesx$0.00
24Shale Shakerday$0.00
25Rental Frac Tank (water and brine storage)day$0.00
26Casing Cutters (wireline)
26 A(jet cutter) 4 1/2”job$0.00
26 B(jet cutter) 5 1/2"job$0.00
26 C(jet cutter) 7"job$0.00
26 D(jet cutter) 8 5/8"job$0.00
26 ECollar busterjob$0.00
27Casing Cutters (mechanical/hydraulic)
27 A4 ½”job$0.00
27 B5 ½”job$0.00
27 C7"job$0.00
27 D8 5/8"job$0.00
28Casing Spear
28 A3.5" - 8.625"job$0.00
28 B9" - 14"job$0.00
29Mechanical/Electrical Plugs/Fishing Tools
29 A4.5” Cast Iron Bridge Plugea.$0.00
29 B4.5” Cement Retainerea.$0.00
29 C5.5" Cast Iron Bridge Plugea.$0.00
29 D5.5” Cement Retainerea.$0.00
29 E7” Cast Iron Bridge Plugea.$0.00
29 F7” Cement Retainerea.$0.00
29 G8 5/8” Cast Iron Bridge Plugea.$0.00
29 H8 5/8” Cement Retainerea.$0.00
29 I9 5/8” Cast Iron Bridge Plugea.$0.00
29 J9 5/8” Cement Retainerea.$0.00
29 K10” Cast Iron Bridge Plugea.$0.00
29 L10” Cement Retainerea.$0.00
30Wireline Services (inc. operator, and hands/riggers)
30 AElectric logging (Gamma Log, CCL, Freepoint)job$0.00
30 ACement Bond Logjob$0.00
30 CPerforatingjob$0.00
30 DSetting Mechanical Plugsjob$0.00
31Fresh Water Chargebbl.$0.00
32Duplex/Triplex Mud Pumpday$0.00
33Cementing Services
33 ACementerhour$0.00
33 BPump Truck Operatorhour$0.00
33 CBulk Truck Operatorhour$0.00
33 DCement Pump Truck OThour$0.00
33 ECement Pump Truck Mileagemile$0.00
34Cement
34 AStandard Cement (Type 1L)sx$0.00
34 BClass H Cementsx$0.00
34 C50/50 Poz. Cementsx$0.00
34 DGas Block Additivesx$0.00
35Cement Handling Chargesx$0.00
36Cement Transportation Chargeton/mile$0.00
37Calcium Chloridesx$0.00
38Cellophane Flake (LCM)sx$0.00
39Bentonitesx$0.00
40Flarejob$0.00
41H2S Scavenger Fluidbbl$0.00
42H2S Safety Companyday$0.00
43Enclosed (sealed) frac tank for H2Sday$0.00
44Waste Disposal Services
44 AWaste Characterization – Fluids and Sludges from Tanks, Flowlines, Vessels, Drums, Secondary Containments, etc. Includes all labor, equipment, and laboratory feesLump sum$0.00
44 BPump, Transport, and Disposal of Sludge and/or Tank Bottoms. Per ton price should include all labor and equipmentton$0.00
44 CPump, Transport, and Disposal of All Generated or Collected Liquids. Per bbl price should include all labor and equipmentbbl$0.00
44 DExcavate, Transport, and Disposal of Contaminated Soil to Landfill. Per ton price should include all labor, equipmentton$0.00
45Pole Truck (tandem axle) - for moving stock tanks, etc.hour$0.00
46Crane - for lifting large heavy tanks and equipmenthour$0.00
47Dozerhour$0.00
47 ADozer - Standby Ratehour$0.00
48Backhoehour$0.00
48 ABackhoe - Standby Ratehour$0.00
49Excavatorhour$0.00
49 AExcavator - Standby Ratehour$0.00
50Skid Steerhour$0.00
50 ASkid Steer - Standby Ratehour$0.00
51Tele Handlerhour$0.00
51 ATele Handler - Standby Ratehour$0.00
5210,000 Square Feet of Composite Matsday$0.00
53Tractor & Low Boy/Float Transportationhour$0.00
54Site Access/Site Prep/Brush Hogging/Tree Clearing/Woodchipper (for location access) Includes all labor and equipment necessary to complete tasks related to accessing sites, clearing, and making them ready for equipment to plug the well.Lump Sum$0.00
55Site Restoration – Recontour and Seed Location – . Removal of gravel at well pad areas. Includes all labor and equipment necessary to complete tasks.Lump Sum$0.00
56Dump truck w/Operator (10cy dump)hour$0.00
57Dump truck w/Operator (20 cy lead dump)hour$0.00
58Dump truck w/Operator (30 cy dump or train)hour$0.00
5970 bbl. Water Truck w/ Vac. Pumphour$0.00
60120-150 bbl Water Tanker w/ Vac. Pumphour$0.00
61Water Truck Operatorhour$0.00
62Vacuum Truck/Cuscohour$0.00
63Vacuum Truck Operatorhour$0.00
64Hot Oilerhour$0.00
65Equipment – Dismantle, Remove, Scrap/Salvage (includes any related surface infrastructure, tanks, flares, heater/treaters, separators, tubulars, well pumps, pumping units, production equipment, compressors, piping, etc.). Includes all labor and equipment necessary to complete tasks.Lump Sum$0.00
66Other Infrastructure Removal – Concrete Pads, Buildings, Fencing, Gates, Electrical Infrastructure (power poles, electrical panels, etc.) Includes all labor and equipment necessary to complete tasks.Lump Sum$0.00
67Flow-Lines – Empty, Purge/Pull, Scrap/Salvage, Cut and Cap Flowlines (use of welder to be billed in line item 15, but not billed in both line item 15 and 69). Includes all labor and equipment necessary to complete tasks.Lump Sum$0.00
68Overhead % for subcontracted services, rentals, & materials%

Grand Total ($) $0.00

NOTES:
1. You must submit a project timeline as outlined in DS document. Please assume 10-hour days.
2. Provide Quantity and Price/Unit for all items listed in the Bid Table, even if the item is not likely to be used for the project. We call this 'Rated Items' and have requested the unit pricing in the event
the Scope of Work changes, a change order is necessary, or we move to a time and materials billing.
3. Bidder cannot mobilize, use, or charge for items in the pricing matrix without prior approval from EGLE Project Manager.
4. If a ‘rated item’ is used to complete a ‘lump sum’ item work activity included in the original scope of work, it cannot be invoiced separately.
For example, if you utilize an ‘excavator’ to complete concrete pad removal (‘Other Infrastructure Removal’ bid item), you cannot charge
for the excavator or operators hours as it should have been included as part of the lump sum price for ‘Other Infrastructure Removal’
5. Only 1 Contractor Site Supervisor can be invoiced per day of onsite work, unless authorized and/or approved by EGLE project manager.
6. Rental and/or purchase of any specialized equipment, supplies, services, or materials must have prior approval from EGLE Project Manager.
7. Overhead % cannot be added to the hourly or daily rates of items already included on Schedule B when invoicing.
8. If a material, such as 'casing' is needed to properly plug the well and is not listed on this pricing matrix, it will be invoiced at cost plus the 'Overhead %'
9. Laborer includes but is not limited to: Roustabout, Heavy Equipment Operator, Tool Hand, and other similar positions. The Laborer rate will also be used by the rig crew when they are completing work activities not assoicated
with the rig, including but not limited to: laying mats, moving equipment, loading/offloading equipment and supplies or other similar general labor duties. Rig crew cannot be invoiced at the Laborer and 'Rig Crew'
line items at the same time, as that would be double-billing.
10. You may add additional lines to this pricing matrix at the BOTTOM if needed.