Drawings Roof Replacement 626-21-501.pdf
PDF 24 MB Posted
- Solicitation number
- 36C24922B0033
About this file
This federal solicitation seeks proposals for a roof replacement project at the Tennessee Valley Healthcare System VA Medical Center in Nashville, Tennessee. Key details include a project scope to replace Building 1's roof for approximately $500,000 to $1,000,000, a performance period of 61 calendar days from notice to proceed, a 100% set-aside for service-disabled veteran-owned small businesses, a bid submission deadline of December 14, 2022, and requirements for payment and performance bonds, safety plans, and experience ratings. The solicitation provides specifications, standards, and requirements for the roof replacement work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Pre-bid site visit 11-22-2022 sign-in sheet.pdf | ||
| 36C24922B0033 0001.docx | DOCX document | |
| Contractor EMR Certification Form.docx | DOCX document | |
| Specs 626-21-501.pdf | ||
| WD TN TN20220178 Dated 09-02-2022.pdf | ||
| 36C24922B0033_1.docx | DOCX document | |
| RFI Form - Nashville Roof Replacement.pdf | ||
| Calculation of Self Performed Work.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID DEDUCTIVE ALTERNATE NO. 1 - ALL WORK ASSOCIATED WITH ROOF AREA #41
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
PROJECT LOCATION MAP PROJECT SITE MAP
PROJECT IMAGE
/7
/2
:1
:3
A
M
G-001
COVER SHEET
1 2NPM
ROOF DEMO AND
REPLACEMENT BUILDING 1
TVHS VA MEDICAL CENTER
NASHVILLE CAMPUS
1310 24TH AVENUE SOUTH
NASHVILLE, TN 37212 JUNE 7, 2021
100% CONSTRUCTION DOCUMENTS
626-21-50120-330
ROOF DEMO AND REPLACEMENT
BUILDING 1
TVHS VA MEDICAL CENTER NASHVILLE CAMPUS
1310 24TH AVENUE SOUTH
NASHVILLE, TN 37212
VA PROJECT #: 626-21-501
WVS
DRAWING LIST
GENERAL
G-001 COVER SHEET 1 2
G-002 GENERAL INFORMATION & NOTES 2 2
ARCHITECTURAL
A-001 OVERALL PROJECT DESCRIPTION - ROOF PLAN 1 9
A-002 FALL PROTECTION PLAN 2 9
A-101 ROOF AREA 1 - DEMOLITION & NEW WORK ROOF PLANS 3 9
A-102 ROOF AREA 2 & 3 - DEMOLITION & NEW WORK ROOF PLANS 4 9
A-103 ROOF AREA 4 & 5 - DEMOLITION & NEW WORK ROOF PLANS 5 9
A-104 ROOF AREA 7 - DEMOLITION & NEW WORK ROOF PLANS 6 9
A-105 ROOF AREA 6, 8 & 9 - DEMOLITION & NEW WORK ROOF PLANS 7 9
A-106 ROOF AREAS 10, 11, 12 & 13 - DEMOLITION & NEW WORK ROOF PLANS 8 9
A-501 DETAILS 9 9
PROJECT LOCATION
NN
BUILDING 1 = AREAS OF ROOF REPLACEMENT
= CRANE LOCATION
= STAGING AREA, PROVIDE (2) TEMPORARY WATER CLOSETS
= CONSTRUCTION PARKING TO BE IN STAGING AREA, 2 TRUCKS MAXIMUM
= OVERALL BLDG 1 OUTLINE
ELECTRICAL
E-001 ELECTRICAL GENERAL NOTES, SYMBOLS LEGEND, AND ABBREVIATIONS
E-501 LIGHTNING PROTECTION DETAILS
24TH AVE S
PIE
RCE A
VE
BID DEDUCTIVE ALTERNATES
DocuSign Envelope ID: 03918131-C4A6-4B5A-A3D3-7911402FD6AA
6/7/2021
WALL SECTION
SYMBOL
COLUMN GRID
ELEVATION SYMBOL
REVISION NOTE
ENLARGED DETAIL CALLOUT
BREAK LINE
ROOF SLOPE
DIRECTION SYMBOL
TYPICAL GRAPHIC SCALE
DETAIL #
PAGE #
TRUE NORTH ARROW
PROJECT NORTH ARROW
ELEVATION SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
A8.1
BUILDING SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
DETAIL SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
XX.X
ELEVATION
0'-0" NORTH
PLAN
N
0 4 8 16
# DEDUCT ALTERNATE
DEMOLITION KEYNOTE WALL TYPE
ROOF PITCH SYMBOLDOOR NUMBER
TYPICAL KEYNOTE CEILING/ SOFFIT
HEIGHT
MATL
1'-0"
-1
AFF ABOVE FINISHED FLOOR
ACP/APC ACOUSTIC CEILING PANEL/
ACOUSTIC PANEL CEILING
ACT ACOUSTIC(AL) TILE
ADJ ADJUSTABLE
ADT'L ADDITIONAL
AGG AGGREGATE
ALT ALTERNATE
AL ALUMINUM
APPROX APPROXIMATE(LY)
ASPH ASPHALT
AUTO AUTOMATIC
B/O BOTTOM OF
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BOT BOTTOM
BRG BEARING
CENTERLINE
C/C CENTER TO CENTER
CJ CONTROL JOINT
CLL CONTRACT LIMIT LINE
CEM CEMENT(ITIOUS)
CMU CONCRETE MASONRY UNIT
CLG CEILING
CLR CLEAR
COL COLUMN
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUOUS
CPT CARPET
CT CERAMIC TILE
CTR CENTER(ED)
DF DRINKING FOUNTAIN
DS DOWNSPOUT
DBL DOUBLE
DEG DEGREE
DEMO DEMOLITION
DET/DTL DETAIL
DIA DIAMETER
DIM DIMENSION
DN DOWN
DWG(S) DRAWING(S)
E EAST
EC ELECTRICAL CONTRACTOR
EHO ELECTRICAL HOLD OPEN
EJ EXPANSION JOINT
EW EACH WAY
EA EACH
EIFS EXTERIOR INSULATION
FINISH SYSTEM
EL ELEVATION
ELEC ELECTRIC(AL)
ELEV ELEVATOR
EMER EMERGENCY
EQ EQUAL
EQUIP EQUIPMENT
EXIST EXISTING
EXT EXTERIOR
EWC ELECTRIC WATER COOLER
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FFE FINISH FLOOR ELEVATION
FV FIELD VERIFY
FEC FIRE EXTINGUISHER CABINET
FDN FOUNDATION
FIN FINISH
FLSHG FLASHING
FLR FLOOR
FRMG FRAMING
FT FOOT/FEET
FTG FOOTING
GC GENERAL CONTRACTOR
GA GAUGE
GALV GALVANIZED
GEN GENERAL
GYP GYPSUM
HM HOLLOW METAL
HDWR HARDWARE
HOL HOLLOW
HOR HORIZONTAL
HT HEIGHT
HVAC HEATING/VENTILATION/AIR
CONDITIONING
ID INSIDE DIAMETER
IN INCH
INCL INCLUDING
INSUL INSULATION
INT INTERIOR
JAN JANITOR
JT JOINT
LAV LAVATORY
LB(S) POUND(S)
L/S LANDSCAPE
LT LIGHT
MO MASONRY OPENING
MAS MASONRY
MAT'L MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MTD MOUNTED
MTL METAL
N NORTH
NIC NOT IN CONTRACT
NTS NOT TO SCALE
NOM NOMINAL
OC ON CENTER
OD OUTSIDE DIAMETER
O TO O OUT TO OUT
OPNG OPENING
OPP OPPOSITE
OVHD OVERHEAD
PEB PRE-ENGINEERED BUILDING
PJF PREFORMED JOINT FILLER
PT PRESSURE TREATED
PERIM PERIMETER
PL PLATE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PLYWD PLYWOOD
PNT PAINT
PR PAIR
PTD PAINTED
PWR POWER
RB RUBBER BASE
RD ROOF DRAIN
RO ROUGH OPENING
RAD RADIUS
REC RECESSED
REINF REINFORCED
REQ'D REQUIRED
REV REVISED (REVISION)
RM ROOM
S SOUTH
SB SPLASH BLOCK
SF SQUARE FEET
SS STAINLESS STEEL
SIM SIMILAR
SPEC SPECIFICATIONS
SQ SQUARE
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
T/O TOP OF
TELE TELEPHONE
TRTD TREATED
TS TUBE STEEL
TYP TYPICAL
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
VCT VINYL COMPOSITION TILE
VIF VERIFY IN FIELD
VERT VERTICAL
VTR VENT THROUGH PIPE
W WEST
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WWF WELDED WIRE FABRIC
WD WOOD
WH WATER HEATER
WT WEIGHT
CL
THE FOLLOWING SYSTEMS ARE A DESIGN/BUILD RESPONSIBILITY OF THE CONTRACTOR
OR PRODUCT MANUFACTURER AND WILL REQUIRE THE DEFERRED SUBMITTAL OF
DESIGN WORK TO THE VA FOR PLAN REVIEW AND PERMITTING:
1. LIGHTNING PROTECTION
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/7
/2
:1
:3
A
M
G-002
GENERAL INFORMATION & NOTES
2 2NPM
ROOF DEMO AND
REPLACEMENT BUILDING 1
TVHS VA MEDICAL CENTER
NASHVILLE CAMPUS
1310 24TH AVENUE SOUTH
NASHVILLE, TN 37212 JUNE 7, 2021
100% CONSTRUCTION DOCUMENTS
626-21-50120-330
WVS
1. ALL WORK SHALL BE COMPLETED IN ACCORDANCE WITH ALL PUBLISHED APPLICABLE LOCAL / STATE / FEDERAL / NATIONAL CODES, ORDINANCES AND REGULATIONS ALONG WITH ALL RELATED VA DIRECTIVES, DESIGN GUIDES AND MANUALS, SPECIFICATIONS AND STANDARDS PLUS ALL VA REQUIREMENTS (FEDERAL AND LOCAL) THAT ARE PROJECT SPECIFIC TO THE DOCUMENTED SCOPE OF WORK ON
THIS SITE.
2. EACH CONTRACTOR SHALL HAVE PUBLIC LIABILITY, PROPERTY DAMAGE AND WORKMAN’S COMPENSATION INSURANCE AS REQUIRED BY THE VA IN THE BIDDING DOCUMENTATION. CONTACT THE VA/CO DURING THE BIDDING PHASE WITH ANY QUESTIONS, VERIFICATIONS, AND DOCUMENTATION NECESSARY CONCERNING ALL REQUIREMENTS FOR PROJECT INSURANCE COVERAGE.
3. EACH CONTRACTOR PRIOR TO THE COMMENCEMENT OF WORK SHALL FULLY COORDINATE AND VERIFY WITH ALL OTHER CONTRACTORS, OTHER TRADES AND THE VA/COR CONCERNING ALL SPACE REQUIREMENTS FOR THIS PROJECT. THE GENERAL/PRIME CONTRACTOR SHALL BE RESPONSIBLE FOR COMMUNICATING, DOCUMENTING AND COORDINATING ALL SPACE REQUIREMENTS WITH THE VA/COR TO AVOID
CONFLICTS AND MISCOMMUNICATION.
4. BEFORE SUBMITTING A BID, ALL CONTRACTORS WILL CAREFULLY EXAMINE THE DRAWINGS AND SPECIFICATIONS SO AS TO BE THOROUGHLY FAMILIAR WITH ALL THE CONTRACT REQUIREMENTS. EACH BIDDER SHOULD THEN VISIT THE SITE OF THE WORK TO BECOME ACQUAINTED WITH ALL VISIBLE FIELD CONDITIONS AFFECTING THE CONTRACT, SUCH AS OBSTACLES WHICH MAY BE ENCOUNTERED AND ALL OTHER CONDITIONS RELATIVE TO WHAT COULD AFFECT/IMPACT THE WORK OR BE AFFECTED BY THE PERFORMANCE OF THE WORK.
5. IF AWARDED THE CONTRACT, THE CONTRACTORS SHALL NOT BE ALLOWED ANY EXTRA COMPENSATION BY REASON OF ANY UNFORESEEN DIFFICULTIES OR OBSTACLES WHICH THE BIDDER COULD HAVE REASONABLY ANTICIPATED PRIOR TO BIDDING. SHOULD ANY DISCREPANCIES, ERRORS, CONFLICT OR ITEMS NEEDING CLARIFICATION BE DISCOVERED IN THE PLANS AND/OR SPECIFICATIONS, THE CONTRACTOR SHALL NOTIFY THE VA/CO PRIOR TO SUBMITTING A BID AND THE VA/COR BEFORE STARTING ANY OF THE WORK.DRAWINGS ARE PREPARED USING DIMENSIONS AND PRODUCT DRAWINGS FOR SPECIFIC PRODUCTS. DETAILS FOR SPECIFIC PRODUCTS MAY CHANGE BEFORE THEY ARE ACTUALLY INCORPORATED INTO THE WORK, AND PRODUCTS BY OTHER MANUFACTURERS ARE ALSO ACCEPTABLE.
THEREFORE, ACTUAL INSTALLATION DETAILS AND DIMENSIONS MAY DIFFER FROM THOSE SHOWN. CONTRACTOR SHALL VERIFY
INSTALLATION REQUIREMENTS FOR ALL PRODUCTS TO BE INCORPORATED IN THE WORK
6. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED INTO DISCIPLINES FOR CONVENIENCE. THE SEPARATIONS ARE USED ONLY FOR THE PURPOSES OF CONVENIENCE AND REFERENCE AND IN NO WAY DO THEY DEFINE OR LIMIT THE SCOPE OR INTENT OF ANY PART OF THE DRAWINGS AND SPECIFICATIONS AS A WHOLE. THE FACT THAT THE DRAWINGS ARE SEPARATED IN NO WAY SUGGESTS THAT THE WORK IS NOT TO BE CONSTRUCTED AS A COMPLETE, INTEGRATED AND UNIFIED WHOLE.
7. THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS PREPARED BY SPECIFIC ENGINEERING DISCIPLINES ARE COMPLEMENTARY; ITEMS SHOWN IN ANY ONE LOCATION IN THE DRAWINGS SHALL BE CONSIDERED TO BE REQUIREMENTS OF THE CONTRACT FOR CONSTRUCTION. IN THE EVENT OF AN INCONSISTENCY BETWEEN THE DRAWINGS AND SPECIFICATIONS, OR WITHIN EITHER DOCUMENT, THE CONTRACTOR SHALL SEEK CLARIFICATION OR INTERPRETATION FROM THE COR PRIOR TO BIDDING.
WHERE INCONSISTENCIES ARE NOT CLARIFIED PRIOR TO BIDDING, AND WHERE THE ACTUAL SOLUTION OR INTENT CANNOT BE REASONABLY INFERRED, THE CONTRACTOR SHALL PROVIDE THE BETTER QUALITY OR GREATER QUANTITY OF WORK.
8. THE CONTRACTOR SHALL NOTIFY THE COR IMMEDIATELY SHOULD DISCREPANCIES BE FOUND IN THE DRAWINGS AND
SPECIFICATIONS.
9. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL FIELD CONDITIONS AND DIMENSIONS AS THEY RELATE TO THIS PROJECT.
SHOULD DISCREPANCIES EXIST BETWEEN THE WORK INDICATED AND ACTUAL FIELD CONDITIONS NOTIFY THE COR PRIOR TO
BIDDING.
10. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR REFERENCE ONLY AND ARE NOT INTENDED TO ACCURATELY DEPICT ACTUAL OR DESIGNATED CONDITIONS. WRITTEN DIMENSIONS SHALL GOVERN.
11. CONTRACTORS SHALL REFERENCE ALL DRAWINGS IN ALL SECTIONS OF WORK FOR FULLY DEFINING THEIR SCOPE OF WORK RESPONSIBILITIES AND COORDINATE SAME WITH THE GENERAL/PRIME CONTRACTOR. SUBCONTRACTORS AND SUPPLIERS FOR EACH TRADE ARE ADVISED THAT INFORMATION PERTINENT TO THEIR SCOPE OF WORK ALSO OCCURS IN OTHER SECTIONS OF THE DRAWINGS AND THE
COMPLETE SET OF CONTRACT DOCUMENTS.
12. ALL ENGINEERING SYSTEMS WORK INCLUDED IN THE CONTRACT DRAWINGS SHALL BE TAKEN IN A SENSE AS A DIAGRAMMATIC REPRESENTATION OF ITS INTENDED PLACEMENT AND DISTRIBUTION WITHIN THE GENERAL PROXIMITY WHERE SHOWN. THE SIZE AND MEANS OF RUNNING DISTRIBUTION SYSTEMS ARE SHOWN BUT IT IS NOT INTENDED TO SHOW EVERY CONNECTION, FITTING, OFFSET, SUPPORT OR
ELEMENT.
13. ALL EXISTING BUILDING UTILITIES AND INFRASTRUCTURE SERVICES SYSTEMS THAT FEED OTHER SPACES OUTSIDE THE DEMISED PROJECT AREA AND THAT ARE LOCATED WITHIN THE AREA OF WORK, THEREBY INTERFERING WITH THE NEW CONSTRUCTION, SHALL BE REROUTED
AND RELOCATED AS REQUIRED TO MAINTAIN FULL SERVICE TO THE AFFECTED AREAS.
14. THE AREA(S) OF CONSTRUCTION ALONG ALL PUBLIC PROJECT ACCESS ROUTES SHALL BE PROTECTED FROM DUST AND DIRT THROUGH THE USE OF VA/COR APPROVED DUSTPROOF PROTECTION IN THE “GENERAL” DRAWINGS SECTION AND COORDINATE ALL SITE-SPECIFIC
CONDITIONS IMPACTS ENCOUNTERED WITH THE VA/COR.
15. EACH CONTRACTOR SHALL MAINTAIN A COMPETENT OSHA-30 FOREMAN OR DIRECT REPRESENTATIVE ON THE JOB AT ALL TIMES. THE CONTRACTOR SHALL COOPERATE WITH AND COORDINATE WITH THE SUPERINTENDENT AND FOREMAN OF OTHER TRADES IN ORDER THAT
THERE BE NO DELAYS IN THE EXECUTION AND COMPLETION OF THE WORK.
16. DURING CONSTRUCTION, EACH CONTRACTOR SHALL KEEP ON SITE ACCURATE FIELD RECORDS OF ALL CONCEALED WORK THAT DIFFERS FROM THE CONTRACT DRAWINGS. THESE AS-BUILT, MARKED-UP, RECORD DRAWINGS WILL BE KEPT UP TO DATE BY THE GENERAL/PRIME CONTRACTOR AND PROVIDED TO THE VA/COR FOR DISTRIBUTION AT THE COMPLETION OF THE PROJECT.
17. IT SHALL BE THE RESPONSIBILITY OF EACH CONTRACTOR TO ADEQUATELY PROTECT EXISTING CONSTRUCTION AND FINISHES TO REMAIN IN PLACE DURING BOTH DEMOLITION AND CONSTRUCTION SEQUENCES OF THE WORK. ANY DAMAGE TO SUCH AREAS SHALL BE RESTORED AND REFINISHED TO A “LIKE-NEW” CONDITION PRIOR TO THE VA/COR’S ACCEPTANCE OF THAT WORK.
18. THE GENERAL/PRIME CONTRACTOR IS RESPONSIBLE FOR THE PATCH, REPAIR, REFINISHING AND/OR REPLACEMENT OF ALL CONSTRUCTION, MATERIALS, ASSEMBLIES, EQUIPMENT, SIGNAGE AND FINISHES DAMAGED BY THE PROJECT DEMOLITION, TEMPORARY CONSTRUCTION, NEW CONSTRUCTION OR THE MOVEMENT OF PERSONNEL, TOOLS, EQUIPMENT, MATERIALS, ETC. BOTH INSIDE AND OUTSIDE OF THE DESIGNATED
AREAS OF WORK.
19. PROVIDE THE CUTTING AND PATCHING FOR ALL DEMOLITION WORK AND ALL NEW CONSTRUCTION WORK BEING PERFORMED OUTSIDE OF THE
PROJECT LIMIT LINES REQUIRED TO PROPERLY COMPLETE THE PROJECT SCOPE OF WORK.
20. THE GENERAL/PRIME CONTRACTOR IS RESPONSIBLE TO PROVIDE THE REMOVAL OF ALL CONSTRUCTION DEMOLITION DEBRIS, SOIL AND MATERIALS FROM THE PROJECT SITE ON A DAILY BASIS UNLESS SPECIFICALLY REFERENCED OTHERWISE IN THE PROJECT SPECIFIC
LOGISTICAL SEQUENCING REQUIREMENTS.
21. PROVIDE SEALANT AT ALL INTERSECTIONS BETWEEN DIFFERENT MATERIALS.
22. ALL WOOD IN CONTACT WITH CONCRETE SHALL BE PRESSURE TREATED.
23. ALL NEW ROOF SLOPES TO BE 1/4" = 1'-0". CONDITIONS WHERE SLOPE IS NOT OBTAINABLE NOTIFY AND COORDINATE WITH COR.
24. FINAL PRODUCT TO BE IN COMPLIANCE WITH ALL APPLICABLE NRCA CODES AND MANUALS
1. ALL CONTRACTORS, SUBCONTRACTORS, AND THEIR REPRESENTATIVES WORKING ON THIS PROJECT SHALL AT ALL TIMES PRIOR TO AND DURING THE
COURSE OF THEIR ACTIVITY BE RESPONSIBLE FOR THE SAFETY OF THEIR EMPLOYEES.
2. EACH CONTRACTOR OR SUBCONTRACTOR, AS REPRESENTATIVES OF THEIR EMPLOYEES, SHALL ASCERTAIN THAT THE CONDITIONS UNDER WHICH THEY WILL BE REQUIRED TO ACCOMPLISH THEIR WORK ARE SAFE AND MEET ALL APPLICABLE REQUIREMENTS OF THE OCCUPATIONAL SAFETY AND HAZARD ACT, ALONG
WITH ALL OTHER APPLICABLE GOVERNING REGULATIONS AND VA REQUIREMNTS.
3. THE BEGINNING OF WORK ON SITE BY A CONTRACTOR OR SUBCONTRACTOR SHALL INDICATE HIS/HER SATISFACTION AND FULL ACCEPTANCE OF THE CURRENT SITE CONDITIONS REGARDING SAFEY AND THE NECESSARY COMPLIANCE WITH ALL CONTRACT REQUIREMENTS. THE CONTRACTOR ACCEPTS FULL RESPONSIBILITY FOR ANY ACCIDENTS, INJURIES, AND/OR DAMAGES INCURRED AS A RESULT OF ANY VISIBLE OR KNOWN UNSAFE CONDITIONS THAT EXIST.
4. IF UNSATISFIED WITH THE CURRENT SITE SAFETY CONDITIONS AND/OR THE NECESSARY COMPLIANCE, THE CONTRACTOR OR SUBCONTRACTOR SHALL INDICATE THE ACTIONS AND/OR DEVICES NECESSARY TO RENDER THE JOBSITE SAFE. IF THE WORK OF OTHER PARTIES, UPON INSPECTION, IS FOUND AT ANY TIME TO BE UNSAFE, THE CONTRACTOR OR SUBCONTRACTOR SHALL IMMEDIATELY STOP ALL WORK AND NOTIFY THE GENERAL/PRIME CONTRACTOR AND THE VA/COR. THE SUBMISSION OF A BID FOR ANY PORTION OF WORK INCLUDED IN THIS CONTRACT SHALL ALSO INDICATE ACKNOWLEDGMENT AND ACCEPTANCE
OF THESE REQUIREMENTS.
SPECIAL SAFETY NOTES
GENERAL NOTES GENERAL SYMBOL LEGEND
ARCHITECTURAL SYMBOL LEGEND
ABBREVIATIONS
1.
2.
3.
4.
CONTRACTOR SHALL VERIFY All DIMENSIONS AND ELEVATIONS IN THE FIELD PRIOR TO COMMENCING WORK.
CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF DIMENSIONS SHOWN ON THE DRAWINGS. NOTIFY THE VA/COR OF ANY DISCREPANCY BEFORE
STARTING WORK.
A SUCCESSFUL REVIEW OF SHOP DRAWINGS AND SUBMITTALS BY THE ARCHITECT/ENGINEER DOES NOT RELIEVE CONTRACTOR OF THE RESPONSIBILITY TO REVIEW AND CHECK SHOP DRAWINGS BEFORE SUBMITTAL TO VA/COR. THE CONTRACTOR REMAINS SOLELY RESPONSIBLE FOR ERRORS AND OMISSIONS ASSOCIATED WITH THE PREPARATION OF SHOP DRAWINGS AS THEY PERTAIN TO DETAILS AND GIVEN DIMENSIONS IN THE CONTRACT
DOCUMENTS.
CONTRACTOR SHALL OBTAIN VA/COR WRITTEN APPROVAL PRIOR TO PROCEEDING WITH ANY CHANGES FROM THE INFORMATION PROVIDED HEREIN.
5. THE CONTRACTOR SHALL IDENTIFY ALL EMPLOYEES THAT WILL BE WORKING UNDER THE AWARDED CONTRACT. CONTRACTOR PERSONNEL SHALL BE EMPLOYEES SUB CONTRACTOR, SUPPLIERS AND DELIVERY PERSONNEL ENTERING THE MEDICAL CENTER. THOSE EMPL0YEES SHALL BRING 2 FORMS OFGOVERNMENT ISSUED ID TO OBTAIN A VA CONTRACTOR FLASH IDENTIFICATION BADGE THAT SHALL BE WORN ABOVE THE BELT AT ALL TIMES WHILE ON MEDICAL CENTER PROPERTY. IF ISSUED A TEMPORARY BADGE CONTRACTOR EMPLOYEES SHALL RETURN ALL TEMPORARY I.D. BADGES TO DESIGNATED PERSONNEL AT THE END OF THE PERIOD
OF PERFORMANCE OF THE CONTRACT. LOST BADGES WILL RESULT IN A SURCHARGE.
1.
2.
NORMAL WORK SHIFT HOURS FOR THE NASHVILLE MEDICAL CENTER VETERANS HOSPITAL IS 7:00 AM UNTIL 4:30 PM DAILY, MONDAY THROUGH FRIDAY
CERTAIN WORK ITEMS AND CONSTRUCTION ACTIVITIES THAT CREATE NOISE, DUST, VIBRATIONS AND THAT WOULD CREATE DISTURBANCES TO THE MEDICAL CENTER AND/OR ANY OF THE ADJACENT OCCUPIED AREAS WILL NEED TO BE PERFORMED DURING PERIODS OF AFTER HOURS/OFF-HOURS WORK. ITEMS THAT WILL REQUIRE AFTER HOURS ACTIVITIES SHALL BE FULLY
COORDINATED WITH VA COR PRIOR TO START OF CONSTRUCTION.
AFTER HOURS/OFF-HOURS OF OPERATION SHALL BE SCHEDULED FOR THE FOLLOWING DAYS AND TIMES AS COORDINATED, SCHEDULED AND AUTHORIZED BY THE COR.
a. MONDAY THROUGH FRIDAY– 5:00 PM UNTIL 6:00 AM
b. WEEKENDS/HOLIDAYS (AS ALLOWED)– TIMES TO BE DETERMINED WITH THE COR
3. THE FOLLOWING CONSTRUCTION ACTIVITIES SHALL BE CONSIDERED AFTER HOURS/OFF-HOURS OPERATIONS:
a. ALL WORK IN THE ADJACENT OCCUPIED SPACES TO THE CURRENT STAGE/AREA OF WORK.
b. ALL WORK THAT WILL REQUIRE SYSTEM SHUTDOWNS.
c. ALL CONCRETE OR METAL DECKING CORING, CUTTING OR DRILLING.
d. THE APPROVED USE OF POWER ACTUATED FASTENERS.
e. ALL WORK (DEMOLITION OR NEW) THAT WILL CAUSE IMPACT NOISE AND VIBRATIONS THAT CAN BE HEARD OR FELT IN THE
SURROUNDING ADJACENT OCCUPIED SPACES/AREAS.
4. COORDINATE CONTRACTOR PARKING WITH VA COR.
GENERAL SCOPE OF WORK (SOW) DESCRIPTION
MISCELLANEOUS
CONSTRUCTION PERIOD STAGING OF WORK - GENERAL NOTES
GENERAL
1. FURNISH ALL LABOR, TOOLS, MATERIALS, AND EXPERTISE TO COMPLETE PROJECT 626-21-501, "ROOF DEMO AND REPLACEMENT BUILDING 1" IN
STRICT ACCORDANCE WITH THE SPECIFICATIONS AND DRAWINGS AT THE TVHS VA MEDICAL CENTER NASHVILLE CAMPUS 1310 24TH AVENUE SOUTH
NASHVILLE, TN 37212
DEFERRED SUBMITTALS
1ST FLOOR
ROOF
1ST FLOOR
ROOF
1ST FLOOR
ROOF
1ST FLOOR
ROOF
1ST FLOOR
ROOF
1ST FLOOR
ROOF
1ST FLOOR
ROOF
1ST FLOOR
ROOF
1ST FLOOR
ROOF
1ST FLOOR
ROOF1ST FLOOR
ROOF
1ST FLOOR
ROOF
2ND FLOOR
ROOF
4TH FLOOR
ROOF
2ND FLOOR
ROOF
GARDEN
COURTYARD
2ND FLOOR
ROOF
2ND FLOOR
ROOF
2ND FLOOR
ROOF
2ND FLOOR
ROOF
2ND FLOOR
ROOF
2ND FLOOR
ROOF
GARDEN
COURTYARD
CANOPY
ROOF
CANOPY
ROOF
CANOPY ROOF
4TH FLOOR
ROOF
5TH FLOOR
ROOF
3RD FLOOR
ROOF
4TH FLOOR
ROOF
4TH FLOOR
ROOF
1ST FLOOR
ROOF
3RD FLOOR
ROOF
4TH FLOOR
ROOF
3RD FLOOR
ROOF
4TH FLOOR
ROOF
5TH FLOOR
ROOF
1ST FLOOR
ROOF
4TH FLOOR
ROOF
4TH FLOOR
ROOF
5TH FLOOR
ROOF
5TH FLOOR
ROOF
5TH FLOOR
ROOF
4TH FLOOR
ROOF
1ST FLOOR
ROOF
2ND FLOOR
ROOF
4TH FLOOR
ROOF
2ND FLOOR
ROOF
2ND FLOOR
ROOF
3RD FLOOR
ROOF
5TH FLOOR
ROOF
1ST FLOOR
ROOF
ROOF AREA 1
1,405 SF
ROOF AREA 2
306 SF
ROOF AREA 4
1,668 SF
ROOF AREA 5
2,990 SF
ROOF AREA 3
996 SF
ROOF AREA 6
1,892 SF
ROOF AREA 7
5,296 SF
ROOF AREA 8
830 SF
ROOF AREA 10
339 SF
ROOF AREA 11
242 SF
ROOF AREA 12
190 SF
A-101
1 _____ A-101
A-102
1 _____ A-102
A-105
1 _____ A-105
A-104
2 _____ A-104
A-105
2 _____ A-105
A-106
1 _____ A-106
A-106
2 _____ A-106
A-106
3 _____ A-106
ROOF AREA 9
55 SF
A-103
1 _____ A-103
A-103
2 _____ A-103
A-105
3 _____ A-105
ROOF AREA 13
462 SF
A-106
7 _____ A-106
ROOF AREAS TO BE REPLACED
ROOF LEGEND:
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/7
/2
:1
:5
A
M
A-001
OVERALL PROJECT DESCRIPTION -
ROOF PLAN
1 9NPM
ROOF DEMO AND
REPLACEMENT BUILDING 1
TVHS VA MEDICAL CENTER
NASHVILLE CAMPUS
1310 24TH AVENUE SOUTH
NASHVILLE, TN 37212 JUNE 7, 2021
100% CONSTRUCTION DOCUMENTS
626-21-50120-330
WVS
Scale: 1" = 20'-0"
OVERALL ROOF PLAN
A. CONTRACTOR TO ENSURE PROPER SAFETY
BARRIERS AND ENCLOSURES ARE PROVIDED
AT ALL ENTRY/EXIT POINTS FROM BUILDING
WHERE WORK IS BEING PERFORMED ABOVE.
SAFETY BARRIER TO INCLUDE COVERED
WALKWAYS BELOW AREAS WHERE ROOF
WORK IS BEING PERFORMED. SIGNAGE AND
BARRIER THE RESTRICT PEDESTRIAN TRAFFIC
IN AREAS WHERE WORK IS BEING PERFORMED
AND ANY PROTECTIVE MEASURES REQUIRED
TO PROTECT PATIENTS, STAFF, VISITOR OR
OTHER PERSONNEL FROM THE ROOF WORK
BEING PERFORMED.
B. CONTRACTOR TO SET UP AND MAINTAIN
TEMPORARY GUARDS AT EDGE OF ROOF
WHERE WORK IS BEING PERFORMED AND ALL
PERSONNEL WEAR PROPER SAFETY DEVICES/
FALL PROTECTION.
C. LIGHTNING PROTECTION - CONTRACTOR SHALL
DESIGN A LIGHTNING PROTECTION SYSTEM
THAT MEETS VA SPECIFICATION 26 41 00
*FACILITY LIGHTNING PROTECTION* AND ALL
NFPA RELATED DOCUMENTS. LIGHTNING
PROTECTION SYSTEM SHALL MEET UL
REQUIREMENTS SUCH THAT THE SYSTEM
SHALL HAVE A MASTER LABEL CERTIFICATE.
D. CONTRACTOR SHALL COORDINATE ALL
DISCONNECTIONS OF POWER, HVAC,
ANTENNAS, ETC. REQUIRED FOR THE
INSTALLATION OF THE NEW ROOF SYSTEM
WITH THE COR PRIOR TO PERFORMING ANY
OPERATIONS.
E. CONTRACTOR SHALL INSTALL EXISTING FALL
PROTECTION THAT IS CURRENTLY STOCK PILED
AT VARIOUS LOCATIONS ON THE ROOF. FALL
PROTECTION IS A WEIGHTED, GRAVITY SYSTEM
AND DOES NOT REQUIRE FASTENERS OR ROOF
SYSTEM PENETRATIONS TO BE INSTALLED ON
TOP OF NEW ROOF. COORDINATE WITH COR.
F. EXTERIOR ROOF CANOPIES TO NORTH SIDE OF
BUILDING AT ER ENTRANCE NOT SHOWN FOR
CLARITY.
0 2010 40
N O
R T
H
PLAN
N
AREA OF WORK
KEY PLAN
2 4
# ROOF AREA
ROOF AREAS S.F.
ROOF AREA 1
TOTAL ROOF AREA
REPLACEMENT:
ROOF AREA 2
ROOF AREA 3
ROOF AREA 4
ROOF AREA 5
ROOF AREA 6
ROOF AREA 7
ROOF AREA 8
ROOF AREA 9
ROOF AREA 10
ROOF AREA 11
ROOF AREA 12
1,405
1,668
2,990
1,892
5,296
16,671 S.F.
ROOF AREA 13 462
1. ROOF ACCESS DOOR.
2. EXISTING LADDER.
1ST FLOOR
ROOF
1ST FLOOR
ROOF
1ST FLOOR
ROOF
1ST FLOOR
ROOF
1ST FLOOR
ROOF
1ST FLOOR
ROOF
1ST FLOOR
ROOF
1ST FLOOR
ROOF
1ST FLOOR
ROOF
1ST FLOOR
ROOF1ST FLOOR
ROOF
1ST FLOOR
ROOF
2ND FLOOR
ROOF
4TH FLOOR
ROOF
2ND FLOOR
ROOF
GARDEN
COURTYARD
2ND FLOOR
ROOF
2ND FLOOR
ROOF
2ND FLOOR
ROOF
2ND FLOOR
ROOF
2ND FLOOR
ROOF
2ND FLOOR
ROOF
GARDEN
COURTYARD
CANOPY
ROOF
CANOPY
ROOF
CANOPY ROOF
4TH FLOOR
ROOF
5TH FLOOR
ROOF
3RD FLOOR
ROOF
4TH FLOOR
ROOF
4TH FLOOR
ROOF
1ST FLOOR
FLOOR ROOF
3RD FLOOR
ROOF
4TH FLOOR
ROOF
3RD FLOOR
ROOF
4TH FLOOR
ROOF
5TH FLOOR
ROOF
1ST FLOOR
ROOF
4TH FLOOR
ROOF
4TH FLOOR
ROOF
5TH FLOOR
ROOF
5TH FLOOR
ROOF
5TH FLOOR
ROOF
4TH FLOOR
ROOF
1ST FLOOR
ROOF
2ND FLOOR
ROOF
4TH FLOOR
ROOF
2ND FLOOR
ROOF
2ND FLOOR
ROOF
3RD FLOOR
ROOF
5TH FLOOR
ROOF
1ST FLOOR
ROOF
ROOF AREA 2
306 SF
ROOF AREA 4
1,668 SF
ROOF AREA 5
2,990 SF
ROOF AREA 3
996 SF
ROOF AREA 8
830 SF
STACKS OF EXISTING NON-INSTALLED FALL
PROTECTION RAILING (EXAMPLE SHOWN IN
PHOTO BELOW) ARE LOCATED ON VARIOUS
ROOF AREAS. ROUGHLY +/- 1,000 LINEAR FT
OF RAILING ON VARIOUS ROOF AREAS. UPON
COMPLETION OF REROOFING, AREAS SHOWN
WITH HATCH AND KEYNOTE (1) SHALL HAVE
THIS FALL PROTECTION INSTALLED,
AMOUNTING TO +/- 779 LINEAR FT. IT SHALL BE
THE RESPONSIBILITY OF THE CONTRACTOR
TO CATALOGUE THE SIZES AND NUMBERS OF
RAILS, AND SUBMIT A LAYOUT PLAN OF
INSTALLATION TO THE VA COR. ANY
REMAINING FALL PROTECTION RAILS SHALL
BE STORED AS DIRECTED BY VA COR.
NEW LADDER
ROOF AREAS TO HAVE
EXISTING FALL PROTECTION
INSTALLED
3/
4"
BASE
GALVANIZED STEEL
PIPE RAILING
BASIS OF DESIGN: SAFETY RAIL 2000 GUARDRAIL SYSTEM
VARIES V.I.F.
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/7
/2
:1
:5
A
M
A-002
FALL PROTECTION PLAN
2 9NPM
ROOF DEMO AND
REPLACEMENT BUILDING 1
TVHS VA MEDICAL CENTER
NASHVILLE CAMPUS
1310 24TH AVENUE SOUTH
NASHVILLE, TN 37212 JUNE 7, 2021
100% CONSTRUCTION DOCUMENTS
626-21-50120-330
WVS
N
AREA OF WORK
KEY PLAN
2 4
# ROOF AREA
Scale: 1" = 20'-0"
OVERALL FALL PROTECTION ROOF PLAN
1. AREA TO RECEIVE FALL PROTECTION RAIL.
2. EXISTING LADDER.
FALL PROTECTION LEGEND
A. CONTRACTOR TO ENSURE PROPER SAFETY
BARRIERS AND ENCLOSURES ARE PROVIDED
AT ALL ENTRY/EXIT POINTS FROM BUILDING
WHERE WORK IS BEING PERFORMED ABOVE.
SAFETY BARRIER TO INCLUDE COVERED
WALKWAYS BELOW AREAS WHERE ROOF
WORK IS BEING PERFORMED. SIGNAGE AND
BARRIER THE RESTRICT PEDESTRIAN TRAFFIC
IN AREAS WHERE WORK IS BEING PERFORMED
AND ANY PROTECTIVE MEASURES REQUIRED
TO PROTECT PATIENTS, STAFF, VISITOR OR
OTHER PERSONNEL FROM THE ROOF WORK
BEING PERFORMED.
B. CONTRACTOR TO SET UP AND MAINTAIN
TEMPORARY GUARDS AT EDGE OF ROOF
WHERE WORK IS BEING PERFORMED AND ALL
PERSONNEL WEAR PROPER SAFETY DEVICES/
FALL PROTECTION.
C. LIGHTNING PROTECTION - CONTRACTOR SHALL
DESIGN A LIGHTNING PROTECTION SYSTEM
THAT MEETS VA SPECIFICATION 26 41 00
*FACILITY LIGHTNING PROTECTION* AND ALL
NFPA RELATED DOCUMENTS. LIGHTNING
PROTECTION SYSTEM SHALL MEET UL
REQUIREMENTS SUCH THAT THE SYSTEM
SHALL HAVE A MASTER LABEL CERTIFICATE.
D. CONTRACTOR SHALL COORDINATE ALL
DISCONNECTIONS OF POWER, HVAC,
ANTENNAS, ETC. REQUIRED FOR THE
INSTALLATION OF THE NEW ROOF SYSTEM
WITH THE COR PRIOR TO PERFORMING ANY
OPERATIONS.
E. CONTRACTOR SHALL INSTALL EXISTING FALL
PROTECTION THAT IS CURRENTLY STOCK PILED
AT VARIOUS LOCATIONS ON THE ROOF. FALL
PROTECTION IS A WEIGHTED, GRAVITY SYSTEM
AND DOES NOT REQUIRE FASTENERS OR ROOF
SYSTEM PENETRATIONS TO BE INSTALLED ON
TOP OF NEW ROOF. COORDINATE WITH COR.
F. EXTERIOR ROOF CANOPIES TO NORTH SIDE OF
BUILDING AT ER ENTRANCE NOT SHOWN FOR
CLARITY.
G. TEMPORARY LADDERS AND TIE DOWN
LOCATIONS FOR WORKER ACCESS TO BE
DETERMINED BY CONTRACTOR, COORDINATE
WITH COR.
Scale: 3/4" = 1'-0"
EXIST. FALL PROTECTION RAIL
C O
N N
EC
TIN
G
C O
R R
ID
O R R
O O F
C O
N N
EC
TIN
G
C O
R R
ID
O R R
O O F
1ST FLOOR
ROOF
1ST FLOOR
ROOF
2ND FLOOR
ROOF
NON-VA BUILDING
A-501
TYP.
A-501
A-501
A-501
A-101
A-101 3
A-501
1ST FLOOR
ROOF
1ST FLOOR
ROOF
2ND FLOOR
ROOF
NON-VA BUILDING
5' - 10"
61' - 11"
55' - 3"
6' - 3"
9' - 8"
AREAS WITH PROPOSED ROOF
REPLACEMENT
INDICATES ROOF SLOPE
ROOF DRAIN
SLOPE: 1/4"
ROOF LEGEND:
3/8" 3/8"1'-6"
M
IN
. ROOF AREA 1
3/8" x 2 1/2" STEEL RAILS
3/4" ROUND NON-SLIP STEEL BAR RUNGS
WELD ALL AROUND TO VERICAL STEEL
BARS
3/8" x 3" BENT PLATE, WELD TO
VERT. RAILS. SECURE WITH 1/2"
EXPANSION BOLT THRU BRICK,
AIR SPACE AND INSULATION INTO
CMU BACKUP.
6"
V
.I .F
EXIST. BRICK WALL
EXIST. ROOF 1
R O
O F
A R
E A
H
T
V .I .F
" ROOF AREA 1
EXIST. ROOF
EXIST. BRICK WALL
GRIND SMOOTH
## KEY NOTES:
# KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/7
/2
:1
:5
A
M
A-101
ROOF AREA 1 - DEMOLITION & NEW
WORK ROOF PLANS
3 9NPM
ROOF DEMO AND
REPLACEMENT BUILDING 1
TVHS VA MEDICAL CENTER
NASHVILLE CAMPUS
1310 24TH AVENUE SOUTH
NASHVILLE, TN 37212 JUNE 7, 2021
100% CONSTRUCTION DOCUMENTS
626-21-50120-330
WVS
N
AREA OF WORK
KEY PLAN
2 4
# ROOF AREA
Scale: 1/8" = 1'-0"
ROOF AREA 1 NEW WORK PLAN
Scale: 1/8" = 1'-0"
ROOF AREA 1 DEMOLITION PLAN 0 4 8 16
N O
R T
H
PLAN
0 4 8 16
N O
R T
H
PLAN
1 REMOVE ALL COMPONENTS OF COMPLETE
ROOFING SYSTEM DOWN TO EXISTING
STRUCTURAL DECK. INCLUDING, BUT NOT
LIMITED TO: ROOF INSULATION, COVER BOARD,
ROOF MEMBRANE, AND ROOF EDGE & COPING.
2 REMOVE ALL ABANDONED EQUIPMENT,
SUPPORTS, PIPES, ANTENNAS, ETC. NOT IN
USE. CONFIRM ABANDONED ITEMS WITH COR
PRIOR TO REMOVAL.
3 EXISTING GUTTER TO BE REMOVED.
4 EXISTING LIGHTNING PROTECTION TO BE
REMOVED. INSTALL NEW LIGHTNING
PROTECTION AFTER REROOFING PER
ELECTRICAL DRAWINGS.
5 EXISTING DOWNSPOUTS TO BE REMOVED.
6 EXISTING LADDER TO REMAIN, DO NOT DISTURB
DURING CONSTRUCTION.
A. CONTRACTOR TO ENSURE PROPER SAFETY
BARRIERS AND ENCLOSURES ARE PROVIDED
AT ALL ENTRY/EXIT POINTS FROM BUILDING
WHERE WORK IS BEING PERFORMED ABOVE.
SAFETY BARRIER TO INCLUDE COVERED
WALKWAYS BELOW AREAS WHERE ROOF
WORK IS BEING PERFORMED. SIGNAGE AND
BARRIER THE RESTRICT PEDESTRIAN TRAFFIC
IN AREAS WHERE WORK IS BEING PERFORMED
AND ANY PROTECTIVE MEASURES REQUIRED
TO PROTECT PATIENTS, STAFF, VISITOR OR
OTHER PERSONNEL FROM THE ROOF WORK
BEING PERFORMED.
B. CONTRACTOR TO SET UP AND MAINTAIN
TEMPORARY GUARDS AT EDGE OF ROOF
WHERE WORK IS BEING PERFORMED AND ALL
PERSONNEL WEAR PROPER SAFETY DEVICES/
FALL PROTECTION.
C. LIGHTNING PROTECTION - CONTRACTOR SHALL
DESIGN A LIGHTNING PROTECTION SYSTEM
THAT MEETS VA SPECIFICATION 26 41 00
*FACILITY LIGHTNING PROTECTION* AND ALL
NFPA RELATED DOCUMENTS. LIGHTNING
PROTECTION SYSTEM SHALL MEET UL
REQUIREMENTS SUCH THAT THE SYSTEM
SHALL HAVE A MASTER LABEL CERTIFICATE.
D. CONTRACTOR SHALL COORDINATE ALL
DISCONNECTIONS OF POWER, HVAC,
ANTENNAS, ETC. REQUIRED FOR THE
INSTALLATION OF THE NEW ROOF SYSTEM
WITH THE COR PRIOR TO PERFORMING ANY
OPERATIONS.
E. CONTRACTOR SHALL INSTALL ROOF RAILING
SYSTEM THAT IS CURRENTLY ON SITE. RAILING
SYSTEM IS A WEIGHTED, GRAVITY SYSTEM AND
DOES NOT REQUIRE FASTENERS OR ROOF
SYSTEM PENETRATIONS TO BE INSTALLED ON
TOP OF NEW ROOF TO MATCH THE RAILINGS
PREVIOUSLY INSTALLED. COORDINATE WITH
COR.
SF AREA 1: 1,405 SF AREA 1: 1,405
1 INSTALL NEW VAPOR BARRIER ON EXISTING
STRUCTURAL DECK
2 INSTALL MIN R30 POLY ISO ROOF INSULATION
3 INSTALL 1/2" FIBER REINFORCED GYPSUM
BOARD COVER BOARD
4 INSTALL 2 PLY SBS MODIFIED BITUMEN
ROOFING VIA COLD ADHESIVE APPLIED METHOD.
5 INSTALL NEW GUTTER
6 INSTALL NEW DOWNSPOUTS
7 INSTALL NEW LADDER FOR ROOF ACCESS
EXISTING CONDITION - ROOF AREA 1 PHOTO
EXISTING CONDITION - ROOF AREA 1 PHOTO
Scale: 1/2" = 1'-0"
LADDER FRONT ELEVATION
Scale: 1/2" = 1'-0"
LADDER ELEVATION
1ST FLOOR ROOF
R
D F
L O
O R
R O
O F
RTU
R
R
1ST FLOOR ROOF
R
D F
L O
O R
R O
O F
RTU
R
R
2ND FLOOR
ROOF
ROOF AREA 2
ROOF AREA 3
DISCHARGE DOWNSPOUT TO
DAYLIGHT AT EXISTING ROOF DRAIN.
A-501
TYP.
A-501
TYP.
A-501
TYP.
A-501
A-501
A-501
A-501
2ND FLOOR
ROOF
ROOF AREA 2
ROOF AREA 3
EXISTING ROOF DRAIN BELOW
7' - 11"
28' - 8"
AREAS WITH PROPOSED ROOF
REPLACEMENT
INDICATES ROOF SLOPE
ROOF DRAIN
SLOPE: 1/4"
ROOF LEGEND:
## KEY NOTES:
# KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/7
/2
:1
:0
A
M
A-102
ROOF AREA 2 & 3 - DEMOLITION & NEW
WORK ROOF PLANS
4 9NPM
ROOF DEMO AND
REPLACEMENT BUILDING 1
TVHS VA MEDICAL CENTER
NASHVILLE CAMPUS
1310 24TH AVENUE SOUTH
NASHVILLE, TN 37212 JUNE 7, 2021
100% CONSTRUCTION DOCUMENTS
626-21-50120-330
WVS
N
AREA OF WORK
KEY PLAN
2 4
# ROOF AREA
Scale: 1/8" = 1'-0"
ROOF AREA 2 & 3 NEW WORK PLAN
Scale: 1/8" = 1'-0"
ROOF AREA 2 & 3 DEMOLITION PLAN 0 4 8 16
N O
R T
H
PLAN
0 4 8 16
N O
R T
H
PLAN
1 REMOVE ALL COMPONENTS OF COMPLETE
ROOFING SYSTEM DOWN TO EXISTING
STRUCTURAL DECK. INCLUDING, BUT NOT
LIMITED TO: ROOF INSULATION, COVER BOARD,
ROOF MEMBRANE, AND ROOF EDGE & COPING.
2 REMOVE ALL ABANDONED EQUIPMENT,
SUPPORTS, PIPES, ANTENNAS, ETC. NOT IN
USE. CONFIRM ABANDONED ITEMS WITH COR
PRIOR TO REMOVAL.
3 REMOVE EXISTING ROOF DRAIN BASKET
4 EXISTING GUTTER TO BE REMOVED
5 EXISTING LIGHTNING PROTECTION TO BE
REMOVED. INSTALL NEW LIGHTNING
PROTECTION AFTER REROOFING PER
ELECTRICAL DRAWINGS.
6 EXISTING EQUIPMENT TO REMAIN.
REMOVE FLASHING AS NECESSARY FOR
REROOFING.
7 EXISTING LADDER TO REMAIN.
8 EXISTING DOWNSPOUTS TO BE REMOVED.
A. CONTRACTOR TO ENSURE PROPER SAFETY
BARRIERS AND ENCLOSURES ARE PROVIDED
AT ALL ENTRY/EXIT POINTS FROM BUILDING
WHERE WORK IS BEING PERFORMED ABOVE.
SAFETY BARRIER TO INCLUDE COVERED
WALKWAYS BELOW AREAS WHERE ROOF
WORK IS BEING PERFORMED. SIGNAGE AND
BARRIER THE RESTRICT PEDESTRIAN TRAFFIC
IN AREAS WHERE WORK IS BEING PERFORMED
AND ANY PROTECTIVE MEASURES REQUIRED
TO PROTECT PATIENTS, STAFF, VISITOR OR
OTHER PERSONNEL FROM THE ROOF WORK
BEING PERFORMED.
B. CONTRACTOR TO SET UP AND MAINTAIN
TEMPORARY GUARDS AT EDGE OF ROOF
WHERE WORK IS BEING PERFORMED AND ALL
PERSONNEL WEAR PROPER SAFE DEVICES/
FALL PROTECTION.
C. LIGHTNING PROTECTION - CONTRACTOR SHALL
DESIGN A LIGHTNING PROTECTION SYSTEM
THAT MEETS VA SPECIFICATION 26 41 00
*FACILITY LIGHTNING PROTECTION* AND ALL
NFPA RELATED DOCUMENTS. LIGHTNING
PROTECTION SYSTEM SHALL MEET UL
REQUIREMENTS SUCH THAT THE SYSTEM
SHALL HAVE A MASTER LABEL CERTIFICATE.
D. CONTRACTOR SHALL COORDINATE ALL
DISCONNECTIONS OF POWER, HVAC,
ANTENNAS, ETC. REQUIRED FOR THE
INSTALLATION OF THE NEW ROOF SYSTEM
WITH THE COR PRIOR TO PERFORMING ANY
OPERATIONS.
E. CONTRACTOR SHALL INSTALL ROOF RAILING
SYSTEM THAT IS CURRENTLY ON SITE. RAILING
SYSTEM IS A WEIGHTED, GRAVITY SYSTEM AND
DOES NOT REQUIRE FASTENERS OR ROOF
SYSTEM PENETRATIONS TO BE INSTALLED ON
TOP OF NEW ROOF TO MATCH THE RAILINGS
PREVIOUSLY INSTALLED. COORDINATE WITH
COR.
SF AREA 2: 306 SF AREA 3: 996 SF AREA 2: 306 SF AREA 3: 996
1 INSTALL NEW VAPOR BARRIER ON EXISTING
STRUCTURAL DECK
2 INSTALL MIN R30 POLY ISO ROOF INSULATION
3 INSTALL 1/2" FIBER REINFORCED GYPSUM
BOARD COVER BOARD
4 INSTALL 2 PLY SBS MODIFIED BITUMEN
ROOFING VIA COLD ADHESIVE APPLIED METHOD.
5 INSTALL NEW GUTTER
6 PROVIDE NEW ROOF DRAIN INSERT
BASIS OF DESIGN: OLYFLOW HERCULES DRAIN
BY OMG ROOFING OR EQUAL, FOLLOW ALL
MANUFACTURER RECOMMENDATIONS.
7 INSTALL NEW DOWNSPOUT
EXISTING CONDITION - ROOF AREA 3 PHOTO
EXISTING CONDITION - ROOF AREA 2 PHOTO
ROOF AREA 2
ROOF AREA 3
V
V
D N
R A
M P
R
R
V
V
D N
R A
M P
R
R
V
R
V
R
4TH FLOOR
ROOF
40' - 0"
9' - 6"
4TH FLOOR
ROOF
A-501
TYP.
A-501
TYP.
A-501
_____ TYP.
A-501
TYP.
A-501
TYP. (5X)
A-501
AREAS WITH PROPOSED ROOF
REPLACEMENT
INDICATES ROOF SLOPE
ROOF DRAIN
SLOPE: 1/4"
ROOF LEGEND:
2ND FLOOR
ROOF
40' - 1"
9' - 0"
9' - 0"
7' - 0"
2ND FLOOR
ROOF
A-501
A-501
A-501
TYP.
A-501
_____ TYP.
## KEY NOTES:
# KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/7
/2
:1
:0
A
M
A-103
ROOF AREA 4 & 5 - DEMOLITION & NEW
WORK ROOF PLANS
5 9NPM
ROOF DEMO AND
REPLACEMENT BUILDING 1
TVHS VA MEDICAL CENTER
NASHVILLE CAMPUS
1310 24TH AVENUE SOUTH
NASHVILLE, TN 37212 JUNE 7, 2021
100% CONSTRUCTION DOCUMENTS
626-21-50120-330
WVS
N
AREA OF WORK
KEY PLAN
2 4
# ROOF AREA
Scale: 1/8" = 1'-0"
ROOF AREA 5 DEMOLITION PLAN
Scale: 1/8" = 1'-0"
ROOF AREA 5 NEW WORK PLAN 0 4 8 16
N O
R T
H
PLAN
0 4 8 16
N O
R T
H
PLAN
Scale: 1/8" = 1'-0"
ROOF AREA 4 DEMOLITION PLAN 0 4 8 16
N O
R T
H
PLAN
Scale: 1/8" = 1'-0"
ROOF AREA 4 NEW WORK PLAN 0 4 8 16
N O
R T
H
PLAN
1 REMOVE ALL COMPONENTS OF COMPLETE
ROOFING SYSTEM DOWN TO EXISTING
STRUCTURAL DECK. INCLUDING, BUT NOT
LIMITED TO: ROOF INSULATION, COVER BOARD,
ROOF MEMBRANE, AND ROOF EDGE & COPING.
2 REMOVE ALL ABANDONED EQUIPMENT,
SUPPORTS, PIPES, ANTENNAS, ETC. NOT IN
USE. CONFIRM ABANDONED ITEMS WITH COR
PRIOR TO REMOVAL.
3 REMOVE EXISTING ROOF DRAIN BASKET
4 EXISTING LIGHTNING PROTECTION TO BE
REMOVED. INSTALL NEW LIGHTNING
PROTECTION AFTER REROOFING PER
ELECTRICAL DRAWINGS.
5 EXISTING EQUIPMENT TO REMAIN.
REMOVE FLASHING AS NECESSARY FOR
REROOFING.
6 EXISTING VENT STACK TO REMAIN. REMOVE
FLASHING AS NECESSARY FOR REROOFING.
7 REMOVE MISCELLANEOUS PIPING AND
ASSOCIATED HARDWARE.
8 EXISTING PIPES TO REMAIN. REMOVE FLASHING
AS NECESSARY FOR REROOFING.
9 EXISTING LADDER TO REMAIN.
A. CONTRACTOR TO ENSURE PROPER SAFETY
BARRIERS AND ENCLOSURES ARE PROVIDED
AT ALL ENTRY/EXIT POINTS FROM BUILDING
WHERE WORK IS BEING PERFORMED ABOVE.
SAFETY BARRIER TO INCLUDE COVERED
WALKWAYS BELOW AREAS WHERE ROOF
WORK IS BEING PERFORMED. SIGNAGE AND
BARRIER THE RESTRICT PEDESTRIAN TRAFFIC
IN AREAS WHERE WORK IS BEING PERFORMED
AND ANY PROTECTIVE MEASURES REQUIRED
TO PROTECT PATIENTS, STAFF, VISITOR OR
OTHER PERSONNEL FROM THE ROOF WORK
BEING PERFORMED.
B. CONTRACTOR TO SET UP AND MAINTAIN
TEMPORARY GUARDS AT EDGE OF ROOF
WHERE WORK IS BEING PERFORMED AND ALL
PERSONNEL WEAR PROPER SAFE DEVICES/
FALL PROTECTION.
C. LIGHTNING PROTECTION - CONTRACTOR SHALL
DESIGN A LIGHTNING PROTECTION SYSTEM
THAT MEETS VA SPECIFICATION 26 41 00
*FACILITY LIGHTNING PROTECTION* AND ALL
NFPA RELATED DOCUMENTS. LIGHTNING
PROTECTION SYSTEM SHALL MEET UL
REQUIREMENTS SUCH THAT THE SYSTEM
SHALL HAVE A MASTER LABEL CERTIFICATE.
D. CONTRACTOR SHALL COORDINATE ALL
DISCONNECTIONS OF POWER, HVAC,
ANTENNAS, ETC. REQUIRED FOR THE
INSTALLATION OF THE NEW ROOF SYSTEM
WITH THE COR PRIOR TO PERFORMING ANY
OPERATIONS.
E. CONTRACTOR SHALL INSTALL ROOF RAILING
SYSTEM THAT IS CURRENTLY ON SITE. RAILING
SYSTEM IS A WEIGHTED, GRAVITY SYSTEM AND
DOES NOT REQUIRE FASTENERS OR ROOF
SYSTEM PENETRATIONS TO BE INSTALLED ON
TOP OF NEW ROOF TO MATCH THE RAILINGS
PREVIOUSLY INSTALLED. COORDINATE WITH
COR.
SF AREA 4: 1,668
SF AREA 5: 2,990
SF AREA 4: 1,668
SF AREA 5: 2,990
1 INSTALL NEW VAPOR BARRIER ON EXISTING
STRUCTURAL DECK
2 INSTALL MIN R30 POLY ISO ROOF INSULATION
3 INSTALL 1/2" FIBER REINFORCED GYPSUM
BOARD COVER BOARD
4 INSTALL 2 PLY SBS MODIFIED BITUMEN
ROOFING VIA COLD ADHESIVE APPLIED METHOD.
5 PROVIDE AND INSTALL FLASHING FOR EXISTING
VENT STACK
6 PROVIDE NEW ROOF DRAIN INSERT
BASIS OF DESIGN: OLYFLOW HERCULES DRAIN
BY OMG ROOFING OR EQUAL, FOLLOW ALL
MANUFACTURER RECOMMENDATIONS.
7 PROVIDE AND INSTALL FLASHING FOR EXISTING
PIPES.
EXISTING CONDITION - ROOF AREA 4 PHOTO
EXISTING CONDITION - ROOF AREA 5 PHOTO
EXISTING CONDITION - ROOF AREA 5 PHOTO
EXISTING CONDITION - ROOF AREA 5 PHOTO
4TH FLOOR ROOF
3RD FLOOR ROOF
2ND FLOOR ROOF
R
R R
R R
4TH FLOOR ROOF
3RD FLOOR ROOF
2ND FLOOR ROOF
R
R R
R R
1 2
4 5
E.J.E.J.
E.J.E.J.
A-501
TYP.
A-501
TYP.
A-501
V.I.F.
A-501 _____ V.I.F.
A-501
A-501 _____ 1
A-501
A-501
A-501 _____5
A-501
TYP.
AREAS WITH PROPOSED ROOF
REPLACEMENT
INDICATES ROOF SLOPE
ROOF DRAIN
SLOPE: 1/4"
ROOF LEGEND:
72' - 0"
84' - 3"
100' - 7"
86' - 2"
74' - 11"
## KEY NOTES:
# KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/7
/2
:1
:1
A
M
A-104
ROOF AREA 7 - DEMOLITION & NEW
WORK ROOF PLANS
6 9NPM
ROOF DEMO AND
REPLACEMENT BUILDING 1
TVHS VA MEDICAL CENTER
NASHVILLE CAMPUS
1310 24TH AVENUE SOUTH
NASHVILLE, TN 37212 JUNE 7, 2021
100% CONSTRUCTION DOCUMENTS
626-21-50120-330
WVS
N
AREA OF WORK
KEY PLAN
2 4
# ROOF AREA
Scale: 1/8" = 1'-0"
ROOF AREA 7 DEMOLITION PLAN
Scale: 1/8" = 1'-0"
ROOF AREA 7 NEW WORK PLAN
0 4 8 16
N O
R T
H
PLAN
0 4 8 16
N O
R T
H
PLAN
1 REMOVE ALL COMPONENTS OF COMPLETE
ROOFING SYSTEM DOWN TO EXISTING
STRUCTURAL DECK. INCLUDING, BUT NOT
LIMITED TO: ROOF INSULATION, COVER BOARD,
ROOF MEMBRANE, AND ROOF EDGE & COPING.
2 REMOVE ALL ABANDONED EQUIPMENT,
SUPPORTS, PIPES, ANTENNAS, ETC. NOT IN
USE. CONFIRM ABANDONED ITEMS WITH COR
PRIOR TO REMOVAL.
3 REMOVE EXISTING ROOF DRAIN BASKET
4 EXISTING LIGHTNING PROTECTION TO BE
REMOVED. INSTALL NEW LIGHTNING
PROTECTION AFTER REROOFING PER
ELECTRICAL DRAWINGS.
5 EXISTING EQUIPMENT TO REMAIN.
REMOVE FLASHING AS NECESSARY FOR
REROOFING.
6 DEMO EXISTING PAVERS AND SUPPORTS PRIOR
TO REROOFING.
A. CONTRACTOR TO ENSURE PROPER SAFETY
BARRIERS AND ENCLOSURES ARE PROVIDED
AT ALL ENTRY/EXIT POINTS FROM BUILDING
WHERE WORK IS BEING PERFORMED ABOVE.
SAFETY BARRIER TO INCLUDE COVERED
WALKWAYS BELOW AREAS WHERE ROOF
WORK IS BEING PERFORMED. SIGNAGE AND
BARRIER THE RESTRICT PEDESTRIAN TRAFFIC
IN AREAS WHERE WORK IS BEING PERFORMED
AND ANY PROTECTIVE MEASURES REQUIRED
TO PROTECT PATIENTS, STAFF, VISITOR OR
OTHER PERSONNEL FROM THE ROOF WORK
BEING PERFORMED.
B. CONTRACTOR TO SET UP AND MAINTAIN
TEMPORARY GUARDS AT EDGE OF ROOF
WHERE WORK IS BEING PERFORMED AND ALL
PERSONNEL WEAR PROPER SAFE DEVICES/
FALL PROTECTION.
C. LIGHTNING PROTECTION - CONTRACTOR SHALL
DESIGN A LIGHTNING PROTECTION SYSTEM
THAT MEETS VA SPECIFICATION 26 41 00
*FACILITY LIGHTNING PROTECTION* AND ALL
NFPA RELATED DOCUMENTS. LIGHTNING
PROTECTION SYSTEM SHALL MEET UL
REQUIREMENTS SUCH THAT THE SYSTEM
SHALL HAVE A MASTER LABEL CERTIFICATE.
D. CONTRACTOR SHALL COORDINATE ALL
DISCONNECTIONS OF POWER, HVAC,
ANTENNAS, ETC. REQUIRED FOR THE
INSTALLATION OF THE NEW ROOF SYSTEM
WITH THE COR PRIOR TO PERFORMING ANY
OPERATIONS.
E. CONTRACTOR SHALL INSTALL ROOF RAILING
SYSTEM THAT IS CURRENTLY ON SITE. RAILING
SYSTEM IS A WEIGHTED, GRAVITY SYSTEM AND
DOES NOT REQUIRE FASTENERS OR ROOF
SYSTEM PENETRATIONS TO BE INSTALLED ON
TOP OF NEW ROOF TO MATCH THE RAILINGS
PREVIOUSLY INSTALLED. COORDINATE WITH
COR.
SF AREA 7: 5,296
SF AREA 7: 5,296
1 INSTALL NEW VAPOR BARRIER ON EXISTING
STRUCTURAL DECK
2 INSTALL MIN R30 POLY ISO ROOF INSULATION
3 INSTALL 1/2" FIBER REINFORCED GYPSUM
BOARD COVER BOARD
4 INSTALL 2 PLY SBS MODIFIED BITUMEN
ROOFING VIA COLD ADHESIVE APPLIED METHOD.
5 PROVIDE NEW ROOF DRAIN INSERT
BASIS OF DESIGN: OLYFLOW HERCULES DRAIN
BY OMG ROOFING OR EQUAL, FOLLOW ALL
MANUFACTURER RECOMMENDATIONS.
Scale: 1/8" = 1'-0"
ROOF AREA 7 EXISTING PAVER PLAN
SF AREA 7: 5,296
0 4 8 16
N O
R T
H
PLANEXISTING CONDITION - ROOF AREA 7 PHOTOS
FAN ROOM #6 ROOF
R
FAN ROOM #6 ROOF
R
RR
1ST FLOOR ROOF R
V
E
1ST FLOOR ROOF R
V
E
5TH FLOOR
ROOF
40' - 0"
5TH FLOOR
ROOF
1 2 3 4
A-501
A-501
A-501
AREAS WITH PROPOSED ROOF
REPLACEMENT
INDICATES ROOF SLOPE
ROOF DRAIN
SLOPE: 1/4"
ROOF LEGEND:
3' - 7"
A-501
A-501
TYP.
SEE DETAIL
4/A-501
45' - 5"
"1
A-501
_____ TYP.
A-501
_____TYP.
A-501
TYP.
A-501
TYP.
## KEY NOTES:
# KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/7
/2
:1
:1
A
M
A-105
ROOF AREA 6, 8 & 9 - DEMOLITION &
NEW WORK ROOF PLANS
7 9NPM
ROOF DEMO AND
REPLACEMENT BUILDING 1
TVHS VA MEDICAL CENTER
NASHVILLE CAMPUS
1310 24TH AVENUE SOUTH
NASHVILLE, TN 37212 JUNE 7, 2021
100% CONSTRUCTION DOCUMENTS
626-21-50120-330
WVS
N
AREA OF WORK
KEY PLAN
2 4
# ROOF AREA
Scale: 1/8" = 1'-0"
ROOF AREA 8 DEMOLITION PLAN
Scale: 1/8" = 1'-0"
ROOF AREA 8 NEW WORK PLAN 0 4 8 16
N O
R T
H
PLAN
0 4 8 16
N O
R T
H
PLAN
Scale: 1/8" = 1'-0"
ROOF AREA 9 DEMOLITION PLAN
Scale: 1/8" = 1'-0"
ROOF AREA 9 NEW WORK PLAN 0 4 8 16
N O
R T
H
PLAN
0 4 8 16
N O
R T
H
PLAN
1 REMOVE ALL COMPONENTS OF COMPLETE
ROOFING SYSTEM DOWN TO EXISTING
STRUCTURAL DECK. INCLUDING, BUT NOT
LIMITED TO: ROOF INSULATION, COVER BOARD,
ROOF MEMBRANE, AND ROOF EDGE & COPING.
2 REMOVE ALL ABANDONED EQUIPMENT,
SUPPORTS, PIPES, ANTENNAS, ETC. NOT IN
USE. CONFIRM ABANDONED ITEMS WITH COR
PRIOR TO REMOVAL.
3 REMOVE EXISTING ROOF DRAINS BASKET
4 EXISTING LIGHTNING PROTECTION TO BE
REMOVED. INSTALL NEW LIGHTNING
PROTECTION AFTER REROOFING PER
ELECTRICAL DRAWINGS.
5 EXISTING EQUIPMENT TO REMAIN.
REMOVE FLASHING AS NECESSARY FOR
REROOFING.
6 EXISTING VENT STACK TO REMAIN. REMOVE
FLASHING AS NECESSARY FOR REROOFING.
7 EXISTING HVAC DUCTWORK TO REMAIN AND TO
BE PROTECTED FROM DAMAGE THROUGHOUT
REROOFING CONSTRUCTION PERIOD.
A. CONTRACTOR TO ENSURE PROPER SAFETY
BARRIERS AND ENCLOSURES ARE PROVIDED
AT ALL ENTRY/EXIT POINTS FROM BUILDING
WHERE WORK IS BEING PERFORMED ABOVE.
SAFETY BARRIER TO INCLUDE COVERED
WALKWAYS BELOW AREAS WHERE ROOF
WORK IS BEING PERFORMED. SIGNAGE AND
BARRIER THE RESTRICT PEDESTRIAN TRAFFIC
IN AREAS WHERE WORK IS BEING PERFORMED
AND ANY PROTECTIVE MEASURES REQUIRED
TO PROTECT PATIENTS, STAFF, VISITOR OR
OTHER PERSONNEL FROM THE ROOF WORK
BEING PERFORMED.
B. CONTRACTOR TO SET UP AND MAINTAIN
TEMPORARY GUARDS AT EDGE OF ROOF
WHERE WORK IS BEING PERFORMED AND ALL
PERSONNEL WEAR PROPER SAFE DEVICES/
FALL PROTECTION.
C. LIGHTNING PROTECTION - CONTRACTOR SHALL
DESIGN A LIGHTNING PROTECTION SYSTEM
THAT MEETS VA SPECIFICATION 26 41 00
*FACILITY LIGHTNING PROTECTION* AND ALL
NFPA RELATED DOCUMENTS. LIGHTNING
PROTECTION SYSTEM SHALL MEET UL
REQUIREMENTS SUCH THAT THE SYSTEM
SHALL HAVE A MASTER LABEL CERTIFICATE.
D. CONTRACTOR SHALL COORDINATE ALL
DISCONNECTIONS OF POWER, HVAC,
ANTENNAS, ETC. REQUIRED FOR THE
INSTALLATION OF THE NEW ROOF SYSTEM
WITH THE COR PRIOR TO PERFORMING ANY
OPERATIONS.
E. CONTRACTOR SHALL INSTALL ROOF RAILING
SYSTEM THAT IS CURRENTLY ON SITE. RAILING
SYSTEM IS A WEIGHTED, GRAVITY SYSTEM AND
DOES NOT REQUIRE FASTENERS OR ROOF
SYSTEM PENETRATIONS TO BE INSTALLED ON
TOP OF NEW ROOF TO MATCH THE RAILINGS
PREVIOUSLY INSTALLED. COORDINATE WITH
COR.
SF AREA 9: 55
SF AREA 8: 830
SF AREA 9: 55
SF AREA 8: 830
0 4 8 16
N O
R T
H
PLAN
0 4 8 16
N O
R T
H
PLAN
SF AREA 6: 1,892 SF AREA 6: 1,892
Scale: 1/8" = 1'-0"
ROOF AREA 6 DEMOLITION PLAN
Scale: 1/8" = 1'-0"
ROOF AREA 6 NEW WORK PLAN
1 INSTALL NEW VAPOR BARRIER ON EXISTING
STRUCTURAL DECK
2 INSTALL MIN R30 POLY ISO ROOF INSULATION
3 INSTALL 1/2" FIBER REINFORCED GYPSUM
BOARD COVER BOARD
4 INSTALL 2 PLY SBS MODIFIED BITUMEN
ROOFING VIA COLD ADHESIVE APPLIED METHOD.
5 NEW FLASHING FOR EXISTING VENT STACK
6 PROVIDE NEW ROOF DRAIN INSERT
BASIS OF DESIGN: OLYFLOW HERCULES DRAIN
BY OMG ROOFING OR EQUAL, FOLLOW ALL
MANUFACTURER RECOMMENDATIONS.
7 NEW FLASHING WHERE REMOVED
EXISTING CONDITION - ROOF AREA 6 PHOTO
EXISTING CONDITION - ROOF AREA 8 PHOTO
EXISTING CONDITION - ROOF AREA 9 PHOTO
NOTE COURTYARD AREA:
COORDINATE CONSTRUCTION MATERIAL ROUTE WITH VA COR.
NOTE COURTYARD AREA:
COORDINATE CONSTRUCTION MATERIAL ROUTE WITH VA COR.
1ST FLOOR ROOF
R
1ST FLOOR ROOF
R
CANOPY ROOF
R
CANOPY ROOF
R
RR
CANOPY ROOF
E
R R
CANOPY ROOF
E
R R
20' - 0"
1 2
3 4
A-501
TYP.
A-501
A-501
1 2 3 4 5
22' - 10"
8' - 0"
1 2 3 4
A-501
A-501
4TH FLOOR
ROOF
MORGUE GARAGE
9' - 6"
1ST FLOOR
4TH FLOOR
ROOF
MORGUE GARAGE
A-501
TYP.
SEE DETAIL
4/A-501
A-501
1ST FLOOR
AREAS WITH PROPOSED ROOF
REPLACEMENT
INDICATES ROOF SLOPE
ROOF DRAIN
SLOPE: 1/4"
ROOF LEGEND:
1 2
14' - 2"
1 2 3 4
A-501
TYP.
A-501
A-501
A-501
## KEY NOTES:
# KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/7
/2
:1
:2
A
M
A-106
ROOF AREAS 10, 11, 12 & 13 -
DEMOLITION & NEW WORK ROOF
PLANS
8 9NPM
ROOF DEMO AND
REPLACEMENT BUILDING 1
TVHS VA MEDICAL CENTER
NASHVILLE CAMPUS
1310 24TH AVENUE SOUTH
NASHVILLE, TN 37212 JUNE 7, 2021
100% CONSTRUCTION DOCUMENTS
626-21-50120-330
WVS
N
AREA OF WORK
KEY PLAN
2 4
# ROOF AREA
Scale: 1/8" = 1'-0"
ROOF AREA 10 DEMOLITION PLAN
Scale: 1/8" = 1'-0"
ROOF AREA 10 NEW WORK PLAN
Scale: 1/8" = 1'-0"
ROOF AREA 11 DEMOLITION PLAN
Scale: 1/8" = 1'-0"
ROOF AREA 11 NEW WORK PLAN
Scale: 1/8" = 1'-0"
ROOF AREA 12 DEMOLITION PLAN
Scale: 1/8" = 1'-0"
ROOF AREA 12 NEW WORK PLAN
0 4 8 16
N O
R T
H
PLAN
0 4 8 16
N O
R T
H
PLAN
0 4 8 16
N O
R T
H
PLAN
0 4 8 16
N O
R T
H
PLAN
0 4 8 16
N O
R T
H
PLAN
0 4 8 16
N O
R T
H
PLAN
A. CONTRACTOR TO ENSURE PROPER SAFETY
BARRIERS AND ENCLOSURES ARE PROVIDED
AT ALL ENTRY/EXIT POINTS FROM BUILDING
WHERE WORK IS BEING PERFORMED ABOVE.
SAFETY BARRIER TO INCLUDE COVERED
WALKWAYS BELOW AREAS WHERE ROOF
WORK IS BEING PERFORMED. SIGNAGE AND
BARRIER THE RESTRICT PEDESTRIAN TRAFFIC
IN AREAS WHERE WORK IS BEING PERFORMED
AND ANY PROTECTIVE MEASURES REQUIRED
TO PROTECT PATIENTS, STAFF, VISITOR OR
OTHER PERSONNEL FROM THE ROOF WORK
BEING PERFORMED.
B. CONTRACTOR TO SET UP AND MAINTAIN
TEMPORARY GUARDS AT EDGE OF ROOF
WHERE WORK IS BEING PERFORMED AND ALL
PERSONNEL WEAR PROPER SAFE DEVICES/
FALL PROTECTION.
C. LIGHTNING PROTECTION - CONTRACTOR SHALL
DESIGN A LIGHTNING PROTECTION SYSTEM
THAT MEETS VA SPECIFICATION 26 41 00
*FACILITY LIGHTNING PROTECTION* AND ALL
NFPA RELATED DOCUMENTS. LIGHTNING
PROTECTION SYSTEM SHALL MEET UL
REQUIREMENTS SUCH THAT THE SYSTEM
SHALL HAVE A MASTER LABEL CERTIFICATE.
D. CONTRACTOR SHALL COORDINATE ALL
DISCONNECTIONS OF POWER, HVAC,
ANTENNAS, ETC. REQUIRED FOR THE
INSTALLATION OF THE NEW ROOF SYSTEM
WITH THE COR PRIOR TO PERFORMING ANY
OPERATIONS.
E. CONTRACTOR SHALL INSTALL ROOF RAILING
SYSTEM THAT IS CURRENTLY ON SITE. RAILING
SYSTEM IS A WEIGHTED, GRAVITY SYSTEM AND
DOES NOT REQUIRE FASTENERS OR ROOF
SYSTEM PENETRATIONS TO BE INSTALLED ON
TOP OF NEW ROOF TO MATCH THE RAILINGS
PREVIOUSLY INSTALLED. COORDINATE WITH
COR.
SF AREA 12: 190
SF AREA 11: 242
SF AREA 10: 339
SF AREA 12: 190
SF AREA 11: 242
SF AREA 10: 339
1 REMOVE ALL COMPONENTS OF COMPLETE
ROOFING SYSTEM DOWN TO EXISTING
STRUCTURAL DECK. INCLUDING, BUT NOT
LIMITED TO: ROOF INSULATION, COVER BOARD,
ROOF MEMBRANE, AND ROOF EDGE & COPING.
2 REMOVE ALL ABANDONED EQUIPMENT,
SUPPORTS, PIPES, ANTENNAS, ETC. NOT IN
USE. CONFIRM ABANDONED ITEMS WITH COR
PRIOR TO REMOVAL.
3 REMOVE EXISTING ROOF DRAIN BASKET
4 EXISTING LIGHTNING PROTECTION TO BE
REMOVED. INSTALL NEW LIGHTNING
PROTECTION AFTER REROOFING PER
ELECTRICAL DRAWINGS.
5 EXISTING EQUIPMENT TO REMAIN.
REMOVE FLASHING AS NECESSARY FOR
REROOFING.
6 ABANDONED CURB TO BE REMOVED
1 INSTALL NEW VAPOR BARRIER ON EXISTING
STRUCTURAL DECK
2 INSTALL MIN R30 POLY ISO ROOF INSULATION
3 INSTALL 1/2" FIBER REINFORCED GYPSUM
BOARD COVER BOARD
4 INSTALL 2 PLY SBS MODIFIED BITUMEN
ROOFING VIA COLD ADHESIVE APPLIED METHOD.
5 PROVIDE NEW ROOF DRAIN INSERT
BASIS OF DESIGN: OLYFLOW HERCULES DRAIN
BY OMG ROOFING OR EQUAL, FOLLOW ALL
MANUFACTURER RECOMMENDATIONS.
6 NEW FLASHING WHERE REMOVED
EXISTING CONDITION - ROOF AREA 10 PHOTO
EXISTING CONDITION - ROOF AREA 11 PHOTO
EXISTING CONDITION - ROOF AREA 12 PHOTO
Scale: 1/8" = 1'-0"
ROOF AREA 13 DEMOLITION
PLAN
0 4 8 16
N O
R T
H
PLAN
SF AREA 11: 462
Scale: 1/8" = 1'-0"
ROOF AREA 13 NEW WORK
PLAN
0 4 8 16
N O
R T
H
PLAN
SF AREA 11: 462
EXISTING CONDITION - ROOF AREA 13 PHOTO
NOTE COURTYARD AREA:
COORDINATE CONSTRUCTION MATERIAL ROUTE WITH VA COR.
NOTE COURTYARD AREA:
COORDINATE CONSTRUCTION MATERIAL ROUTE WITH VA COR.
PT WOOD
BLOCKING
PT WOOD CANT STRIP
SBS BASE SHEET
R.30 POLY ISO.
INSULATION ADHERED
TO EXISTING DECK.
EXISTING
STRUCTURAL DECK
TO REMAIN
EXISTING EQUIPMENT
TO BE REINSTALLED
EXISTING EQUIPMENT BASE
5/8" GYP. COVER
BOARD
VAPOR BARRIER
SBS CAP SHEET
REMOVE & REINSTALL
EXIST. METAL CAP
RUN BASE…